ML22112A189

From kanterella
Jump to navigation Jump to search

Acceptance Review for Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9
ML22112A189
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/22/2022
From: Shawn Williams
Plant Licensing Branch II
To: Grzeck L
Duke Energy Carolinas
Williams S
References
EPID L-2022-LLA-0050
Download: ML22112A189 (2)


Text

From:

Williams, Shawn To:

Grzeck, Lee Cc:

Vaughan, Jordan L

Subject:

Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance Review for additional mode change limitations applicable to the adoption of Technical Specifications Tasks TSTF-359, Revision 9 (EPID L-2022-LLA-0050)

Date:

Friday, April 22, 2022 11:58:43 AM Mr. Grzeck,

By letter dated March 31, 2022 (Agencywide Documents Access and Management System Accession No. ML22090A090), Duke Energy Carolinas, LLC, submitted a license amendment to revise Technical specifications (TS) for Oconee Nuclear Station, Units 1, 2, and 3 (ONS). The proposed amendment would revise ONS TS to address additional mode change limitations applicable to the adoption of Technical Specifications Tasks Force (TSTF) Traveler No. 359, Revision 9, Increase Flexibility in Mode Restraints (ADAMS Accession No. ML031190607) per Amendment Numbers 417, 419, and 418 to Renewed Facility Operating Licenses for ONS Units 1, 2, and 3, respectively (ADAMS Accession No. ML20237F435).

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> to complete. The NRC staff expects to complete the review by January 2023, which is within 1 year from acceptance, as requested in your submittal. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be

communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Shawn Williams, Senior Project Manager Plant Licensing Branch 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation