Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
Results
Other: ML19158A272, ML19158A273, ML19158A274, ML19158A275, ML19158A276, ML20295A413, ML20295A415, ML20295A416, ML20295A417, ML20295A418, ML20295A419, ML20295A420, ML20295A421, ML20329A323, ML21118A864, ML21118A865, ML21118A866, ML21118A867, ML21118A868, ML21118A869, ML21118A870, ML21168A352, ML21168A353, ML21168A354, ML21168A355, ML21168A356, ML21168A357, ML21168A358, ML21168A359, ML21168A361, ML21168A362, ML21168A363, ML21168A364, ML21237A177, ML23074A102, ML24010A058, ML24010A061, ML24095A040, ML24095A041, ML24095A042, ML24095A043, ML24095A044, ML24095A045, ML24095A046, ML24095A047, ML24179A264, ML24179A265, ML24179A266, ML24179A267, ML24179A268... further results
|
MONTHYEARML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18134A1102018-05-15015 May 2018 Letter to J. Bondre Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to NUHOMS Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Supplemental Informa Project stage: Acceptance Review ML18134A1112018-05-15015 May 2018 Enclosure 1: Rsi (Non-Proprietary) (Letter to J. Bondre Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to NUHOMS Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043 Project stage: Acceptance Review ML18179A1042018-06-15015 June 2018 Attachment 1 - Summary of Proposed Changes - LAR 1032-5 Project stage: Request ML18213A0382018-08-0101 August 2018 Enclosursi (Letter to P. Narayanan Acceptance Review (Continued) of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to NUHOMS Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) Project stage: Acceptance Review ML18213A0372018-08-0101 August 2018 Letter to P. Narayanan Acceptance Review (Continued) of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1 to NUHOMS Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Suppl Project stage: Acceptance Review ML18268A1392018-09-20020 September 2018 Modification to Requested Changes on HI-STORM FW Amendment 5 Request Project stage: Request ML18345A1742018-12-0707 December 2018 Attachment 2: HI-2188306, Revision 1, Certificate of Compliance Renewal Application for the HI-STAR 100 Dry Storage System - Non-Proprietary Project stage: Request ML18355A8642018-12-21021 December 2018 Enclosure 1 - RAI (Non-Proprietary) (Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to NUHOMS Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Project stage: RAI ML18355A8632018-12-21021 December 2018 Letter to P. Narayanan Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 1, to NUHOMS Eos System (Docket No. 72-1042, CAC No. 001028, EPID: L-2018-LLA-0043) - Request for Additional Information Project stage: RAI ML18362A3032018-12-28028 December 2018 E-Mail from K. Banovac to K. Manzione Acknowledgement of NRC Receipt of HI-STAR 100 CoC Renewal Application Project stage: Other ML19046A0642019-02-13013 February 2019 Letter to J. Tomlinson Acceptance Review of Request for Amendment No. 5 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Cask System (W/Enclosure) Project stage: Acceptance Review ML19092A1752019-03-20020 March 2019 Attachment 2 - Draft HI-STORM 100 Amendment 15 Certificate of Compliance (Non-Proprietary) Project stage: Request ML19086A1352019-03-26026 March 2019 E-Mail from K. Banovac to K. Manzione Starting Acceptance Review of HI-STAR 100 CoC Renewal Application Project stage: Acceptance Review ML19094A7402019-04-0303 April 2019 4/3/19, E-Mail from K. Banovac/Nrc to K. Manzione/Holtec Holtec Letter 5014860 - Question About Proprietary Information - Follow-up Information Project stage: Other ML19178A1232019-06-28028 June 2019 Letter to P. Narayanan Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 2 NUHOMS Eos System (Dkt: 72-1042, CAC: 001028, EPID: L-2019-LLA-0078) Request for Supplemental Information Project stage: Acceptance Review ML19178A1242019-06-28028 June 2019 Enclosure 1: Rsi (non-proprietary) (Letter to P. Narayanan Acceptance Review of Tn Americas LLC Application for Certificate of Compliance No. 1042, Amendment No. 2 NUHOMS Eos System (Dkt: 72-1042, CAC: 001028, EPID: L-2019-LLA-0078)) Project stage: Acceptance Review ML19182A0602019-07-0909 July 2019 Letter to J. Tomlinson Acceptance Review of Request for Amendment No. 15 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System - Request for Supplemental Information (W/Enclosure) Project stage: Acceptance Review ML19247B7182019-09-0303 September 2019 Letter to J. Tomlinson Amendment No. 5 to Certificate of Compliance No. 1023 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Request for Additional Information (W/Enclosure 1) Project stage: RAI ML19269C8092019-09-10010 September 2019 Conversation Record of 9/10/2019 Call with Holtec Project stage: Other ML19317D5782019-11-0606 November 2019 HI-STAR 100 CoC Renewal Acceptance Letter Project stage: Acceptance Review ML19350A5762019-12-12012 December 2019 HI-STAR 100 Renewal Updated Non-Proprietary Documents Project stage: Request ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2762019-12-20020 December 2019 Enclosure 4: Preliminary CoC 1032 Amendment No. 4 SER (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2722019-12-20020 December 2019 Memorandum to J. Cai User Need for Rulemaking for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Other ML20010D5642020-01-10010 January 2020 Proprietary Determination Letter for HI-STAR 100 CoC Renewal Submittals Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20128J2932020-04-28028 April 2020 International, Submittal of Responses to Nrc,S 1st Round RAIs for HI-STORM 100 Amendment Number 15 Project stage: Request ML20136A4752020-05-15015 May 2020 Holtec International Submittal of Responses to Nrc'S RAIs 3-1 and 3-6 for HI-STORM 100 Amendment Number 15 Project stage: Request ML20153A7682020-06-0101 June 2020, 11 June 2020 International, Submittal of Responses to NRC RAIs on the Renewal of the HI-STAR 100 Storage CoC Project stage: Request ML20245E4632020-09-0101 September 2020 International - Submittal of Supplemental Information on HI-STORM 100 Amendment 15 Project stage: Request ML20269A4252020-09-25025 September 2020 International - Submittal of Supplemental Information on HI-STORM 100 Amendment 15 Project stage: Request ML20267A3452020-09-30030 September 2020 Request for Clarification of Response to RAI for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20318A3222020-11-13013 November 2020 Submittal of Clarification RAI Responses on HI-STAR 100 License Renewal Project stage: Other ML20318A3212020-11-13013 November 2020 Submittal of Clarification RAI Responses on HI-STAR 100 License Renewal Project stage: Request ML20323A0432020-11-17017 November 2020 NRC 699 (11-10-20 Call W Holtec, Signed) Project stage: Other ML20329A3232020-11-24024 November 2020 International, Clarification RAI Responses on HI-STAR 100 License Renewal Updated Project stage: Other ML20351A3712020-12-16016 December 2020 Proprietary Determination Letter for HI-STAR 100 11-13-2020 Submittal Project stage: Other ML20352A0452020-12-16016 December 2020 NRC 699 (12-3-2020 Call W Holtec on HI-STAR 100, Signed) Project stage: Other ML20295A4212021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix B-100U Project stage: Other ML20295A4222021-01-27027 January 2021 Preliminary CoC 1014 Amendment No. 15 Safety Evaluation Report Project stage: Approval ML20295A4202021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix A-100U Project stage: Other ML20295A4152021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 for Holtec Intl Project stage: Other ML20295A4132021-01-27027 January 2021 User Need for Rulemaking for the Holtec HI-STORM 100 Cask System, Amendment No. 15 Project stage: Other ML20295A4162021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix a Project stage: Other ML20295A4182021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix C Project stage: Other 2019-07-09
[Table View] |
|
---|
Category:License-Dry Cask
