License Amendment Request 269, Revised License Pages Cyber Security Plan Implementation Schedule Milestone Change
ML12261A416
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/17/2012
From: Meyer L
Point Beach
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NRC 2012-0073
Download: ML12261A416 (16)


Text

ENERGY POINT BEACH September 17, 2012 NRC 2012-0073 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units Iand 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 269, Revised License Paqes Cvber Securitv Plan lm~lementationSchedule Milestone Chanqe

References:

(1) NextEra Energy Point Beach, LLC letter to NRC, License Amendment Request 269, Cyber Security Plan Implementation Schedule Milestone Change, dated June 18,2012 (ML12172A386)

Pursuant to 10 CFR 50.90, NextEra Energy Point Beach, LLC (NextEra) hereby submits a revision to License Amendment Request (LAR) 269 (Reference I ) for Point Beach Nuclear Plant (PBNP), Units 1 and 2. This letter provides corrected revised operating license pages for the Physical Protection license condition.

This letter does not change the description or evaluation provided in Enclosure 1 of Reference (1). The No Significant Hazards Consideration determination provided in Reference (1) is not altered by the information in this revision. The proposed change continues to satisfy the criteria of 10 CFR 51.22 for categorical exclusion from the requirements for an environmental assessment. contains proposed revised marked-up operating license pages for the Physical Protection license condition. Enclosure 2 contains the proposed revised operating license pages.

These pages replace the proposed operating license pages previously submitted in Reference (1).

These changes have been reviewed by the NextEra Onsite Review Group. A copy of this submittal is also being provided to the designated Wisconsin Official pursuant to 10 CFR 50.91.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 If you have any questions or require additional information, please contact Mr. James Costedio, Licensing Manager, at 9201755-7427.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on September 17,2012.

Very truly yours, NextEra Energy Point Beach, LLC Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

ENCLOSURE 1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 269 REVISED LICENSE PAGES PROPOSED POINT BEACH NUCLEAR PLANT RENEWED FACILITY OPERATING LICENSE CHANGES (MARK-UP) 6 Pages Follow

D. Phvsical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4)," submitted by letter dated May 10, 2006. NextEra Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 243 as supplemented bv a chanae approved bv License Amendment No. xxx.

E. Safetv lniection Loaic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondarv Water Chemistrv Monitorinq Proclram NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. ldentification of a sampling schedule for the critical parameters and control points for these parameters;
2. ldentification of the procedures used to quantify parameters that are critical to control points;
3. ldentification of process sampling points;
4. Procedure for the recording and management of data; Renewed License No. DPR-24 Amendment No. 243
5. Procedures defining corrective actions for off control point chemistry condition; and
6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.

I. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, FPLE Point ~ e a c hmay

  • make changes to the programs and activities described in the supplement without prior Commission approval, provided that FPLE Point ~ e a c hevaluates
  • such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NextEra Energy Point Beach shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

Strategies shall be developed and maintained for addressing large fires and explosions that include the following key areas:

1. Fire fighting response strategy with the following elements:
a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets On April 16,2009, the name "FPLE Point Beach, L L C was changed to "NextEra Energy Point Beach, LLC."

Renewed License No. DPR-24 Amendment No. 237

c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel
2. Operations to mitigate fuel damage considering the following:
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy
g. Spent fuel pool mitigation measures
3. Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders M. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 241, are hereby incorporated into this license. NextEra Energy Point Beach shall operate the facility in accordance with the additional conditions.
5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Appendix B - Environmental Technical Specifications
3. Appendix C - Additional Conditions Date of Issuance: December 22,2005 Renewed License No. DPR-24 Amendment No. 244

D. Phvsical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4)," submitted by letter dated May 10, 2006. NextEra Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 247 as supplemented by a chanae approved bv License Amendment No. xxx.

E. Safetv lniection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No.

174, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondarv Water Chemistrv Monitorincr Prosram NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. ldentification of a sampling schedule for the critical parameters and control points for these parameters;
2. ldentification of the procedures used to quantify parameters that are critical to control points;
3. ldentification of process sampling points; Renewed License No. DPR-27 Amendment No. 247 I
4. Procedure for the recording and management of data;
5. Procedures defining corrective actions for off control point chemistry condition; and
6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

H. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, FPLE Point ~ e a c hmay

  • make changes to the programs and activities described in the supplement without prior Commission approval, provided that FPLE Point ~ e a c hevaluates
  • such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

I. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NextEra Energy Point Beach shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

K. Mitiqation Strateqy Strategies shall be developed and maintained for addressing large fires and explosions that include the following key areas:

1. Fire fighting response strategy with the following elements:
a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets
c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel On April 16,2009, the name "FPLE Point Beach, LLC" was changed to "NextEra Energy Point Beach, LLC."

Renewed License No. DPR-27 Amendment No. 244 1

2. Operations to mitigate fuel damage considering the following
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy g- Spent fuel pool mitigation measures
3. Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 245, are hereby incorporated into this license. NextEra Energy Point Beach shall operate the facility in accordance'with the additional conditions.
5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A -Technical Specifications
2. Appendix B - Environmental Technical Specifications
3. Appendix C - Additional Conditions Date of Issuance: December 22,2005 Renewed License No. DPR-27 Amendment No. 244 1

ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 269 REVISED LICENSE PAGES PROPOSED POINT BEACH NUCLEAR PLANT RENEWED FACILITY OPERATING LICENSE CHANGES (RE-TYPED) 6 Pages Follow

D. Phvsical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approvedphysical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4)," submitted by letter dated May 10, 2006. NextEra Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 243 as supplemented by a change approved by License Amendment No. xxx.

E. Safetv lniection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondarv Water Chemistrv Monitorinq Proqram NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. ldentification of a sampling schedule for the critical parameters and control points for these parameters;
2. ldentification of the procedures used to quantify parameters that are critical to control points;
3. ldentification of process sampling points;
4. Procedure for the recording and management of data; Renewed License No. DPR-24 Amendment No.
5. Procedures defining corrective actions for off control point chemistry condition; and
6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

H. The licensee is authorized to repair Unit 1 steam generators by replacement of major components. Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Point Beach Nuclear Plant Unit No. 1 Steam Generator Repair Report dated August 9, 1982 and revised March 1, 1983 and additional commitments identified in the staff's related safety evaluation.

I. The FSAR supplement, dated February 25, 2004, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, FPLE Point ~ e a c hmay

  • make changes to the programs and activities described in the supplement without prior Commission approval, provided that FPLE Point ~ e a c hevaluates
  • such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

J. The FSAR supplement, dated February 25, 2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NextEra Energy Point Beach shall complete these activities no later than October 5, 2010, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

K. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

L. Mitiqation Strateqv Strategies shall be developed and maintained for addressing large fires and explosions that include the following key areas:

1. Fire fighting response strategy with the following elements:
a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets On April 16, 2009, the name "FPLE Point Beach, LLC" was changed to "NextEra Energy Point Beach, LLC."

Renewed License No. DPR-24 Amendment No.

c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel
2. Operations to mitigate fuel damage considering the following:
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy
g. Spent fuel pool mitigation measures
3. Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders M. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 241, are hereby incorporated into this license. NextEra Energy Point Beach shall operate the facility in accordance with the additional conditions.
5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on October 5, 2030.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Appendix B - Environmental Technical Specifications
3. Appendix C - Additional Conditions Date of Issuance: December 22,2005 Renewed License No. DPR-24 Amendment No.

D. Phvsical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4)," submitted by letter dated May 10, 2006. NextEra Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 247 as supplemented by a change approved by License Amendment No. xxx.

E. Safetv lniection Loaic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April 27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No.

174, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondarv Water Chemistrv Monitorina Proaram NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. ldentification of a sampling schedule for the critical parameters and control points for these parameters;
2. ldentification of the procedures used to quantify parameters that are critical to control points;
3. ldentification of process sampling points; Renewed License No. DPR-27 Amendment No.

I

4. Procedure for the recording and management of data;
5. Procedures defining corrective actions for off control point chemistry condition; and
6. A procedure for identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

H. The FSAR supplement, dated February 25,2004, as revised, submitted pursuant to 10 CFR 54.21 (d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71 (e)(4) following the issuance of this renewed operating license. Until that update is complete, FPLE Point ~ e a c hmay

  • make changes to the programs and activities described in the supplement without prior Commission approval, provided that FPLE Point ~ e a c hevaluates
  • such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

I. The FSAR supplement, dated February 25,2004, as revised, describes certain future activities to be completed prior to the period of extended operation. NextEra Energy Point Beach shall complete these activities no later than March 8, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

J. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

K. Mitiqation Strateqy Strategies shall be developed and maintained for addressing large fires and explosions that include the following key areas:

1. Fire fighting response strategy with the following elements:
a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets
c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel On April 16,2009, the name "FPLE Point Beach, LLC" was changed to "NextEra Energy Point Beach, LLC."

Renewed License No. DPR-27 Amendment No.

I

2. Operations to mitigate fuel damage considering the following
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy
g. Spent fuel pool mitigation measures
3. Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders L. Additional Conditions The additional conditions contained in Appendix C, as revised through Amendment No. 245, are hereby incorporated into this license. NextEra Energy Point Beach shall operate the facility in accordance with the additional conditions.
5. The issuance of this renewed operating license is without prejudice to subsequent licensing action which may be taken by the Commission with regard to the ongoing rulemaking hearing on the Interim Acceptance Criteria for Emergency Core Cooling Systems (Docket No. RM 50-1).
6. This renewed operating license is effective as of the date of issuance, and shall expire at midnight on March 8, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By R. W. Borchardt, Deputy Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A -Technical Specifications
2. Appendix B - Environmental Technical Specifications
3. Appendix C - Additional Conditions Date of Issuance: December 22,2005 Renewed License No. DPR-27 Amendment No.