ML20054J620

From kanterella
Jump to navigation Jump to search
Corrected Copy of PNO-III-82-058A:on 820623,stop Work Order Issued Due to Missing or Inaccurate Documentation (Travelers).Licensee Will Meet W/Region III on 820712 to Discuss QA Program & Corrective Actions
ML20054J620
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/23/1982
From: Knop R, Spessard R, Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-82-058A, PNO-III-82-58A, NUDOCS 8206290356
Download: ML20054J620 (1)


Text

60ERCC.TEb 60PV PRELIMINARY NOIlt RATION OF EVENT OR UNUSUAL OCCURRENCE--PEO-III-82_58A D2te:Jun2 23, 1982 This prelimin ry notification constitutes EARLY notice of events of POSSIBLE cafety er public interest significance. The information is, as initially received without veri-fication or evaluation, and is basically all that is known by the staff on this date.

Fccility: Illinois Power Company Licensee Emergency Classification:

Clintori Nuclear Power Station Notification of Unusual Event Docket No. 50-461 Alert Clinton, IL 61727 Site Area Emergency General Emergency x Not Applicable Subj ect : CONSTRUCTION HALTED AT CLINTON (UPDATE)

Th2 Licensee has informed Region III (Chicago) that it is issuing stop work orders in six areas of plant construction because of missing or inaccurate documentation (travelers).

Bstdwin and Associates, the plant constructor, conducted a review of all piping mechanical, electrical, and instrumentation documentation' June 19, 20 and 21 af ter Region III expressed concern with licensee management that the site QA program was not keeping pace with construction. (See PNO-III-82-58). As a result of that review, the licensee has issued stop work orders, ef fective June 23,1982 on: (1) containment structural steel installation, (2) electrical equipment installation, (3) installation of all electrical instrumentation.

Th2 licensee will issue stop work orders, effective June 28 on: (1) all nee conduit installation except in the Containment Building, (2) safety-related work for i heating, ventilation and air conditioning equipment (HVAC), and (3) seismic hanger support walds (first attachment welds only) for HVAC.

Th2 Licensee will meet with Region III on July 12 to discuss its quality assurance program and the corrective action it plans to take concerning activities covered by the stop work order. The Senior Resident Inspector will continue to monitor the situation.

M;dia interest is expected. The licensee plans to issue a press release. Region III will not issue a press release, but wiLL respond to inquiries. The State of Illinois will be notified.

The Senior Hesident Inspector was notified of the work stoppage at 1 p.m. (CDT)

June 23, 1982. This information is current as of 4 p.m. (CDT) June 23, 1982.

Contact:

hW R. Walker

!)W R. Knop R. S essard 384-2565 384-2547 384-2552 8206290356 820623 PDR I&E PNO-III-82-058 PDR DISTRIBUTJON: jf H. St . Nt E ~

HNBB T3o Phillips T 3 M E/W 7,* Willste fd')

Chgirman Palladino EDO NRR IE NMSS Comm. Gilinsky AEOD Landow (OIA) RES Comm. Bradford PA Comm. Ahearne MPA Air Rightd7 6 MAIL: 7 Comm. Roberts ELD SP INPO 73 7 ADM:DL h ', l ACRS *NSAC r//<.)

SECY CA Regions I fY/ , II b , IV F34 ,V [ M Licensee (Corporate Office) 8 94 [