Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service ListsML22102A275 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle, 07201036, 07100008, 07200078, 07200077 ![Constellation icon.png](/w/images/b/be/Constellation_icon.png) |
---|
Issue date: |
04/12/2022 |
---|
From: |
Simpson P Constellation Energy Generation |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
---|
References |
---|
RS-22-051 |
Download: ML22102A275 (6) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle, 07201036, 07100008, 07200078, 07200077 |
---|
Category:Letter type:RS
MONTHYEARRS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-126, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-592023-11-29029 November 2023 Amendment No. 15 to Indemnity Agreement No. B-59 RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments2023-11-0808 November 2023 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 2024-01-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Nine Mile Point]] OR [[:Byron]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Limerick]] OR [[:Ginna]] OR [[:Clinton]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:07201036]] OR [[:07100008]] OR [[:07200078]] OR [[:07200077]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Nine Mile Point]] OR [[:Byron]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Limerick]] OR [[:Ginna]] OR [[:Clinton]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] OR [[:07201036]] OR [[:07100008]] OR [[:07200078]] OR [[:07200077]] </code>. |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-22-051 April 12, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457, and 72-73 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454, STN 50-455, and 72-68 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Independent Spent Fuel Storage Installation Materials License No. SNM-2505 NRC Docket No. 72-08 and 72-78 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket Nos. 50-461 and 72-1046 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-10, 50-237, 50-249, and 72-37 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket Nos. 50-333 and 72-12 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373, 50-374, and 72-70
April 12, 2022 U.S. Nuclear Regulatory Commission Page 2 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352, 50-353, and 72-65 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220, 50-410, and 72-1036 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-12 Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171, 50-277, 50-278, and 72-29 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket Nos. 50-244 and 72-67 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 and 72-77 Exelon Generation Company, LLC 10 CFR 71 - Packaging and Transportation of Radioactive Material NRC Docket No.71-008
Subject:
Update to Correspondence Addressees and Service Lists
References:
- 1. Letter from P. R. Simpson (Constellation Energy Generation, LLC) to U.S.
NRC, "Update to Correspondence Addresses and Service Lists," dated February 16, 2022
- 2. Letter from P. R. Simpson (Constellation Energy Generation, LLC) to U.S.
NRC, "Request to Transfer 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages under the common Exelon Quality Assurance Program Approval No. 71-0008, to the common Constellation Quality Assurance Program Approval No. 71-0008," dated February 9, 2022 Constellation Energy Generation, LLC (CEG) is providing an updated correspondence addressee and service list. The CEG correspondence addressees were last provided in Reference 1. As discussed in Reference 1, a request to revise the 10 CFR Part 71 Quality
April 12, 2022 U.S. Nuclear Regulatory Commission Page 3 Assurance Program Approval No. 0008 to reflect the transfer from EGC to CEG was submitted in Reference 2.
As stated in previous updates, CEG requests that copies of correspondence pertaining to individual nuclear sites be addressed to Mr. David P. Rhoades (Senior Vice President, Constellation Energy Generation, LLC, President and Chief Nuclear Officer, Constellation Nuclear).
CEG requests that copies of correspondence pertaining to individual nuclear sites addressed to Mr. David P. Rhoades (Senior Vice President, Constellation Energy Generation, LLC, President and Chief Nuclear Officer, Constellation Nuclear) that contain sensitive, proprietary, or other types of items that are not transmitted via the normal electronic distribution process, be sent to the appropriate Director Licensing as found in Table 1 below.
Table 1: Address for Director of Licensing and Regulatory Affairs for Each CEG Nuclear Site Nuclear Site Director Licensing Braidwood Station, Units 1 and 2 Byron Station, Units 1 and 2 Clinton Power Station, Unit 1 Director Licensing Dresden Nuclear Power Station, Constellation Energy Generation, LLC Units 1, 2, and 3 4300 Winfield Road Warrenville, IL 60555 LaSalle County Station, Units 1 and 2 Quad Cities Nuclear Power Station, Units 1 and 2 Limerick Generating Station, Units 1 and 2 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Director Licensing Three Mile Island Nuclear Station, Unit 1 Constellation Energy Generation, LLC Calvert Cliffs Nuclear Power Plant, 200 Exelon Way, KSA-3E Units 1 and 2 Kennett Square, PA 19348 R.E. Ginna Nuclear Power Plant Nine Mile Point Nuclear Station, Units 1 and 2 James A. FitzPatrick Nuclear Power Plant Please ensure that these changes are forwarded to the appropriate NRC Regional offices as well.
April 12, 2022 U.S. Nuclear Regulatory Commission Page 4 There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact me at (630) 657-2823.
Respectfully, Patrick R. Simpson Sr. Manager Licensing Constellation Energy Generation, LLC
Attachment:
Correspondence Addressee and Service List Update cc: NRC Region I, Regional Administrator NRC Region III, Regional Administrator NRC Project Manager - Braidwood Station NRC Project Manager - Byron Station NRC Project Manager - Calvert Cliffs Nuclear Power Plant NRC Project Manager - Clinton Power Station NRC Project Manager - Dresden Nuclear Power Station, Unit 1 NRC Project Manager - Dresden Nuclear Power Station, Units 2 and 3 NRC Project Manager - James A. FitzPatrick Nuclear Power Plant NRC Project Manager - LaSalle County Station NRC Project Manager - Limerick Generating Station NRC Project Manager - Nine Mile Point Nuclear Station NRC Project Manager - Peach Bottom Atomic Power Station, Unit 1 NRC Project Manager - Peach Bottom Atomic Power Station, Units 2 and 3 NRC Project Manager - Quad Cities Nuclear Power Station NRC Project Manager - R. E. Ginna Nuclear Power Plant NRC Project Manager - Three Mile Island Nuclear Station, Unit 1
ATTACHMENT Correspondence Addressee and Service List Update Constellation Energy Generation, LLC Corporate Offices Mr. David P. Rhoades Senior Vice President, Constellation Energy Generation, LLC, President and Chief Nuclear Officer, Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555 David.Rhoades@constellation.com Chief Operating Officer, Fleet Operations, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Midwest Operations, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Northeast Operations, Constellation Energy Generation, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Senior Vice President, Mid-Atlantic Operations, Constellation Energy Generation, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Senior Vice President, Engineering and Technical Services, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Fleet Services, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Governance and Oversight, Constellation Energy Generation, LLC 200 Exelon Way, KSA-3N Kennett Square, PA 19348 Vice President, Strategy and Growth, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Nuclear Security and Licensing, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Fleet Support, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Page 1
ATTACHMENT Correspondence Addressee and Service List Update Associate General Counsel, Constellation Energy Generation, LLC 101 Constitution Ave NW Suite 400E Washington, DC 20001 Assistant General Counsel, Constellation Energy Generation, LLC 4300 Winfield Road Warrenville, IL 60555 Assistant General Counsel, Constellation Energy Generation, LLC 200 Exelon Way, Suite 305 Kennett Square, PA 19348 Page 2