Monthly Operating Rept for Aug 1992 for Perry Nuclear Power Plant Unit 1
ML20105B382
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/31/1992
From: Hegrat H, Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1545, NUDOCS 9209180336
Download: ML20105B382 (6)


Text

.. . . .. . . - - . . , , . -- .. .- ._ . -.- . . . - ~ - , _ .

f ;- t : .sh\

cswismson ENERGY

' PERRY NUCLEAR POWER PLANT - Aail dress:

Michael D. Lyster 10 CENTER ROAD PERRY. OHIO 44081 PERRY, OHIO 4408i - VICE PRESIDENT - NUCLEAR

. (216) 259-3737 ^

Septerrber 15, 1992 PY-CCI/NRR-1545 L ,

U.S. Nuclear hegulatory Commission Document Control Desk Vashington, D.C. 20555 Perry Nuclear Power Plant Docket No.-50-440 Monthly Oprrating Report JGentlement-Attached'is the August 1992 Honthly Operating Report for Perry Unit 1. This report is submitted in accordance with Technical Specification 6.9.1.8.

-.If,there are any questionc,-please feel free to call.

Sincere y, it ,

-Michael D'.^Lyster

-MDL'DVC ss Attachment J.

- cc: ; NRR Project Manager USNRC Senior Resident Inspector - Perry

.id 3C, Region III Diiettor,.0ffice 01. Resource Management 0?do EPA I ,

.9209180336 920831 PDR -ADOCK 05000440-R . PDR f/ p' 1) 1 210020-~ , 6 Cleveicna flednc elmM ?0 /

, fcicac Eit:-son y' l

e_ -

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POVER f :1.N';

August 1, 1992 - August 31, 1992 HONTHLY OPERATING REPORT TO NRC DOCKET NUMBER : 50-440 LICCNSB NUMBER: HPF-58

. .. . . _. . ._ .. . . . - . - . .. . . . . ~ . ~ - . . .. .. .-. . . . - -

4

,,y.. T ..

1 Table of Contents

- Average Daily Undt-Power Level , , , , , , , , , , , , , , , , , , , , y Operating Data Report .-.., , , , , , , , . . . . . . . . . , , . . . 2 Unit--shutdowns ~and-Ibver.  : Reductions . . . - , . , _ , , . . . . - - . . . . 3 i

v q

,\ .

p.,-

C- 7 fr_

4 4,

h.

t

+ --

swa ..s--a we,. - . , - - -- w -- , .-

]

.f . ., .+

'I Average Daily Unit Poser Level

' DOCKET NO. 50-440 UNIT Perry-1 OATE -09/15/92 Contact H. L. Heg cat Telephone (216)259-3737 MONTH August 1992 DAY AVbnAG DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net) (hVe-Net) 1- 1177- 17 1180 2 1068 18 1178 ~~

3 1145 19 1182

, 4 1178 20 1184" 5- 1180 21 1184

~6: 1179' 22 1121 '

7 1170 23 1059 8 1163 24 1166 9 1170 ~~

25 1165 10 1165 26 1164 E11 11' 27 _

1169 12 1.d3 28 1173 13 1182 29 940 f14 1182 30 917 15~ '182

. 31 -

1115 16- 1180 l; "_

l.-

?

L-: .

,5 . _..

  • - Operating Data Report UNIT: PERRY-1 DATE: 09/15/92 OPERATING STATUS
1. Docket: 50-440
2. Reporting Period: August 1992
3. Utility

Contact:

H. L. Hegrat (216) 259-3737 _

4. Licensed Thermal Power (MVt): 3.579 5.- Nameplate Rating (Gross MVe): 1150
6. Design Electrical Rating (Net Hve): 1191
7. -Maximum Vt.pendable Capacity (Gross MVe): 2225 8.- Maximum Dependable Capac.ity (Net MVe): 1166
19. If changes occur in capacity ratings (Item Numbers 4 through 8) since last report, give reasons:

None

10. Power. Level lo Vhich Restricted, If Any (Net MVe): 100%
11. Reasons for Rcstrictions, If Any: Operating :lcense Limit g

This Mcnth Yr-to-Date Cumulative

12. aurs'In Reporting Period 744.0 5,855.0 41,963.0
13. Bours. Reactor Vas Critical __

744.0 3,892.5 30.575.1

14. Reactor Reserve Shutdown Hours 0.0 - 0.0 0.0 15.' Hours Generator On-Line 744.0 3,723.1- 29,617.0
16. Unit Reserve-Shutdovn Hours 0.0 0.0 0.0
17. Gross Thermal Energy'(MVH) 2,602,799 ~~ 12,653,621 101,286,510
18. Gross Electrijal Energy (MVH1 892,583 4,336,074 ~34,830,876 L l19. Net _ Electrical Energy (MVH) 853,856 4,127,175 33,078,329
20. Unit Service Factor 100.0% 63.6% . 70.6%

-21. Unit Availability _Facter 100.0%_ 63.6% 70.6%

22. Unit Capacity Factor (Using MDC Net) 98.4% 60.5% 68.6*
23. Unit Capacity Factor (Using DER Net', ~~

96.4% -59.2% 66.2%

24. Unit Forced Orn.a3e_ Rate O'.Cf- 6.1% 7.9%

125. Forced Outage Hours 0 ._0_ 240.9 2,524.2

26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duratice of Each):

None

27. If Shut Down at end of Report. Period, Estimated Date of Startup:

N/A t --

00DED/6199/SS l-l- s 5

m

- r .. ,

' 4- *

, :p 74 d

' UNIT SilUTDOWN AND POWER REDUCTIONS. DOCKET NO. 50-4 t. 0~ .

~NM UNIT:NAME P i- l

REPORT i!ONTH
~ August 1992 DATE OWIN92  ;

CONTACT H. L. . Hegrat - .-

~ TELEPHONE (21G)239-3737  !

1 j 'b 8n" n A y k Licensee g C .

ause and. Corrective- ,

-No.

Date

~

C t" 0: Event' ** .c m. -

C "u M .O s) s u v cm AC'I " E" l- o. es o m. ' .O cu et o- ~ o

" ,5 $ { @"j5 - $U' I

j. N $ :@

ov 7

as r e oa - Rehort ,- -

u Prevent Recurrence '

92-05' 08/29/92 s 0 H 5'- N/A- N/A N/A- Request hj systern dispatcher to reduce power due to load requirecents.

i-  ;

t i

i  ;

h 1

. I' q t

\  ;

SUMMARY

During August, 1992, Perry-1 began' the nonth at full power. On August 29, 1992, reactor peer was

~

reduced as requested by the systcra dispatcher. Perry-1 ended the n. cith at full pcwer. _

i

' Method: Exhibit'G-Instructions for F: Forced eason: l S: Scheduled A-Equipment Failure (Exp1 min) l-flanu al Preparation of Data Entry B-Maintenance or Test 2-Manual Scram Sheets for Licensee Event  ;

C-Refueling 3-Automatic Scram Report (LER) File (NUREG1322) r D-Regulatary Restriction 4-Continued E-Operator' Training &: 5Peduced. Load 5 Exhibit 1-Same Scurce l 4

License Examination 9-Other'

F-Administrative- ,

C-Operational Error (Explain) i li-Other (Explain) ,

}

s ~ ,m s

, _ .