MONTHYEARML25051A1322025-02-20020 February 2025 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit No. 1 - Alternative Request to Use Code Case N-740-2 for Dissimilar Metal Weld Overlay ML25043A2292025-02-12012 February 2025 NRR E-mail Capture - Brunswick Steam Electric Plant, Unit No. 1 - February 12, 2025, Verbal Approval for Duke Energy Request to Use a Later Edition of ASME B&PV Code ML24351A0262024-12-10010 December 2024 Duke Energy Fleet - Alternative Request for ASME Code Case N-572 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0472021-12-23023 December 2021 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21200A1582021-07-16016 July 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ML21168A0042021-06-17017 June 2021 Notification of Inspection and Request for Information ML21137A1622021-04-26026 April 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060) ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20294A0642020-10-20020 October 2020 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML21033A8562020-08-0505 August 2020 NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091 ML20121A1262020-04-29029 April 2020 Radiation Safety Baseline Inspection Information Request ML20111A1212020-04-20020 April 2020 NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048 ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19252A4572019-09-0808 September 2019 (FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results ML19252A4092019-09-0606 September 2019 (E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2 ML19219A2132019-08-0707 August 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19162A3902019-06-11011 June 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12 ML19162A3912019-06-11011 June 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography 2025-02-20
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML25006A0902025-01-0606 January 2025 Request for Information for Brunswick Unit 2 Baseline ISI Inspection - March 10-14, 2025 ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML22192A0862022-07-12012 July 2022 RQ Inspection Notification Letter ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21239A0652021-09-0808 September 2021 Request for Additional Information Regarding Proposed Alternative to ASME Section XI Requirements for Repair - Replacement of Buried Service Water Piping (EPID L-021-LLR-0014) - Public ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283C5532019-10-18018 October 2019 Redacted - Brunswick Steam Electric Plant, Units 1 and 2 - Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19081A0722019-03-21021 March 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19015A0302019-01-14014 January 2019 NRR E-mail Capture - Brunswick 2nd Round RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19010A3872019-01-10010 January 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML18360A0362018-12-21021 December 2018 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML18360A0352018-12-21021 December 2018 NRR E-mail Capture - Brunswick Draft 2nd Round RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18282A1492018-10-0909 October 2018 NRR E-mail Capture - Brunswick RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18263A3042018-09-20020 September 2018 NRR E-mail Capture - Brunswick Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18250A3082018-08-31031 August 2018 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits Report ML18225A0122018-08-10010 August 2018 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits Report RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18130A8262018-05-15015 May 2018 Supplemental Information Needed for Acceptance. Amendment Request to Revise the Technical Specifications to Relocate the Pressure Temperature Limit Curves to a Pressure and Temperature Limits Report ML18088A0072018-03-27027 March 2018 NRR E-mail Capture - Brunswick Units 1 & 2 Request for Additional Information - Relief Request for RPV Shell Circumferential Weld Examination (L-2018-LLR-0001) ML18071A3732018-03-12012 March 2018 NRR E-mail Capture - Correction: Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) ML18067A1032018-03-0808 March 2018 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) ML18010A0502018-01-0505 January 2018 E-mail Re. Brunswick Units 1 and Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) ML18010A0512018-01-0505 January 2018 Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) (Nonproprietary) ML17339A9132017-12-0505 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - Human Factors (EPID: L- 2017- LLA- 0398) ML17317B0022017-12-0404 December 2017 Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) ML17339A0702017-12-0404 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - Electrical Engineering (EPID: L- 2017- LLA- 0398) ML17339A0732017-12-0404 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - PRA (EPID: L- 2017- LLA- 0398) ML17328A4872017-11-24024 November 2017 Unit 2 - Request for Additional Information Related the Emergency Amendment Request for One-Time Extension of EDG Completions Time ML17275A2772017-10-0202 October 2017 E-mail, Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CAC Nos. MF8864 and MF8865) (Non-Proprietary) ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17082A3042017-03-0909 March 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CACs MF8864 and MF8865) ML17037A0022017-02-0303 February 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related to LAR to Modify the TS Requirements for End States Associated with the Implementation of the Approved TSTF Traveler TSTF-423-A (MF8466 and MF8467) 2025-01-06
[Table view] |
Text
From:
Adam Nielsen To:
Thomas.Sherrill3@duke-energy.com Cc:
Jack Bell
Subject:
Document request for RP inspection at Brunswick inspection report 2023-01 Date:
Tuesday, January 17, 2023 1:11:00 PM Attachments:
Brunswick doc request_RPinspection_23-01.pdf Please see the attached document request for our upcoming RP inspection scheduled for February 13 - 17, 2023. Note that some of the items may be outside RPs purview, so coordination with other groups might be required (e.g. ventilation testing records, etc.).
We would like to have the documents available by February 6, 2023. However, if you run into difficulty and need more time for certain items, just let us know and we can work with you.
