Jamie M. Coleman 7825 River Road

~ Southern Nuclear Regu latory A ffairs Direc tor Way nesboro, GA 3083 0 Vogtle 3 & 4 706 - 848-6926 tel

May 6, 2022

Docket No. : 52-025 ND-22-0276 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.2.05.09c (Index Number 8771

Ladies and Gentlemen :

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC ) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) 2.2.05.09c (Index Number 8771. This ITAAC confirms that Main Control Room (MCR) Load Shed Panels identified in Combined License Appendi x C Table 2.2.5-1 perform their active safety function after receiving a signal from the Protection and Safety Monitoring System (PMS). The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

Ct)MML ~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure : Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.05.09c (Index Number 8771

JMC / DCH/sfr U.S. Nuclear Regulatory Commission ND-22-0276 Page 2 of 3

To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND.LI.L06 File AR.01.02.06

Nuclear Regulato ry Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-22-0276 Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Utilities Mr. T. Bundros

Westinghouse Electric Company 1 LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph. D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-22-0276 Enclosure Page 1 of 4

Southern Nuclear Operating Company ND-22-0276 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.05.09c [Index Number 877]

U.S. Nuclear Regulatory Commission ND-22-0276 Enclosure Page 2 of 4

ITAAC Statement Design Commitment 9.c) The MCR Load Shed Panels identified in Table 2.2.5-1 perform their active safety function after receiving a signal from the PMS.

Inspections, Tests, Analyses Testing will be performed on the MCR Load Shed Panels listed in Table 2.2.5-1 using real or simulated signals into the PMS.

Acceptance Criteria The MCR Load Shed Panels identified in Table 2.2.5-1 perform their active safety function identified in the table after receiving a signal from the PMS.

ITAAC Determination Basis Testing was performed to demonstrate the Main Control Room (MCR) Load Shed Panels identified in Combined License (COL) Appendix C Table 2.2.5-1 (Attachment A) performed their active safety function after receiving a signal from the Protection and Safety Monitor ing System (PMS).

Testing was performed in accordance with Unit 3 component test packages listed in Reference 1 and confirmed that the MCR Load Shed Panels identified in Attachment A performed their active safety function to de-energize MCR loads after receiving a signal from the PMS.

An actuation signal from PMS was generated using the PMS Maintenance and Test Panel (MTP) to actuate the MCR Load Shed Panel 1, Division A. The MCR Load Shed Panel was verified locally to have actuated after the receipt of the actuation signal and the stage 1 and stage 2 loads were verified to be de-energized. The MCR Load Shed Panel 1, Division A was reset and the loads were verified to be energized. This methodology was repeated for MCR Load Shed Panel 2, Division A, MCR Load Shed Panel 1, Division C, and MCR Load Shed Panel 2, Division C.

The completed Unit 3 component test results (reference 1) confirmed that the MCR Load Shed Panels identified in Table 2.2.5-1 perform their active safety function identified in the table after receiving a signal from the PMS.

Reference 1 is available for NRC inspection as part of Unit 3 ITAAC Completion Packages (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.05.09c Completion Package (Reference 2) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0276 Enclosure Page 3 of 4

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.2.05.09c was performed for VEGP Unit 3 and that the associated acceptance criteria is met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-VES-ITR - 800877, Rev 0, "Unit 3 Recorded Results of Main Control Room Load Shed :

ITAAC 2.2.05.09c, NRC Index Number : 877" 2. 2.2.05.09c-U3-CP-Rev0, ITAAC Completion Package U.S. Nuclear Regulatory Commission ND-22-0276 Enclosure Page 4 of 4

Attachment A

  • E t f COLA d" CT bl 2 2 5 1 xcerp rom Pl oen IX a e.. -
  • Equipment Name *Tag No. *Active Function MCR Load Shed Panel 1 VES-EP-01 De-energize MCR Loads

MCR Load Shed Panel 2 VES-EP-02 De-energize MCR Loads