 Issue dateTitleTopic
ML24222A6779 August 2024Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License ConditionSafe Shutdown
High winds
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis24 July 2023Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces AnalysisSafe Shutdown
Finite Element Analysis
Aging Management
RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage12 October 2022Response to Request for Additional Information License Amendments Related to Fuel StorageGNF3
RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical17 June 2022Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical
RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs3 March 2022Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs
RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated23 February 2022Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PSurveillance Frequency Control Program
NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2 February 2022Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
VT-2
Foreign Material Exclusion
Stress corrosion cracking
Through-Wall Leakage
JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments16 September 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel19 August 2021Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 DieselWater Inventory Control
Recently irradiated fuel
Offsite Circuit
RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)17 August 2021Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)
NMP2L2773, Company - Response to Request for Additional Information30 June 2021Company - Response to Request for Additional InformationBoric Acid
JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments11 June 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.10 May 2021Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.Safe Shutdown
JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting20 April 2021Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting
RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)16 April 2021Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)Ultimate heat sink
RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)7 April 2021Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)Ultimate heat sink
RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b31 March 2021Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
Probabilistic Risk Assessment
Offsite Circuit
Siren
Loss of condenser vacuum
RS-21-027, Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.6521 February 2021Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65Fitness for Duty
ML21022A13022 January 2021Response to Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69Safe Shutdown
Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)29 October 2020Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)Internal Flooding
Probabilistic Risk Assessment
FLEX
Significance Determination Process
Large early release frequency
Maintenance Rule Program
Hardened vent
Offsite Circuit
Very Early Warning Fire Detection
RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.6916 October 2020Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69Safe Shutdown
Mission time
Probabilistic Risk Assessment
Squib
Incorporated by reference
Seismically rugged
Large early release frequency
Earthquake
Failure to Scram
RS-20-104, Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink11 September 2020Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat SinkSafe Shutdown
Ultimate heat sink
RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5683 September 2020Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568
NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-87916 October 2019Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879Boric Acid
Nondestructive Examination
Affidavit
JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8804 June 2019Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880
NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants1 May 2019Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants
RS-19-052, Supplement to the Response to Request for Additional Information Regarding License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High ..24 April 2019Supplement to the Response to Request for Additional Information Regarding License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High ..
RS-19-019, Response to Request for Additional Information Regarding Relief Request 13R-152 April 2019Response to Request for Additional Information Regarding Relief Request 13R-15
JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8808 January 2019Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880Commercial Grade Dedication
Nondestructive Examination
RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements29 November 2018Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing RequirementsSafe Shutdown
Fitness for Duty
Health Physics Network
Nuclear Accident Reporting System
Severe Accident Management Guideline
Minimum staff
Potassium iodide
RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.27 July 2018Response to Request for Additional Information and Supplemental Information-License Amendment.Minimum staff
RS-18-086, Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System16 July 2018Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling SystemEarthquake
RS-18-078, Supplemental Information Related to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control18 June 2018Supplemental Information Related to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlWater Inventory Control
RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2 May 2018Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
Authorized possession limits
RS-18-014, Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits25 January 2018Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits
RS-17-147, Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-0110 November 2017Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-01Probabilistic Risk Assessment
FLEX
Large early release frequency
RS-17-146, Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis19 October 2017Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis
RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)8 August 2017Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)Hot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
FLEX
B.5.b
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Integrated leak rate test
Flooding Focused Evaluation
Maintenance Rule Program
RS-17-101, Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis28 July 2017Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis
RS-17-102, Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-0120 July 2017Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-01Mission time
Internal Flooding
Probabilistic Risk Assessment
Maintenance Rule Program
Water hammer
RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)17 July 2017Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography13 March 2017Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyHydrostatic
Nondestructive Examination
Incorporated by reference
Flow Accelerated Corrosion
Dissimilar Metal Weld
RS-17-010, Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval9 February 2017Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval
RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings12 December 2016Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings
RS-16-176, County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ic1 December 2016County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichSafe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 August 2016Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
RS-16-159, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings28 July 2016County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access OpeningsMaintenance Rule Program
RS-16-144, Response to Request for Additional Information on Severe Accident Mitigation Alternatives for License Renewal Environmental Review Dated July 6, 201611 July 2016Response to Request for Additional Information on Severe Accident Mitigation Alternatives for License Renewal Environmental Review Dated July 6, 2016
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public DisclosureSafe Shutdown
High winds
Loop seal
Ultimate heat sink
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
B.5.b
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Fire Watch
Downpower
Siren
Affidavit
Thermography