4300 Winfield Road Warrenville, IL 60555 Exelon Generation 630 65 7 2000 Office RS-19-019 April 2, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 10 CFR 50.55a
Subject:
Response to Request for Additional Information Regarding Relief Request 13R-15
References:
- 1. Letter from D. Gullett (Exelon Generation Company, LLC) to U.S. NRC, "End of Interval Relief Request Associated with The Third Ten-Year lnservice Inspection (ISi) Interval" dated September 19, 2018(ML18267A058)
- 2. Email from B. Vaidya (U.S. NRC) to R. Steinman (Exelon Generation Company, LLC), "Request for Additional Information Regarding Relief Request 13R-15" dated February 5, 2019(ML19036A656)
In Reference 1, Exelon Generation Company, LLC (EGC) submitted relief request 13R-15, for LaSalle County Station (LSCS), Units 1 and 2. The proposed request seeks relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components." The request applies to the third ten-year lnservice Inspection (ISi) interval, which concluded on September 30, 2017, for LSCS, Units 1 and 2. The third ten-year ISi interval complied with the ASME Boiler and Pressure Vessel Code,Section XI, 2001 Edition with the 2003 Addenda.
In Reference 2, the NRC requested additional information that is needed to complete review of the proposed relief request.
In response to this request, EGC is providing the additional information requested in Attachments 1 through 5.
U.S. Nuclear Regulatory Commission April 2, 2019 Page 2 There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Jason Taken at (630) 657-3660.
Attachments:
cc:
- 1. Additional Information Supporting 10 CFR 50.55a Relief Request 13R-15 Proposed Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) - lnservice Inspection Impracticality
- 2. Complete Examination Datasheets for IMS-2044-13
- 3. Complete Examination Datasheets for IRR-2001-03
- 4. Complete Examination Datasheets for IRR-2001-04
- 5. Follow-up Examination Datasheets IMS-2044-13 USNRC Region Ill, Regional Administrator USNRC Senior Resident Inspector, LSCS USNRC Project Manager, LSCS Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT 1 Additional Information Supporting 10 CFR 50.55a Relief Request 13R-15 Proposed Alternative in Accordance with 10 CFR 50.55a(g}(5}(iii) -
lnservice Inspection Impracticality By letter dated September 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML18267A058), Exelon Generating Company (EGC, the licensee) submitted relief request 13R-15, requesting relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, Rules for lnservice Inspection (ISi) of Nuclear Power Plant Components, for LaSalle Units 1 and 2. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(5)(iii), the licensee requested relief from the "essentially 100 percent" volumetric examination coverage requirements of the ASME Code,Section XI for certain welds on the basis that the code requirement is impractical. The Nuclear Regulatory Commission (NRC) has determined that the following additional information is necessary to complete its review and make a regulatory decision.
MPHB RAl-1 The staff has reviewed the licensee's proposed relief request for Risk-Informed In-service Inspection (RI-ISi) R-A Categories which included stainless steel and carbon steel welds (Main Steam). On page 2 of the submittal dated September 19, 2018, the licensee stated that it is implementing ASME Code Case N-578-1, "Risk-Informed Requirements for Class 1, 2 or 3 Piping, Method B." Table 1 of the ASME Code Case N-578-1, Footnote 3 states: "Includes 100% of the examination location. When the required examination volume or area cannot be examined due to interference by another component or part geometry, limited examinations shall be evaluated for acceptability. Acceptance of limited examinations or volumes shall not invalidate the results of the risk-informed evaluation. Areas of acceptable limited examinations, and their bases shall be documented."
(A) The staff requests that the licensee provide inspection results obtained during the third 10-year ISi interval for the following welds under R-A examination category.
(1) Component ldentification-IMS-2044 (Main Steam), Pipe to Valve weld; Examination Category, R-A; Item Number, R1.20.
(2) Component ldentification-IRR-2001-03--- (Recirculation Piping), Header to Sweep-0-Let weld, Examination Category, R-A; Item Number, R1.20.
(3) Component ldentification-IRR-2001-04--- (Recirculation Piping), Header to Sweep-0-Let weld, Examination Category, R-A; Item Number, R1.20.
(B) Examinations of the welds listed above with a limited inspection coverage do not provide adequate information on structural integrity of the un-inspected area/volume of the subject welds.
Consistent with the criterion addressed in Note 3 of Table 1 of the Code Case N-578-1, the staff requests that the licensee provide a summary of its engineering evaluation for accepting the examination coverage that is less than essentially 100% for the welds. Provide the results of the previous examination coverage that was obtained for the afore-mentioned welds during the second 10-year ISi interval.
1
Response
ATTACHMENT 1 Additional Information Supporting 10 CFR 50.55a Relief Request 13R-15 Proposed Alternative in Accordance with 10 CFR 50.55a(g}(5}(iii) -
lnservice Inspection Impracticality Attachments 2, 3, and 4 provide the complete examination datasheets for welds IMS-2044-13, IRR-2001-03, IRR-2001-04, respectively, from the third 10-year ISi Interval.
For Item ( 1) above, I MS-2044-13 is a pipe-to-valve weld from line 2MS38M-18" to valve 2B21-F418B. This weld is carbon steel RISI Category R-A, Item R1.20 (no defined damage mechanism), requiring a qualified ultrasonic examination technique. Qualification of the ultrasonic equipment and procedure is required by ASME Section XI, Appendix VIII as modified by 10 CFR 50.55a. This weld was previously examined in October 1996 during L2R07. Exam coverage was not specifically reported, but with no identified limitations was assumed to be 100%. This examination was performed prior to the demonstration requirements stated above.
The technique used in 1996 (1 & 1/2 V-Path) was acceptable at the time but was excluded from the qualified procedure used in 2009 due to being ineffective on non-parallel surfaces (valve counterbore and OD taper transition areas). During the 2009 (L2R12) examination, a 70° shear exam was performed in addition to the 45° shear exam to maximize the qualified coverage.
Items (2) and (3), IRR-2001-03 and IRR-2001-04, are both similar configuration pipe to sweep-o-let welds, providing the connection between the Reactor Recirculation loop ring header and individual risers supplying recirculation flow to the reactor vessel. Based on the sweep-o-let curvature, portions of the weld could only be examined from one side. Both welds are stainless steel RISI Category R-A, Item R1.20 (Category 'A' IGSCC, with no other defined damage mechanism), requiring a qualified ultrasonic technique. Qualification of the ultrasonic equipment and procedure is required by ASME Section XI, Appendix VIII as modified by 10 CFR 50.55a.
These welds were previously examined in October 1996 during L2R07 with a reported 100%
coverage achieved by scanning from one side of the weld only. These examinations were performed prior to the demonstration requirements stated above; based on the methodology prior to ASME Section XI, Appendix VIII requirements, 100% coverage could be claimed.
During the 2013 (L2R14) examination, areas with limited access were scanned with a 60° refracted longitudinal transducer, interrogating the opposite side of the weld. Since this is not a demonstrated technique, no additional coverage was credited.
All three of the welds were examined to the maximum extent practical given the limitations posed by component configuration and design. Exams used the latest techniques, procedures and equipment in accordance with ASME Section XI, Appendix VIII as implemented by the Performance Demonstration Initiative (POI). Despite the limitations, these exams provide an acceptable level of quality and safety because sufficient data was obtained to make a determination on the integrity of the piping. These welds are part of a larger population; the results as considered in the aggregate with the entire sample population confirm the absence of significant degradation that could affect the structural integrity of the components. Additionally, weld IMS-2044-13 was re-examined during the Spring 2011 Unit 2 LaSalle Station refueling outage L2R13. After performance of weld crown reduction, 100% coverage was achieved with no identified indications.
2
ATTACHMENT 1 Additional Information Supporting 10 CFR 50.55a Relief Request 13R-15 Proposed Alternative in Accordance with 10 CFR 50.55a(g}(5}(iii) -
lnservice Inspection Impracticality provides the examination datasheets for the follow-up examination of IMS-2044-13.
MPHB RAl-2 Consistent with the requirements addressed in Note 2 of Table IWC-2500-1, the staff requests that the licensee provide an explanation for accepting the examination coverage that is much less than essentially 100% for the following weld :
Component ldentification-HP-PU2-04-Welded attachment to pump; Examination Category, C-C; Item Number, C3.30; Inspection coverage obtained-16%.
Response
The 16% coverage obtained is the maximum possible coverage due to the physical configuration of the component. The HP-PU2-04 weld to the Unit 2 High Pressure Core Spray Pump is surrounded by a permanent concrete support structure, except for a localized area in-line with the pump suction piping. Figures 1 and 2 depict the configuration and accessibility of the weld.
3
ATTACHMENT 1 Additional Information Supporting 10 CFR 50.55a Relief Request 13R-15 Proposed Alternative in Accordance with 10 CFR 50.55a(g}(5}(iii) -
lnservice Inspection Impracticality Exposed Area Examined Figure 1: Unit 2 High Pressure Core Spray Pump 2E22-C001 4
ATTACHMENT 1 Additional Information Supporting 10 CFR 50.55a Relief Request 13R-15 Proposed Alternative in Accordance with 10 CFR 50.55a(g}(5}(iii) -
lnservice Inspection Impracticality
. &£4 kX, M./.
27**
Figure 2: HP-PU2-04 Weld Exam Datasheet Coverage Sketch 5
Complete Examination Datasheets for IMS-2044-13
Site:
Outage:
System:
HITACHI LaSalle L2R12 MS Exams Doto Sheet Col Sheet Performed 70° Shear D-06S N/A 4S0 Shear D-064 N/A Examination Results:
EXAMINATION
SUMMARY
SHEET Component ID:
ASME Cat.:
R-A Procedure GEH-PDl-UT-1Ver/Rev6 GEH-PDl-UT-1Ver/Rev6 IMS-2044-13 P-V ASME Item Rl.20 Aug Req Calibration Block Exam/Oper.
Personnel CB-02-132 Alicia Hutton CB-02-132 Alicia Hutton RISI Cert Level II II Report No.:
l2Rl2-047 Date 1/26/2009 V26/2009 During the ultrasonic examination of the above referenced weld, no recordable indications were detected utilizing o 45° and 70° shear wave search unit.
S9.8% of the required examination volume was examined.
This examination meets the requirements of ASME Section XI, 2001 Edition. 2003 Addenda.
Examination results were compared to Data Report D-228A from:
1996 These examinations were performed under Work Order:
01011137-01 This Summary and the following data sheets hove been reviewed and accepted by the following personnel:
- ,<)~,.-g: /~ -~A(~,Mb1
'°'"
Doto Utillty 'liAki..
1_.--.;z ~~
ANll Review:
Date:
Dose:
0 Change
~No Change 3
mr.
Page _1_ of cf/'{
91 Ultrasonic Calibration and E>eamination Record HITACHI Manual Piping and Components Site/Unit:
Report Number:
L2R12-047 LaSalle/2 Data Sheet Number:
D-064 Outage:
L2R12 Linearity Sheet L-009 Calibration Data for Block:
CB-02-132 Procedure:
GEH-PDl-UT-1 cs Flat
.5"-2.0" Calibration Cal Time Ver I Rev:
§ ORR: !iM Material Size Thick Initial Cal:
lll6 Search Unit Data Ultragel II 8125 Cal Check:
l6ll Couplant Couplant batch KBA 010HKV
.5U't..Round 261711 58°F Cal Check:
!iM Manufacturer:
Serial Number Size/Shape:
Thermometer S/N Cal Temp.
Final Cal:
1737 0.4/n.
45° 45° Incident Point:
Nominal Angle:
Measured Angle:
DAC Construction 2.25MHz Comp-G Shear l
Scan Direction Ax Frequency:
Style:
Mode:
Elements:
Cal Reflector 1.5"Notch Search Unit Cable Signal Amplitude:
80%
RG-174
§'.
Q Signal Sweep:
4.30Div Cable Type:
Length:
Connectors:
Signal dB:
7.6dB Sweep 0-10=
5.000/n Metal Path Instrument Settings Calibration Verification Panametrics l Epoch 4 031574612 Field Simulator Block S/N:
Manufacturer/Model:
Serial Number:
CAL-RHOM-123 5.275us 0.124 in,L41.sec.
0.8-3.0MHz Reflector FSDH
!iM Zero:
Velocity:
Narrowband Filter:
Amplitude 190Ai
!iM Gain (dB) 7.6
!iM Auto Fullwave 5.000in SgJMax Sweep(SDJ 2.l
!iM Rep Rate:
Rectification:
Range:
Pulser/Energy:
Acceptable Linearity performed :
11..1511.009 4000hms 0%
2.0MHz
!!LE.
Damping:
Reject:
Frequency:
Mode:
Exam Data for Weld: IMS-2044-13 P-V Exam Comments I Limitations:
Configuration:
Clrc exams performed on pipe side base material only and weld aown with skew angles to oamln11 th* additional required exam 110lum1.
OD 80°F 261711 No recordable Indications.
Previously rectJrded geamltly absefllf!d below recordable lewis.
Exam Surface:
Exam Temp.
Exam Thermometer Na oam performed from downstream side due to component canflgurat/an.
Increased e>tam l/Olume due ta RI-ISi requlRlments. 5ft attached cawrage plat Scan gain levels set to maintain an 10 response betwftn 59' 01ld 209' FSH.
This exceeds the 12dB requlRlments of RJ.ISI.
O" exam performed ta locate caunterllore and/or any 10 transition.
Axial UPST Scan dB Recordable Exam Caunterllore/10 transit/an located by O" beam, eNam 110lume el(fendfld from toe of weld ta meet RI-ISi.
Circ DNST Indications Angle Reviewed prevfaus T&C data ta validate e>tam technique and compared ta the Ax Upst 24.l
!ifil 45°
- as-found" configuration with any changes noted.
The palf/an af the intersecting long seam Is oamlned 110lumetrlcafly within the eNamlnat/an boundaries of this clrc seam.
Circ Upst 28.4 NRI 45°
!iM
!iM
!iM
!iM
,Jt Exam Start 1636 Exam End:
1648
!iM
!iM
!iM
!iM wl,4 f£ Ali~ l1
- ~ IA )&ij /
~
1~z~. o<f Initials:
Examiner:
Level:
6?j_iewed By:
D /
Date:
jio/o<J
~
!iM
!iM R/tT-V~
I Initials:
Examiner 2:
Level:
Utility Review:
Date:
f)jA_h~fo J,---J...-&!
Page 'f of ~
Initial Cal/Exam Date:
1i..26l2009 ANll Review:
Date:
- I Ultrasonic Calibration and Examination Record HITACHI Manual Piping and Components Site/Unit Report Number:
L2R12-047 LaSalle/2 Data Sheet Number:
D-065 Outage:
L2R12 Linearity Sheet L-009 Calibration Data for Block:
CB-02-132 Procedure:
GEH-PDl-UT-1 cs Flat
.5"-2.0
Calibration Cal Time Ver I Rev:
§ DRR: !:JM Material Size Thick Initial Cal:
1134 Search Unit Data Ultragel II 8125 Cal Check:
1650 Couplant Couplant batch KBA 01CX3D
.5"/Rd.
261711 58°f Cal Check:
!:JM Manufacturer:
Serial Number Size/Shape:
Thermometer S/N Cal Temp.
Final Cal:
1730 0.41in.
70° 70° Incident Point:
Nominal Angle:
Measured Angle:
DAC Construction 2.25MHz Comp-G Shear Scan Direction AK Frequency:
Style:
Mode:
Elements:
Cal Reflector 1.5"Notch Search Unit Cable Signal Amplitude:
80%
RG-174
§'.
Q Signal Sweep:
4.40Div Cable Type:
Length:
Connectors:
Signal dB:
24.ldB Sweep 0-10=
10.000in Metal Path Instrument Settings Calibration Verification Panametrics l E129.ch 4 031574612 Field Simulator Block S/N:
CAL-RHOM-123 Manufacturer/Model:
Serial Number:
9.655us 0.1315 inJusec.
0.8-3.0MHz Reflector FSDH
!:JM Amplitude Zero:
Velocity:
Narrowband Filter:
44%
!:JM Gain(dBI 24.1
!:JM Auto Fullwave 10.000in Sq.lMax Sweep(SDI 2.1
!:JM Rep Rate:
Rectification:
Range:
Pulser/Energy:
Acceptable Linearity performed :
1/..15{1,009 4000hms 0%
2.0MHz
!?ff.
Damping:
Reject Frequency:
Mode:
Exam Data for Weld: IMS-2044-13 P-V Exam Comments I Limitations:
Configuration:
Clrc eJ1ams performed on pipe side base material only and weld aown with skew angles ta l!Jlamlne the addttlonal required eJ1am volume.
OD 80°f 261711 No recordable Indications.
70" eJ1am performed to obtain coveroge of Ille required eJ1Um volume.
Exam Surface:
Exam Temp.
Exam Thermometer No l!Jlam performed from downs!A!am side due to component canflgutallon.
Increased eJ1am volume due to RI-IS/ requirements. See attached coverage plot Scan gain lewis ut to maintain an ID response between 596 and Z096 FSH.
This eJICeeds !he lZdB requirements of RI-IS/.
O" l!Jlam performed to locate counterllore and/or any ID translllon.
Axial UPST Scan dB Recordable Exam Counterllore/ID transition located by O" beam, eJ1am volume Clllended from toe of weld lo mftl RI-ISi.
Circ DNST Indications Angle Reviewed previous T&C data lo validate eJ1am technique and compared lo the AK Upst 41.0 NRI 70°
- as-found' ainflguflJl/on with any changes noted.
!:JM
!:JM
!:JM
!:JM 1/
!:JM
!:JM
!:JM
!:JM 11/j /}
Exam Start 1652 Exam End:
1705
!:JM
!:JM
!:JM
!:JM
~ Alicia Hu_tt~~
l1 if,u2~/
~
i-1~*0'1 Initials:
Examiner :~
Level:
7redBy:~/~
Level:
Dote:
((!{°i
)../"A..
!:JM
!:JM A~v ur'/A~
Utility Review:
I Initials:
Examiner 2:
Level:
RJJvliv 1-:A.-()9' Page }
~
Initial Cal/Exam Date:
1/..26{1,009 ANll Review:
Date:
of
System:
Position I 1
I 2
I 3
I 4
I 5
I HITACHI I I Wall Thickness Profile Sheet MS I
Component ID Number:
IMS-2044-13
()"
I 90*
I 1eo* I 270" I
~
Crown Height
.15"
.BB I
NIA I NIA I NIA 1.10 I NIA NIA NIA NIA NIA Alicia Hutton Drown by:
I NIA I NIA NIA NIA NIA NIA PIPE
!1 l/26/2009 Level:
Dote:
Crown Width:
1.3" I
Nominal Diameter:
1B.O
Weld Length:
57.5" FL~W
<t.
,r / VI '-" '4............
~
/* Ut:J Cevel:
Dote:
11 Site:
LaSalle Unit:
Report No.:
Project:
L2Rl2 I
~
~ 4
((]
OJ
[Ll I
~
[fil I
eLP£.
\\~/
Valve UPST Component:
DNST Component:
I FLOW....
VALVE
)2 ANll Review:
Dote:
Page LI of
Weld IMS-2044-13 RISI Weld, Category R-A Item R1.20 Prepared By I Level I Dat0 l/.. £.~~
12/;eftlf Reviewed By I Date NIA Site Approval By I Date ~#Z Degradation Mechanism = None Defined Component: Pipe to Valve UT Procedure GE-PDl-UT-1
¥
~Profile of component
<"-..,...* Wald butlering 1,
.I (whera applJcBble)
,a I
T
~.!.
~-, (<:*~
t
'lio '
....L I
\\t Examination Volume A-8-C-D Eumination Volnme For Piping Welds Less Tluln NPS 4, When No Degndation Mecbani!m Hu Been Ddmnlned
{ PnllleclCCJl'l'CIOfl8ll
\\_,
,/
~--""-*---- Weld bull8ring (where applied)
T B '"'"'"
~J_I Al;~;~;~:~;~;~;~;~;~
~
H 112*
112*
Eumination Vohune For Piping Welds NPS 4 And Larger, When No Degradation Meclumism Ha Been Determined 18.0 Dia.
CB-02-132 Scan as shown in figures. The absolute minimum scan includes the weld plus%". If there is a CB, scan at least %" beyond the CB.
Note scan distance(s) on data sheet. e.g.
Scanned 1.5" from weld toe to assure adequate coverage.
Either locate the counterbore or state that no counterbore can be detected.
Scan at a minimum of 4X (+12dB) over calibration gain.
Scan both sides unless restricted by physical limitations.
Any questions or problems call your Supervisor or Project Level 111 ASAP.
If this weld is new and "Base-Line" data is being obtained, perform TC's, otherwise validate existing TC's with new TC Data Sheet Report Number Pag6' o~
e HITACHI Pipe Weld Coverage Calculation Sheet LaSalle Unit 2 I L2R12 I MS-2044-13 Spring I 2009 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Weld Length =
Required Area Scanned Area Total Required Total Scanned
%Coverage Exam Area = 0.843 Area Area Upstream Scan I
0.843 0.697 Downstream Scan I 0.843 0.477 3.373 2.02 59.8%
CW Scan I
0.843 0.422 CCW Scan I
0.843 0.422
% Total Composite Coverage =
59.8%
CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360.
Required Exam Area Scanned of Area Weld Length Percent Exam Volume = o.
Area Sq. In.
Manual Manual Manual Manual NIA I NIA NIA NIA NIA NIA NIA NIA I NIA NIA NIA NIA NIA NIA NIA I NIA I NIA I
NIA NIA I NIA I NIA NIA NIA NIA NIA Comments:
L2R12-047 PageS"'-of Sc-Complete Examination Datasheets for IRR-2001-03
e Examination Summary Sheet Report No.:
c HITACHI L2Rl4-026 Site:
LaSalle Unit 2 Component IRR-2001-03 Outage:
L2R14 /3rd Int 2nd Per Configurotio Ring Header to Sweep-0-Let
-\\"" 1-CJ*l\\
System:
MiR~~
ASME Cat:
R-A ASME Item:
Rl.20 Aug.
N/A Exams Data Cal Procedure Calibration Block Examination I Oper.
Cert Level:
Performed:
Sheet Sheet Personnel:
Date:
45° Shear D-056 N/A GEH-PDl-UT-2 V6 PDI Alt Blk 25609 Dave Hancock II 2-20-13 60° Shear D-057 N/A GEH-PDl-UT-2 V6 POI Alt Blk 25609 Dave Hancock II 2-20-13 60° RL 0-058 N/A GEH-PDl-UT-2 V6 PDI Alt Blk 25609 Dave Hancock II 2-20-13 Examination Results:
This component was examined with POI approved procedures, equipment and personnel were utilized in accordance with Section XI of the American Society of Mechanical Engineers Code 2001 Edition with /03 Addenda, Appendix VIII as modified by the Performance Demonstration Initiative (POI) program description for execution of this examination.
In accordance with GEH-ADM-1062, GEH developed from previous data, scan plans with the required information (examination volume requirements) at a minimum. LaSalle County Station NOES personnel reviewed and approved scan plans. Based on previous T&C's, the scan plan directed the use of (.50)" dia., 45° shear wave with 60° shear wave search units as a contingency for limited access areas. This weld was found to be acceptable with no recordable indications.
Limitation Details - Ring Header to Sweep-o-let presents limitations in the crotch areas of the weld. These areas were examined with an additional 60° RL search unit This resulted in an aggregate coverage of 86%.
c The examination results were compared with data report D-152A from L2R07 outage with
~No Change These examinations were performed under Work Order:
01428188 Ochange This summary and the following data sheets have been reviewed and accepted by the following personnel:
,~ll~ < d ilJh :4 tLs:12. Jj/.;i *.;13 *J3 RWP: 10013933 Dose :
274 mr.
Level Dote Uti9]~-rJ-J
,J;~ /, 3 ANll Reviewed B/.
I Dote I Page_l _ of _ 8_
.~ITACHI 1 1 Wall Thickness 11 Site:
LaSalle Unit
~
I Report No.:
Profile Sheet Project L2R14 3rd lnterval/1.nd Period I
~
~ 4 System:
RR I
Component ID Number:
IRR-2001-03
[))
Position I o*
I 90*
I 1ao* I 270" I
OJ f2l rn
@]
NIA 1.197' NIA NIA Crown Height FLUSH 2
I NIA 1.667' NIA NIA Crown Width:
1.2
\\~ /
Sweee:.o-let I
Rinfl.er Header 3
I NIA I 1.556" I NIA I NIA I UPST Component:
DNST Component:
Nominal Diameter:
16.0
4 I
NIA 1.163" NIA NIA Weld Length:
48.0
5 I
FLOW-
<t.
.,s*
,:: Low
\\ t,'
\\
I
\\
I
{)A Initials:
David Hancock Drown by:
!1 2/20/2013 1 _ j _c_W SJ. h
---::=~
-'lfu{J_?
Level:
Dote:
GE Reviewed By: c~-= Level:
Dote:
z~
Page
r
._HITACHI 1 1 Wall Thickness Profile Sheet System:
RR I
Component ID Number:
IRR-2001-03 Position I o*
I 90*
I 180° I 270° I 1.10" I NIA NIA NIA Crown Height FLUSH 2
I 1.276" I NIA NIA NIA Crown Width:
1.2
3 I 1.350" I NIA I NIA I NIA I Nominal Diameter:
16.0
4 I NIA I NIA I NIA NIA Weld Length:
48.0" 5
~
~
Initials:
David Hancock Drown by:
JtA'kS:h /~ z/2Jr; GE Rev;~- Level:
Dote:
I!
2/20/2013 Level:
Dote:
LaSalle Unit
?.
I Report No.:
11 Site:
Project l2Rl4 3rd lnterva/Q.nd Period l2Rl4-026 I
I
\\
\\
~
[))
GJ Ring_ Header UPST Component ct:
'f
~ 4
[}]
I rn
~
\\~ /
SweeQ:Q-let DNST Component FLOW....
Page 3 of f3
ER-ATTAdiMENT 7 Coverage Summary Form Revision 4 LaSalle Unit:
02 Date:
02/20/2013 REPORT NUMBER:
L2R14-026 Page 4
--'----of 8
omponent I EPN:
IRR-2001-()3 System:
Reactor Reclrc onfiguration:
Ring Header {Pipe) to Sweep-0-Let Diameter:
16" Thickness:
_1_._2_" ---------
Descriotion of Restricted/ Limitation:
Limitation due to confiauration at O and 180 Dearees caused bv the crotch area of the sweeo-o-let.
48.0" Lenath (Circumference) 18:1 Measured D Calculated (0.D. Diameter x Pi Number of Angles Utilized See Comments Percent% Coverage Obtained I 86% I (Upstream+ Dnstream, etc.) I #of Scans ial Upstream O & 180 {AU1) 15.2 TV 29.0 (L) x 1.05
~) x 0.5 (T) o.o R
0.0 (L) x 0.0
~) x 0.0 (T) ial Downstream O & 180 {AD1) 14.4 TV 29.0 (L) x 1.10
~) x 0.45 (T) 14.4 lal Upstream 90 & 270 {AU2) 15.4 TV 19.0 (L) x 1.05
~) x 0.77 (T) 0.0 ial Downstream 90 & 270 {AD2) 11.2 TV 19.0 (L) x 1.20
~) x 0.49 (T) 0.0 ire Facing Clockwise {CW) 100
% Coverage No restrictions to circumferential scanning lcirc Facing Counter Clockwise {CCW) 100
% Coverage No restrictions to circumferential scanning otal examination all axial scans R
29.0 (L) x 1.10
~) x 0.45 (T)
R
!!:Q___ (L) x
~
~) x 0.0 (T)
R 0.0 (L) x 0.0
~) x~
(T) 100%
Axial Upstream 15.2 (AU1) +
15.4 (AU2) = 30.6 (TV) -
0.0 (R) = 30.6 {A) I 30.6 (TV)
X 100 =
100 43.8% Axial Dnstream 14.4 (AD1) +
11.2 (AD2) = 25.6 (TV) -
14.4 (R) = 11.2 {A) I 25.6 (TV) X 100 =
43.8 omments: Examination was performed utilizing a 45 and 60 shear for axial coverage and 45 shear for circumferential coverage. Based on the coverage plots, the 45 shear did not dd any additional axial coverage and therefore was not utilized for this calculation. Limitation was due to the configuration and caused single sided access for the axial
,xamination only. Dual coverage was obtained from 7.25" CW to 16.75" CW (9.5") and 31.25" CW to 40.75"CW (9.5"). Due to the change in OD configuration separate calculations
- ere performed to determine the total volume using page 2 for the dimensions to calculate for the volume with dual sided coverage and page 3 for the dimensions for single sided
- olume.
Date:
d-:;13-\\3
, \\ ~
v ~ ><:._,,........,,,, =I 0 '4 ' * "Jffe..w.
Date:
- >./)Bf, J f 1 "
- "f"t("
Date:
.NII:
I HITACHI Ultrasonic Calibration and Examination Record Manual Piping USN-60 SW Site/Unit: LaSa/le/2 Outage:
L2R14 3rd Interval/2nd Period Calibration Data for Block:
25609 SS Flat 0.5"-2.0
Calibration Col Time Material Size Thick Initial Col:
2250 Ultraqelll 11625 Col Check:
!:JM Couplont Couplont botch 279282 72°F Col Check:
!:JM Thermometer S/N Col Temp.
Final Col:
0107 DAC Construction Scan Direction Ax Col Reflector 2"1DNotch Signal Amplitude:
80%
Signal Sweep:
8.4Div Signal dB:
14.0dB Sweep0-10=
.3.000in Meta/Poth Calibration Verification Field Simulator Block S/N:
CAL-RHOM-080 Reflector FSDH NIA Amplitude 80%
!:JM Goin (dB) 27
!:JM Sweep (SD)
.3.6 NIA Acceptable Linearity performed :
211/201.3 Exam Data for Weld:
/RR-2001-03 Ringer Header to Swee12-o-let Configuration:
OD 70°F 279282 Exam Surface:
Exam Temp.
Exam Thermometer Axial UPST Scan dB I Recordable Exam Circ DNST Indications Angle -
AX UPST 27 NRI 45° I
AX DNST I
27 NRI 45° CIRC UPST 27 NRI 45° CIRC DNST 27 NRI 45° Report Number:
Doto Sheet Number:
Linearity Sheet Procedure:
GEH-PD/-UT-2 Ver I Rev:
§ ORR:
---~ ----- -------!
KBA Manufacturer:
0..3 in.
Incident Point 2.25MHz Frequency:
Search Unit Data 010HD8 Serial Number 45° Nominal Angle:
113-242-591 Shear Style:
Mode:
Search Unit Cable RG-
§'.
0.5"1Round Size/Shope:
45° Measured Angle:
l
,,,,,;-..,., I Q
____ill Type:
Coble Length:
Connectors:
5.90us Probe Deloy:
450 Voltage:
5000hms Damping:
I-Instrument Settings G
Mo EIT I USN 60 SW nufocturer/Model:
0.1211 in/usec.
Velocity:
F ullwave ctificotion:
Re 0%
Reject:
3.000in Range:
2.25MHz Frequency:
0229PO Serial Number:
Square Pulser Type:
Auto High PRF:
220 Pulse Width:
Ex am Comments I Limitations:
Exams performed to maintain 596 to 2096 ID roll.
Circ exams performe d on both sides of base material and on weld crown with ine the additional required exam volume.
skew angles to exam Previously recorded geometry observed below recordable levels.
Supplementol 60°RL examination due to single side access.
Dual side coverage a chieved. (7.25" to 16.75"1and131.25" to 40.75"1 Exam Start Exam End:
I.Id David Hancock ll
~SJ/
GE Reviewed By:
D rrrr-7':_.
2*21*1'
j Initials:
Examiner:
Level:
Level:
Dote:
!:JM NIA Initials:
Examiner 2:
Level:
Initial Col/Exam Dote:
2/..20/201.3 Page 5 of 1J
[
Ultrasonic Calibration and Examination Record H ITACH_* ____ Lj ~~~!""!!'~!!!!M!'!!!an!!!!u!'!!!a!!!!
I P
!'!!!i!!pi!'!!!n!"'g !!!!U!!!!SN!!!!-!!6!!0 !!sw
"""'!!!!!!"'!!!~~lll!"!!"!~
Report Number:
Doto Sheet Number:
L2R14-026 D-057 Site/Unit: LaSalle I 2 Outage:
L2R14 3rd Interval/2nd Period Linearity Sheet L-001 _j Procedure:
GEH-PDl-UT-2 Calibration Data for Block:
SS Flat 0.5"-2.0" Calibration Material Size Thick Initial Col:
Ultragel II 11625 Col Check:
Couplont Couplant batch 279282 72"F
~heck:
Thermometer S/N Cal Temp.
Col:
DAC Construction Scan Direction Ax Col Reflector 2"/D Notch Col Time 2300 I
!:JM.
I Ver I Rev:
§ ORR:
!:JM.
Search Unit Data KBA OOL2KB 0.5"1Round Manufacturer:
Serial Number Size/Shope:
0.4in.
60° 60° Incident Point Nominal Angle:
Measured Angle:
2.25MHz 113-242-591 Shear l
Frequency:
Style:
Mode:
Elements:
I Search Unit Cable
§'.
Q I
Signal Amplitude:
Signal Sweep:
I Signal dB:
Sweep 0-10=
80%
7.4Div 29.5dB Metal Path RG-174 Coble Type:
Length:
Instrument Settings Connectors: ---j Calibration Verification Field Simulator Block S/N:
CAL-RHOM-080 Reflector FSDH NIA I
Amplitude 80%
NIA I
Gain (dBi 29.5
!:JM. -1 Sweep !SDI 2.9 NIA 9.90us Probe Deloy:
450 Voltage:
GE/TI USN 60 SW Manufacturer/Model:
0.1287 in./usec.