MONTHYEARML21316A1932021-11-16016 November 2021 1. Renewed CoC No. 1008, Renewed Amendment No. 0 ML21316A1962021-11-16016 November 2021 4. Renewed CoC No. 1008, Renewed Amendment No. 1 ML21316A1992021-11-16016 November 2021 7. Renewed CoC No. 1008, Renewed Amendment No. 2 ML21316A2022021-11-16016 November 2021 10. Renewed CoC No. 1008, Renewed Amendment No. 3 ML21168A3532021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 0 ML21168A3562021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 1 ML21168A3592021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 2 ML21168A3622021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 3 ML19270D3582019-09-27027 September 2019 Amendment No. 3 to Final CoC No. 1008 ML19137A3032019-06-21021 June 2019 Enclosure 1: Proposed CoC No. 1008, Amendment No. 3 (Memorandum to J. Cai User Need for Rulemaking for Amendment No. 3 to the Holtec International Storage, Transport and Repository (HI-STAR) 100 Storage System) ML18004A5422018-01-0404 January 2018 International - Affidavit Pursuant to 10 CFR 2.390 ML0605903191999-10-13013 October 1999 Enclosure 1-Correction to Page 1.1-1 of Appendix a of the HI-STAR 100 Certificate of Compliance 2021-09-09
[Table view] Category:ISFSI
MONTHYEARML21316A1932021-11-16016 November 2021 1. Renewed CoC No. 1008, Renewed Amendment No. 0 ML21316A1962021-11-16016 November 2021 4. Renewed CoC No. 1008, Renewed Amendment No. 1 ML21316A1992021-11-16016 November 2021 7. Renewed CoC No. 1008, Renewed Amendment No. 2 ML21316A2022021-11-16016 November 2021 10. Renewed CoC No. 1008, Renewed Amendment No. 3 ML21168A3532021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 0 ML21168A3562021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 1 ML21168A3592021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 2 ML21168A3622021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 3 ML19270D3582019-09-27027 September 2019 Amendment No. 3 to Final CoC No. 1008 ML19137A3032019-06-21021 June 2019 Enclosure 1: Proposed CoC No. 1008, Amendment No. 3 (Memorandum to J. Cai User Need for Rulemaking for Amendment No. 3 to the Holtec International Storage, Transport and Repository (HI-STAR) 100 Storage System) ML18004A5422018-01-0404 January 2018 International - Affidavit Pursuant to 10 CFR 2.390 ML0605903191999-10-13013 October 1999 Enclosure 1-Correction to Page 1.1-1 of Appendix a of the HI-STAR 100 Certificate of Compliance 2021-09-09
[Table view] Category:(Amend) DKT 72
MONTHYEARML21316A1932021-11-16016 November 2021 1. Renewed CoC No. 1008, Renewed Amendment No. 0 ML21316A1962021-11-16016 November 2021 4. Renewed CoC No. 1008, Renewed Amendment No. 1 ML21316A1992021-11-16016 November 2021 7. Renewed CoC No. 1008, Renewed Amendment No. 2 ML21316A2022021-11-16016 November 2021 10. Renewed CoC No. 1008, Renewed Amendment No. 3 ML21168A3532021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 0 ML21168A3562021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 1 ML21168A3592021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 2 ML21168A3622021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 3 ML19270D3582019-09-27027 September 2019 Amendment No. 3 to Final CoC No. 1008 ML19137A3032019-06-21021 June 2019 Enclosure 1: Proposed CoC No. 1008, Amendment No. 3 (Memorandum to J. Cai User Need for Rulemaking for Amendment No. 3 to the Holtec International Storage, Transport and Repository (HI-STAR) 100 Storage System) ML18004A5422018-01-0404 January 2018 International - Affidavit Pursuant to 10 CFR 2.390 ML0605903191999-10-13013 October 1999 Enclosure 1-Correction to Page 1.1-1 of Appendix a of the HI-STAR 100 Certificate of Compliance 2021-09-09
[Table view] |
Text
NRC FORM 651 U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Page 1
of 4
The U.S. Nuclear Regulatory Commission is issuing this Certificate of Compliance pursuant to Title 10 of the Code of Federal Regulations, Part 72, "Licensing Requirements for Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste" (10 CFR Part 72). This certificate is issued in accordance with 10 CFR 72.238, certifying that the storage design and contents described below meet the applicable safety standards set forth in 10 CFR Part 72, Subpart L, and on the basis of the Final Safety Analysis Report (FSAR) of the cask design. This certificate is conditional upon fulfilling the requirements of 10 CFR Part 72, as applicable, and the conditions specified below.
