MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2022-177, Subsequent License Renewal Application - Second Annual Update2022-11-28028 November 2022 Subsequent License Renewal Application - Second Annual Update L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System ML22193A1142022-09-12012 September 2022 Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling System L-2021-221, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 10 Responses Supplement 12021-11-19019 November 2021 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 10 Responses Supplement 1 L-2021-147, Subsequent License Renewal Application - Aging Management Supplement 3 Revision 12021-07-26026 July 2021 Subsequent License Renewal Application - Aging Management Supplement 3 Revision 1 L-2021-129, Ssubsequent License Renewal Application: Aging Management Requests for Confirmation Of/Additional Information (Rci/Rai) Set 1 Responses2021-07-0808 July 2021 Ssubsequent License Renewal Application: Aging Management Requests for Confirmation Of/Additional Information (Rci/Rai) Set 1 Responses L-2021-113, Subsequent License Renewal Application - Aging Management Supplement 32021-05-27027 May 2021 Subsequent License Renewal Application - Aging Management Supplement 3 NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses ML20329A2142020-11-16016 November 2020 Enclosure 1, Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Enclosures Summary ML20329A2642020-11-16016 November 2020 Enclosure 4, Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) ML20329A2192020-11-16016 November 2020 Enclosure 2, Affidavits Supporting Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 ML20329A2482020-11-16016 November 2020 Enclosure 3, Attachment 2, Appendix E Applicant'S Environmental Report Subsequent Operating License Renewal Point Beach Nuclear Plant Units 1 and 2 NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2018-0028, NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2018-07-30030 July 2018 NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document2018-04-12012 April 2018 Transmittal of Construction Truss License Amendment Request Document NRC 2018-0018, License Amendment Request 288, Request to Extend Containment Leakage Rate Test Frequency2018-03-30030 March 2018 License Amendment Request 288, Request to Extend Containment Leakage Rate Test Frequency NRC 2017-0043, License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants2017-08-31031 August 2017 License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2017-06-23023 June 2017 License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances2017-03-31031 March 2017 License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances NRC 2016-0030, License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region2016-07-29029 July 2016 License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region NRC-2016-0009, License Amendment Request 2821 Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves2016-03-10010 March 2016 License Amendment Request 2821 Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves NRC 2016-0002, License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program2016-02-12012 February 2016 License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program NRC 2015-0075, License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation2016-01-15015 January 2016 License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation NRC 2015-0004, LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2015-03-27027 March 2015 LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process NRC 2014-0075, Supplement to License Amendment Request 273 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Prog2014-12-0808 December 2014 Supplement to License Amendment Request 273 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Prog NRC 2014-0003, License Amendment Request 273 Re Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program2014-07-0303 July 2014 License Amendment Request 273 Re Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program NRC-2014-0035, License Amendment Request (LAR) 275, Application to Revise Technical Specifications Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2014-07-0202 July 2014 License Amendment Request (LAR) 275, Application to Revise Technical Specifications Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC 2013-0092, License Amendment Request 271 Supplement 1 Transition to 10 CFR 50.48(c)- NFPA 8052013-09-16016 September 2013 License Amendment Request 271 Supplement 1 Transition to 10 CFR 50.48(c)- NFPA 805 NRC 2013-0028, Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 22013-06-26026 June 2013 Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 3 ML13182A3502013-06-26026 June 2013 License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 3 NRC 2013-0028, License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 32013-06-26026 June 2013 License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 3 NRC 2013-0051, License Amendment Request 272, Exemption Request - Optimized Zirlo Fuel Rod Cladding2013-06-0404 June 2013 License Amendment Request 272, Exemption Request - Optimized Zirlo Fuel Rod Cladding NRC 2013-0022, Supplement to License Amendment Request 252 Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2013-03-0101 March 2013 Supplement to License Amendment Request 252 Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) NRC 2013-0005, License Amendment Request 252, Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2013-01-15015 January 2013 License Amendment Request 252, Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) NRC 2012-0073, License Amendment Request 269, Revised License Pages Cyber Security Plan Implementation Schedule Milestone Change2012-09-17017 September 2012 License Amendment Request 269, Revised License Pages Cyber Security Plan Implementation Schedule Milestone Change NRC 2012-0065, License Amendment Request 270, Operations Manager Qualification Requirements2012-08-16016 August 2012 License Amendment Request 270, Operations Manager Qualification Requirements NRC 2012-0040, License Amendment Request 269, Cyber Security Plan Implementation Schedule Milestone Change2012-06-18018 June 2012 License Amendment Request 269, Cyber Security Plan Implementation Schedule Milestone Change NRC 2011-0066, License Amendment Request 254, Removal of the Table of Contents from Technical Specifications2011-06-23023 June 2011 License Amendment Request 254, Removal of the Table of Contents from Technical Specifications NRC 2010-0189, License Amendment Request 261, Extended Power Uprate Response to Request for Clarification2010-12-21021 December 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Clarification NRC 2010-0154, License Amendment Request 261 - Extended Power Uprate - Response to Request for Additional Information2010-09-28028 September 2010 License Amendment Request 261 - Extended Power Uprate - Response to Request for Additional Information NRC 2010-0146, License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-09-28028 September 2010 License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate NRC 2010-0145, License Amendment Request 261, Supplement 9 Extended Power Uprate2010-09-21021 September 2010 License Amendment Request 261, Supplement 9 Extended Power Uprate NRC 2010-0132, License Amendment Request 261, Extended Power Uprate Response to Request for Additional Information2010-09-0101 September 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Additional Information NRC 2010-0133, License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change2010-08-12012 August 2010 License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change NRC 2010-0112, License Amendment Request 261, Extended Power Uprate Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-08-0202 August 2010 License Amendment Request 261, Extended Power Uprate Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate NRC 2010-0084, License Amendment Request 263A, Request for Approval of Revised Cyber Security Plan2010-07-0808 July 2010 License Amendment Request 263A, Request for Approval of Revised Cyber Security Plan 2023-09-19
[Table view] |
Text
Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.755.2321 NMC Committed to Nuclear Excellence 920.388.2560 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0051 10 CFR 50.90 June 11,2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Dockets 50-266 and 50-301 Point Beach Nuclear Plant, Units 1 and 2 License Amendment Request 228 Technical Specification LCO 3.1.8, Physics Tests Exceptions - MODE 2 In accordance with the provisions of 10 CFR 50.90, Nuclear Management Company, LLC (NMC) is submitting a request for an amendment to the Technical Specifications (TS) for Point Beach Nuclear Plant, Units 1 and 2.
The proposed amendment would revise TS 3.1.8, Physics Tests Exceptions, to correct a typographical error in the numbering of a function. The existing typographical error inappropriately makes the TS more restrictive than intended.
NMC requests approval of the proposed License Amendment by September 2002, with the amendment being implemented within 45 days. The approval date was administratively selected to allow for NRC review but the plant does not require this amendment to allow continued safe full power operation.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Wisconsin Official.
To the best of my knowledge and belief, the statements contained in this document are true and correct. In some respects, these statements are not based entirely on my personal knowledge, but on information furnished by cognizant NMC employees and consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 11, 2002.
,2044 Mark E. Warner Site Vice President JG/kmd X0
NRC 2002-0051 Page 2 Attachments: 1 - Description of Changes 2 - Proposed Technical Specification Changes 3 - Proposed Technical Specification Bases Changes 4 - Revised Technical Specification Pages cc: NRC Regional Administrator NRC Project Manager NRC Resident Inspector PSCW
NRC 2002-0051 Page 1 of 6 DESCRIPTION OF CHANGES LICENSE AMENDMENT REQUEST 228 TECHNICAL SPECIFICATION LCO 3.1.8, PHYSICS TESTS EXCEPTIONS - MODE 2 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
NRC 2002-0051 Page 2 of 6
1.0 INTRODUCTION
This License Amendment Request (LAR) is made pursuant to 10 CFR 50.90 to correct a typographical error in TS LCO 3.1.8, Physics Tests Exceptions - Mode 2, in the numbering of a function. The existing typographical error inappropriately makes the TS more restrictive than intended.
2.0 BACKGROUND
The primary purpose of the Mode 2 Physics Tests exceptions is to permit relaxations of existing LCOs to allow certain Physics Tests to be performed.
During the conversion of Point Beach Custom Technical Specifications (CTS) to Improved Technical Specifications (ITS), Point Beach originally proposed ITS LCO 3.1.8 to specify that the number of required channels for Reactor Trip System Interlock, Power Range Neutron Flux, P-10, may be reduced to "3" required channels.
This proposed allowance was consistent with NUREG-1431, Standard Technical Specifications, Westinghouse Plants and was accepted by the NRC reviewers. At that time, Power Range Neutron Flux, P-10, was identified as "Function 17.d" of ITS Table 3.3.1-1.
In response to NRC requests for additional information (RAI 3.3.1-14, dated November 17, 2000) on a different section of the ITS conversion submittal, Point Beach reinstated a previously deleted function (Function 17.b) into ITS Table 3.3.1-1 (NMC letter to NRC dated February 6, 2001). To maintain conformity with NUREG-1431, the functions in that Table that were previously numbered 17.b, 17.c and 17.d were renumbered as Functions 17.c, 17.d and 17.e respectively. However, we inadvertently did not renumber the corresponding reference to the P-10 interlock within LCO 3.1.8 when this function was renumbered to 17.e in ITS Table 3.3.1-1. Consequently, LCO 3.1.8 continued to reference Function 17.d, which was no longer the P-10 interlock. Renumbering of these functions in LCO 3.3.1 (ITS Table 3.3.1-1) thus caused LCO 3.1.8 to refer to the incorrect function (Function 17.d).
The proposed change is intended to rectify this condition and correct the reference in LCO 3.1.8 to the appropriate function in TS Table 3.3.1-1 (Function 17.e).
System License Basis The reactor fuel is protected by LCOs that preserve the initial conditions of the core assumed during the safety analyses. The methods for development of the LCOs that are excepted by the Physics Test Exceptions LCO are described in the Westinghouse Reload Safety Evaluation Methodology Report. These Physics Tests, and other tests that may be required to calibrate nuclear instrumentation or to diagnose operational problems, may require the operating control or process variables to deviate from their LCO limitations.
NRC 2002-0051 Page 3 of 6 The FSAR defines requirements for initial testing of the facility, including Physics Tests.
Table 13.2.2-1 summarizes the zero, low power, and power tests. Requirements for reload fuel cycle Physics Tests are defined in ANSI/ANS-19.6.1-1985. Although Physics Tests are generally accomplished within the limits for all LCOs, conditions may occur when one or more LCOs must be suspended to make completion of Physics Tests possible or practical. This is acceptable as long as the fuel design criteria are not violated. When one or more of the requirements specified in LCO 3.1.3, "Moderator Temperature Coefficient (MTC)," LCO 3.1.4, LCO 3.1.5, LCO 3.1.6, and LCO 3.4.2 are suspended for Physics Tests, the fuel design criteria are preserved as long as the power level is limited to _<5%, the reactor coolant temperature is kept _>530 0 F, and shutdown margin is within the limits provided in the Core Operating Limits Report (COLR).
Test Exception LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. A discussion of the criteria satisfied for the other LCOs is provided in their respective bases.
LCO 3.1.8 allows the reactor parameters of MTC and minimum temperature for criticality to be outside their specified limits. In addition, it allows selected control and shutdown rods to be positioned outside of their specified alignment and insertion limits. One Power Range Neutron Flux channel may be bypassed, reducing the number of required channels from "4" to "3". Operation beyond specified limits is permitted for the purpose of performing Physics Tests and poses no threat to fuel integrity, provided the surveillance requirements (SRs) are met.
During the performance of Physics Tests initiated in Mode 2, when LCO 3.1.8 applies, the requirements of LCO 3.1.3, LCO 3.1.4, LCO 3.1.5, LCO 3.1.6, and LCO 3.4.2 may be suspended and the number of required channels for LCO 3.3.1, "RPS Instrumentation," Functions 2, 5, and 17.e, may be reduced to "3" required channels, provided:
- a. RCS lowest loop average temperature is _>530°F;
- b. SDM is within the limits provided in the COLR; and
- c. THERMAL POWER is
3.0 PROPOSED CHANGE
The proposed amendment would revise TS LCO 3.1.8, Physics Tests Exceptions Mode 2, to correct a typographical error in the numbering of a function. The existing typographical error inappropriately makes the TS more restrictive than intended. The reference to Function 17.d would be corrected to read Function 17.e. LCO 3.1.8 is intended to specify that the number of required channels for LCO 3.3.1, "RPS Instrumentation," Functions 2, 5, and 17.e, may be reduced to "3" required channels, provided the additional stated conditions are satisfied. LCO 3.3.1, Function 17.e, is Reactor Trip System Interlock, Power Range Neutron Flux, P-10.
Technical Specification Bases changes are also being made to reflect the proposed Technical Specifications changes.
The proposed change is consistent with NUREG-1431, Standard Technical Specifications, Westinghouse Plants, Revision 2.
NRC 2002-0051 Page 4 of 6 4.0 ANALYSIS The original application to convert the Point Beach Current Technical Specifications (CTS) to the Improved Technical Specifications (ITS) was dated November 15, 1999. In that application, we stated that the CTS implicitly provides an exception to the operability requirements for the P-10 interlock during Low Power Physics Testing, thereby making the explicit accounting in ITS administrative.
The NRC Safety Evaluation, dated August 8, 2001, associated with Amendments 201/206 (ITS Conversion), stated, "The CTS allowance permitting an additional Power Range channel to be removed from service during Low Power Physics testing, which also results in an implicit exception to operability requirements for the ... P-10 interlock, has been explicitly stated in the ITS. This change is administrative since it represents a clarification of current plant practice." (SE Table DOC No. 3.1.10, A7)
The P-10 interlock is specified as Function 17.e in TS Table 3.3.1-1. For LCO 3.1.8, the NRC Safety Evaluation clearly approved an exception to operability requirements for the P-10 interlock, which is Function 17.e, and not for Function 17.d, which is the P-9 interlock. Therefore, the proposed change merely restores the originally approved exception for the P-10 interlock within LCO 3.1.8 by correctly identifying this function as Function 17.e.
The incorrect LCO 3.1.8 exception to operability requirements for Function 17.d (the P-9 interlock) is immaterial, because the TS do not require this function during Mode 2 (i.e.,
no nonconservatism existed in the TS as a result of this typographical error).
5.0 NO SIGNIFICANT HAZARDS DETERMINATION In accordance with the requirements of 10 CFR 50.90, Nuclear Management Company (licensee) hereby requests amendments to facility operating licenses DPR-24 and DPR-27, for Point Beach Nuclear Plant, Units 1 and 2, respectively. The purpose of the proposed amendments is to revise TS LCO 3.1.8, Physics Tests Exceptions - Mode 2, to correct a typographical error in the numbering of a function. The existing typographical error inappropriately makes the TS more restrictive than intended.
Nuclear Management Company has evaluated the proposed amendments in accordance with 10 CFR 50.91 against the standards in 10 CFR 50.92 and has determined that the operation of the Point Beach Nuclear Plant in accordance with the proposed amendments presents no significant hazards. Our evaluation against each of the criteria in 10 CFR 50.92 follows:
NRC 2002-0051 Page 5 of 6
- 1. Operation of the Point Beach Nuclear Plant in accordance with the proposed amendments does not result in a significant increase in the probability or consequences of any accident previously evaluated.
The primary purpose of the Mode 2 Physics Tests exceptions is to permit relaxations of existing LCOs to allow certain Physics Tests to be performed. The proposed change will permit the number of required channels specified in LCO 3.3.1, "RPS Instrumentation," for Power Range Neutron Flux, P-10 interlock, to be reduced to "3" required channels for Physics Tests, as originally analyzed and approved by NRC. LCO 3.1.8 already allows one power range neutron flux channel to be bypassed, reducing the number of required channels from "4" to "3". With this reduction in the number of required channels, the fuel design criteria are preserved as long as the power level is limited to < 5% RTP, the reactor coolant temperature is kept _>530 0 F, and shutdown margin (SDM) is within the limits provided in the Core Operating Limits Report (COLR). These three conditions are not affected by the proposed change. This change only restores the allowance previously analyzed as acceptable.
Therefore, the probability or consequences of an accident previously evaluated will not be significantly increased as a result of the proposed change.
- 2. Operation of the Point Beach Nuclear Plant in accordance with the proposed amendments does not result in a new or different kind of accident from any accident previously evaluated.
The proposed change does not involve any physical alteration of plant systems, structures or components, nor does it alter parameters governing normal plant operation. This change does not introduce any new or different normal operation or accident initiators. With the reduction in the number of required instrumentation channels, the fuel design criteria continue to be preserved as originally analyzed.
Equipment important to safety will continue to operate as designed. The changes do not result in any event previously deemed incredible being made credible. The changes do not result in more adverse conditions or result in any increase in the challenges to safety systems. Therefore, operation of the Point Beach Nuclear Plant in accordance with the proposed amendment will not create the possibility of a new or different type of accident from any accident previously evaluated.
- 3. Operation of the Point Beach Nuclear Plant in accordance with the proposed amendments does not result in a significant reduction in a margin of safety.
The primary purpose of the Mode 2 Physics Tests exceptions is to permit relaxations of existing LCOs to allow certain Physics Tests to be performed. The analysis for Physics Tests is based on one power range neutron flux channel being bypassed.
Therefore, reducing the requirement for an interlock associated with the bypassed channel is bounded by the original analysis. There are no new or significant changes to the initial conditions contributing to accident severity or consequences. The proposed amendment will not otherwise affect the plant protective boundaries, will not cause a release of fission products to the public, nor will it degrade the performance of any other structures, systems or components important to safety.
Therefore, the proposed change will not result in a significant reduction in the margin of safety.
NRC 2002-0051 Page 6 of 6 Conclusion Operation of the Point Beach Nuclear Plant in accordance with the proposed amendment will not result in a significant increase in the probability or consequences of any accident previously analyzed; will not result in a new or different kind of accident from any accident previously analyzed; and, does not result in a significant reduction in any margin of safety. Therefore, operation of the Point Beach Nuclear Plant in accordance with the proposed amendment does not result in a significant hazards determination.
6.0 ENVIRONMENTAL EVALUATION NMC has determined that the information for the proposed amendment does not involve a significant hazards consideration, authorize a significant change in the types or total amounts of effluent release, or result in any significant increase in individual or cumulative occupational radiation exposure. Therefore, we conclude that the proposed amendment meets the categorical exclusion requirements of 10 CFR 51.22(c)(9) and that an environmental impact appraisal need not be prepared.
NRC 2002-0051 Page 1 of 2 PROPOSED TECHNICAL SPECIFICATION CHANGES LICENSE AMENDMENT REQUEST 228 TECHNICAL SPECIFICATION LCO 3.1.8, PHYSICS TESTS EXCEPTIONS - MODE 2 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
PHYSICS TESTS Exceptions- MODE 2 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 PHYSICS TESTS Exceptions--MODE 2 LCO 3.1.8 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.3, "Moderator Temperature Coefficient (MTC)";
LCO 3.1.4, "Rod Group Alignment Limits";
LCO 3.1.5, "Shutdown Bank Insertion Limits";
LCO 3.1.6, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended and the number of required channels for LCO 3.3.1, "RPS Instrumentation," Functions 2, 5, and 17.de, may be reduced to "3" required channels, provided:
- a. RCS lowest loop average temperature is >_ 530'F;
- b. SDM is within the limits provided in the COLR; and
- c. THERMAL POWER is _<5% RTP.
APPLICABILITY: During PHYSICS TESTS initiated in MODE 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to 15 minutes restore SDM to within limit.
AND A.2 Suspend PHYSICS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TESTS exceptions.
B. THERMAL POWER not B.1 Open reactor trip Immediately within limit, breakers.
(continued)
Point Beach 3.1.8-1 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206
NRC 2002-0051 Page 1 of 2 PROPOSED TECHNICAL SPECIFICATION BASES CHANGES LICENSE AMENDMENT REQUEST 228 TECHNICAL SPECIFICATION LCO 3.1.8, PHYSICS TESTS EXCEPTIONS - MODE 2 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
PHYSICS TESTS Exceptions - MODE 2 B 3.1.8 BASES APPLICABLE The PHYSICS TESTS include measurement of core nuclear SAFETY ANALYSES parameters or the exercise of control components that affect process (continued) variables. Among the process variables involved are AFD and QPTR, which represent initial conditions of the unit safety analyses. Also involved are the movable control components (control and shutdown rods), which are required to shut down the reactor. The limits for these variables are specified for each fuel cycle in the COLR. As described in LCO 3.0.7, compliance with Test Exception LCOs is optional, and therefore no criteria of the NRC Policy Statement apply. Test Exception LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. A discussion of the criteria satisfied for the other LCOs is provided in their respective bases.
Reference 6 allows special test exceptions (STEs) to be included as part of the LCO that they affect. It was decided, however, to retain this STE as a separate LCO because it was less cumbersome and provided additional clarity.
LCO This LCO allows the reactor parameters of MTC and minimum temperature for criticality to be outside their specified limits. In addition, it allows selected control and shutdown rods to be positioned outside of their specified alignment and insertion limits. One Power Range Neutron Flux channel may be bypassed, reducing the number of required channels from "4" to "3". Operation beyond specified limits is permitted for the purpose of performing PHYSICS TESTS and poses no threat to fuel integrity, provided the SRs are met.
