PNO-V-85-079, on 851126,safety Injection Occurred on High Steam Flow Signal.Cause Under Investigation.Plant Stabilized & Maintaining Hot Standby Conditions.Licensee Plans to Evaluate Data & Make Appropriate Adjustments

From kanterella
Jump to navigation Jump to search
PNO-V-85-079:on 851126,safety Injection Occurred on High Steam Flow Signal.Cause Under Investigation.Plant Stabilized & Maintaining Hot Standby Conditions.Licensee Plans to Evaluate Data & Make Appropriate Adjustments
ML20137L281
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 11/27/1985
From: Ang W, Mendonca M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-85-079, PNO-V-85-79, NUDOCS 8512030403
Download: ML20137L281 (1)


. . .. -

{

h -

~

PRELIMINARY NOTIFICATION 0F EVENT OR UNUSUAL OCCURRENCE--PNO-V-79 Date: 11-27-85.

(This preliminary notification constitutes'EARLY notice of events of POSSIBLE safety.

~cr public interest significance. The information presented is as initially received without verification or evaluation and-is basically all that is known by Region V atsff'on this date.

FACILITY: Pacific Gas and Electric Emergency Classification Diablo Canyon Unit 2 X Notification of Unusual Event-Docket No. 323 Alert Site Area Energency

. General Emergency Not Applicable

SUBJECT:

SAFETY INJECTION DURING LOAD REJECTION TEST d

JA~t cpproximately 11:09 PM (PST)~on November 26, a Unit 2 safety injection occurred on high steam flow signal. The cause is being investigated by the licensee. All safety

, eystems responded as- designed. for the safety injection and consequent reactor trip. -The

cafsty injection was . terminated about 4 minutes af ter the event and injected about

, 900 gallons from the boron injection tank into the reactor coolant system.

Tha plant was stabilized at about 11:20 PM and is maintaining hot standby conditions.

During stabilization of the plant, a level control valve for one'of the motor-driven euxiliary feedwater pumps closed when it was selected to manual. The licensee is

-invastigating this problem.

Th2 licensee plans to evaluate the data from this test, make appropriate adjustments, and retest.- Currently, plant restart is scheduled for late today (November 27,'1985).

Ths licensee declared and reported an Unusual Event.

Thare has been press interest.- The licensee has notified the media through daily plant status, report.

. This information is. current as of 10:00'AM (PST); November 27, 1985.

CONTACT: -M Mendonca, SRI Diablo Canyon, 805-595-7500

! 'W. Ang, RV, FTS 463-3864-r DISTRIBUTION t

j H St. 'MNBB -Phillips' E/W Willste Air Rights Mail:

-Chsirman Pallidino EDO, NRR IE NMSS -

ADM:DMB

, Comm. Zech' PA[ H. Schierling OIA- RES DOT:Trans'Only f

Comm. Bernthal MPA , AEOD" i U C:mm. Roberts ELD Comm. Asselstine- Regions:

SECY INPO NSAC-ACRS- ' Licensee:

! CA (Reactor Licensees) REGION V: FORM 211 PDR- Resident Inspector _ (Revised 3/14/83)-

~

079 PDR

. -- - -_