Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24025A15925 January 2024NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016)
ML24029A11316 January 2024Notification of Inspection and Request for Information (Email)
ML24002A7382 January 2024NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2
ML23349A02715 December 2023Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 5.5.2
ML23284A33211 October 2023Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060)Non-Destructive Examination
ML23271A17928 September 2023Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11
ML23270B83626 September 2023Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and StandardsNondestructive Examination
Aging Management
License Renewal
Operational leakage
ML23267A00321 September 2023RP Inspection Document Request
ML23262B45019 September 2023NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology
ML23248A2615 September 2023NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process
ML23269A04122 August 2023Code Case N-752 Audit; August 22, 2023, E-mail Providing Additional Information Regarding Design and Quality Program RequirementsAging Management
Flow Accelerated Corrosion
License Renewal
ML23220A2348 August 2023NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML23202A06519 July 2023NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089)Coatings
Incorporated by reference
Through Wall Leak
ML23207A07614 July 2023EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06
ML23192A05511 July 2023Relief Request Later Edition of ASME Code for ISI
ML23188A0737 July 2023Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications
ML23177A19926 June 2023NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078)
ML23172A01320 June 2023Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program
ML23159A0055 June 202356557-EN 56557 - Paragon - Redlined
ML23153A1892 June 2023Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program
ML23151A34830 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23144A08624 May 2023Acceptance of Requested Licensing Action Proposed Relief Request (RA-23-0018) to Use ASME Code Case 853Stress corrosion cracking
ML23142A27322 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23131A41910 May 2023003 Radiation Safety Baseline Inspection Information RequestContraband
Process Control Program
Coronavirus
ML23125A1455 May 2023Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752
ML23124A1214 May 2023Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)
ML23095A0054 April 2023002 Radiation Safety Baseline Inspection Information RequestOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML23087A02827 March 2023Acceptance of Requested Licensing Action Amendment TSTF-505
ML23087A24927 March 202350.69 Acceptance Email
ML23086C03627 March 2023Request for Additional Information Steam Generator Tube Inspection Report (03R31)
ML23082A04323 March 2023002 Radiation Safety Baseline Inspection Information Request FinalHigh Radiation Area
Locked High Radiation Area
Process Control Program
COVID-19
ML23080A18920 March 2023RP Inspection Document RequestProcess Control Program
ML23073A22813 March 2023Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review
ML23065A0946 March 2023NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-22-0081 - LAR to Address Administrative Changes to the Operating License and Technical Specifications (L-2023-LLA-0020)
ML23058A05627 February 2023Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System InstrumentationSurveillance Frequency Control Program
Operational leakage
ML23048A15116 February 2023Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003)
ML23038A1837 February 2023Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752
ML23030B90330 January 2023Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email)
ML23032A24726 January 2023Document Request Letter for Brunswick Upcoming RP Inspection 2023002
ML23018A18917 January 2023Document Request for RP Inspection at Brunswick Inspection Report 2023-01High Radiation Area
ML23031A15517 January 20231/17/2023 Email from John Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, to Diane Curran, Counsel to Beyond Nuclear and the Sierra Club, Request for Extension of Scoping Comment Period for Oconee EIS
ML23017A22313 January 2023Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email)
ML23011A01511 January 2023NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.bAnticipated operational occurrence
ML23006A1896 January 2023NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308
ML23006A0646 January 2023NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308
ML22336A06928 November 2022Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information RequestCommercial Grade Dedication
ML22303A00524 October 2022EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC
ML22294A08121 October 2022Nrc/Duke Steam Generator Inspection Call for November 8, 2022Stress corrosion cracking
ML22291A46017 October 2022Relief Request Impractical RPV and Rx Coolant Sys. Welds
ML22285A15512 October 2022NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b