ITAAC Closure Notification on Completion of ITAAC 3.3.00.07bc (Index Number 794)
ML22168A212
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/17/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 3.3.00.07bc, ND-22-0466
Download: ML22168A212 (6)


Text

Jamie M. Colem a n 7825 Rive r Road

>-,, Southern Nuclear Reg u latory Affa irs Direc tor Waynesboro, GA 30830 Vogt le 3 & 4 706-84 8 -6 459 tel JUN 1 '7 2022

Docket No. : 52-025

ND-22-0466 U.S. Nuclear Regulatory Commission 1 O CFR 52.99(c)(1)

Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.07bc [Index Number 794]

Ladies and Gentlemen:

In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.07bc [Index Number 794]. This ITAAC verified Class 1 E divisional electrical cables and communication cables associated with only one division are routed in their respective divisional raceways in the radiologically controlled area of the auxiliary building. The closure process for this ITAAC is based on the guidance described in NEl-08-01, " Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52 ", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848 - 6991.

Respectfully submitted,

k ~ itf JMC Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 ITAAC Completion of ITAAC 3.3.00.07bc [Index Numbe r 794 ]

JMC / CMK/sfr U.S. Nuclear Regulatory Commission ND-22-0466 Page 2 of 3

To:

Southern Nuclear O p erating Compan y / Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. Pitts Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J. M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow M r. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND.LI.L06 File AR.01.02.06

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez - Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasq u ez Mr. J. Eargle Ms. K. Mccur ry Mr. J. Parent Mr. B. Griman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-22-0466 Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Utilities Mr. T. Bundros

Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Geo rgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-22-0466 Enclosure Page 1 of 3

Southern Nuclear Operating Company ND-22-0466 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 3 ITAAC Completion of ITAAC 3.3.00.07bc [Index Number 794]

U.S. Nuclear Regulatory Commission ND-22-0466 Enclosure Page 2 of 3

IT AAC Statement

Design Commitment

7.b)Class 1 E divisional electrical cables and communication cables associated with only one division are routed in their respective divisional raceways.

Inspections/Tests/ Analyses

Inspections of the as-built Class 1 E divisional cables and the as-built raceways that route the Class 1 E cables will be conducted.

Acceptance Criteria

c) Class 1 E electrical cables and communication cables in the radiologically controlled area of the auxiliary building associated with only one division are routed in raceways assigned to the same division. There are no other safety division electrical cables in a raceway assigned to a different division.

ITAAC Determination Basis

Multiple IT AAC are performed to demonstrate that Class 1 E divisional electrical cables and communication cables associated with only one division are routed in their respective divisional raceways. The subject ITAAC requires inspections of the as-built Class 1 E divisional cables and the as-built raceways that route the Class 1 E cables be conducted to confirm that Class 1 E electrical cables and communication cables in the radiologically controlled area of the auxiliary building associated with only one division are routed in raceways assigned to the same division and that there are no other safety division electrical cables in a raceway assigned to a different division. The raceway and cable divisional grouping is described in APP-GW-E1-001, Electrical System Design Criteria (Reference 1 ). Installation specifications provided to the constructor identify the routing criteria, consistent with the ITAAC commitment.

Class 1 E electrical cables and communication cables in the radiologically controlled area of the auxiliary building were routed in raceways in accordance with design drawings and installation specifications issued for construction, and work package requirements. Completed raceway installation, in-progress and completed cable installation, and completed cable terminations were inspected to ensure the routing criteria in the installation specifications are satisfied.

Inspections were performed in accordance with the Construction Quality Verification Program 26139-000-4MP-T81C-N7101 (Reference 2). The completed inspection records document the satisfactory routing of the Class 1 E electrical cables and communication cables associated with only one division in raceways assigned to the same division and that there are no other safety division electrical cables in a raceway assigned to a different division.

Cable Separation Report (Reference 3) identifies the inspection reports associated with the cable routing inspections, and confirms that the Class 1 E electrical cables and communication cables in the radiologically controlled area of the auxiliary building associated with only one division are routed in raceways assigned to the same division and that there are no other safety division electrical cables in a raceway assigned to a different division.

U.S. Nuclear Regulatory Commission ND-22 - 0466 Enclosure Page 3 of 3

The Cable Separation Report (Reference 3) is available for NRC inspection as part of the Unit 3 ITAAC Completion Package (Reference 4).

List of IT AAC Findings

In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The IT AAC completion review is documented in the ITAAC Completion Package for ITAAC 3.3.00.0?bc (Reference 4) and is available for NRC review.

IT AAC Completion Statement

Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.0?bc was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. APP-GW-E1-001, Electrical System Design Criteria
2. 26139-000-4MP -T81 C-N7101, Construction Quality Verification Program
3. SV3 - 1200-ITR-AUXRD, Unit 3 Cable Separation Report for the Radiologically Controlled Area of the Auxiliary Building
4. Unit 3 ITAAC 3.3.00.07bc Completion Package