Certificate No.
Effective Date (Certificate)
Expiration Date Docket No.
Amendment No.
Amendment Effective Date Package Identification No.
1008 10/04/1999 10/04/2019 72-1008 0
10/04/1999 USA/72-1008 Renewed Effective Date mm/dd/2021 Renewed Expiration Date 10/04/2059 Revision No.
0 Revision Effective Date N/A Issued To: (Name/Address)
Holtec International Holtec Technology Campus One Holtec Blvd Camden, NJ 08104 Safety Analysis Report Title Holtec International Inc., Final Safety Analysis Report for the HI-STAR 100 Cask System Docket No. 72-1008 CONDITIONS
- 1. CASK The HI-STAR 100 Cask System is certified as described in the Final Safety Analysis Report (FSAR) and in NRCs Safety Evaluation Report (SER) accompanying the Certificate of Compliance. It is designed for both storage and transfer of irradiated nuclear fuel.
- a.
Model No.: HI-STAR 100 (MPC-24, MPC-68, MPC-68F)
The HI-STAR 100 Cask System is comprised of the multi-purpose canister (MPC), which contains the fuel, and the overpack, which contains the MPC. The two digits after the MPC designate the number of reactor fuel assemblies for which the respective MPCs are designed. The MPC-24 is designed to contain up to 24 Pressurized Water Reactor (PWR) fuel assemblies. The MPC-68 is designed to contain up to 68 Boiling Water Reactor (BWR) fuel assemblies. Any MPC-68 containing fuel assemblies with known or suspected defects, such as ruptured fuel rods, severed rods, loose fuel pellets, or which cannot be handled by normal means due to fuel cladding damage, is designated as MPC-68F. The MPC-24 and the MPC-68 (including the MPC-68F) are identical in external dimensions and will fit into the same overpack design.
NRC FORM 651A U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Supplemental Sheet Certificate No.
1008 Amendment No.
0 Renewed Yes Page 2
of 4
- 1. b.
Description The complete HI-STAR 100 Cask System for storage of spent nuclear fuel is comprised of two discrete components: the MPC and the storage/transport overpack. The HI-STAR 100 CASK System consists of interchangeable MPCs which constitute the confinement boundary for BWR or PWR spent nuclear fuel and an overpack which provides the helium retention boundary, gamma and neutron radiation shielding, and heat rejection capability. All MPCs have identical exterior dimensions which render them interchangeable. A single overpack design is provided which is capable of storing each type of MPC.
The HI-STAR 100 MPCs are welded cylindrical structures with flat ends. Each MPC is an assembly consisting of a honeycombed fuel basket, a baseplate, canister shell, a lid, and a closure ring. The outer diameter and cylindrical height of each MPC is fixed. However, the number of spent nuclear fuel storage locations in each of the MPCs depends on the fuel assembly characteristics. The MPC provides the confinement boundary for the stored fuel. The confinement boundary is a seal-welded enclosure constructed entirely of a stainless steel alloy.
The inner surfaces of the HI-STAR 100 overpack form an internal cylindrical cavity for housing the MPC. The outer surface of the overpack inner shell is buttressed with intermediate shells of gamma shielding.
The fuel transfer and auxiliary equipment necessary for Independent Spent Fuel Storage Installation operation are not included as part of the HI-STAR 100 Cask System reviewed for a Certificate of Compliance under 10 CFR Part 72, Subpart L. Such equipment may include, but is not limited to, special lifting devices, transfer trailers or equipment, and vacuum drying/helium leak test equipment.
- 2. OPERATING PROCEDURES Written operating procedures shall be prepared for cask handling, loading, movement, surveillance, and maintenance. The users site-specific written operating procedures shall be consistent with the technical basis described in Chapter 8 of the FSAR.
- 3. QUALITY ASSURANCE Activities in the areas of design, procurement, fabrication, assembly, inspection, testing, operation, maintenance, repair, modification of structures, systems and components, and decommissioning that are important to safety shall be conducted in accordance with a Commission-approved quality assurance program which satisfies the applicable requirements of 10 CFR Part 72, Subpart G, and which is established, maintained, and executed with regard to the cask system.
NRC FORM 651A U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Supplemental Sheet Certificate No.
1008 Amendment No.
0 Renewed Yes Page 3
of 4
- 4.
HEAVY LOADS REQUIREMENTS Each lift of a HI-STAR 100 spent fuel cask must be made in accordance with the existing heavy loads requirements and procedures of the licensed facility in which the lift is made. A plant-specific safety review (in accordance with 10 CFR 50.59 or 10 CFR 72.48, if applicable) is required to show operational compliance with existing plant-specific heavy loads requirements.
- 5. APPROVED CONTENTS Contents of the HI-STAR 100 Cask System must meet the fuel specifications given in Appendix B to this certificate.
- 6.
APPROVED DESIGN FEATURES Features or characteristics for the site or cask must be in accordance with Appendix B to this certificate.
- 7.
CHANGES TO THE CERTIFICATE OF COMPLIANCE The holder of this certificate who desires to make changes to the certificate, which includes Appendix A (Technical Specifications) and Appendix B (Approved Contents and Design Features), shall submit an application for amendment of the certificate.
- 8. AUTHORIZATION The HI-STAR 100 Cask System, which is authorized by this certificate, is hereby approved for general use by holders of 10 CFR Part 50 and 10 CFR Part 52 licenses for nuclear reactors at reactor sites under the general license issued pursuant to 10 CFR 72.210, subject to the conditions specified by 10 CFR 72.212, and the attached Appendix A and Appendix B.
- 9. FSAR UPDATE FOR RENEWED CoC The CoC holder shall submit an updated FSAR to the Commission, in accordance with 10 CFR 72.4, within 90 days after the effective date of the renewal. The updated FSAR shall reflect the changes resulting from the review and approval of the CoC renewal, including the HI-STAR 100 FSAR supplement that is documented in Appendix D of the HI-STAR 100 CoC renewal application, Revision 1.D, dated November 24, 2020 (ADAMS Accession No. ML20329A323). The CoC holder shall continue to update the FSAR pursuant to the requirements of 10 CFR 72.248.
NRC FORM 651A U.S. NUCLEAR REGULATORY COMMISSION (10-2004) 10 CFR 72 CERTIFICATE OF COMPLIANCE FOR SPENT FUEL STORAGE CASKS Supplemental Sheet Certificate No.
1008 Amendment No.
0 Renewed Yes Page 4
of 4
- 10. 10 CFR 72.212 EVALUATIONS FOR RENEWED CoC USE Any general licensee that initiates spent fuel dry storage operations with the HI-STAR 100 Cask System after the effective date of the CoC renewal and any general licensee operating a HI-STAR 100 Cask System as of the effective date of the CoC renewal, including those that put additional storage systems into service after that date, shall:
- a. As part of the evaluations required by 10 CFR 72.212(b)(5), include evaluations related to the terms, conditions, and specifications of this CoC amendment as modified (i.e., changed or added) as a result of the CoC renewal.
- b. As part of the document review required by 10 CFR 72.212(b)(6), include a review of the FSAR changes resulting from the CoC renewal and the NRC Safety Evaluation Report related to the CoC renewal.
- c. Ensure that the evaluations required by 10 CFR 72.212(b)(7) and (8) capture the evaluations and review described in (a.) and (b.) of this CoC condition.
- d. Complete this condition prior to entering the period of extended operation or no later than one year after the effective date of the CoC renewal, whichever is later.
- 11. AMENDMENTS AND REVISIONS FOR RENEWED CoC All future amendments and revisions to this CoC shall include evaluations of the impacts to aging management activities (i.e. time-limited aging analyses and aging management programs) to assure they remain adequate for any changes to structures, systems, and components within the scope of renewal.
FOR THE NUCLEAR REGULATORY COMMISSION John McKirgan, Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Attachments:
- 1. Appendix A
- 2. Appendix B Dated: