Text

Design Features 3.0

Table 3-1 List of ASME Code Alternatives for HI-STORM Multi-Purpose Canisters (MPCs)

MPC Closure NB-5230 Radiographic (RT) or Root (if more than one weld pass is required)

Ring, Vent and ultrasonic (UT) examination and final liquid penetrant examination to be Drain Cover required. performed in accordance with NB-5245. The Plate Welds closure ring provides independent redundant closure for vent and drain cover plates. Vent and drain port cover plate welds are helium leakage tested. As an alternative, the helium leakage test does not have to be performed if the REDUNDANT PORT COVER DESIGN is used..

MPC Lid to NB-5230 Radiographic (RT) or

Shell Weld ultrasonic (UT) examination examination is permitted. PT required. examination will include the root and final weld layers and each approx. 3/8" of weld depth.

Certificate of Compliance No. 1014 Amendment No. 15 Appendix D 3-6