ML22146A095
ML22146A095 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 07/27/2017 |
From: | Randy Baker NRC/RGN-III/DRS/OLB |
To: | |
Baker R | |
Shared Package | |
ML17142A146 | List: |
References | |
Download: ML22146A095 (93) | |
Text
OT-3701-E12_506_RO Rev 0
JOB PERFORMANCE MEASURE SETUP SHEET
System: E12, Residual Heat Removal Time Critical: No Alternate Path: Yes Applicability: RO Safety Function: 4 - Heat Removal From The Core Setting: Simulator Validated: 36 minutes
References:
SOI-E12 Rev. 71 & ONI -E12-2Rev. 38 Required Material SOI-E12 - Residual Heat Removal System Tasks: 205-535-01-01 Warmup and Initiate Shutdown Cooling from Standby Readiness Task Standard: Initiate SDC in Alternate Return Path mode prior to exceeding 200° F in vessel.
K/A Data: 205000 Ability to (a) predict the impacts of the following on the Shutdown Cooling System (RHR Shutdown Cooling Mode); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: A2.06 SDC/RHR pump trips.
Importance RO 3.4 / SRO 3. 5. A2.10 R Valve operation. Importance: RO 2.9 SRO 2.9 Ability to manually operate and/or monitor in the control room: A4.01 SDC/RHR pumps Importance RO 3.7 / SRO 3.7. A4.03 SDC/RHR discharge valves Importance RO 3.6 / SRO 3.5. A4.09 System flow. Importance RO 3.1 / SRO 3.1
OT-3701-E12_506_RO Rev 0
JOB PERFORMANCE MEASURE SETUP SHEET contd.
- 1. Simulator Setup Instructions: Reset simulator to a shutdown IC with RPV temperature about 160°. Insert malfunctions mv06_1e12f0053a & cb01_1e12C0002b for F053A failure and RHR B pump breaker trip. Set decay heat level to obtain a H/U rate of ~
40°/hr (~8.83E6 watts). Maintain reactor v essel level between 260 and 270 inches using G33 blowdown. Simulator driver to control vessel level. Complete necessary portions of SOI-E12 Sect 4.7 through Step 4.7.18. Provide marked-up copy of SOI-E12. For 2017 ILO: R eset simulator to IC 68. Load schedule E12-506. Place simulator in freeze.
Place simulator in run after reading Initial Conditions to Operator. Remove Attachment 42 from SOI and give to Evaluator.
- 2. Location / Method: Simulator / performance
- 3. Initial Condition: The p lant shutdown due to scram yesterday. Currently in Mode 4 and the Unit Supervisor is operating in IOI-12, Maintaining Cold Shutdown. RHR B was operating in Shutdown Cooling when the pump tripped 20 minutes ago. The Unit Supervisor has entered ONI -E12-2 Loss of Decay Heat Removal. Reactor Recirculation pumps are in operation. Reactor temperature band is 135 to 145° F. RPV temperature was 140° F prior to trip. Current RPV temperature is ~160° F. The RO shifting SDC loops became ill.
- 4. Initiating Cue: The Unit Supervisor directs you the Reactor Operator to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path.
Section 4.7 Shutdown Cooling Startup for RHR A is complete through Step 4.7.18.
Monitor Reactor Temperature per IOI-12.
Start Time: End Time:
Operator:
OT-3701-E12_506_RO Rev 0
JPM BODY SHEET
Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Step 1
SOI-E12, RESIDUAL HEAT REMOVAL SYSTEM
2.0 Precautions And Limitations
2.2 Observe the following limitations during the operation of the RHR pumps:
- Do not operate the RHR pump against a shutoff head for greater than 8 seconds.
2.6 Operation of the LPCI mode of RHR with injection flow to the vessel shall only be done in an accident condition, a plant emergency condition, or an approved test condition of short duration. ONI-E12-2, Loss of Decay Heat Removal, and IOI-11, Shutdown From Outside Control Room, direct the use of the LPCI injection lines as Alternate Shutdown Cooling flow paths. Use of this flow path is still subject to reportability (as described in PAP-1604) when used for Alternate Shutdown Cooling.
4.7 Shutdown Cooling Startup for RHR A(B)
Operator reviews place-kept copy of SOI-E12 including Precautions and Limitations and panel H13-P601.
Standard: The Operator reviews place-kept copy of SOI-E12
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 2
4.7.19 Hold the Oncoming RJR HXS BYPASS VALVE in CLOSE for 59 -62 seconds.
Critical Step: The Operator closes 1E12 -F048A for 59 -62 seconds.
Instructor Cue: None
Notes: If the Operator fails to close thevalve inside this time band, this Critical Step can be recovered in JPM Step 9.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 3
4.7.20 Hold the Oncoming RHR HXS OUTLET VALVE in CLOSE until clo sed.
Critical Step: The Operator closes 1E12 -F003A.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 4
4.7.21 It is desired to establish the Normal 1E12-1E12-Return Path F053A F053B RHR Upper Pool Cooling Isol is closed 1E12-1E12-F037A F037B LPCI Injection Valve is closed 1E12-1E12-F042A F042B THEN PERFORM the following:
4.7.21.a IF the Feedwater System is shutdown, THEN VERIFY the Oncoming RHR loop FDW HDR SHUTOFF is closed, to prevent flow to the feedwater system.
1B21-F065A 1B21-F065B
Standard: The Operator observes that feedwater is shutdown and the B21-F065s are closed.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 5
CAUTIONS
- The RHR PUMP MIN FLOW VALVE is downpowered in the closed position. Throttling open the RHR HXS BYPASS VALVE, 1E12 -F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
- Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.21.b INITIATE flow through the SHUTDOWN COOLING TO FDW SHUTOFF as follows: 1E12-F053A
4.7.21.b.1 PERFORM the following simultaneously :
- HOLD the SHUTDOWN COOLING TO FDW SHUTOFF in OPEN, UNTIL open. 1E12-F053A
- TAKE the RHR PUMP to START. 1E12-C002A 4.7.21.b.2 WITHIN 8 seconds, THROTTLERHR HXS BYPASS VALVE, UNTIL RHR PUMP FLOW is at least 2575 gpm.
Standard The Operator starts to open 1E12-F053A and starts RHR A pump.
