PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18

From kanterella
Jump to navigation Jump to search
Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18
ML22258A240
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/12/2022
From: Fleming J
Holtec Decommissioning International, Holtec
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HDI PNP 2022-025
Download: ML22258A240 (3)


Text

SAFEGUARDS: IN.FORMATION _~

HOLTEC DECOMMISSIONING INTERNATIONAL Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI .PNP 2022-025 10 CFR 50.54(p)(2)

September 12, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 Palisades Nuclear Plant Docket No. 50-255 Renewed Facility Operating License No. DPR-'20 In accordance with Title 10 of the Code of Federal Regulations Part 50 (10 CFR 50), Section 54, Conditions of licenses, paragraph (p)(2), (1 O CFR 50.54(p)(2)), Holtec Decommissioning -

International, LLC (HDI), is submitting on behalf of Holtec Palisades, LLC, Revision 18 to the Palisades Nuclear Plant (PNP) Physical Security Plan (PSP). The Enclosure contains a de_scription and basis for each change included in PSP Revision 18. Revision 18 of the PSP is provided as an Attachment to the Enclosure, The changes made to the PSP were analyzed as required by 10 CFR 50.54(p)(2). The analyses concluded that.the changes do not decrease the safeguards effectiveness of the PSP.

Accordingly, this revision is submitted under the provisions of 10 CFR 50.54(p)(2).

Information contained in the Enclosure to this document has been classified as Safeguards information. Therefore, HDI requests that this information be withheld from public disclosure in accordance with 10 CFR 73.22, Protection.of Safeguards lnfonnation: Specific Requirements.

This letter contains no new commitments and no revised commitments.

_$bould you have. any _questiorn> o_r re.q11ir~u:1dditlQD.~LinforrnJ'!tion,__pleJ1§e.J~ontact Jin, Miks_a, Regulatory Assurance Engineer at (269) 764~2945~--- * -- - ' ""'c-c.:-:-:::cc= - - - -

_Res_pectfully, . ,- .. , -.-.-.c.: ... ;*..

Digitally signed by Jean A.

Jean A. FIem1

~~

leming ,

2022.09.12 11 :55:24 -04'00' Jean A. Fleming

_Vice President, Licensing, Regulatory Affairs & PSA Holtec International -

NOTICE: The Enclosure to this letter contains "Safeguards Information." Upon separation of the Enclosure from this letter this page becomes "DECONTROLLED."

SAFEGUARDS INFORMATION

SAFEGUARDS lNFORMATIQN _

HDI PNP 2022-025 Page 2 of 2

Enclosure:

Palisades Nuclear Plant Physical Security Plan Change Summary

Attachment:

Palisades Nuclear Plant Physical Security Plan, Revision 18 cc: NRC Region Ill Regional Administrator, w/o Enclosure NRC Senior Resident Inspector - Palisades Nuclear Plant, w/o Enclosure NRC Project Manager - Palisades Nuclear Plant, w/o Enclosure .

_J NOTICE: The Enclosure to this letter contains "Safeguards Information/ Upon separation of the Enclosure from this letter this pag*e becomes "DECONTROLLED."

SAFEGUARDS INFORMATION.

SAFEGUARDS INFORMATION HDI PNP 2022-025 Enclosure Paae 1 of 32 Enclosure to HDI PNP 2022-025 Palisades Nuclear Plant Physical Security Plan Change Summary NOTICE: The Enclosure to this letter contains "Safeguards Information." Upon separation of the Enclosure from this page this page becomes "DECONTROLLED."

SAFEGUARDS INFORMATION