Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22194A415 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-9, Redacted | |
ML22194A407 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-5, Redacted | |
ML22194A451 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-1, Redacted | |
ML22194A438 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-17, Piping System Flow Diagram, Liquid Effluents from Nuclear Plant to Fairfield Penstock | |
ML22194A436 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-12, System Flow Diagram Feedwater (Nuclear) | Hydrostatic |
ML22194A431 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-5, System Flow Diagram Circulating Water Cooling | |
ML22194A447 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Rev 21, NRC17 | |
ML22194A443 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.5-11, Rev. 16, Redacted | |
ML22194A432 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-20, Rev. 19, Service Building First Floor and Second Floor | |
ML22194A444 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 4, Drawing E-302-676, Rev. 15, Chemical and Volume Control | |
ML22194A414 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-36, Rev. 1, System Flow Diagram Aeb DG2 Room HVAC | |
ML22194A437 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-25, Sheet 1, Drawing D-302-851, Piping System Flow Diagram Industrial Cooling Water | |
ML22194A429 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1C, of Drawing E-302-673, Revision 20, Piping System Flow Diagram Chemical and Volume Control Design Engineering | |
ML22194A420 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.5-1, Sheet 1, Drawing D-302-231, Revision 40, Redacted | |
ML22194A405 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-12, Rev. 8, Building Service System Flow Diagram Turbine Building Ventilation System | |
ML22194A430 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.2-2, Rev. 6, Control Diagram Turbine Stop Valve | |
ML22194A446 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-31, Rev. 15, Building Service System Flow Diagram R.B.C.R.D.M. Shroud Vent System | |
ML22194A428 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-3, Main System System Steam Dump/Turbine Bypass (Ms) | |
ML22194A448 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-32, Rev. 22, System Flow Diagram CRDM Cooling Water | |
ML22194A409 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-33, Rev. 6, Building Service System Flow Diagram Technical Support Center and Main Control Board Ventilation System | |
ML22194A410 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-15, Rev. 12, Building Service System Flow Diagram Intermediate Building ESF SWGR Rooms and Speed Switch Rooms Cooling Systems | |
ML22194A404 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.5-7, Redacted | |
ML22194A400 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-1, Rev. 30, Control Room Normal and Emergency Air Handling System | |
ML22194A416 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-10, Redacted | |
ML22194A403 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-9, Rev. 23, Building Service System Flow Diagram Auxiliary Building Main Exhaust System | |
ML22194A453 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-11, Redacted | |
ML22194A401 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-3, Redacted | |
ML22194A418 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 3, Piping System Flow Diagram Waste Processing | |
ML22194A427 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-4, Rev. 18, Control Building Control Access Exhaust | |
ML22194A411 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A of Drawing E-302-671, Rev. 11, Piping System Flow Diagram Chemical and Volume Control Design Engineering | |
ML22194A425 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 2, Piping System Flow Waste Processing | |
ML22194A445 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-14, Rev. 32, Piping System Flow Diagram Non-Nuclear Plant Drains | Hydrostatic |
ML22194A449 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-6, Rev. 14, Sheet 1B, Chemical and Volume Control | |
ML22194A417 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-7A, System Flow Diagram Condensate Polishing | |
ML22194A439 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-10, System Flow Diagram Feedwater (Non-Nuclear) | |
ML22194A435 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-18, Rev. 20, System Flow Diagram Boron Recycle | Loop seal FLEX |
ML22194A424 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.5-1, Sheet 2, Redacted | |
ML22194A442 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A, System Flow Diagram Chemical and Volume Control | |
ML22194A413 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.5-1CB, Redacted | |
ML22194A421 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-11a, Redacted | |
ML22194A406 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.2-5, System Flow Diagram Generator Gas & Vents | |
ML22194A422 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-2, Rev. 22, Building Service System Flow Diagram Relay and Computer Room Cooling System | |
ML22194A454 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-24, Rev. 18, Piping System Flow Diagram Chilled Water - to Cooling Coils B | Hydrostatic |
ML22194A434 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.3-3, Rev. 12, System Flow Diagram Main Reheat Steam (Non-Nuclear) | Hydrostatic |
ML22194A440 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.4-22, Rev. 31, Chilled Water Pump & Chiller Area | |
ML22194A426 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 3 of Drawing E-302-675, Revision 37, Piping System Flow Diagram Chemical and Volume Control Design Engineering | |
ML22194A441 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.4-14, Nuclear Blowdown Processing System Holdup Tank and Demineralizer | |
ML22194A452 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 12.1-7, Redacted | |
ML22194A423 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 10.3-1, Rev. 42, System Flow Diagram Main Steam (Nuclear) | Hydrostatic |
ML22194A433 | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.5-1A, Redacted |