__ ,m v.

. V m

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT September I - September 30, 1986 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE' NLS1BER: NPF-4 5 Submitted By: I Plant h ical Mana er a 'n PlantOperationspanager 8701060118 860930 PDR ADOCK 05000440 R PDR 4,{o vi Q

. - -. ._ - _ . . _ __ ~ . . _ . . _ _ _ - _ _ _ _ _ _ . . . .-_ ___._ . _ , - .

Table of Contents Operations Summary . . . . .. . . . . . . . . . . , , , , , , , , , , 3 Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . .2 Operating Data Report . . .. . . . . . . , , , , , , , , , , , , , ,3 Unit Shutdown and Power Reductions . . . . . . . . . . . , , . . . , .4

c - -

9. 3

".[' .

- +

b b

September Operations Summary Nuclear Heatup continued this month. Safety relief valve '(SRV) testing and low pressure testing of RCIC for Test' Condition HEATUP were completed, as'was the constant heatup rate calibration for the power range nuclear instrumentation. HVAC flow verification (M99) preoperational testing is expected to be completed by mid October.

Perry experienced its first scram while critical this month on September 2, 1986. The reactor scram occurred due to an upscale trip on the Intermediate Range Neutron Monitors (IRM) during initial nuclear.heatup testing. A sudden increase in sensed steam pressure caused the steam bypass valves to fully open resulting in a reactor pressure decrease. Subsequent operator action to reshut the bypass valves combined with an isolated pressure transmitter caused all the steam bypass valves to shut resulting in a void collapse and. neutron flux spike. Following corrective maintenance on the Steam Bypass System'and other maintenance activities, the reactor returned to operation on September 7.

c._____________.___________

{s. 1,

.~

t Average Daily Unit Power Level DOCKET No. 50-440 UNIT Perry - One DATE 10/02/86 COMPLETED BY T. Farmer.

TELEPHONE 216/259-3737

'!. MONTH- September, 1986 DAY AVER /GE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

-(MWe-Net) (MWe-Net) 1 0 17 0 2 -0 18 0 3 0 19 0 4' O 20 0 -

5 0 21 0 6- 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 ,

10 0 26 0 11 0 27- 0 12 0 28 - 0 13 0- 29 0 14 0 30 0 15~ 0 31 N/A 16 0 INSTRUCTIONS-On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

.e-Oparating Data Rzport

. . . q DOCKET NO. 50-440 DATE 10/02/86 COMPLETED BY T. Farmer TELEPHONE 216/259-3737 OPERATING STATUS

1. Unit Name: Perry-One
2. -Reporting Period: September, 1986
3. ' Licensed Thermal Power (MWt): 178
4. Nameplate Rating (Gross MWe): 1250
5. Design Electrical Rating (Net MWe): 1205
6. Maximum Dependable Capacity (Gross MWe): N/A
7. Maximum Dependable Capacity (Net MWe): N/A
8. If Changes: Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report. Give Reasons:

N/A

.9. Power Level To Which Restricted. If Any (Net MWe): 0

10. Reasons for Restrictions. If Any: NRC Restriction to 5% Reactor Power This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 720 4727 4727
12. Number of Hours Reactor Was 602.9 604.03 604.03 Critical
13. Reactor Reserve Shutdown Hours 0 0 0 14 . Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated 18.244- 18,244 18,244-m (MWH)

-17. Gross Electrical Energy Generated 0 0 0 (MWH)

18. Net Electrical Energy Generated 0 0 0 (MWH)-
19. Unit Service Factor 0 0 0
20. Unit Availability. Factor 0 0 0
21. Unit Capacity Factor (Using- 0 0 0 MDC Net)
22. Unit Capacity Factor (Using 0 0 0 DER Net)
23. U, pit Forced Outage Rate 0 0 0
24. Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):

None

25. If Shut Down At End of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 06/06/86

  • INITIAL ELECTRICITY 07/28/86
    • COMMERCIAL OPERATION ll/13/86
  • Generator Syncronization
    • End Power Ascension (100 Hour Warranty Run)

N/A - Not applicable due to 5% Power Restriction

l, I

SF N

: o SF co hr D ec a de t ud e l

e d

HR, - -

HGF EDCBAR og u,oC

- - - - - - - - e vjyq OOA LORRMEa t p d ip eeaq s hemceg fiuo er ier uunin r an nal et p  :

y agN t is t al em

( i s eot i ne  : ujy o*

i Eot ronan xnr E rg nt mjy',CD C p aa xTy c o c g y' g u c 2."

l l t ar eF a imaR a iEviie oi nr e nns r l R L

) r ait u eEi o t nr Tr p vc r ig i ee oee o c s rnn

( n&t t ( t t s U E i E e N x o x # e I p n p T l l a a S i i

>ug R H n n .

E U

) ) P T g g. , O D R O T W 3 N 4321 M vgggCw M S

- - - - e O OAMMt t uaah ugg N A ht nno T N H D eouud rmaa:

al l S P e O

( t EiS p W E

t xcc e R p r l Sa m R

acm i r b

e E D

na ,r U

) m C 1 T 9 I 8 O 6 N S

P C r a e u v s eAe nc t t &

i roc 4 eno c

5 1 EEf E r E 0vnox ut r x 2et r h roe r c h 2nr i i ) ty Pb e t b r i n i i RSet c v t e hp e e C p eaG O I

oer M D

- r t a - TP UO S t s t , EL NC a iI LE I K m ( fon ET TE e Lons PE T Er t HDDN S R or O AAN o ) Lfu NBTM u i c E Y E E .O r Fc Dt 2 T P 5 c ieai 1

0e 0 e 1 .

l nt o 6 /r -

es an / F 0r 4 e s 2 a 3 ~v 4

( e 5 r / - 0 N 9 m 8O U - e 6 n R 3 r e E 7 G 3 .

7

7 -

f THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN SR. VICE PRESCENT NUCLEAR October 14, 1986 PY-CEI/NRR-0544 L Mr. Lee Ililler Of fice of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report

Dear Mr. Hiller:

Attached is the September, 1986 monthly operating report for Perry Unit 1. This report is submitted in accordance with Technical Specification 6.9.1.8.

Please feel free to contact me if you have any questions.

Very truly yours, Murray R. Edelman Senior Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.

John Stefano (2)

K. Connaughton Document Control Desk (USNRC)

J. G. Keppler, Region III 16d j