Please call me with any questions.
- Thanks, Adam Nielsen Senior Health Physicist US NRC Region II (404) 997-4660
Brunswick Steam Electric Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2023001 During the week of February 13 - 17, 2023, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the Brunswick Steam Electric Plant (NRC Inspection Procedures 71124.01, 71124.03, and 71151).
To minimize the impact to your onsite resources during the inspection and ensure the inspectors have the necessary information to complete the inspection while on site, we have enclosed a request for documents needed for this activity. The NRC requests that these documents be provided to the inspectors no later than February 6, 2023.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding: a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational Radiation Safety Cornerstone Brunswick Licensing
Contact:
Thomas Sherrill (910) 832-2703 thomas.sherrill3@duke-energy.com Inspection Dates:
February 13 - 17, 2023 Documents Due to Region II by: February 6, 2023 NRC Inspection Procedures (IPs):
71124.01 - Radiological Hazard Assessment and Exposure Controls 71124.03 - In-Plant Airborne Radioactivity Control and Mitigation 71151 - Performance Indicator Verification Note: Please provide the current version of these documents in an electronic format if possible (The preferred file format is MSWord, or searchable.pdf files). To the extent possible, please organize the information in directories as requested below and if possible, use a descriptive name for the files provided. If there are questions regarding the documents requested, or method of transfer, please do not hesitate to contact the lead inspector.
Documentation for inspection procedures 71124.01 and 71151 should be from March 4, 2022 to present. Documentation for inspection procedure 711124.03 should be from April 2, 2021 to present. These dates are approximate to the last time these inspections were conducted. Also, provide only a listing and title for CRs requested for each inspection procedure and inspectors will select a sample from these for in-depth review during the inspection.
If you have any questions, please call Adam Nielsen at 404-997-4660. Thank you in advance for your effort in putting together this material.
General and Miscellaneous Information
- 1. List of primary site contact(s) for each inspection area including name(s), e-mail and telephone numbers.
- 2. Corrective Action Program procedures.
- 3. Schedule of major outage maintenance/work activities during the week of the inspection (Gantt chart if available).
71124.01 - Radiological Hazard Assessment and Exposure Controls (Last inspected on March 4, 2022)
- 1. List of Radiation Work Permits (RWPs) (including their dose and dose rate limits), for the upcoming outage.
- 2. Site and Corporate procedures related to Radiation Protection (RP) controls (e.g., posting, labeling, surveys, RWPs, contamination control, high radiation area (HRA)/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, etc.)
- 3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm follow-up, etc.)
- 4. List of non-fuel items stored in spent fuel pool.
- 5. Most recent 10 CFR 61 analysis for the Dry Active Waste (DAW) waste stream.
- 6. ALARA work plans for the top 3 highest dose jobs for the upcoming outage.
- 7. ALARA report from the previous refueling outage.
- 8. Most recent self-assessment or audit covering RP controls.
- 9. List of CRs related to RP controls (e.g., radworker error, HP technician error, posting issues, radioactive source controls, HRA/LHRA/VHRA issues, survey problems, etc.) generated since March 4, 2022. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last Inspected on April 2, 2021)
- 1. Procedures related to airborne monitoring and control (e.g. use of purge systems, use of portable HEPA/charcoal units, temporary ventilation enclosures, use of CAMs, air sampling guidance, alpha air sampling, etc.), as applicable.
- 2. Procedures related to the use of respiratory protection devices, (e.g. SCBA, TEDE-ALARA guidance, PAPRs, storage, maintenance, training, QA, fit-testing, etc.)
- 3. Copy of the last 2 grade D air testing certificates for each supplied air system and SCBA filling station.
- 4. Documentation of the last 2 surveillances performed on SCBAs available for emergency use (typically monthly).
- 5. Two most recent HEPA filter DOP and charcoal test results for the Control Room Emergency Ventilation (CREV) System, all trains (typically every 18-months).
- 6. Most recent audit or self-assessment covering airborne controls and respiratory protection
- 7. List of CRs related to airborne monitoring and respiratory protection since April 2, 2021. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
- 8. SCBA qualification records:
a) List of all licensed operators qualified to wear an SCBA b) List of all RP personnel qualified to wear an SCBA 71151 - Performance Indicator Verification (Occupational Radiation Safety Cornerstone Only)
- 1. Procedure(s) for gathering and reporting PI data.
- 2. List of all CRs related to LHRA/VHRA issues or significant unintended doses since March 4, 2022. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
- 3. List of electronic dosimeter alarms since March 4, 2022 (dose and dose rate).
Inspector Contact Information:
Mailing Address:
Adam Nielsen US NRC Region II U.S. Nuclear Regulatory Commission ATTN: Adam Nielsen Sr. Health Physicist 245 Peachtree Center Ave., N.E (404) 997-4660 Suite 1200 adam.nielsen@nrc.gov Atlanta, GA 30303