ST-HL-AE-2725, Monthly Operating Rept for June 1988 for South Texas Project Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1988 for South Texas Project Unit 1
ML20151F018
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 06/30/1988
From: Mcburnett M, Nesrsta J
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ST-HL-AE-2725, NUDOCS 8807260300
Download: ML20151F018 (9)


Text

, - _ _ __ ,-

4;p4ggggg7 .

ST4 L.AF- aqa5 l

,I PAG: 1 OF 1 b,

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT i HONTHLY OPERATING REPORT FOR THE HONTH OF JUNE HOUSTON LIGHTING AND POWER CO.

NRC DOCKET NO. 50-498 LICENSE NO. HrF-76 Prepared by: 1 O h Lead Performance" fechnician bate Reviewed by: 7/1/8 Performance Technician Supervisor Date Reviewed By:

7[f' /[

P.ar( Eg eering a ager bate Reviewed By:  % 7/1/rf Plant Su r tend n D'atie Approved By: Alfwm d 7/f!/

Pla'nt ha nager Date 8807260300 000630 PDR ADOCK 05000490 pnu R

{(Q) \

.* .' ATTACHMENT .

. ST HL AE M L4 PAGE t OF 9 _ _

l OPERATING DATA REPORT DOCKET NO. 50-499 UNIT 1 DATE June 8, 1988 COMPLETED BY J. J. Nesrsta TELEPHONE 512-972-7827 OPERATING STATUS

1. REPORTING PERIOD: 06/01-06/30 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (HWt): 3817 MAX. DEPEND. CAPACITY (MWe-Net): Not Determined DESIGN ELECTRICAL RATING (MWe-Net):1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): Unit in power ascension testing phase.

THIS MONTH YR TO DATE CDMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL...... 397.07 1192.67 1192.67
6. REACTOR RESERVE SHUTDOWN HOURS............. 0 0 0
7. HOURS GENERATOR ON LINE. . . . . . . . . . . . . . . . . . . 3 5 8. 3 4 1039.14 1039.14
8. UNIT RESERVE SHUTDOWN H0URS................ 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . . . . 443,688 1,184,935 1,184,935
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).... 117,510 308,072.8 308,072.8
11. NET ELECTRICAL ENERGY GENERATED (MVH)...... 76,943 184,515 184,515 I?. REACTOR SERVICE FACTOR..................... N/A N/A N/A__
13. REACTOR AVAILABILITY FACTOR................ N/A N/A N/A
14. UNIT SERVICE FACT 0R........................ N/A N/A N/A
15. UNIT AVAILABILITY FACTOR................... N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC)........... N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design MWe).... N/A N/A N/A
18. UNIT FORCED OUTAGE RATE.................... N/A N/A N/A
19. SKUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Scheduled 7 day outage to begin in September for Bottom Hounted Instrumentation Inspection.

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 03/08/88 03/08/88, INITIAL ELECTRICITY 03/30/88 03/30/88 COMMERCIAL OPERATION 08/08/88 NL.NRC.R.APR.AT (C68)

.,s

]

=

l UNIT SHUTDOWES AND POWER REDUCTIONS

  • DOCKET NO. 50-498 UNIT NAME 1 <-

DATE June 8, 1988 COMPLETED BY J. J. Necrsta TELEPHONE 512-972-7827 REPORT MONTH June 4

1 2 No. Date Type Duration Reason Method of Licensee Systgm Cause & Corrective Compongnt (Hours) Shutting Event Code Code Action to 3

Down Reactor Report # Prevent Recurrence 88-09 880525 F 310.97 A 4 N/4 SJ l P Steam Generator Feed -

Pump failure while performfug Loss of Of fsite Power Ted,.

' Design modifica*,,1ons to feedpumpa are being implemented.