Velocity:
Fu I/wave Rectification:
5.000in Range:
Serial Number:
Square Pulser Type:
Auto High PRF:
I I
I 500 Ohms 0%
2.25 MHz 220 I
Damping:
Reject Frequency:
Pulse Width:
i---- Exam Comments I Limitations:
l Acceptable linearity performed :
I Exam Data for Weld:
IRR-2001-03 Ringer Header to Sweep-o-let Configuration:
E11ams performed to maintain 5% to 20% ID roll.
OD Exam Surface:
70"F Exam Temp.
279282 Exam Thermometer I
ID geometty observed below recordable levels.
60° eitam performed to obtain coverage of the required eitom volume.
j Axial Circ UPST Scan dB I Recordable Exam DNST Indications Angle
~
- ~
N~~
~---
!:JM.
-:4---+---N-/.-
- 4--1--
N/.-J\\-~-!:JM.
~J\\~~~=-:
tJ_,,Z~A----i Exam Start Exam End:
I I
!:JM.
NIA NIA NIA N A 1--------~----~--~-------'--..C.-~----------------- -- ------'
/II)_
David Hancock Initials:
Examiner:
Initials:
Examiner 2:
Initial Cal/Exam Date:
2120/2013
!l Level:
NIA level:
I 0wS~~
GE Reviewed By: 0
---~----- ---
4 -
-i-(21ll3 Level:
Date:
Page (o of B
l Ultrasonic Calibration and Examination Record HITACHI Manual Piping USN-60 SW Site/Unit Report Number:
L2R14-026 LaSalle/2 Doto Sheet Number:
D-058 Outage:
L2R14 3rd lntervall2nd Period Linearity Sheet L-001 Calibration Data for Block:
25609 Procedure:
GEH-PD/-UT-2 SS Flat 0.5"-2.0
Calibration Col Time Ver I Rev: § ORR:
NIA Material Size Thick Initial Col:
2255 Search Unit Data Ultragel II 11625 Col Check NIA Couplont Couplont botch RTD 04-.304 2{10x18Jmm1Rect.
Col Check:
1 ~
Manufacturer:
Serial Number Size/Shape:
279282 72"F Thermometer S/N Col Temp.
Final Cal:
0110 0.6in.
60" 60° Incident Point Nominal Angle:
Measured Angle:
DAC Construction 2.0MHz 60°TRL2-Aust Long.
~
Scan Direction Ax Frequency:
Style:
Mode:
Elements:
Cal Reflector 2"/DNotch Search Unit Cable Signal Amplitude:
80%
RG-174
§'.
Q Signal Sweep:
7.4Div Cable Type:
Length:
Connectors:
Signal dB:
54.5dB Sweep 0-10 =
5.000in Metal Path Instrument Settings Calibration Verification GEIT I USN 60 SW 0229PO Manufacturer/Model:
Serial Number:
Field Simulator Block S/N:
CAL-RHOM-080 10.l.3 us 0.2.307 in./usec.
Square Reflector FSDH I
~
Amplitude 58%
I
~
Probe Delay:
Velocity:
Pulser Type:
Goin (dB) 47 I
~
450 Fu I/wave 5.000in Auto High Sweep (SD) 2.6 I
NIA Voltage:
Rectification:
Range:
PRF:
Acceptable Linearity performed :
2111201.3 SOOOhms 0%
2.0MHz 250 Damping:
Reject Frequency:
Pulse Width:
Exam Data for Weld:
IRR-2001-0.3 I
Ringer Header to Sweee-o-let Exam Comments l Limitations:
Configuration:
Exams performed to maintain 596 to 2096 ID roll.
ID geometl}I observed below recordable levels.
OD 70°f 279282 Supplemental 60"RL examination due to single side access.
Exam Surface:
Exam Temp.
Exam Thermometer Axial UPST Scan dB Recordable Exam Circ DNST Indications Angle AX UPST 60 NRI 60°
~
~
~
~ N/A
~
~ I ~
NIA tJ rA I Exam Start 0049 Exam End:
0058 I
~
~
!iM NA
,flJ Daold Han<0<*
ll
()w~ /" ~
z *Z/
- I~
s Examiner:
Level:
GE Reviewed By: 0 Level:
Dote:
!iM
!:iM Initials:
Examiner 2:
Level:
Initial Cal/Exam Date:
2120l201.3 Page 1 off>
Manual UT EXAMINATION SCAN PLANS e HITACHI Scan Plan Summary #:
16 Code N/A Cat N/A Item Rl.20 GLBB-01 High Stress Weld IGSCCCat Risk Cat Rl.20 - Not subject to Descriptio a Damage Mechanism Previous Data
- "~
Exam Coverage Requirements Exam is lower 1/Jrd t extended 112" on both sides beyond the weld crown width or thickness transitions on the ID, which ever is greater.
Verify all existing Thicknesses with 0° transducer and Contours prior to start of examination component 10 IRR-2001-03'2.'fl5 He.AQeY-System: Reactor Recirc Configuration: -Pipe to Sweep-0-Let Material:
SS Diameter: 16.00 CRC Nom "'t": 1.031 Fresh TsC's ~
Col Blk 1: POI Alt Blk 25609 Ca1Blk2:
Scan Access; Limited Dual Technique: 1/2 V Procedure: GEH-PDl-UT-2 Wave Angle Mode SU Max Size Freq Notes SU 1:
4S0 Shear
.SO 2.2S MHz i SU 2:
60° Shear
.so 10x18 2.2S MHz 2.0 MHz
! SU3:
60° Long SU4:
SU 5:
I I
SU 1 SU2 SU3 SU4 SUS Up Stream "*
On Stream
~~
CW/CCW
- ~.
Scan Sensitivity
(........ ~
,__.,,....._*"~Wold~
- ""'"'8 ~
Set ID roll at 5 to 20% FSH Notes Refer to Procedure for scanning speed, overlap and skew angles.
Electronic Signature.
GE Hitachi Project Level Ill J
Origmol on file.
'-'.-C ~-,, ;v '. -*-*--
Exelon Site Level Ill 49 :,~ oO-.n-13 2/7/2013 12:39:40 PM 1.) Scan as needed with the 60° SU's for complete coverage 2.) Draw fresh T&C's, previous data may be used if field validated 3.) Provide two T&C's, 0° & 90°. Provide dimensions for limitations Complete Examination Datasheets for IRR-2001-04
e HITACHI Examination Summary Sheet Report No.:
c L2R14-027 Site:
LaSalle Unit 2 Component IRR-2001-04 Outage:
L2R14 / 3rd Int znd Per Configuratio Ring Header to Sweep-0-Let
"'-,...,~
System:
AHA ~g.
ASME Cat:
R-A ASME Item:
Rl.20 Aug.
N/A Exams Data Cal Procedure Calibration Block Examination I Oper.
Cert Level:
Performed:
Sheet Sheet Personnel:
Date:
45°Shear D-053 N/A GEH-PDl-UT-2 V6 POI Alt Blk 25609 Mark Hilborn II 2-20-13 60°Shear D-054 N/A GEH-PDl-UT-2 V6 PDI Alt Blk 25609 Patrick Mahoney II 2-20-13 60° RL D-058 N/A GEH-PDl-UT-2 V6 POI Alt Blk 25609 Patrick Mahoney II 2-20-13 Examination Results:
This component was examined with PDI approved procedures, equipment and personnel were utilized in accordance with Section XI of the American Society of Mechanical Engineers Code 2001 Edition with /03 Addenda, Appendix VIII as modified by the Performance Demonstration Initiative (PDI) program description for execution of this examination.
In accordance with GEH-ADM-1062, GEH developed from previous data, scan plans with the required information (examination volume requirements) at a minimum. LaSalle County Station NOES personnel reviewed and approved scan plans. Based on previous T&C's, the scan pion directed the use of {.501" dio.. 45° shear wove with 60° shear wave search units as o contingency for limited access areas. This weld was found to be acceptable with no recordable indications.
Limitation Details - Ring Header to Sweep-o-let presents limitations in the crotch areas of the weld. These areas were examined with an additional 60° RL search unit This resulted in an aggregate coverage of 85.3%.
c The examination results were compared with data report D-153A from L2R07 outage with
~No Change These examinations were performed under Work Order:
01428188 Ochange This summary and the following data sheets have been reviewed and accepted by the following personnel:
Pr~~
~.z./t.*/I'!> _,/ -
'IA, CJ 0 Iii ".l*'.l~*I~
RWP: 10013933 Dose:
254 mr.
e e Oat;; 71/l '~
or,Ji
/J
,, Jr--/\\
~ J. '-1 t 3 ANll Reviewed By/
/Dote I Page_l _ of _ 8_
._HITACHI 11 Wall Thickness 11 Site:
LaSalle Unit
~
I Report No.:
Profile Sheet Project L2R14 3rd Interval/2nd Period I
L2R14-027 System:
RR I
~
~ ~
Component ID Number:
IRR-2001-04
[))
Position I o*
I 90° I iso* I 270° I 1
2 3
4 5
0.85" NIA 0.84" NIA I 1.03" I NIA I 1.20 I NIA I
~1N~
UeAP~
NIA NIA I NIA I I NIA I I NIA I Do rn NIA Crown Height FLUSH NIA Crown Width:
1.0" I
Ring_ Header NIA I UPST Component Nominal Diameter:
16.0"
~~
Weld Length:
48.0
NIA I
0° = OSR of dnst elbow 4Ss (J>~ '°... <t.