Critical Step: If the operator starts the RHR pump, he must shut it down.
Instructor Cue: If necessary, after report of valve failure, if pump was started, question operator on a course of action.
Direct Operator to establish shutdown cooling.
Notes: Operator may or may not start pump if he notices failure of 1E12-F053A.
1E12-F053A is failed closed and will lose indication simulating blown fuse. If Operator started pump, the Minimum Flow Valve was down-powered per step 4.7.10.c and the pump will not have minimum flow protection.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 6
4.7.22 It is desired to establish the Refuel 1E12-1E12-Return Path F037A F037B
Operator determines that this step is N/A.
Standard: This Step is N/A. The Operator cannot use Refuel Mode Path.
Instructor Cue: None
Notes: Plant not in Mode 5, Vessel Head insta lled.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 7
CAUTION
- Operation of the RHR Loop with Vessel Injection via the LPCI Injection Line has the potential to result in fatigue failure of incore instrument tubes and burnishing of fuel channels.
- The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HXS BYPASS VALVE, 1E12-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
- Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.23 It is desired to establish the Alternate 1E12-1E12-Return Path F042A F042B Normal Shutdown Cooling return path 1E12-1E12-is unavailable F053A F053B Refuel Shutdown Cooling return path is 1E12-1E12-unavailable F037A F037B THEN PERFORM the following:
4.7.23.a REFER TO Alternate Shutdown Cooling Data (Attachment 42) and TAKE Pre-Start Data.
Standard: The Operator re quests/obtains/completes Attachment 42.
Instructor Cue: None
Notes: When Operator goes to green book to obtain Att-42, provide him with a Yellow copy of Attachment 42.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 8
CAUTIONS
- The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HXS BYPASS VALVE, 1E12-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
- Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.23.b INITIATE flow through the LPCI INJECTION VALVE as follows:
1E12-F042A 4.7.23.b.1 PERFORM the following simultaneously:
- TAKE the LPCI INJECTION VALVE to OPEN. 1E12-F042A
- TAKE the RHR PUMP to START. 1E12-C002A
Critical Step: The Operator takes 1E12-F042A to OPEN and starts RHR A pump.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 9
4.7.23.b.2 WITHIN 8 seconds, THROTTLE RHR HXS BYPASS VALVE, UNTIL RHR PUMP FLOW is at least 2575 gpm.
1E12-F048A 1E12-R603A 4.7.23.c JOG OPEN the RHR HXS BYPASS VALVE in 1000 -2000 gpm increments, UNTIL RHR PUMP FLOW is 2575-7100 gpm.
1E12-F048A 1E12-R603A
Critical Step: Within 8 seconds the Operator open s 1E12-F048A until flow is > 2575 gpm then controls flow within directed band.
Instructor Cue: Reactor coolant temperature band is 135 to 145 deg F
Notes: If JPM Step 2 was performed correctly, this Step is not Critical.
Reactor coolant temperature should be between 165 and 180 degrees if Operator establishes flow with some urgency. If Operator delays and spends time reviewing the procedure, Reactor temperature could be as high as 190 degrees. Initial flow will be 3500 gpm. Temperature indication will be RHR Out on SPDS or Point 5 on recorder with E12-F003A closed.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 10
4.7.23.d NOTIFY the following of the use of the Shutdown Cooling return flow to the Vessel via LPCI INJECTION VALVE so the required fuel inspection may be scheduled:
- Reactor Engineering.
- Outage Planning.
4.7.23.e INITIATE a special report to the NRC in accordance with NOP -OP-1015, Event Notifications.
4.7.23.f GO TO RHR Shutdown Cooling Operations for RHR A(B).
Standard: The Operator will proceed to Section 7.6, RHR Shutdown Cooling Operations for RHR A(B).
Instructor Cue: Steps 4.7.23.d & e are being performed by the Shift Manager.
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 11
7.6 RHR Shutdown Cooling Operations for RHR A(B)
NOTES
- Normal Design parameters for Shutdown Cooling/Test Mode operation:
- RHR Pump Flow 7000-7100 gpm.
- RHR A Head Spray Flow 0 - 500 gpm.
- RHR Suction Pressure Less than 135 psig.
- RHR HX ESW Outlet Temps Less than 108 oF.
- RHR Pump Suct Temp Less than 100oF (Refuel Mode).
- RHR HXS RHR Outlet Temp Less than 86 oF (Refuel Mode).
- The following actions can be performed in any logical order or repeated to support current plant conditions.
Step 11 - Continued next page
OT-3701-E12_506_RO Rev 0
Step 11 - Continued
7.6.1 OBSERVE the following limitations when in Shutdown Cooling:
- MAINTAIN cooldown rate less than 100oF in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.
- DO NOT allow any RHR piping which has been inadvertently drained to be refilled with water from the Reactor Vessel.
- MAINTAIN Vessel temperature below 190oF while in Shutdown Cooling.
- WHEN using the normal OR refuel mode return paths, THEN MAINTAIN the following:
- MAINTAIN RHR Pump flow at 7000-7100 gpm during steady state conditions.
- MAINTAIN RHR Pump flow at 6000-7100 gpm during system adjustments.
- WHEN using the alternate return path, THEN MONITOR the following additional items:
- MAINTAIN RHR flow in the band 2575-7100 gpm. 1E12-F042A
Standard: The Operator establishes flow of 2575-7100 gpm.
Instructor Cue: None
Notes: Reactor temperature will increase steadily if cooling is not established.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-E12_506_RO Rev 0
Step 12
7.6.2 PERFORM the following as needed to maintain desired cooldown rate AND RHR Pump flow 7000-7100 (alternate return path 2575-7100):
1E12-R603A 1E12-R603B:
- THROTTLE RHR HXS OUTLETVALVE. 1E12-F003A
- THROTTLE RHR HXS BYPASS VALVE. 1E12-F048A
Critical Step: The Operator thrott les open s 1E12-F003A and 1E12-F048A is throttled close to establish a cooldown.
Instructor Cue: Establish a cooldown to restore temperature within band of 135 to 145 degrees.
Notes: Exceeding 200 degrees Reactor Water temperature would be a failure.
200 degrees is a MODE change.
Operator can establish full cooling and not have a problem with 100 degrees per hour.
Terminate JPM once satisfied with cooldown rate.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Terminating Cue: Shutdown Cooling Flow established through Alternate Return path, a cooldown rate has been established and Reactor Water Temperature is maintained less than 200 degrees.
Evaluation Results: SAT_____ UNSAT_____
End Time
OT-3701-E12_506_RO Rev 0
JPM CUE SHEET
- The plant shutdown due to scram yesterday.
CONDITIONS:
- Currently in Mode 4 and the Unit Supervisor is operating in IOI-12 Maintaining Cold Shutdown.
- RHR B was operating in Shutdown Cooling when the pump tripped 20 minutes ago.
- The Unit Supervisor has entered ONI-E12-2 Loss of Decay Heat Removal.
- Reactor Recirculation pumps are in operation.
- Reactor temperature band is 135 to 145 degrees F.
- RPV temperature was 140 degrees F prior to trip.
- Current RPV temperature is 160° F.
- The Unit Supervisor directs you the Reactor operator to continue shifting Shutdown Cooling loops from B to A using RHR A through the Normal Return Path. Section 4.7
- Shutdown Cooling Startup for RHR A is complete through Step 4.7.18.
- Monitor Reactor Temperature per IOI-12.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 1 of 346
RESIDUAL HEAT REMOVAL SYSTEM
Effective Date: 5-2-17
Preparer: Michael Garnett / 4-4-17 Date
Approver: Ed Condo / 4-6-17 Date
Working Copy - Verified Today Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 2 of 346
TABLE OF CONTENTS PAGE
1.0SCOPE 7
2.0 PRECAUTIONS AND LIMITATIONS 7
3.0PREREQUISITES 14
4.0STARTUP 15
4.1 Startup to Standby 15
4.2 LPCI Automatic Initiation 22
4.3 LPCI Manual Pushbutton Initiation 25
4.4 LPCI Manual Startup 26
4.5 Containment Spray Automatic Initiation 28
4.6 Startup for RHR A(B) for Suppression Pool Cooling/Test Mode Operation or Suppression Pool Pumpdown to Radwaste 30
4.7 Shutdown Cooling Startup for RHR A(B) 33
4.8 RHR Loop C Flush/Test Mode Startup 50
4.9 Alternate Keep Fill Startup 53
4.10 Fuel Pool Cooling Assist Startup 55
4.11 Water Leg Pump Startup 59
4.12 Placing RHR Conductivity Alarm In Service 64
5.0 NORMAL OPERATIONS/DATA 65
6.0SHUTDOWN 66
6.1 LPCI Shutdown to Standby Readiness 66
6.2 Suppression Pool Cooling/Test Mode Shutdown to Standby Readiness for RHR A(B) 68
6.3 Shutdown Cooling Shutdown to Standby Readiness for RHR A(B) 70
6.4 Shutdown from Standby Readiness to Secured Status 77
6.5 RHR Loop C Test Mode Shutdown to Standby Readiness 80
6.6 Fuel Pool Cooling Assist Shutdown 81
6.7 Alternate Keep Fill Shutdown 84
6.8 Removing RHR Conductivity Alarm From Service 87
7.0 SYSTEM OPERATIONS 88
7.1 LPCI Operations 88
7.2 Suppression Pool Cooling/Test Mode Operations for RHR A(B) 91
7.3 Suppression Pool Pumpdown to Radwaste 96
7.4 Raising Suppression Pool Level Using Condensate Transfer and Storage Water with RHR in Suppression Pool Cooling 99
7.5 Shifting Shutdown Cooling From Loop A(B) to Loop B(A) 100
7.6 RHR Shutdown Cooling Operations for RHR A(B) 101
7.7 Fill and Vent of RHR A(B,C) 117
7.8 Fill and Vent of RHR Prerequisites 120
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 1.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 7 of 346
1.0 SCOPE
This instruction provides the detailed operating instructions for the Residual Heat Removal (RHR) System.
2.0 PRECAUTIONS AND LIMITATIONS
2.1 Portions of this system are covered by Technical Specifications; these include the equipment and controls necessary to support RHR system operation in the following modes:
x Low Pressure Coolant Injection (LPCI)
x Suppression Pool Cooling
Also, this system has controls which are related to T.S. 3.3.3.2, Remote Shutdown System.
2.2 Observe the following limitations during the operation of the RHR pumps:
x Do NOT operate the RHR pump against a shutoff head for greater than 8 seconds.
x All pump trips shall be investigated prior to restarting the pump, except during emergency conditions in which operation of the pump is required to provide protection of the plant or public.
x Observe the following pump restart limitations:
x The motor may be started twice successively from ambient temperature or once from rated motor temperature.
x Repetitive starts are governed by motor operating temperature. In absence of thermal devices to determine machine temperature, the following can be used as a guide: the motor can be assumed to have returned to rated temperature after 80 minutes idle time or 30 minutes running time, after which time another start is permissible.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 2.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 8 of 346
x Limit RHR pump flow as follows:
x 8520 gpm with flow bypassing the RHR heat exchangers. This limit is based on RHR Pump runout flow.
x 7800 gpm with flow through the RHR heat exchangers. This limit is based on RHR heat exchanger maximum flow.
2.3 Any time it is suspected that the RHR Loops are NOT filled or the system has been breached, fill and vent the RHR Loop as applicable.
2.4 The reactor shall be placed and maintained in a Cold Shutdown condition whenever a loop of RHR is used in the Fuel Pool Cooling Assist mode.
2.5 The disconnect, MCC EF1B07-H, for SHUTDOWN COOLING OTBD SUCT ISOL, 1E12-F008, shall be closed only to perform Shutdown Cooling or related shutdown operations. It shall be open during all other conditions to satisfy 10CFR50 Appendix R considerations.
2.6 Operation of the LPCI mode of RHR with injection flow to the vessel shall only be done in an accident condition, a plant emergency condition, or an approved test condition of short duration. ONI-E12-2, Loss of Decay Heat Removal, and IOI-11, Shutdown From Outside Control Room, direct the use of the LPCI injection lines as Alternate Shutdown Cooling flow paths. Use of this flow path is still subject to reportability (as described in NOP-OP-1015, Event Notifications) when used for Alternate Shutdown Cooling.
2.7 Water Hammer:
Do NOT start a pump in the effected loop prior to ensuring the loop is filled. This could result in water hammer in a loop that is severe enough to cause component damage or pressure boundary failure. Potential causes of voiding include:
x A loss of pumping power with RHR A(B) TEST VALVE TO SUPR POOL, 1E12-F024A(B), open.
x A Division 1(2) RHR Isolation during Shutdown Cooling Operation may allow steam voids to form.
x Opening RHR A(B) SUPR POOL SUCTION VALVE, 1E12-F004A(B), when the RHR Pump A(B) suction piping is filled with water that is at greater than 200qF.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 2.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 9 of 346
x Deviation from written instructions when operating the system.
x Maintenance or testing on portions of the system that require realigning valves.
2.8 If it becomes necessary to close RHR A(B) TO CNTMT SHUTOFF, 1E12-F027A(B), then to prevent back leakage or thermal changes from over pressurizing the isolated piping refer to RHR A(B) To Cntmt Shutoff 1E12-F027A(B) Operation and perform the actions.
2.9 If the RHR PUMP A(B,C), MIN FLOW VALVE, 1E12-F064A(B,C), is NOT capable of opening to provide minimum flow (except as allowed in 3.5.2 for Shutdown Cooling),
Then declare RHR Pump A(B,C) INOPERABLE and take one of the following actions:
x Ensure RHR Pump A(B,C), 1E12-C002A(B,C) breaker open with its control power fuses removed.
x Provide increased monitoring whenever RHR Pump A(B,C) is in operation to ensure RHR A(B,C) does NOT operate at less than 1650 gpm for greater than 8 seconds.
x If RHR A(B) Pump is operated at less than 1650 gpm for greater than 8 seconds, an Engineering analysis of RHR Pump A(B,C) shall be performed prior to declaring RHR Pump A(B,C) OPERABLE.
2.10 Operation of RHR Loop A in the Test Mode or Suppression Pool Cooling when SPCU is in operation through the Suppression Pool Return Line Bypassing RHR A could result in loss of flow to the SPCU pump.
2.11 If LPCS & RHR A WATER LEG PUMP, 1E21-C002, or RHR B & C WATER LEG PUMP, 1E12-C003, are shutdown, Then the respective Feedwater Leakage Control System (N27A or N27B), will become inoperable.
2.12 If RHR A, B, or C are placed on alternate keep fill or the respective Waterleg pump is shutdown the affected RHR loop will be inoperable.
2.13 To provide a suction to the LPCS & RHR A WATER LEG PUMP, 1E21-C002, the LPCS SUPR POOL SUCTION VALVE, 1E21-F001, must be open.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 2.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 10 of 346
2.14 To provide suction to the RHR B & C WATER LEG PUMP, 1E12-C003, the RHR C SUPR POOL SUCTION VALVE, 1E12-F105, must be open.
2.15 Prior to placing RHR in Shutdown Cooling mode, RPV pressure shall be less than 135 psig.
2.16 RP should be notified prior to conducting Suppression Pool evolutions, so the survey frequency may be increased as necessary.
2.17 Opening of RHR PUMP A(B) MIN FLOW VALVE, 1E12-F064A(B) or RHR A(B)
UPPER POOL COOLING ISOL, 1E12-F037A(B), while in shutdown cooling could result in the draining of the vessel. Do NOT allow any RHR piping, which has been inadvertently drained down, to refill with Reactor Vessel Water.
2.18 Valve alignments and system manipulations on the RHR system when SHUTDOWN COOLING OTBD SUCT ISOL, 1E12-F008, and SHUTDOWN COOLING INBD SUCT ISOL, 1E12-F009, are open shall be supervised by the Shift Manager or Unit Supervisor when required by OAI-0201 Section 4.4.2.
2.19 LPCI operability requires flow both through the RHR Heat Exchangers and the RHR Heat Exchanger Bypass line; therefore, anytime RHR A(B) HXS INLET VALVE, 1E12-F047A(B), is NOT open or either RHR A(B) HXS OUTLET VALVE, 1E12-F003A(B), or RHR A(B) HXS BYPASS VALVE, 1E12-F048A(B), is NOT capable of automatically opening LPCI shall be declared INOPERABLE.
2.20 When 1E12-F024A(B) is open, system flow through 1E12-F024A(B) shall be maintained greater than 6000 gpm. 6000 gpm is the minimum flow allowable to prevent voiding at the high point in the RHR system piping. The normal Suppression Pool Cooling/Test Mode flow is 7100-7300 gpm.
2.21 The pump rotation during fill and vent operations shall be minimized.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 2.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 11 of 346
2.22 Operating the RHR System in a Secondary Mode of operation, except Shutdown Cooling, will *INOP the LPCI mode of RHR due to the system being unable to realign within the Technical Specification response time requirements.
With temperature is less than 200qF the LPCI does NOT need to be declared inoperable when the RHR loop is in Shutdown Cooling as long as it can be realigned to the LPCI mode (either remotely or locally), is NOT otherwise inoperable.
When placing a loop of RHR in Shutdown Cooling greater than 200qF the RHR loop shall be considered inoperable for ALL Modes except Shutdown Cooling Mode of operation due to the possiblilty of system voiding during a Shutdown Cooling Isolation.
2.23 When venting or draining the ESW side of the RHR Heat Exchangers the expelled water should NOT be discharged to Radwaste. This lake water will shorten the life of the Radwaste demineralizers and biologically foul the resin which will cause gas buildup in Radwaste shipping containers. The preferred actions are to collect this water in a container which RP and CHEM can sample for release outside the RRA or have RP and CHEM approve running the vent/drain hose to a non-radiological drain. In the event lake water must be drained to a radiological drain, Radwaste shall be informed of amount of lake water to be drained and the drain to receive it.
2.24 If the RHR HX ESW inlet or outlet valves, 1P45-F014A(B) or 1P45-F068A(B), are NOT full open the associated RHR loop shall be declared inoperable. This is because the valves may NOT reposition properly during accident conditions.
2.25 The RHR pumps should NOT be operated in minimum flow for excessive periods of time. If an RHR pump is operated in minimum flow for greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, a Condition Report should be generated for Engineering to evaluate the effects on the pump.
2.26 Erosion may occur on the RHR Pump minimum flow lines. Consideration should be given to placing RHR Pumps in the suppression pool cooling/test mode during extended operation rather than leaving them in minimum flow.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 2.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 12 of 346
2.27 Leakage past the following valves is considered Leakage Outside Containment.
To control leakage past these valves, they shall be torqued to the following specified values in Mode 1, 2, or 3:
x 1E12F0071A - 140 FT/LBS.
x 1E12F0072A - 140 FT/LBS
x 1E12F0511A - 123 FT/LBS.
x 1E12F0071B - 96 FT/LBS.
x 1E12F0072B - 96 FT/LBS
x 1E12F0511B - 123 FT/LBS.
x 1E12F0071C - 96 FT/LBS.
x 1E12F0072C - 96 FT/LBS.
1E12F0511B is not normally closed; however, if it should need to be closed due to leakage past 1E12F0071B or 1E12F0072B, it will need to be torqued to 123 FT/LBS.
2.28 If a Loop of RHR has been drained that Loop of RHR shall be run in Suppression Pool Cooling/Test Mode (RHR A,B), RHR Loop C Flush/Test Mode (RHR C) to sweep air pockets from portions of the system that cannot be vented prior to the Loop being declared operable.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 2.0
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 13 of 346
2.29 The following table provides torque specifications when manually operating selected valves:
Valve Hand Wheel Torque
1E12-F010 285 ft-lbs
1E12-F039A(B,C) 206 ft-lbs
1E12-F066A 93 ft-lbs
1E12-F085A 400 inch-lbs
1E12-F502A,C 120 ft-lbs
1E12-F552A 106 ft-lbs
1E12-F599A 30 ft-lbs +25%, -0%
1E12-F621 118 ft-lbs
2.30 Observe the following RHR Pump Motor Oil level limitations as can be determined when the pump motors are de-energized:
x RHR Pump A (B, C), 1E12-C002A (B, C) oil levels should be maintained within 7/16 above and below the reference line of the oil reservoir sight glass.
x RHR B & C WATER LEG PUMP, 1E12-C003 constant level oiler should be maintained per the specified inches below shaft centerline stated on the Oil Level Plate.
2.31 RHR A can NOT be operated in Shutdown Cooling when ADHR system is aligned for decay heat removal.
2.32 OAI-0502 requires a minimum vent duration of 2 minutes after a solid stream of fluid has been achieved when venting ECCS systems. Steps for venting state for at least 2 minutes. Time of the vent starts when an air free stream is achieved.
END OF SECTION
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.5
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 100 of 346
7.5 Shifting Shutdown Cooling From Loop A(B) to Loop B(A)
7.5.1 REFER TO Shutdown Cooling Startup LoopLoop and PLACE the Oncoming loop in B A service.
7.5.2 REFER TO Shutdown Cooling Loop Loop Shutdown to Standby Readiness and A B SHUTDOWN the Offgoing RHR loop.
END OF SECTION
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 33 of 346
4.7 Shutdown Cooling Startup for RHR A(B)
NOTES
x Both Loops of RHR may be placed in Shutdown Cooling by performing all the required Steps for one loop and then performing the required Steps for the other loop.
x Local Field Actions maybe required in the following places:
x CC 620 Switchgear rooms to operate disconnect stitches.
x AX 620RHR B Penetration Room to operate flush valves.
x AX 574 to operate RHR B to Radwaste Shutoff Valve, 1E12-F504 (RHR B only).
NA 4.7.1 A Loss of Shutdown Cooling has NOT occurred
NOT Operating in EOPs
The Oncoming The Oncoming Loop Loop Shutdown Cooling RHR Loop has A B Loop flowpath has NOT operated in NOT been Shutdown Cooling maintained filled within the last and vented the last 10 days 10 days
A waiver for the requirement to perform RHR Loop flushing from Operations Manager has NOT been granted
THEN PERFORM the following:
4.7.1.a CONFIRM the Oncoming RHR loop 1E12-1E12-RHR SHUTDOWN CLG SUCT valve is F006A F006B closed.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 34 of 346
NA 4.7.1.b Information Tag is Caution Tag is on 1H13-1H13-on the RHR the RHR P601-P601-Conductivity Alarm Conductivity Alarm 20-G5 17-G5 window(s) window(s)
THEN REFER TO Placing RHR Conductivity Alarm In Service and VERIFY the actions are complete.
NOTE
Both loops of RHR should be flushed when placing SDC into service during non-refueling periods. Only one loop needs to be flushed prior to establishing Shutdown Cooling. The second loop of RHR should be flushed when Mode 4 is reached to make it available for use in the SDC mode. Delaying the flush of the second RHR loop minimizes inoperability time and the time to establish Shutdown Cooling.
4.7.1.c REFER TO Flush of RHR Loop A(B)
When in Standby Readiness Mode and VERIFY the flush the oncoming loop is complete.
NA 4.7.1.d IF the Suppression Pool water does NOT meet the limits for transfer quality per Chemistry, THEN REFER TO Flush of RHR A(B)
With CST Water and VERIFY the actions complete.
4.7.1.e REFER TO SOI-P45/49 and VERIFY Loop Loop the associated Emergency Service A B Water System Loop in operation.
4.7.1.f REFER TO SOI-P42 and VERIFY the Loop Loop associated Emergency Closed Cooling A B System Loop in operation.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 35 of 346
NOTES
x With temperature is less than 200qF the LPCI does NOT need to be declared inoperable for the LPCI Mode when the RHR loop is in Shutdown Cooling as long as it can be realigned to the LPCI mode (either remotely or locally), is NOT otherwise inoperable.
x When placing a loop of RHR in Shutdown Cooling greater than 200qF the RHR loop shall be considered inoperable for ALL Modes except Shutdown Cooling Mode of operation due to the possiblilty of system voiding during a Shutdown Cooling Isolation.
NA 4.7.2 IF operating in MODE 3, THEN NOTIFY the Unit Supervisior that RHR loop being placed into Shutdown Cooling will be inoperable for ALL Modes except Shutdown Cooling Mode, UNTIL Mode 4 is entered.
4.7.3 NOTIFY Radiation Protection of the Change to Shutdown Cooling Operation.
NA 4.7.4 IF Placing RHR A in service, THEN CONFIRM the ADHR system is NOT in service removing Decay heat.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 36 of 346
NA 4.7.5 Performing Section 7.5, Shifting Shutdown Cooling From Loop A(B) to Loop B(A)
Starting RHR A in Shutdown Cooling Loop A
RHR B pump is NOT running 1E12-C002B
THEN VERIFY RHR B SHUTDOWN 1E12-CLG SUCT valve control switch in F006B CLOSED.
NA 4.7.6 Performing Section 7.5, Shifting Shutdown Cooling From Loop A(B) to Loop B(A)
Starting RHR B in Shutdown Cooling Loop B
RHR A pump is NOT running1E12-C002A
THEN VERIFY RHR A SHUTDOWN 1E12-CLG SUCT valve control switch in F006A CLOSED.
4.7.7 VERIFY RHR B HXS SECOND VENT 1E12-TO SUPR POOL is CLOSED. F073B
4.7.8 VERIFY the following:
x RHR SUPR POOL SUCTION 1E12-1E12-VALV keylock switch in CLOSED. F004A F004B
x RHR HXS BYPASS VALVE is 1E12-1E12-OPEN. F048A F048B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 37 of 346
x RHR HXS OUTLET VALVE is 1E12-1E12-OPEN. F003A F003B
NOTE
SHUTDOWN COOLING OTBD SUCT ISOL, 1E12-F008, disconnect MCC EF1B07-H can be verified closed by power being present to the valve position indication.
4.7.9 VERIFY the SHUTDOWN COOLING EF1 OTBD SUCT ISOL, 1E12-F008, valve B07-H disconnect is CLOSED.
4.7.10 REFER TO SOI-P45/49 and VERIFY A B Emergency Service Water System Loop in operation.
4.7.11 REFER TO SOI-P42 and VERIFY A B Emergency Closed Cooling System Loop in operation.
NA 4.7.12 SHUTDOWN SHUTDOWN 1E12-1E12-COOLING OTBD COOLING INBD F008 F009 SUCT ISOL is SUCT ISOL is closed closed
THEN PERFORM the following:
4.7.12.a WHEN Reactor Vessel pressure is less than 135 psig, THEN VERIFY the following are reset:
x Trip unit 1B21-N679D (1H13-P694).
x Trip unit 1B21-N679A (1H13-P691).
x Trip unit 1B21-N679C (1H13-P693).
x Trip unit 1B21-N679B (1H13-P692).
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 38 of 346
N/A 4.7.12.b MOMENTARILY DEPRESS BOTH of the following to reset the NS4 logic:
x MSL & NS4 OTBD ISOL SEAL IN1B21H RESET. -S32
x MSL & NS4 INBD ISOL SEAL IN1B21H RESET. -S33
4.7.13 HOLD the Oncoming RHR HXS1E12-1E12-OUTLET VALVE in CLOSE for F003A F003B 54-56 seconds.
NA 4.7.14 IF the Oncoming RHR PUMP MIN 1E12-1E12-FLOW VALVE is energized, F064A F064B THEN PERFORM the following:
4.7.14.a VERIFY the Oncoming loop RHR1E12-1E12-PUMP MIN FLOW VALVE is closed. F064A F064B
4.7.14.b PERFORM independent verification of1E12-1E12-the Oncoming RHR PUMP MIN FLOW F064A F064B VALVE position.
4.7.14.c OPEN the Oncoming RHR PUMP MINEF1 EF1 FLOW VALVE, 1E12-F064, disconnect. B07-D07-CC CC
NOTE
RPV level may increase during Quenching steam voids due to flow from the Condensate Transfer System while performing the following steps.
NA 4.7.15 IF SHUTDOWN COOLING OTBD 1E12-SUCT ISOL is closed, F008 THEN PERFORM the following:
4.7.15.a VERIFY SHUTDOWN COOLING 1E12-INBD SUCT ISOL is closed. F009 Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 39 of 346
NA 4.7.15.b IF Reactor Temperature is greater than or equal to 200qF, THEN PERFORM the following to collapse steam voids:
4.7.15.b.1 REFER TO Flush Valve Operation and 1E12-MANUALLY SLOWLY OPEN the F315 Shtdn Cooling Suct Hdr Flush Supply, UNTIL flow noise is heard.
4.7.15.b.2 WHEN the RHR suction piping has 1E12-filled for approximately 5 minutes, F315 THEN REFER TO Flush Valve Operation and MANUALLY SLOWLY OPEN the Shtdn Cooling Suct Hdr Flush Supply.
NA 4.7.15.c IF Reactor Temperature is less than 200qF, 1E12-THEN REFER TO Flush Valve F315 Operation and MANUALLY OPEN the Shtdn Cooling Suct Hdr Flush Supply.
4.7.15.d TAKE the SHUTDOWN COOLING 1E12-OTBD SUCT ISOL to OPEN. F008
4.7.16 VERIFY the Oncoming RHR 1E12-1E12-SHUTDOWN CLG SUCT in OPEN. F006A F006B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 40 of 346
NA 4.7.17 IF SHUTDOWN COOLING INBD 1E12-SUCT ISOL is closed, F009 THEN PERFORM the following:
NA 4.7.17.a IF Shtdn Cooling Suct Hdr Flush 1E12-Supply is closed, F315 THEN REFER TO Flush Valve
Operation and MANUALLY SLOWLY OPEN the Shtdn Cooling Suct Hdr Flush Supply.
4.7.17.b HOLD RHR B HXS SECOND VENT 1E12-TO SUPR POOL in OPEN, UNTIL F073B open.
4.7.17.c WHEN the Suction Header has vented 1E12-for 5 minutes, F073B THEN HOLD RHR B HXS SECOND VENT TO SUPR POOL in CLOSE, UNTIL closed.
4.7.17.d REFER TO Flush Valve Operation and 1E12-CLOSE the Shtdn Cooling Suct Hdr F315 Flush Supply.
4.7.17.e TAKE SHUTDOWN COOLING INBD 1E12-SUCT ISOL to OPEN. F009 Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 41 of 346
CAUTION
The following step will reduce Reactor Vessel Water inventory. Reactor Vessel level should be raised to near the high level alarm setpoint prior to this step to prevent exceeding the low level setpoint.
NA 4.7.18 IF Reactor Temperature is greater than 200qF, THEN PERFORM the following to warmup the RHR suction piping:
NA 4.7.18.a IF placing RHR A in Shutdown Cooling, 1E12-THEN TAKE RHR A TO RADWASTE F049 ISOL to OPEN.
NA 4.7.18.b IF placing RHR B in Shutdown Cooling, 1E12-THEN OPEN RHR B to Radwaste F504 Shutoff Valve.
4.7.18.c VERIFY that Radwaste is ready to receive water from RHR.
4.7.18.d NOTIFY Radwaste that a flush is to be commenced.
4.7.18.e NOTE the Oncoming RHR IN to HXTR 1E12-1E12-Temperature on RHR R601 R601 TEMPERATURES recorder. Pt 1 Pt 2 (red) (dark green)
Temp: qF
NOTE
The dust and oil film, which may accumulate during standby readiness periods, may smoke when heated during the performance of the following steps.
4.7.18.f THROTTLE the RHR TO RADWASTE 1E12-ISOL in OPEN for 1 to 3 seconds. F040 Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 42 of 346
NA 4.7.18.g RHR DISCH to RW RHR DISCH to RW 1E12-Temperature on Temperature on R601 the RHR the RHR Pt 11 TEMPERATURES TEMPERATURES (light green) recorder is 200qF recorder has stabilized near RPV temperature
THEN VERIFY RHR TO RADWASTE 1E12-ISOL is CLOSED. F040
NA 4.7.18.h IF placing RHR A in Shutdown Cooling, THEN TAKE the RHR A TO 1E12-RADWASTE ISOL to CLOSE. F049
NA 4.7.18.i IF placing RHR B in Shutdown Cooling, THEN CLOSE the RHR B to 1E12-Radwaste Shutoff Valve. F504
4.7.18.j NOTIFY Radwaste that the flush has been secured.
4.7.18.k THROTTLE open RHR HXS DUMP 1E12-1E12-VALVE for 1 to 3 seconds. F011A F011B
NA 4.7.18.l RHR IN RHR IN 10 1E12-1E12-To HXTR To HXTR minutes R601 R601 temperature temperature on has Pt 1 Pt 2 has risen the RHR elapsed (red) (dark green) 5-10qF from TEMPER-the initial ATURES temperature recorder has noted stabilized near RPV temperature
THEN HOLD RHR HXS DUMP 1E12-1E12-VALVE in CLOSE, UNTIL closed. F011A F011B
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 43 of 346
4.7.19 HOLD the Oncoming RHR HXS 1E12-1E12-BYPASS VALVE in CLOSE for F048A F048B 59-62 seconds.
4.7.20 HOLD RHR HXS OUTLET VALVE in 1E12-1E12-CLOSE, UNTIL closed. F003A F003B
NA 4.7.21 It is desired to establish the Normal 1E12-1E12-Return Path F053A F053B
RHR Upper Pool Cooling Isol is closed 1E12-1E12-F037A F037B
LPCI Injection Valve is closed 1E12-1E12-F042A F042B
THEN PERFORM the following:
NA 4.7.21.a IF the Feedwater System is shutdown, 1B21-1B21-THEN VERIFY the Oncoming RHR F065A F065B loop FDW HDR SHUTOFF is closed, to prevent flow to the feedwater system.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 44 of 346
CAUTIONS x The RHR PUMP MIN FLOW VALVE is downpowered in the closed position. Throttling open the RHR HXS BYPASS VALVE, 1E12-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
x Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.21.b INITIATE flow through the 1E12-1E12-SHUTDOWN COOLING TO FDW F053A F053B SHUTOFF as follows:
4.7.21.b.1 PERFORM the following simultaneously:
x HOLD the SHUTDOWN 1E12-1E12-COOLING TO FDW SHUTOFF in F053A F053B OPEN, UNTIL open.
x TAKE the RHR PUMP to START. 1E12-1E12-C002A C002B
4.7.21.b.2 WITHIN 8 seconds, THROTTLE 1E12-1E12-RHR HXS BYPASS VALVE, UNTIL F048A F048B RHR PUMP FLOW is at least 1E12-1E12-2575 gpm. R603A R603B
4.7.21.c JOG OPEN the RHR HXS BYPASS 1E12-1E12-VALVE in 1000-2000 gpm increments, F048A F048B UNTIL RHR PUMP FLOW is 1E12-1E12-6000-7100 gpm. R603A R603B
4.7.21.d GO TO RHR Shutdown Cooling Operations for RHR A(B).
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 45 of 346
NA 4.7.22 It is desired to establish the Refuel 1E12-1E12-Return Path F037A F037B
Shutdown Cooling To Fdw Shutoff is 1E12-1E12-closed F053A F053B
LPCI Injection Valve is closed 1E12-1E12-F042A F042B
RHR to Cntmt Pools Spectacle Flange 1E12-1E12-blank is removed D501A D501B
The RPV Head has been removed
The Containment Pools are filled
THEN PERFORM the following:
4.7.22.a MONITOR FPCC SURGE TANK G41-G41-LEVEL while establishing Refuel Mode R366A R366B Shutdown Cooling.
(INTENTIONALLY BLANK)
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 46 of 346
CAUTIONS x The RHR PUMP MIN FLOW VALVE is downpowered in the closed position. Throttling open the RHR HXS BYPASS VALVE, 1E12-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
x Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.22.b INITIATE flow through the RHR 1E12-1E12-UPPER POOL COOLING ISOL as F037A F037B follows:
4.7.22.b.1 PERFORM the following simultaneously:
x HOLD the RHR UPPER POOL 1E12-1E12-COOLING ISOL in OPEN, F037A F037B UNTIL open.
x TAKE the RHR PUMP to START. 1E12-1E12-C002A C002B
4.7.22.b.2 WITHIN 8 seconds, THROTTLE 1E12-1E12-RHR HXS BYPASS VALVE, UNTIL F048A F048B RHR PUMP FLOW is at least 1E12-1E12-2575 gpm. R603A R603B
4.7.22.c JOG OPEN the RHR HXS BYPASS 1E12-1E12-VALVE in 1000-2000 gpm increments, F048A F048B UNTIL RHR PUMP FLOW is 1E12-1E12-7000-7100 gpm. R603A R603B
4.7.22.d GO TO RHR Shutdown Cooling Operations for RHR A(B).