The requirements of LCO 3.1.3, LCO 3.1.4, LCO 3.1.5, LCO 3.1.6, and LCO 3.4.2 may be suspended and the number of required channels for LCO 3.3.1, "RT-S-RPS Instrumentation," Functions 2, 5, and 17.de, may be reduced to "3" required channels, during the performance of PHYSICS TESTS provided:
- a. RCS lowest loop average temperature is > 530°F;
- b. SDM is within the limits provided in the COLR; and
- c. THERMAL POWER is
APPLICABILITY This LCO is applicable when performing low power PHYSICS TESTS.
The Applicability is stated as "during PHYSICS TESTS initiated in MODE 2" to ensure that the 5% RTP maximum power level is not exceeded. Should the THERMAL POWER exceed 5% RTP, and Point Beach B 3.1.8-5 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206
NRC 2002-0051 Page 1 of 3 REVISED TECHNICAL SPECIFICATION PAGES LICENSE AMENDMENT REQUEST 228 TECHNICAL SPECIFICATION LCO 3.1.8, PHYSICS TESTS EXCEPTIONS - MODE 2 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
PHYSICS TESTS Exceptions -MODE 2 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 PHYSICS TESTS Exceptions--MODE 2 LCO 3.1.8 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.3, "Moderator Temperature Coefficient (MTC)";
LCO 3.1.4, "Rod Group Alignment Limits";
LCO 3.1.5, "Shutdown Bank Insertion Limits";
LCO 3.1.6, "Control Bank Insertion Limits"; and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended and the number of required channels for LCO 3.3.1, "RPS Instrumentation," Functions 2, 5, and 17.e, may be reduced to "3" required channels, provided:
- a. RCS lowest loop average temperature is > 530'F;
- b. SDM is within the limits provided in the COLR; and
- c. THERMAL POWER is _<5% RTP.
APPLICABILITY: During PHYSICS TESTS initiated in MODE 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. SDM not within limit. A.1 Initiate boration to 15 minutes restore SDM to within limit.
AND A.2 Suspend PHYSICS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TESTS exceptions.
B. THERMAL POWER not B.1 Open reactor trip Immediately within limit, breakers.
(continued)
Point Beach 3.1.8-1 Unit 1 - Amendment No.
Unit 2 - Amendment No.
PHYSICS TESTS Exceptions - MODE 2 B 3.1.8 BASES APPLICABLE The PHYSICS TESTS include measurement of core nuclear SAFETY ANALYSES parameters or the exercise of control components that affect process (continued) variables. Among the process variables involved are AFD and QPTR, which represent initial conditions of the unit safety analyses. Also involved are the movable control components (control and shutdown rods), which are required to shut down the reactor. The limits for these variables are specified for each fuel cycle in the COLR. As described in LCO 3.0.7, compliance with Test Exception LCOs is optional, and therefore no criteria of the NRC Policy Statement apply. Test Exception LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. A discussion of the criteria satisfied for the other LCOs is provided in their respective bases.
Reference 6 allows special test exceptions (STEs) to be included as part of the LCO that they affect. It was decided, however, to retain this STE as a separate LCO because it was less cumbersome and provided additional clarity.
LCO This LCO allows the reactor parameters of MTC and minimum temperature for criticality to be outside their specified limits. In addition, it allows selected control and shutdown rods to be positioned outside of their specified alignment and insertion limits. One Power Range Neutron Flux channel may be bypassed, reducing the number of required channels from "4" to "3". Operation beyond specified limits is permitted for the purpose of performing PHYSICS TESTS and poses no threat to fuel integrity, provided the SRs are met.
The requirements of LCO 3.1.3, LCO 3.1.4, LCO 3.1.5, LCO 3.1.6, and LCO 3.4.2 may be suspended and the number of required channels for LCO 3.3.1, "RPS Instrumentation," Functions 2, 5, and 17.e, may be reduced to "3" required channels, during the performance of PHYSICS TESTS provided:
- a. RCS lowest loop average temperature is >_530'F;
- b. SDM is within the limits provided in the COLR; and
- c. THERMAL POWER is *5% RTP.
APPLICABILITY This LCO is applicable when performing low power PHYSICS TESTS.
The Applicability is stated as "during PHYSICS TESTS initiated in MODE 2" to ensure that the 5% RTP maximum power level is not exceeded. Should the THERMAL POWER exceed 5% RTP, and Point Beach B 3.1.8-5 Unit 1 - Amendment No.