ML23006A064

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308
ML23006A064
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/06/2023
From: Luke Haeg
Plant Licensing Branch II
To: Treadway R
Duke Energy Progress
References
L-2022-LLR-0089
Download: ML23006A064 (3)


Text

From:

Luke Haeg Sent:

Friday, January 6, 2023 9:51 AM To:

Ryan.Treadway@duke-energy.com Cc:

Courtenay, Christopher C; David Wrona

Subject:

Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 (EPID L-2022-LLR-0089)

Dear Mr. Treadway:

By letter dated December 15, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22349A655), Duke Energy Progress, LLC (Duke Energy, the licensee) requested an alternative (RA-22-0308) to certain requirements of the 2007 Edition through 2008 Addenda of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Subsection IWE to conduct alternative visual examinations of the torus metallic liner at Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed alternative request. The acceptance review was performed to determine whether the scope and depth of the technical information was sufficient to allow the NRC staff to complete its detailed technical review. The acceptance review also intended to identify within the request any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing bases of the plant.

Pursuant to Section 50.55a(z)(1) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternative would provide an acceptable level of quality and safety.

The NRC staff has reviewed Duke Energys alternative request and concluded that it provided technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in Duke Energys submittal, the NRC staff has estimated that this request will take approximately 305 hours0.00353 days <br />0.0847 hours <br />5.042989e-4 weeks <br />1.160525e-4 months <br /> to complete and that the review can be completed by January 6, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during routine interactions between Duke Energy and the NRC project manager.

These estimates are based on the NRC staffs initial review of the request and they could change due to several factors, including requests for additional information and unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-0272 or lucas.haeg@nrc.gov.

Luke Haeg Project Manager

NRR/DORL/LPL2-2 U.S. Nuclear Regulatory Commission 301-415-0272

Hearing Identifier:

NRR_DRMA Email Number:

1888 Mail Envelope Properties (DM8PR09MB6407DF884D442B6373D3178598FB9)

Subject:

Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 (EPID L-2022-LLR-0089)

Sent Date:

1/6/2023 9:50:30 AM Received Date:

1/6/2023 9:50:00 AM From:

Luke Haeg Created By:

Lucas.Haeg@nrc.gov Recipients:

"Courtenay, Christopher C" <Christopher.Courtenay@duke-energy.com>

Tracking Status: None "David Wrona" <David.Wrona@nrc.gov>

Tracking Status: None "Ryan.Treadway@duke-energy.com" <Ryan.Treadway@duke-energy.com>

Tracking Status: None Post Office:

DM8PR09MB6407.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3006 1/6/2023 9:50:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: