Letter Sequence Supplement |
---|
EPID:L-2021-LLR-0016, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair (Approved, Closed) |
|
MONTHYEARRS-21-034, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair2021-03-0707 March 2021 Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair Project stage: Request RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs Project stage: Request ML21089A0542021-03-15015 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Relief Request I4R-12, Revision 1 Valve Repairs on Valves 2B33-F060A and 2B33-F060B Project stage: Approval RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 Project stage: Supplement RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 Project stage: Request ML21089A0562021-03-30030 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Request for an Alternative I4R-12, Revision 2 Valve Repairs on Valves 2B33-F060A and 2B33-F060B Project stage: Other ML21188A0192021-07-28028 July 2021 Proposed Alternative I4R-12, Revision 2 from Code Surface Examinations Requirements of the ASME Code for Valves 2B33 F60A and 2B33 F60B Repairs Project stage: Other 2021-03-30
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs 2023-08-04
[Table view] Category:Request for Code Relief or Alternative
MONTHYEARRS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-034, Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair2021-03-0707 March 2021 Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair NMP1L3366, Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2020-12-0101 December 2020 Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting ML20329A0092020-11-23023 November 2020 Incoming Request-La Salle-Exelon Generation Co., LLC 2023-08-04
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-21-043 10 CFR 50.55a March 26, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Unit 2 Renewed Facility Operating License No. NPF-18 NRC Docket No. 50-374
Subject:
Supplemental Information regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2
References:
- 1. Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC (Nuclear Regulatory Commission), "Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair," dated March 7, 2021 (ML21067A000).
- 2. Email from B. Vaidya (U.S NRC) to J. Taken (EGC), "LASALLE UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair, (EPID-L-2021-LLR-0016)," dated March 9, 2021.
- 3. Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC (Nuclear Regulatory Commission), "Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs," dated March 9, 2021 (ML21068A442).
- 4. Email from B. Vaidya (U.S. NRC) to J.Taken (EGC), "LaSalle Unit 2 -
Verbal Authorization of LaSalle Unit 2 Relief Request I4R-12, Revision 1 re: Valve Repairs on Valves 2B33-F060A and 2B33-F060B," dated March 15, 2021.
- 5. Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC (Nuclear Regulatory Commission), "Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2,"
dated March 26, 2021 (ML21085A000).
In Reference 5, Exelon Generation Company, LLC (EGC) requested NRC approval of relief request I4R-12, Revision 2 associated with the fourth Inservice Inspection (ISI) interval for
March 26, 2021 U.S. Nuclear Regulatory Commission Page 2 LaSalle County Station (LSCS), Unit 2 in accordance with 10 CFR 50.55a, "Codes and standards," paragraph (z)(2). Specifically, the referenced letter requested authorization of alternative examination requirements for the repair of Unit 2 Reactor Recirculation flow control valves 2B33-F060A and 2B33-F060B, currently in progress, in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, paragraph IWA-4000.
The fourth interval of the LSCS Unit 2 ISI Program is based on the ASME Code, Section XI, 2007 Edition through 2008 Addenda. The fourth ISI interval at LSCS began on October 1, 2017 and is currently scheduled to end September 30, 2027.
Following submittal of Reference 5, a clarification telephone call took place on March 26, 2021 between NRC and EGC. NRC determined that clarification to the information submitted in Reference 5 was required to complete its review of relief request I4R-12, Revision 2.
The attachment to this letter provides the supplemental information to support NRC review of Reference 5.
EGC requests authorization of the proposed relief request for both 2B33-F060A and 2B33-F060B by March 29, 2021.
There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Jason Taken at (630) 657-3660.
Respectfully, Dwi Murray Sr. Manager - Licensing Exelon Generation Company, LLC
Attachment:
Supplemental Information regarding Relief Request I4R-12 Associated with Alternative Examination Requirements for Repairs of Reactor Recirculation Flow Control Valves, Revision 2 cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector - LaSalle County Station NRC Project Manager, NRR - LaSalle County Station Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT Supplemental Information regarding Relief Request I4R-12 Associated with Alternative Examination Requirements for Repair of Reactor Recirculation Flow Control Valves 2B33-F060A and 2B33-F060B, Revision 2
ATTACHMENT Supplemental Information regarding Relief Request I4R-12 Associated with Alternative Examination Requirements for Repair of Reactor Recirculation Flow Control Valves 2B33-F060A and 2B33-F060B, Revision 2 In the referenced letter, Exelon Generation Company, LLC (EGC) requested NRC approval of relief request I4R-12, Revision 2 associated with the repairs of Unit 2 Reactor Recirculation flow control valves 2B33-F060A and 2B33-F060B. In support of the Nuclear Regulatory Commission (NRC) continued review of the referenced letter, the following supplemental information is provided.
- 1. Approximate size of the wear area and the size of area to be restored above minimum wall thickness.
The total internal surface area of the valve is estimated by assuming the shape of a cylinder with a diameter of 21.83 inches and a length of 72 inches. This results in a total internal surface area of approximately 4937 square-inches. The general wear area in the lower plug guide region was approximated assuming a dome shape. The wear area for 2B33-F060A is noted in the highlighted portions of Figure I4R-12-4 in the referenced letter. The wear area for 2B33-F060B is noted in the highlighted portions of Figure I4R-12-2 in the referenced letter. Conservatively assuming wear on 50% of the surface area of 2B33-F060A and 75% of the surface area of 2B33-F060B, this results in a general wear area of less than 3% of the total valve internal surface area.
The below minimum wall thickness region was a small groove that crosses the minimum wall line at an angle, 360 degrees around. The machined area below minimum wall thickness was approximated by computing the surface area of a bounding right triangle with legs of 0.2 inches and 0.5 inches in length. The resultant area of the exposed surfaces that was below minimum wall thickness was less than 0.6% of the total valve internal surface area for either valve.
- 2. Clarification of "sufficient wall thickness" statement described in the referenced letter.
In the referenced letter, page 6 of Attachment 1 states "Welding and machining will be done to achieve sufficient wall thickness above minimum wall thickness to support restoration of valve functionality across the entire valve body." The intent of this statement is twofold. First, welding and machining is performed to ensure that the valve wall thickness will be restored to above minimum wall thickness in all areas. Second, there are some areas where additional weld material is applied and machined (beyond minimum wall thickness) to support valve body configuration to interface with the modified lower plug guide. To ensure wear does not challenge the minimum wall thickness due to the internal design change, wear rate calculations have been performed based on the utilization of the 316 stainless steel Stellite-overlayed lower plug guide.
These calculations indicate the wear rate to be 0.00015 inches per operating cycle. This supports the determination that welding/machining to approximately 0.2 inches above minimum wall in the area of wear to be of sufficient thickness to support end of life operation with the new design.
Page 1 of 2
ATTACHMENT Supplemental Information regarding Relief Request I4R-12 Associated with Alternative Examination Requirements for Repair of Reactor Recirculation Flow Control Valves 2B33-F060A and 2B33-F060B, Revision 2
- 3. Confirmation of as-left area to determine that minimum wall or above minimum wall thickness has been achieved.
Micrometer measurements will be taken of the depth and internal bores of the machined areas to validate proper dimensions. The measurement tools have precision of 0.001 inches. These measurements will verify the valve body configuration to allow for reassembly and functionality, as well as assuring material thickness above the minimum wall thickness and design requirements.
- 4. Plans, if any, to monitor that minimum wall thickness is maintained over time.
EGC does not plan to monitor minimum wall thickness over time. The internal valve conditions necessitating this repair is believed to have occurred following a sustained low power operating condition in 2015, which is atypical of normal plant operation. Due to valve internal geometry, direct monitoring of minimum wall thickness through a method such as ultrasonic testing is not possible. Additionally, wear rate calculations support valve operation through end of plant life without encroaching on minimum wall thickness.
- 5. Sequence of enhanced visual examination (EVT-1) performance on the anti-rotation device fillet weld.
For the anti-rotation device fillet weld, an enhanced visual examination (EVT-1) will be performed on the first pass and on the final weld in lieu of a liquid penetrant (PT) examination of the final weld.
- 6. Identify the material of the anti-rotation device.
The material of the anti-rotation device is specified as 304L stainless steel material.
- 7. Confirm relief from the radiographic examination.
EGC confirms that radiographic examination will not be performed. Proposed relief to not perform radiographic examination is described in the referenced letter in accordance with 10 CFR 50.55a(z)(2) due to the significant radiological dose associated with the radiographic examination.
Reference:
Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC (Nuclear Regulatory Commission), " Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2," dated March 26, 2021 (ML21085A000).
Page 2 of 2