88-10 880614 F 17.82 A 9 N/A SB THR Tarbine Trip when Stator Cooling Water Filter differential pressure setpoint and associated time delay did not permit placing filter in service without generating trip signal. Design modification is being pursued. (Rx Critical) 1 L 30 t30Vd gec -3V-7H-1S INMHY D

-v a. w 7-- + - - - - - +- e se v in

~

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • DOCKET NO. 50-498 UNIT NAME 1 -

DATE June 8, 1988 COMPLETED BY J. J. Nesrsta j

TELEPHONE 512-972-7827 REPORT MONTH June No. Date Type Duration Reason Method of Licensee Systgm Compongnt Cause & Corrective (Hours) Shutting Event Code Code Action to 3

Down Reactor Report'# Prevent Recurrea.a 88-11 880621 F 0 B 5 N/A SJ P Steam Generator Feed Pump high pressure stop valve Leakoff line spool removal to pennit installation of manual isolation valves. (Rx Critical).

88-12 88C623 S 32.87 B 1 h/A JC PL Shutdown From Outside The Control Room test.

F: Forced Reason: Method: IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

S D-Regulatory Restriction 4-Cont. of Existing IEEE 803A-1953 j%h E-Operator Training & License Examination Outage Cgij F-Administrative 5-Reduction C~ c)

G-Operational Error (Explain) 9-Other # hi[

H-Other (Explain) C) e.rn

'"bp >R A

/

ATTACHMENT ST HL AE 2W <

PAGE < OF 7 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE June 8, 1988 COMPLFTED BY J.J. Nesrsta TELEPHONE 512-972-7827 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (tsfe-Net )

1 0 17 189 2 0 18 186 3 0 19 188 4 0 ,

20 186 5 0 21 179 6 0 22 135 7 0 23 97 8 0 24 0 9 0 25 231 10 0 26 365 11 0 27 470 12 0 28 499 13 0 29 480 14 5 30 464 15 49 31 N/A 16 185 NL.NRC.R.APR.AT (C68)

x-

.? .

. ATTACHMENT ST HL AE 2 73< -

1- PAGE o OF 1 Monthly Summary Unit i began the month with work continuing to return to service following a Steam Generator Feed Pump failure. The feed pump is being replaced with the pump internals from Unit 2 with work on design modifications to be implemented on all three Steam Generator Feed Pumps.

The unit went back on line 6/13/88 and continued power ascension testing at the 30% plateau.

On 6/23/88 the unit was successfully shutdown from outside the control room marking the completion of the final test at the 30% level of the power ascension testing program.

Unit I was restarted on 6/24/88 and achieved 50% reactor power 6/27/88 for the start of testing at the 50% plateau.

  • ATTACHMENT ST HL AE DM

..PACF 1,..nr 9

. =. _ - _ _ _ ,

PORVs and Safety Valves Summary No PORVs or Safety Valves were challenged during this reporting period.

l l

o

l l

~

The Light company P.O. Box 1700 llouston. Texas 77001 (713) 228 9211 Ilouston Lightingk Power July 12, 1988 ST-ML-AE-2725 File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Unit 1 Docket No. STN 50-498 Monthly Operating Report for June 1988 Pursuant to 10CFR50.71(a) and the South Texas Projact Electric Generating Station (STPEGS) Unit 1 Technical Specification 6.9.1.5, attached is the Monthly Operating Report for June 1988.

If you should have any questions on this matter, please contact Mr. C.A. Ayala at (512) 972-8628.

k M. .

&l'lh McBurnett Manager, Operations Support Licensing MAM/CAA/nl

Attachment:

STPEGS Unit 1 Monthly Operating Report - June 1988 s

1\

A Subsidiary of Ilouston Industries Incorporated NL.NRC.R.JUN.LT

ilouston 1.ighting & Power Company ST-HL-AE-2725 File No.: G02 Page 2 CCI Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Ccmmission Associated General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001

, George Dick U. S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 Circle 75 Parkway Jack E. Bess Atlanta, Ga. 30339-3064 Res! dent Inspector / Operations e/o U. S. Nuclear Regulatory Commission Dr. Joseph H. Hendrie P. O. Box 910 50 Be11 port Lane Bay City. TX 77414 Be11 port, NY 11713 Don L. Garrison Resident Inspector / Construction c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)

Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 06/16/88 NL.DIST