PNO-III-82-074, on 820803,Baldwin & Associates Issued Stop Work Order Against Zack Co,Hvac Contractor.Stop Work Order Involves All nonsafety-related HVAC Work Performed in Category I Structures

From kanterella
Jump to navigation Jump to search
PNO-III-82-074:on 820803,Baldwin & Associates Issued Stop Work Order Against Zack Co,Hvac Contractor.Stop Work Order Involves All nonsafety-related HVAC Work Performed in Category I Structures
ML20062E600
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/03/1982
From: Livermore H, Spessard R, Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-82-074, PNO-III-82-74, NUDOCS 8208100164
Download: ML20062E600 (1)


PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III 74 Data: August 3,1982 Thic preliminary notification con:titutes EARLY notico of eventa of POSSIBLE cafety or public interest significance. The information is as initially received without veri-fiention or evaluation, and is basically all that is known by the staff on this date.

Fzcility: Illinois Power Company Licensee Emergency Classification:

Clinton Nuclear Power Station Notification of Unusual Event Docket No: 50-461 Alert Site Area Emergency Clinton, IL 61727 General Emergency XXX Not Applicable

Subject:

THIRD STOP-WORK ORDER CONCERNING HVAC CONTRACTOR AT CLINTON Bsidwin & Associates, the Clinton constructor, has issued a stop-work order against tha Zack Company, the heating, ventilation and air conditioning (HVAC) contractor.

Tha stop-work was effective at 8 a.m. August 3, 1982 and involves all non-safety related HVAC work performed in the plant's Category 1 seismic structures. This includes the following buildings: fuel, control, containment, auxiliary, diesel gtnerator and screen house.

The work was stopped, Baldsin said, because of inadequate controls by Zack over non-safety related work. This is the third stop work effecting Zack since June 28, 1982 (Sse PN0 III 82-58A).The other two stop- work orders are still in effect and pertain to seismic hanger support welds (first attachment) and "all safety-related work."

Neither Region III (Chicago) nor the licensee plans to issue a press release at this time. Region III will respond to inquiries. Some media interest is expected.

The State of Illinois will be notified.

The resident inspector is monitoring the situation. Region III was notified of the stop-work order at 11 a.m. (CDT) August 3, 1982 by the resident inspector. This information is curren a of 2 p.m. (CDT) August 3, 1982. /

,0b

Contact:

H. Livermore

-4 217/935-9521 ~

/ R. Walker R. p ssard l 384-2565 384-2552 l

8208100164 820803 PDR I&E PNO-III-82-074 PDR DISTRIBUTION:

H. St. //o ? MNBB 4 1 Phillips // A E/W id6 Willste //

Chnir= n Palladino EDO NRR IE NMSS Comm. Gilinsky PA OIA RES Comm. Ahearne MPA AEOD Comm. Roberts ELD Air Rights # 6 MAIL:

Comm. Asselstine SP INPO J ADM:DMB SECY NSAC A n DOT: Trans Only ACRS 1

CA ,

Regions I r/ 7 , II C/1 , IV T'// , V f/ Licensee (Corporate Office) f fd 9

PDR

-