NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML23220A234
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/08/2023
From: Luke Haeg
Plant Licensing Branch II
To: Treadway R
Duke Energy Progress
References
L-2023-LLL-0013
Download: ML23220A234 (2)


Text

From:

Luke Haeg Sent:

Tuesday, August 8, 2023 1:04 PM To:

Ryan.Treadway@duke-energy.com Cc:

Duc, Joshua Brian; David Wrona

Subject:

Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule for Robinson, Unit 2 (L-2023-LLL-0013)

Mr. Treadway, By letter dated July 12, 2023 (Agencywide Documents Access and Management System Package Accession No. ML23193A368), Duke Energy submitted, for NRC review and approval, a requested revision to the schedule for the reactor vessel surveillance capsule. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to begin its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to begin its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified in requests for additional information despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> to complete. The NRC staff expects to complete this review by January 31, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the submittal and they can change due to several factors including requests for additional information, unanticipated addition of scope to the review, review by NRC advisory committees, or hearing-related activities.

If you have any questions, please contact me at (301) 415-0272 or luke.haeg@nrc.gov.

Luke Haeg Project Manager NRR/DORL/LPL2-2 301-415-0272

Hearing Identifier:

NRR_DRMA Email Number:

2189 Mail Envelope Properties (DM8PR09MB64075682DFE15DC542DED7B7980DA)

Subject:

Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule for Robinson, Unit 2 (L-2023-LLL-0013)

Sent Date:

8/8/2023 1:03:38 PM Received Date:

8/8/2023 1:03:00 PM From:

Luke Haeg Created By:

Lucas.Haeg@nrc.gov Recipients:

"Duc, Joshua Brian" <Joshua.Duc@duke-energy.com>

Tracking Status: None "David Wrona" <David.Wrona@nrc.gov>

Tracking Status: None "Ryan.Treadway@duke-energy.com" <Ryan.Treadway@duke-energy.com>

Tracking Status: None Post Office:

DM8PR09MB6407.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2684 8/8/2023 1:03:00 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: