RC-16-0083, Virgil C. Summer, Unit 1 - Submittal of Final Safety Analysis Report (FSAR) Updated Through May 31, 2016

From kanterella
Jump to navigation Jump to search
Virgil C. Summer, Unit 1 - Submittal of Final Safety Analysis Report (FSAR) Updated Through May 31, 2016
ML16166A053
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/25/2016
From: Lippard G A
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16166A068 List: ... further results
References
RC-16-0083
Download: ML16166A053 (9)


Text

Attachment 3 (CD-ROM) Contains Sensitive Non-Publicly Available

  • information, Withhold in Accordance with 10 CFR 2.390 George A. Lippard, Ill Vice President, Nuclear Operations 803-345-481 0 . ""-SCE&G@ A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir I Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 FINAL SAFETY ANALYSIS REPORT (FSAR) UPDATED THROUGH MAY 31, 2016 May 25, 2016 RC-16-0083 In accordance with 10CFR50.71(e), South Carolina Electric & Gas Company, acting for itself and as agent for South Carolina Public Service Authority, submits one (1) CD-ROM electronic copy of the Final Safety Analysis Report (FSAR) for the Virgil C. Summer Nuclear Station updated through May 31, 2016. The V. C. Summer Updated FSAR CD-ROM is a complete copy in Adobe PDF format generated from the original native master files and scanned hard copy documents.

This FSAR-Update includes:

  • Changes to the FSAR that were made under the provisions of 1 OCFR50.59, but not previously submitted to the Commission.
  • All affected chapter Table of Contents, List of Tables, List of Figures, and List of Effective Pages updated to reflect the current information contained in the FSAR. Technical changes are annotated by a vertical revision bar and the Revision Notice number. Unaffected vertical revision bars and the amendment number changes from prior updates remain unchanged.

The Fire Protection Evaluation Report (FPER) has been achieved as a historical document as a result of the NFPA 805 program implementation.

Therefore, the FPER will not be transmitted as part of this submittal.

Additionally, some FSAR changes (revision notices) were not completed in time for this FSAR update. Once these changes have been completed, another FSAR update will be submitted to the NRC. This issue has been documented in the station's corrective action program as CR-16-02349.

CD-ROM Contains Sensitive Non-Publicly Available Information, Withhold in Accordance with 10 CFR 2.390 V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F (803) 941-9776 Document Control Desk LTD 325, RR 6500 RC-16-0083 Page 2 of 2 If there are any questions, please contact Scarlet Lutz at (803) 345-5640.

I declare under penalty of perjury that the foregoing is true and correct. I Executed On SOL/GAL/ts Attachments:

1) FSAR Revision Notices Incorporated Since the June 1, 2015 Update 2) VCSNS FSAR CD-ROM (2.390) c: (Without CD unless noted below) K. B. Marsh S. A. Byrne J: B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry C. Haney * (w/CD, 2.390) S. A. Williams (w/CD, 2.390) NRC Resident Inspector K. M. Sutton (w/CD, 2.390) NSRC RTS (LTD 325, RR 6500) File (813.12) PRSF (RC-16-0083 w/CD, 2.390)

FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE-EFFECTIVE 05/31/16 APPROVAL RN No DATE SECTIONS BRIEF DESCRIPTION 06-044 2015-06 FSAR Figure 1.2-4 ECR-50579, Reactor Building Sump Debris Collection.

Modifications were made to meet requirements of NRC Generic Letter 2004-02 and certify that the sump screens can accommodate the debris quantities following a LOCA.11-032 2015-10 FSAR Figure 1.2-13 ECR-50798B, Safety Improvements to the Diesel Generating Building.

This change revised FSAR Figure 1.2-13 to remove "air tight" note for hatch DRDB 404/405.12-006 2015-06 FSAR Table 8.3-3 Part A 1 ECR-50537G, Replace Heat Trace Control Panels. FSAR Table 8.3-3 Part A2 This change added heat tracing circuits to panels XPN2022 and XPN2023. This affects FSAR Table 8.3-3 Part B1 Information and loading for XMC1 DA2Y and XMC1 DB2, which is contained in FSAR Table FSAR Table 8.3-3 Part B2 8.3-3.12-020 2016-03 FSAR Figure 1.2-16 ECR-50628, Update FSAR and FPER FSAR Section 9.5 This revision notice updated the FSAR and made the FPER historical in accordance with FPER Whole Document transition from Appendix R to NFPA 805.12-023 2016-02 FSAR Section 1.2 ECR-50791, Relocation of Hydrogen System to Support Independent Spent Fuel Storage FSAR Section 3.5.1.1.3 Installation (ISFSI). FPER Section 4.11.3.1 This change relocated the Hydrogen Supply systems to mitigate a hazard to Spent Fuel FPER Section 4.11.3.2 FPER Section 4.11. 7 .1 Storage *casks travel path. FPER Section 4.11. 7.2 FPER Figure E-023-001 FSAR Figure 1.2-1 12-024 2016-03 FSAR Figure 1.2-1 ECR-50792, Relocation of Underground Utilities to Support ISFSI FSAR Figure 2.4-6 The change relocated and modified underground utilities to accommodate ISFSI: FSAR Figure 9.5-1, Sh 2 1) Fire Service piping and hydrant modifications, and a new B.5.b firewater line to the FPER Figure E-023-001 Monticello Reservoir for a fire pump truck connection; and 2) Storm Water drain piping and catch basin. V. C. Summer Nuclear Station, Unit 1 Page 1of7 FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE -EFFECTIVE 05/31/16 APPROVAL RN No DATE SECTIONS BRIEF DESCRIPTION 12-025 2016-05 FSAR Figure 1.2-1 ECR50794, Constructed ISFSI Haul Path. FSAR Figure 2.4-6 This change constructed the Haul Path that connects the ISFSI, Fuel Handling Building (FHB) FPER E-023-001 and the HI-STORM cask fabrication pad. The haul path is for transporting empty HI-STORM storage casks from the HI-STORM cask fabrication pad to the FHB, and loaded HI-STORM storage casks from the FHB to the ISFSI.12-036 2016-02 FSAR Figure 1.2-1 ECR-50793A and ECR-507931, Provides Design Instructions for the ISFSI Pad FSAR Figure 2.4-6 This change provided construction details for the ISFSI Storage Pad, Approach Slab, and FPER Figure E-023-001 Protected Area fences and gates. The FSAR/FPER revision notice revises ap'plicable FSAR/FPER figures that depict the plant layout to show these major ISFSI features.13-006 2015-10 FSAR Figure 1.2-1 ECR-50853, Installation of Utility Tie-ins for Emergency Response Building (ERB). FSAR Figure 9.5-1, S2 This change provided connections to the existing fire service water line, potable water line and waste water line. A separate Simplex fire control panel was also installed and networked with the Combined Nuclear Operations.

Building and Nuclear Learning Center panels.13-018 2015-11 , FSAR Section 1.2.3.2 ECR-50797, Upgrades for.Used Fuel Storage. FSAR Section 1.2.3. 7 This change described the onsite ISFSI system description and updated the design functions FSAR Section 3.8.4:1.6 of the FHB and the FHB crane. FSAR Section 3.8.4.4.10 FSAR Section 9.1.2 FSAR Section 9.1.4.2 FSAR Section 9.1.4.3.5 FSAR Section 9. 1.5 FSAR Section 9.1.6 FSAR Section 13.1.2.2.1 FSAR Section 13.4.2.1 FSAR Table 3.2-1 V. C. Summer Nuclear Station, Unit 1

  • Page 2 of 7 FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE-EFFECTIVE 05/31/16 APPROVAL RN No DATE SECTIONS BRIEF DESCRIPTION 13-022 2015-06 FSAR Figure 3.8-17 ECR-50579A, GL 2004-02, RB Sump Debris Collection (RB Sump Strainers).

FSAR Section 3A This change updated Chapters 3 and 6 to include updated text and figures for the new FSAR Section 6.2.1.6 recirculation sump design. FSAR Section 6.2.2.2.1.1 FSAR Section 6.2.2.3.1.1 FSAR Section 6.3.2.6 FSAR Section 6.3.2.14 FSAR Section 6.3.6 FSAR Fiaure 6.2-48 13-029 2016-03 FSAR Figure 1.2-1 ECR50793B and ECR50870, ISFSI Electrical Building (EB) and Auxiliary Electrical FSAR Figure 2.4-6 Equipment Building (AEB). FSAR Section 9.4. 7 This change added an ISFSI EB, which houses equipment used for monitoring the FSAR Figure 9.4-35, Sh1 temperature/ventilation of the spent fuel storage casks. This change also added an ISFSI FSAR Figure 9.4-35; Sh2 AEB, which houses a portable diesel generator to supply backup power to the ISFSI EB. FSAR Figure 9.4-36 FPER Fiaure E-023-001 14-004 . 2016-03 FSAR Figure 1.2-12 ECR 51004, Changed Orientation of Two Main Steam Power Operator Valves (MS PORV). This change rotated the actuator assembly for IPV02000-MS and IPV02010-MS to have its hand-wheel ergonomically positioned to improve accessibility for local control at the valve. Additionally, this change installed permanent moveable platforms adjacent to the MS PORVs IPV02010-MS and IPV02020-MS to facilitate accessibility for manual valve control during a FLEX event, if needed.14-018 2016-01 FSAR Section 5.5.7.2.2.4 CR-12-04658, Administrative Correction.