~ LO\\JJ lRR-LDDl*O'I --
?~Ukk """"'"'
H 2/20/2013 -~J..,) ;;;::, -b __.-~~
fz./.f/
Initials:
Drown by:
Level:
Dote:
GE Revie~~~____:-:: Level:
Dote:
[fJ I
\\i/
FLOW_.
Swe.es>
0- L.E:;T
~
[fil Sweeo-o-let DNST Component Poge l of g
HITACHI System:
Position 1
2 I
3 I
4 I
5 I
?fVl Initials:
RR o*
90° NIA 0.87' NIA 0.87' NIA 1.0" NIA NIA NIA NIA Patrick Mahoney Drawn by:
I 180° 270° NIA NIA ~
NIA qoo f?rNiq HEAPt!I!
l1 2/20/2013 Level:
Date:
Wall Thickness Profile Sheet Site:
Project La Solle L2R14 Unit
~
Report No.:
3rd /n_terva/Rnd Period I
~
~ ~
LlJ Component ID Number:
IRR-2001-04 Crown Height Crown Width:
Nominal Diameter:
Weld Length:
FLUSH 1.0
16.0" 48.0" 4S0 DJ Ring Header UPST Component 0° = OSR of dnst elbow
~
r--\\-
__ _J.*'
\\ I v
FLOW -
IRR-1.c:ot-OL\\
G~~~~~~;I~
121 I
rn FLOW--
I I
/
/
s (J.)E.. p 0... \\,..... '\\
~
Sweep-o-let DNST Component Page
~ of 0
LaSalle
_______ Unit:
02 MENT7 Coverage Summary Form Date:
02/20/2013 REPORT NUMBER:
L2R14-027 omponent I EPN:
IRR-2001-Q4 System:
Page ER-AAJiS-010 Revision 4 4
___ of 8
Reactor Recirc onfiguration:
Ring Header (Pipe) to Sweep-0-Let Diameter:
16" Thickness:
_1_._0_" ________ _
Descriotion of Restricted I Limitation:
Limitation due to confiauration at 90 and 270 Dearees caused bv the crotch area of the sweeo-o-let.
48.0" Lenath (Circumference) ~ Measured D Calculated (0.D. Diameter x Pi Number of Angles Utilized See Comments Percent% Coverage Obtained I 85.3% I (Upstream+ Dnstream, etc.) I #of Scans ial Upstream O & 180 (AU1) 6.3 TV 19.0 (L) x 1.0
~) x 0.33 (T) 0.0 R
0.0 (L) x 0.0
~) x 0.0 (T) ial Downstream O & 180 (AD1) 8.9 TV 19.0 (L) x 1.03"
~) x 0.45 (T) 0.0 ial Upstream 90 & 270 (AU2) 11.0 TV 29.0 (L) x 1.05
~) x 0.36 (T) o.o ial Downstream 90 & 270 (AD2) 11.3 TV 29.0 (L) x 1.0
~) x 0.39_ (T) 11.3 ire Facing Clockwise (CW) 100
% Coverage No restrictions to circumferential scanning
- Circ Facing Counter Clockwise (CCW) 100
% Coverage No restrictions to circumferential scanning otal examination all axial scans R
QQ__(L) x 0.0
~) x ___Q;Q R
QQ__(L) x 0.0
~) x ___Q;Q R
29.0 (L) x
!:Q_ ~) x 0.39 100%
Axial Upstream 44.1 % Axial Dnstream
§.:.L_(AU1) +
11.0 (AU2)
= 17.3 (TV) -
0.0 (R) = 17.3 (A) I 17.3 8.9 (AD1) +
11.3 (AD2) = 20.2 (TV) -
11.3 (R) = 8.9 (A) I 20.2 (T)
(T)
(T)
(TV) x 100 =
100 (TV) x 100
=
44.1
!Comments: Examination was performed utilizing a 45 and 60 shear for axial coverage and 45 shear for circumferential coverage. Based on the coverage plots, the 45 shear did not dd any additional axial coverage and therefore was not utilized for this calculation. Limitation was due to the configuration and caused single sided access for the axial xamination only. Dual coverage was obtained from 19.25" CW to 28.75" CW (9.5") and 43.25" CW to 4.75"CW (9.5"). Due to the change in OD configuration separate calculations
- ere performed to determine the total volume using page 2 for the dimensions to calculate for the volume with dual sided coverage and page 3 for the dimensions for single sided
~~
NII:
Date:
J*:l'5-\\'"~
-~-'\\'"'"'.......
-. 1=1 v' ><IC"'" -
~
Date: {;-/'J-5//3
-~ -
Date: 113-01.f.o1
I
~
I Ultrasonic Calibration and E><amination Record HITACHI Manual Piping USN-60 SW Site/Unit Report Number:
L2R14-027 LaSalle/2 Doto Sheet Number:
D-053 Outage:
L2R14 3rd Interval/2nd Period Li neority Sheet:
L-001 Calibration Data for Block:
25609 Procedure:
GEH-PDl-UT-2 SS Flat 0.5"-2.0" Calibration Col Time I Ver I Rev:
§ ORR:
t:!Ld Material Size Thick Initial Col: i 1356 I
Search Unit Data Ultrag_el II 10325 Col Check J 1542 Couplont:
Couplont botch KBA 010HD8 0.5LRound 279268 74°F Col Check:
t:!Ld Manufacturer:
Serial Number Size/Shope:
Thermometer S/N Col Temp.
Final Col:
1706 0.4in.
45° 46° Incident Point:
Nominal Angle:
Measured Angle:
DAC Construction 2.2SMHz CompG Shear Scan Direction Ax Frequency:
Style:
Mode:
Elements:
Col Reflector 1"/D Notch Search Unit Cable Signal Amplitude:
80%
RG-174
§'.
Q Signal Sweep:
4.9Div Coble Type:
Length:
Connectors:
Signal dB:
15.0dB Sweep 0-10 =
3.000in Metal Path Instrument Settings Calibration Verification GEIT l USN 60 SW 0229PO Field Simulator Block S/N:
Manufacturer/Model:
Serial Number:
CAL-RHOM-080 Reflector FSDH NIA 5.86221J.S 0.1205 in./IJ.sec.
Sg_uare Amplitude 80%
NIA Probe Deloy:
Velocity:
Pulser Type:
GoinldBI 27.0 NIA 450 Fullwave 3.000in Auto High Sweep (SDI 3.6 NIA Voltage:
Rectification:
Range:
PRF:
Acceptable Linearity performed :
211/2013 5000hms 0%
2.25MHz 220 Damping:
Reject:
Frequency:
Pulse Width:
Exam Data for Weld:
IRR-2001-04 Ring_ Header to Sweep-o-let Exam Comments I Limitations:
Configuration:
Exams performed to maintain 596 to 2096 ID roll.
Circ exams performed on both sides of base material and on weld crown with OD 85°F 279268 skew angles to examine the additional required exam volume No recordable indications.
Exam Surface:
Exam Temp.
Exam Thermometer No counterbore detected.
Dual side coverage achieved from 19.25" to 28.75" and 43.25" to 4.75"".
Axial UPST I Scan dB Recordable Exam Circ DNST Indications Angle AX UPST I 32 NRI 46° C/RC UPST I 32 I
NRI I 46° CIRC DNST I 32 I NRI I 46° Exam Start Exam End:
Ax DNST I 32 NRI 46° 1543 1610
~ Mark Hilborn lll.
GE~ ~~3 Initials:
Examiner:
Level:
Level:
Dote:
t:!Ld t:!Ld Initials:
Examiner 2:
Level:
Initial Col/Exam Dote:
212012013 Page 5 of 8
HITACHI Site/Unit:
LaSalle I 2 Outage:
L2R14 Ultrasonic Calibration and Examination Record I
Manual Piping USN-60 SW Report Number:
L2Rl4-027 Doto Sheet Number:
0-054 3rd Interval/2nd Period Calibration Data for Block:
SS Flat 0.5"-2.0" Calibration Col Time Material Size Thick Initial Col:
Ultraqel II 10325 Col Check Couplont Couplont botch 279268 74°F Col Check:
Thermometer SIN Col Temp.
Final Col:
DAC Construction Scan Direction Ax Col Reflector Signal Amplitude:
Signal Sweep:
Signal dB:
1"10 Notch 80%
4.8Div 29.5dB Sweep 0-10 =
4.000 in Metal Path Calibration Verification 1359 1611 NIA 1659 Field Simulator Block S/N:
CAL-RHOM-080 Reflector FSDH NIA Amplitude 80%
!:!M Goin (dBi 31.0 NIA Sweep (SDI 3.6 NIA Acceptable Linearity performed :
211/2013 Exam Data for Weld:
IRR-2001-04 Ring Header to Sweep-o-let Configuration:
279268 OD Exam Surface:
85°F Exam Temp.
Exam Thermometer Axial Circ UPST DNST
~ Patrick Mahoney Initials:
Examiner:
Initials:
Examiner 2:
Scan dB Recordable Exam Indications Angle NRI 59° I
NRI 59° NIA NIA
!l.
Level:
!:!M Level:
I Initial Col/Ex_o_m_D_o_te_: ___ 2_12012_0_1_3 ___ _
Linearity Sheet:
L-001 GEH-PDl-UT-2
~
Procedure:
Ver I Rev:
§ ORR:
_f:!M
_J\\ __
Search Unit Data K8A OOL2K8 0.5LRound Manufacturer:
Serial Number Size/Shope:
0.45in.
60° 59° Incident Point Nominal Angle:
Measured Angle:
2.25MHz CompG Shear Frequency:
Style:
Mode:
Elements:
Search Unit Cable
§'.
Q RG-174 Coble Type:
Length:
Connectors:
8.7662 us Probe Deloy:
450 Voltage:
5000hms Damping:
Instrument Settings GEIT I USN 60 SW Manufacturer/Model:
0.1233 in./usec.
Velocity:
Full wave 4.000in Rectification:
Range:
0%
2.25MHz Reject:
Frequency:
0229PO Serial Number:
Square Pulser Type:
Auto High PRF:
220 Pulse Width:
Exam Comments I Limitations:
Exams performed to maintain 5% to ZO% ID roll.
60° exam performed to obtain coverage of the required exam volume.
Na counterbore detected.
Dual side coverage achieved from 19.Z5" to ZB.75" and 43.Z5" to 4.75"".
Exam Start Exam End:
--:nr-
'J-~l Level:
Dote:
Page {p of 8
HITACHI Ultrasonic Calibration and Examination Record Manual Piping USN-60 SW Site/Unit LaSalle I 2 I
Outogeo LZR14 Calibration Data for Block:
3rd Interval/2nd Period Procedure:
Report Number:
Data Sheet Number:
Linearity Sheet GEH-PDl-UT-2 L2R14-027 D-055 L-001 I
I SS Flat 0.5"-2.0
Calibration Cal Time Material Size Thick Initial Cal:
1404 Ultragelll 10325 Cal Check:
1625 Couplant Couplant batch 279268 74°F Cal Check:
!:lM Thermometer S/N Cal Temp.
Final Cal:
1658 DAC Construction Scan Direction Ax Cal Reflector 1"1D Notch Signal Amplitude:
80%
Signal Sweep:
5.0Div Signal dB:
54.0d8 Sweep 0-10=
4.000in Metal Path Calibration Verification Field Simulator Block S/N:
CAL-RHOM-0 80 Reflector FSDH
!:lM Amplitude 90%
!:lM Gain (dB) 49 NIA Sweep (SD) 3.6 NIA Acceptable Linearity performed :
211/2013 Exam Data for Weld:
IRR-2001-04 Rmg Header to Sweep-a-let Configuration:
279268 I
OD Exam Surface:
85°F Exam Temp.
Exam Thermometer Axial UPST Scan dB I Recordable Exam Circ DNST Indications, Angle AX UPST 60 NRI I 60°
!:lM
!:lM
!:lM NIA
!:lM NIA
!:lM
!:lM I
!:lM
!:lM NIA I
I I
Ver I Rev:
§ DRR: !:lM
~
Search Unit Data RTD 04-304 Manufacturer:
Serial Number 0.Sin.
60° Incident Point Nominal Angle:
2.0MHz 60°TRL2-Aust Long.
Frequency:
Style:
Mode:
Search Unit Cable RG-174 Cable Type:
§'.
Length:
Instrument Settings GEIT I USN 60 SW Manufacturer/Model:
9.89us 0.232 in./µsec.
Probe Delay:
Velocity:
450 Fullwave 4.000in Voltage:
Rectification:
Range:
5000hms
()0.;6 2.0MHz 2(10x18/mm{.Rect.
Size/Shape:
60° Measured Angle:
~
Elements:
Q Connectors:
0229PO Serial Number:
Square Pulser Type:
Auto High PRF:
250 Damping:
Reject:
Frequency:
Pulse Width:
Exam Comments I Limitations:
Exams performed to maintain 596 to 2096 noise level.
No recordable indications.
Utilized 60°RL examination due to single side access in areas of obstruction only.
No counterbore detected.
Exom Stort 1626 Exam End:
rrfl\\
Patrick Mahone't,
!1
~~{
?
/"'
t
~f;n/_1-;
Initials:
Examiner:
Level:
GE Reviewed By.IQ Date:
NIA NIA Initials:
Examiner 2:
Level:
Initial Cal/Exam Date:
2120{.2013 p age (
ofe
Manual UT EXAMINATION SCAN PLANS fti HITACHI Scan Plan Summary#:
17 Component ID IRR-2001-04 Code N/A System: Reactor Recirc Configuration:
Pipe to Sweep-0-Let Cat N/A Material:
SS Diameter:
16.00 Nom "t": 1.031 Item Rl.20 CRC
~ _,
Fresh T'sC's
.;j GLBB-01 High Stress Col Blk 1: POI Alt Blk 25609 Cal Blk2:
Scan Access: Limited Dual Technique: 1/2 V Weld IGSCCCat Risk Cat Rl.20 - Not subject to Descriptio a Damage Mechanism Previous Data Exam Coverage Requirements Exam is lower 1/3rd t extended lie on both sides beyond the weld crown width or thickness transitions on the
' SU 1:
SU2:
SU3:
SU4:
Procedure:
Wave Angle Mode 45° Shear 60° Shear 60° Long GEH-PDl-UT-2 SU Max Size Freq Notes
.50 2.25 MHz
.50 2.25 MHz 10x18 2.0 MHz ID. which ever is greater.
l SUS:
I SU 2 SU3 SU4 SUS SU 1 Verify all existing Thicknesses with 0° transducer and Contours prior to start of examination I i I
Up Stream On Stream CW/CCW
(......... ~
,....-,_...,-*""'-=-~
T
~
I
- ~~o l_J_
H~
111' lll" Electronic Signature Original on file.
GE Hitachi Project Level Ill Exelon Site Level Ill 2/7/2013 12:39:40 PM J...:Sv~
"\\;,_ -**--
1=0! o.g~
I Scan Sensitivity Set ID roll at 5 to 20% FSH Notes Refer to Procedure for scanning speed, overlap and skew angles.
1.) Scan as needed with the 60° SU's for complete coverage 2.) Drow fresh T&.C's, previous data may be used if field validated 3.) Provide two T&.C's, 0° & 90°. Provide dimensions for limitations Follow-up Examination Datasheets IMS-2044-13
HITACHI EXAMINATION
SUMMARY
SHEET Site:
Outage:
System:
LaSalle L2R13 MS ASME Cot:
Exams Performed Doto Col Sheet Procedure Sheet 70° Shear D-036 N/A GEH-POl-UT-1Ver/Rev7 45" Shear D-035 N/A GEH-PDl-UT-1Ver/Rev7 Examination Results:
component tD:
IMS-2~13 PIPE-VALVE ASME Item:
~
Aug Req:
Calibration Block Exom/Oper.
Personnel CAL-PDl-001 Troy Huhe CAL-PDl-001 Troy Huhe Report No; l2R13-024 Cert Level Dote II 2/20/2011 II 2/20/2011 This exam was performed in accordance with Section XI of the American Society of Mechonicol Engineers Cade 2001 Edition with/03 Addenda, Appendix VIII as modified by the Performance Demonstration Initiative (POii program description.
In accordance with GEH-ADM-1062, GEH developed from previous data, scans plans with the required information (examination volume requirements! ot o minimum. LaSalle County Station NOES personnel reviewed and approved scan plans. Based on previous T&C's, the scan pion directed the use of 45° & 70° shear wove search units. Deviation from the scan pion was allowed with regords to search unit size. A smaner diometer size, within procedure limits wos used to gain as much coverage as feasible. GEH Project Level Ill gave concurrence. This weld was found to be acceptable with no recordable indications.
10096 of the ASME Code required coverage was obtained.
Examination results were compared to Doto Report:
LZRlZ-047 from L2Rl2 These examinations were performed under Work Order:
This Summary on the following data sheets hove been reviewed and accepted by the following personnel:
__ ~
r.ij./f -A"'\\ ~1All-
-2*.:>.H\\
llb-l¥t---- au ANll Review:
Date:
0 Change
~No Change RWP:
10011722 Dose:
mr.
Page l of
~
HITACHI Site/Unit LaSalle/ 2 Outage:
L2Rl3 Calibration Data for Block:
CAL-POl-001 cs Material Ultrugel II Couplont mlit Thermometer SIN Scon Direction Cal Reflector Signal Amplitude:
Signal Sweep:
Signal dB:
fJ!11 o.s-ur Calibration Size Thick Initial Cal:
JOlZSG Col Check:
Cauplant batch 82*F Cal Check:
Cal Temp.
Final Cot OAC Construction Ale 1.5" ID Notch 80%
7.0Div
--~-
7.9dif ~.-
Sweep 0-10 =
3.000 In Metal Path Calibration Verification Ultrasonic Calibration and Examination Record Manual Piping and Components Cal Time
~
0914 tJIA 1021 Report Number:
Doto Sheet Number:
Linearity Sheet Procedure:
GEH-POl-UT-1 Ver I Rev: l ORR:
10-21 Search Unit Data KBA
~
Manufacturer:
Serial Number O.l5in.
45*
Incident Point Nominal Angle:
l2R13-024 D-035
~
0.375"£Rounst.
Size/Shope:
~
Measured Angle:
~ COme-G Shear Frequency:
Style:
Mode:
Elements:
Search Unit Cable RG-J74 Coble Type:
f Length:
Instrument Settings Punametrlcs l Epoch 4 Monufocturer/Model:
- 9.
Connectors:
Field Simulator Block S/N:
CAl-RHOH-030 031539906 Serial Number:
Reflector fWl.
Amplitude
~
GoinldBI 7.9 Sweep(SDI u
5.575us Zero:
0.1272 ip/usec.
Velocity:
~
Fullwave Rep Rote:
Rectificotion:
3.000/n Range:
Acceptable Linearity performed :
2/l0(20ll 4000hms Damping:
0%
Reject 2.0HHz Frequency:
Exam Dato for Weld: IHS-2044-13 PIPE-VALVE Configuration:
!H!.f.
Exam Surface:
Exam Temp.
~
Exam Thermometer Axial UPST Scan dB Recordable Exam Circ DNST Indications Angle Alcial UPST 25 HRI
~
Circ UPST 25 HRI
~
~
!!M tJIA tJIA t!8 tJIA tJIA tJIA TroyHuhe Initials:
Examiner:
Levet
.tJ.IL Initials:
Examiner 2:
Level:
jw~~
GE Reviewe~1i",
Utility Review:
Exam End:
~- z.zz.11 Level:
Dote:
-~3-\\'
Dote:
~ll 0.8 -3.0HHz Narrowband Filter.
Sq./HaK Pulser/Energy:
elf Mode:
Initial Col/Exam Dote:
2/20/20ll
-4~~*
(j}l_
ANIJ Review.
Dote:
Page !
of!
---=--
Ultrasonic Calibration and Examination Record HITACHI Manual Piping and Components Site/Unit Report Number:
L2Rll-024 LaSalle{.2 Doto Sheet Number:
0-036 Outage: ~
linearity Sheet l-006 Calibration Dato for Block:
CAL-PDl-001 Procedure:
GEH-PDl-UT-1 cs Flat ~
Calibration Col Time Ver I Rev: z ORR:
10-21 Material Size Thick Initial Col:
0857 Search Unit Data Ultragel ll
~ Col Check: gm Couplont Couplont batch KBA
~
0.375"£Round
~
82°F Col Check:
!iM Manufacturer:
Serial Number Size/Shope:
Thermometer S/N Col Temp.
Final Cat
~
O.l5in.
7<r IQ:
Incident Point Nominal Angle:
Measured Angle:
DAC Construction 2.2SHHz Como-G
~
Scan Direction All Frequency:
Style:
Mode:
Elements:
Col Reflector l.5" Metul Path Search Unit Cable Signal Amplitude:
~
RG-174
§'.
Q Signal Sweep:
7.2Div Coble Type:
Length:
Connectors:
Signal dB:
34.4d8 Sweep 0-10=
6.000in Metal fp_th Instrument Settings Calibration Verification Panametrlcs£Eoach 4 031539906 Field Simulator Block S/N:
Manufacturer/Model:
serial Number:
CAL-RHOH-030 7.3l5us 0.1306 lnlusec.
0.8-3.0HHz Reflector NSDH
!iM Amplitude
!iM Zero:
Velocity.
Norrowbond Filter:
40%
GoinldBI
~
!iM
&!!2 fYl!S:!!
6.000in
~.£MaK Sweep ISO) 2.2
!iM Rep Rote:
Rectification:
Range:
Pulser/Energy:
Acceptable Linearity performed :
2/JOQQll 4000hms
~
2.0MHz M
Damping:
Reject Frequency:
Mode:
Exam Dato for Weld: IHS-2044-ll Plf.E - VALVE Exam Comments l limitations:
Configuration:
Exams performed at reference sensitivity to maintain 596 to 2096 to roll.
OD BO"F 273543 No recordable indications.
Exam Surface:
Exam Temp.
E><om Thermometer Supplemental 10* Shear examination due to single side access.
No exam performed from ONST side due to component configuration.
No counterbore detected.
A>ciol UPST ScondB Recordable Exam Increased exam volume due to RI-ISi requirements. See Circ DNST Indications Angle attached coverage plot
&sl!l!.
UPST 34.4 NRI 10*
!JM
!iM
!J1d
!iM
!iM
!iM
!iM
!J1d Exam Stort 0937 Exam End:
0954
!JM
!iM
!J1d
!iM
- c~
TroJi:'.HUhe
!l.
G~ 4'- f *22*11 Initials:
E><aminer:
Level:
Level:
Dote:
-~I.A_
-4"'\\ 4lSLnr ~
a-.23.:!l lnitiols:
E><ominer 2:
Level:
Utihty Review:
U1A -
Dote:
_0)_2bn Initial CoVE><om Dote; Y19fl.Oll ANfl Review:
Dote:
Page 1 of~
...,...~
TroyHuhe Drown by:
~
ll 2/20(2011 Level:
Dote:
FIA:a ~
~~*.,
- ..'> 4-
~o
\\
~
e-~~11 l..°1.-~Jil"
!!"'l ANu-. llilt
~II Page
~ of ~
LaSalle L2R13 Manual UT EXAMINATION SCAN PLANS HITACHI Scan Plan Summary #:
8 Component ID IMS-2044-13 System: Main Steam Configuration:
Pipe to Valve Code RISK Material:
CS Diameter: 18.00 Nom t": 0.938 Cat Item GL88-0l High Stress R-A Rl.20 0
0 Col 8lk 1:
CRC 0 Fresh rsc*s ~
Scan Access: Single Technique: 1/2 V Weld Procedure: G EH-PDl-UT-1 IGSCCCat Risk Cat Rl.20 - Not subject Description to a Damage Mechanism Previous Data
~
EHam Coverage Requirements Lower 1/3rd T extended beyond weld toes and or counterbore as per drawing below Verify all existing Thicknesses _Contours prior to start of examination A
1-1 111~
Wove Angle Mode SU 1:
70 Shear SU 2:
45 Shear SU 3:
SU4:
SU 5:
SU 1 Up Stream
~
On Stream 0 CW/CCW 0
EnmlaatJaa \\I._ flor..P.1.PIDI Wcldl NI'S 4*Aaa Larpr, waa ffo M*rllmDllM Hal l..,DlklnlUDed Electtonic Signawre.
SU Mox Size Freq Notes SU2
~
0
~
.50" 2.25 MHz
.50" 2.25 MHz SU3 SU4 SUS 0
0 0
D 0
D 0
0 D
Scan Sensitivity Set ID roll at 5 to 20% FSH Notes Refer to Procedure for scanning speed, overlap and skew angles.
1.) Exam volume will increased since last exam if there is counterbore or any transition in thickness.
2.)
GE Hitachi Project Level Ill Jws~maianrue.
Exelon Site Level Ill 4 "4 I\\
- oL.. Ji[;,,.S*!I J.) Document with measurements, all limitations 2/8/201111:42:58 AM