ND-21-1055, ITAAC Closure Notification on Completion of ITAAC 3.3.00.17 (Index Number 822)

From kanterella
(Redirected from ND-21-1055)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 3.3.00.17 (Index Number 822)
ML22070B126
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/11/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 3.3.00.17, ND-21-1055
Download: ML22070B126 (6)


Text

Michael J . Yox 7825 River Road

._ Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706 -848-6459 tel MAR 1 1 2022 Docket No.: 52-025 ND-21-1055 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.17 [Index Number 822]

Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests , Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.17 [Index Number 822] .

This ITAAC confirms that Vital Areas are locked and alarmed with active intrusion detection systems and intrusion is detected and annunciated in both the central and secondary alarm stations. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52 ,"

which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52 .99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted ,

?/1.d,. 'fM/)

Michael J. Y:;_17' ~

Regulatory Affairs Director Vogtle 3 & 4 Enclosure : Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.17 [Index Number 822]

MJY/ RLB/sfr

U.S. Nuclear Regulatory Commission ND-21-1055 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01 .02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-21-1055 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Mr. J. L. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton , Balch Bingham

U.S. Nuclear Regulatory Commission ND-21-1055 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-21-1055 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.17 [Index Number 822]

U.S. Nuclear Regulatory Commission ND-21-1055 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

17. Vital areas are locked and alarmed with active intrusion detection systems that annunciate in the central and secondary alarm stations upon intrusion into a vital area.

Inspections/Tests/ Analyses An inspection of the as-built vital areas, and central and secondary alarm stations are performed.

Acceptance Criteria Vital areas are locked and alarmed with active intrusion detection systems and intrusion is detected and annunciated in both the central and secondary alarm stations.

ITAAC Determination Basis An inspection of the as-built vital areas, and central and secondary alarm stations was performed to confirm the Vogtle Electric Generating Plant (VEGP) Unit 3 vital areas are locked and alarmed with active intrusion detection systems and intrusion is detected and annunciated in both the central alarm station (CAS) and secondary alarm station (SAS), and satisfy the applicable vital area access control requirements of the VEGP Unit 3 and Unit 4 Physical Security Plan associated with 10 CFR 73.55(e)(9)(iii) . The VEGP Unit 3 Plant Security System ITAACs only cover the Unit 3 plant security system design commitment scope.

A walkdown inspection of the as-built vital area portals was performed as described in ITAAC Technical Report SV3-SES-ITR-800822 (Reference 1) and visually confirmed that each VEGP Unit 3 vital area portal has active intrusion detection equipment and locking devices installed per approved design specifications, and that the vital area portal is locked . The inspection then required observation that when each vital area portal intrusion device is activated (e.g ., unlocking via key, latch or crash bar and opening the portal door, etc.) the intrusion detection device actuation was detected and alarmed in both the CAS and SAS. Lastly, the inspection confirmed that each CAS and SAS intrusion detection alarm reset once the associated portal door was closed and locked.

Reference 1 confirmed that each vital area portal has active intrusion detection equipment and locking devices installed per approved design specifications and that the vital area portal is locked, intrusion detection device activation is detected and annunciated in both CAS and SAS for each vital area portal intrusion detection device, and each CAS and SAS intrusion detection alarm resets once the associated portal door is closed and locked.

Reference 1 is available for NRC inspection as part of the Unit 3 ITAAC 3.3.00.17 Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.3.00.17 (Reference 2) and is available for NRC review .

U.S. Nuclear Regulatory Commission ND-21-1055 Enclosure Page 3 of 3 IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.17 was performed for VEGP Unit 3 and that the prescribed acceptance criteria was met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-SES-ITR-800822, Vital Area Portal Inspections, Rev 0 (Security Related Information)
2. 3.3.00.17-U3-CP-Rev0, ITAAC Completion Package