This change corrected FSAR Section 5.5.7.2.2.4, which incorrectly states that the Reactor Pressure Vessel Head (RPVH) "is gradually raised as the water level in the refueling cavity increases." Analysis supports the current \lCSNS practice of performing a "dry" lift in which the RPVH is raised in a single movement disregarding water level in the refueling cavity. V. C. Summer Nuclear Station, Unit 1 Page 3 of 7 FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE-EFFECTIVE 05/31/16 APPROVAL RN No DATE SECTIONS BRIEF DESCRIPTION .14-020 2016-02 FSAR Figure 1.2-5 ECR 51003, FLEX Feed Connections.

FSAR Figure 1.2-12 This change installed a FLEX hose manifold as a diverse means to accomplish several key FSAR Figure 1.2-28 safety functions (core cooling & heat removal, spent fuel cooling and containment integrity)

FSAR Figure 9.1-3 during an Extend Loss of AC Power (ELAP). Storage containers for hoses were also placed FSAR Figure 9.2-2, S2 atstrategic locations in the Intermediate and Auxiliary Buildings.

FSAR Figure 9.2-2, S4 14-022 2016-05 -FSAR Figure 1.2-3 ECR51007, Reactor Coolant System (RCS) Make-up and Boration Piping Modifications.

FSAR Figure 1.2-5 This change modified the Refuel Water Storage Tankvcr5 and Boric Acid Tank piping to add FSAR Figure 6.3-1 new piping with a hose connection for a suction source for a Regional Response Center FSAR Figure 9.1-3 pump or the FLEX RCS Make-up pump. This arrangement will provide a diverse source of FSAR Figure 9.3-16, S3 borated water to the Reactor Coolant System for both inventory and reactivity control during FSAR Figure 9.3-16, S5 an ELAP.14-029 2016-01 FSAR Table 3.9-8 ECR51002, FLEX Water Transfer Connections.

FSAR Figure 9.2-9b This change provided multiple connections and piping between the Condensate Storage FSAR Figure 10.4-16 Tank, Demineralized Water Storage Tank and Filtered Water Storage Tank as part of the NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events.14-039 2016-05 FSAR Figure 8.3-2aa ECR 51006, FLEX Backup Power from Electrical Building.

FSAR Figure 8.3-2ab This change implemented the FLEX alternate power scheme strategies which mitigate an ELAP. These include: 1) Alternate Power Source of Alternate Seal Injection;

2) Alternate Battery Charging for 125VDC Class 1 E Batteries XBA 1 A-ED and XBA 1 B-ED; 3) Alternate Power for the Backup Technical Support center; and 4) Alternate power to Electrical Building 480 VAC Distribution Panel APN04071.14-042 2016-03 FSAR Figure 9.4-25, S1 ECR 50874, Reactor Building Cooling Upgrade (RBCU). FSAR Figure 9.4-25, S2 This change installed new connections to support a new heat sink for the RBCUs. The new Industrial Cooling Water system will increase the heat removal capacity of the RBCUs and will allow for isolation of the existing Industrial Cooling Towers at a later date. V. C. Summer Nuclear Station, Unit 1 Page 4 of 7 FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE -EFFECTIVE 05/31/16 APPROVAL RN No DATE . SECTIONS BRIEF DESCRIPTION 15-007 2016-05 FSAR Table 3.9-8 ECR 508798 and ECR50879, Modifications to the Refuel Water Storage Tank (RWST). FSAR Figure 9.1-3 This change added a riser loop seal to isolate any potential break in the non-safety related FSAR Section 9.1.3.2 section of the Spent Fuel Purification loop. The safety-related riser loop seal prevents drainage of the RWST by only allowing drawdown of tan!< to the low level height equal to the riser height.15-011 2015-07 FSAR Table 6.4-1 CR-14-02981, VCS Unit 1 "Shift Supervisor" Position Title Change to "Shift Manager".

FSAR Section 6.4.1.2.1 This title change was recommended by INPO SOER 96-1, Recommendation

6. FSAR Section 13.1.2.2.1 FSAR Section 13.1.2.3 FSAR Section 13.1.3.1.5 FSAR Section 13.2.1 FSAR Section 13.5.1.3 FSAR Section 13.5.1.3.1 15-012 2015-08 FSAR Table 3.2-1 Correct QAPD title. FSAR Section 13.1.2.2.4 This change corrects the QAPD title in Section 13 and Table 3.2-1 Notes.15-014 2015-08 FSAR Section 9.3 ECR-50682C, Control Rod Drive Mechanism (CROM) Cooling Tower XCI0004 Drawing FSAR Figure 9.4-32 Change. This change added the vent lines on the spray pumps casings shown in FSAR Figure 9.4-32 (Essential Drawing D-302-852).15-015 2016-05 FSAR Figure 8.2-2 ECR508648, Replace Main Transformer Feed Breaker 8902 and Associated Equipment.

FSAR Figure 8.2-2a This change modified the transient recovery voltage (TRV) capacitance for the new XCB8902 from the originally specified 30nF (per phase) to 15nF (per phase). The reduced TRV capacitance is to provide an interrupt rating of 63kA. This rating is the same as the existing XCB8902 and is the interim vendor recommended configuration for XCB8902, until an acceptable long term design rated for 90kA. This design change is an interim configuration that de-rates the new breaker from a faulfrating of 90kA to 63kA. The final configuration implemented by the overall modification will restore the 90kA interrupt rating of the breaker to support VCS3. V. C. Summer Nuclear Station, Unit 1 Page 5 of 7 FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE-EFFECTIVE 05/31/16 APPROVAL RN No DATE SECTIONS

  • BRIEF DESCRIPTION 15-016 2015-08 FSAR Figure 8.3-4 ECR-50811 and ECR-50811A, NFPA 805 Incipient Detection Implementation.

This change added the Incipient Detection fire detection equipment to Figure 8.3-4.15-017 2015-08 FSAR Section 9.3.1.1 ECR-72076, Administrative Correction to Voltages in FSAR. FSAR Section 9.3.1.2 This change corrects the FSAR Section 9.3.1.1 and 9.3.1.2 voltage from 460 to 480 volts for air compressors.15-021 2016-05 FSAR Section 3A ECR70905 Rev. 1, Replacement of Reactor Vessel HvdraNuts with Standard Nuts and FSAR Table 5.2-8 Washers. FSAR Section 9.1.4.2.2.8 This changed replaced the HydraNuts used for the Reactor Vessel Closure Head with FSAR Section 9.1.4.2.2.11 Qonventional nuts and washers. The replacement, conventional nuts and washers, are equal to or better than the original design nuts and washers.15-023 2015-12 FSAR Section 4.2.2.2.2 ECR-50846D and ECR-72103, Weld Repair Contingency for RV Head Inspection During FSAR Section 4.2.4 Refuel 21. FSAR Section 5.4.2 This change updated the FSAR to include Relief Request RR-4-05, "Alternative Weld Repair FSAR Section 5.4.5 for Reactor Vessel Upper Head Penetrations" (approved April 30, 2014) and the weld repairs performed on the reactor vessel head, during RF-21.15-024 2016-01 FSAR Figure 10.4-8 ECR-50157 A, Upgraded the Emergency Feedwater (EFW) Mini-flow Lines to Condensate FSAR Figure 10.4-16 Storage Tank (CST) from Non-nuclear Saftey (NNS) to Quality Related (QR). This change upgraded the 2 inch, 3 inch and 4 inch mini-flow/recirculation lines for the Motor Driven Emergency Feedwater, Turbine Driven Emergency Feedwater pumps and 10 inch condensate return line from the EF tie in point to the CST from NNS to QR The upgrade of the lines also addressed concerns of potential flooding problems of the Diesel Generator Building and the potential crimping of the line during a seismic event.15-025 2016-02 FSAR Table 8.3-3 Part A 1 ECR-50899, Service Water (SW) Traveling Screen Operation after an Engineered Safety FSAR Table 8.3-3 Part A2 Feature (ESF) Signal. FSAR Table 8.3-3 Part 81 This changed removed the function of the SW Traveling Screen to rotate after an ESF FSAR Table 8.3-3 Part 82 demand. The rotating function of the SW Traveling Screen is not required for SW System FSAR Section 9.2.1.3 operability could create a failure mode of debris intrusion after the ESF demand. V. C. Summer Nuclear Station, Unit 1 Page 6 df 7 FSAR/FPER REVISION NOTICES INCORPORATED SINCE JUNE 2015 UPDATE-EFFECTIVE 05/31/16 APPROVAL RN No DATE . SECTIONS BRIEF DESCRIPTION 15-'028 -2016-02 FSAR Figure 9.3-16, SH ECR72120, Reactor Coolant Drain Tank (RCDT) Heat Exchanger (HX) Champs/Q-List 1C Revision.

This change corrected the. Safety Class of the Shell Side of XHE0009 (Excess Letdown Heat Exchanger) as 28.16-005 2016-05 FSAR Figure 8.2-2 ECR50777, Upgrades to Switchyard Bus 3. This administrative change is to correct a drawing that was not captured as part of a previous revision notice. V. C. Summer Nuclear Station, Unit 1 Page7 of 7