ND-22-0002, ITAAC Closure Notification on Completion of 2.3.09.04b (Index Number 428)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of 2.3.09.04b (Index Number 428)
ML22132A266
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/12/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0002
Download: ML22132A266 (8)


Text

Jamie M. Coleman 7825 River Road A Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6926 tel MAY 1 2 2022

Docket No.: 52-025 ND-22-0002 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.3.09.04b [Index Number 4281

Ladies and Gentlemen:

In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.09.04b [Index Number 4281 to verify that the Containment Hydrogen Control System (VLS) igniters energize after receiving a signal from the Diverse Actuation System (DAS). The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

~ m ~

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.09.04b [Index Number 4281

JMC/JTK/sfr U.S. Nuclear Regulatory Commission ND-22-0002 Page 2 of 3

To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06

cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-22-0002 Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Utilities Mr. T. Bundros

Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S. L. Zwack

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 1 of 5

Southern Nuclear Operating Company ND-22-0002 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.09.04b [Index Number 428]

U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 2 of 5

IT AAC Statement

Design Commitment

4.b) The components identified in Table 2.3.9-2 perform the listed function after receiving a manual signal from DAS.

Inspections/Tests / Analyses

Testing will be performed on the igniters using the DAS controls.

Acceptance Criteria

The igniters energize after receiving a signal from DAS.

ITAAC Determination Basis

Testing was performed in accordance with Unit 3 preoperational test procedures listed in Reference 1, to confirm the components identified in Combined License (COL) Appendix C Table 2.3.9-2 (Attachment A) performed the listed function after receiving a manual signal from the Diverse Actuation System (DAS).

Testing was performed in two parts to verify the igniters energize after receiving a signal from DAS. In the first preoperational test procedure documented in Reference 1, Hydrogen Igniter Control Switches 3-DAS-HS213 and 3-DAS-HS214, at the DAS control panel in the Main Control Room (MCR) were switched to the ON position. A digital multimeter was then used to verify the Containment Hydrogen Igniter control relays in Hydrogen Igniter Control Panels 3-VLS-JC-001 (Group 1 ), and 3-VLS-JC-002 (Group 2), we re energized. The Hydrogen Igniter Control Switches we re then switched to the OFF position.

In the second part, the other preoperational test procedure documented in Reference 1 placed Hydrogen lgniters switches VLS-EH-GR1 (Group 1) and VLS-EH-GR2 (Group 2) to the ON position. The same relays verified as energized in the first part of the test were also verified as energized in this procedure; relays in Hydrogen Igniter Control Panels 3-VLS-JC-001 (Group 1 ),

and 3-VLS-JC-002 (Group 2). An inspection verified that each of the sixty-six igniters identified in Attachment A were energized by recording an overall increase of igniter temperatures at 1 O second intervals for 90 seconds. Switches VLS-EH-GR1 (Group 1) and VLS-EH-GR2 (Group

2), were then placed to the OFF position.

Unit 3 preoperational test results as identified in Reference 1 confirmed the igniters energize after receiving a signal from DAS.

Reference 1 is available for NRC inspection as part of Unit 3 ITAAC 2.3.09.04b Completion Package (Reference 2).

U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 3 of 5

ITAAC Finding Review

In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.09.04b (Reference 2) and is available for NRC review.

IT AAC Completion Statement

Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.09.04b was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-VLS-ITR-800428, Rev. 0, "Unit 3 Containment Hydrogen Control (VLS) Igniter Functionality Test from Diverse Actuation System (DAS): ITAAC 2.3.09.04b, Item 4.b)

NRC Index Number: 428"

2. 2.3.09.04b-U3-CP-Rev0 "ITAAC Completion Package" U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 4 of 5

Attachment A

  • E f xcerot rom COLA,ppend1x C Ta bl e 2.3.9-2
  • Equipment Name *Tag Number *Function *Power Group Number Hydrogen Igniter 01 VLS-EH-01 Energize 1 Hydrogen Igniter 02 VLS-EH-02 Energize 2 Hydrogen Igniter 03 VLS-EH-03 Energize 1 Hydrogen Igniter 04 VLS-EH-04 Energize 2 Hydrogen Igniter 05 VLS-EH-05 Energize 1 Hydrogen Igniter 06 VLS-EH-06 Energize 2 Hydrogen Igniter 07 VLS-EH-07 Energize 2 Hydrogen Igniter 08 VLS-EH-08 Energize 1 Hydrogen Igniter 09 VLS-EH-09 Energize 1 Hydrogen Igniter 1 0 VLS-EH-10 Energize 2 Hydrogen Igniter 11 VLS-EH-11 Energize 2 Hydrogen Igniter 12 VLS-EH-12 Energize 1 Hydrogen Igniter 13 VLS-EH-13 Energize 1 Hydrogen Igniter 14 VLS-EH-14 Energize 2 Hydrogen Igniter 15 VLS-EH-15 Energize 2 Hydrogen Igniter 16 VLS-EH-16 Energize 1 Hydrogen Igniter 17 VLS-EH-17 Energize 2 Hydrogen Igniter 18 VLS-EH-18 Energize 1 Hydrogen Igniter 19 VLS-EH-19 Energize 2 Hydrogen Igniter 20 VLS-EH-20 Energize 2 Hydrogen Igniter 21 VLS-EH-21 Energize 1 Hydrogen Igniter 22 VLS-EH-22 Energize 1 Hydrogen Igniter 23 VLS-EH-23 Energize 2 Hydrogen Igniter 24 VLS-EH-24 Energize 2 Hydrogen Igniter 25 VLS-EH-25 Energize 2 Hydrogen Igniter 26 VLS-EH-26 Energize 2 Hydrogen Igniter 27 VLS-EH-27 Energize 1 Hydrogen Igniter 28 VLS-EH-28 Energize 1 Hydrogen Igniter 29 VLS-EH-29 Energize 1 Hydrogen Igniter 30 VLS-EH-30 Energize 2 Hydrogen Igniter 31 VLS-EH-31 Energize 1 Hydrogen Igniter 32 VLS-EH-32 Energize 1 Hydrogen Igniter 33 VLS-EH-33 Energize 2 Hydrogen Igniter 34 VLS-EH-34 Energize 1 Hydrogen Igniter 35 VLS-EH-35 Energize 1 Hydrogen Igniter 36 VLS-EH-36 Energize 2 Hydrogen Igniter 37 VLS-EH-37 Energize 1 U.S. Nuclea r Regulato ry Commission ND-22-0002 Enclosure Page 5 of 5

Attachment A (con't)

  • Excerot from COL Appendix C Table 2.3.9-2
  • Equipment Name *Tag Number ' *Function *Power Group Number Hydrogen Igniter 38 VLS-EH-38 Energize 2 Hydrogen Igniter 39 VLS-EH-39 Energize 1 Hydrogen Igniter 40 VLS-EH-40 Energize 2 Hydrogen Igniter 41 VLS-EH-41 Energize 2 Hydrogen Igniter 42 VLS-EH-42 Energize 1 Hydrogen Igniter 43 VLS-EH-43 Energize 1 Hydrogen Igniter 44 VLS-EH-44 Energize 1 Hydrogen Igniter 45 VLS-EH-45 Energize 2 Hydrogen Igniter 46 VLS-EH-46 Energize 2 Hydrogen Igniter 47 VLS-EH-47 Energize 1 Hydrogen Igniter 48 VLS-EH-48 Energize 2 Hydrogen Igniter 49 VLS-EH-49 Energize 1 Hydrogen Igniter 50 VLS-EH-50 Energize 2 Hydrogen Igniter 51 VLS-EH-51 Energize 1 Hydrogen Igniter 52 VLS-EH-52 Energize 2 Hydrogen Igniter 53 VLS - EH-53 Energize 2 Hydrogen Igniter 54 VLS-EH-54 Energize 1 Hydrogen Igniter 55 VLS-EH-55 Energize 1 Hydrogen Igniter 56 VLS-EH-56 Energize 2 Hydrogen Igniter 57 VLS-EH-57 Energize 2 Hydrogen Igniter 58 VLS-EH-58 Energize 1 Hydrogen Igniter 59 VLS-EH-59 Energize 2 Hydrogen Igniter 60 VLS - EH-60 Energize 1 Hydrogen Igniter 61 VLS-EH-61 Energize 1 Hydrogen Igniter 62 VLS-EH-62 Energize 2 Hydrogen Igniter 63 VLS-EH-63 Energize 1 Hydrogen Igniter 64 VLS-EH-64 Energize 2 Hydrogen Igniter 65 VLS-EH-65 Energize 1 Hydrogen Igniter 66 VLS-EH-66 Energize 2