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 47 of 346
CAUTIONS
x Operation of the RHR Loop with Vessel Injection via the LPCI Injection Line has the potential to result in fatigue failure of incore instrument tubes and burnishing of fuel channels.
x The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HXS BYPASS VALVE, 1E12-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
x Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
NA 4.7.23 It is desired to establish the Alternate 1E12-1E12-Return Path F042A F042B
Normal Shutdown Cooling return path 1E12-1E12-is unavailable F053A F053B
Refuel Shutdown Cooling return path is 1E12-1E12-unavailable F037A F037B
THEN PERFORM the following:
4.7.23.a REFER TO Alternate Shutdown Cooling Data (Attachment 42) and TAKE Pre-Start Data.
(INTENTIONALLY BLANK)
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 48 of 346
CAUTIONS
x The RHR PUMP MIN FLOW VALVE is downpowered in the closed position.
Throttling open the RHR HXS BYPASS VALVE, 1E12-F048A(B) after starting the pump ensures pump min flow requirements are met following pump start.
x Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
4.7.23.b INITIATE flow through the 1E12-1E12-LPCI INJECTION VALVE as follows: F042A F042B
4.7.23.b.1 PERFORM the following simultaneously:
x TAKE the LPCI INJECTION 1E12-1E12-VALVE to OPEN. F042A F042B
x TAKE the RHR PUMP to START. 1E12-1E12-C002A C002B
4.7.23.b.2 WITHIN 8 seconds, THROTTLE 1E12-1E12-RHR HXS BYPASS VALVE, UNTIL F048A F048B RHR PUMP FLOW is at least 1E12-1E12-2575 gpm. R603A R603B
4.7.23.c JOG OPEN the RHR HXS BYPASS 1E12-1E12-VALVE in 1000-2000 gpm increments, F048A F048B UNTIL RHR PUMP FLOW is 1E12-1E12-2575-7100 gpm. R603A R603B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 4.7
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 49 of 346
4.7.23.d NOTIFY the following of the use of the 1E12-1E12-Shutdown Cooling return flow to the F042A F042B Vessel via LPCI INJECTION VALVE so the required fuel inspection may be scheduled:
x Reactor Engineering.
x Outage Planning.
4.7.23.e INITIATE a special report to the NRC in accordance with NOP-OP-1015, Event Notifications.
4.7.23.f GO TO RHR Shutdown Cooling Operations for RHR A(B).
END OF SECTION
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 101 of 346
7.6 RHR Shutdown Cooling Operations for RHR A(B)
NOTES
x Normal Design parameters for Shutdown Cooling/Test Mode operation:
o RHR Pump Flow 7000-7100 gpm.
o RHR A Head Spray Flow 0 - 500 gpm.
o RHR Suction Pressure Less than 135 psig.
o RHR HX ESW Outlet Temps Less than 108qF.
o RHR Pump Suct Temp Less than 100qF (Refuel Mode).
o RHR HXS RHR Outlet Temp Less than 86qF (Refuel Mode).
x The following actions can be performed in any logical order or repeated to support current plant conditions.
7.6.1 OBSERVE the following limitations when in Shutdown Cooling:
x MAINTAIN cooldown rate less than 100qF in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.
x DO NOT allow any RHR piping which has been inadvertently drained to be refilled with water from the Reactor Vessel.
x MAINTAIN Vessel temperature below 190qF while in Shutdown Cooling.
x WHEN using the normal OR refuel mode return paths, THEN MAINTAIN the following:
x MAINTAIN RHR Pump flow at 7000-7100 gpm during steady state conditions.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 102 of 346
x MAINTAIN RHR Pump flow at 6000-7100 gpm during system adjustments.
x WHEN using the alternate return 1E12-1E12-path, THEN MONITOR the F042A F042B following additional items:
x MAINTAIN RHR FLOW in the 1E12-1E12-band 2575-7100 gpm. F042A F042B
x MAINTAIN RHR H2O DISCH 1E12-1E12-temperature greater than 65qF. R601 R601 Pt 5 Pt 6 (magenta) (orange)
7.6.2 PERFORM the following as needed to 1E12-1E12-maintain desired cooldown rate AND R603A R603B RHR Pump flow 7000-7100 (alternate return path 2575-7100):
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE. F003A F003B
x THROTTLE RHR HXS BYPASS 1E12-1E12-VALVE. F048A F048B
NA 7.6.3 RHR A is in Shutdown Cooling
Head spray is desired
THEN PERFORM the following:
7.6.3.a CONFIRM that the RCIC INJECTION 1E51-VLV is closed. F013 Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 103 of 346
NOTE
The HD SPRAY FLOW 1E12-R607 indication taps in downstream of the RHR Pump flow 1E12-R603A(B) indicator. Changing head Spray flow does not change RHR Pump flow.
7.6.3.b PERFORM the following, UNTIL HD 1E12-SPRAY FLOW is 500 gpm AND RHR R607 Pump flow 7000-7100 (alternate return 1E12-1E12-path 2575-7100): R603A R603A
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE. F003A F003B
x THROTTLE RHR HXS BYPASS 1E12-1E12-VALVE. F048A F048B
x THROTTLE RHR A HEAD 1E12-SPRAY ISOL. F023
7.6.3.c WHEN the Rx Vessel pressure is at 1E12-atmospheric pressure, F023 THEN VERIFY RHR A HEAD SPRAY ISOL is closed.
NA 7.6.4 IF oncoming loop of ESW was NOT started per SOI-P45/49, THEN PERFORM the following:
7.6.4.a VERIFY the following:
x ESW PMP HOUSE VENT SUPP 1M32-1M32-FAN 1, is RUNNING. C001A C001B
x ESW PMP HOUSE EXH LOUVER 1M32-1M32-70 is OPEN F070A F070B
x ESW PUMP DISCH VALVE is fully 1P45-1P45-OPEN F130A F130B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 104 of 346
7.6.4.b RECORD ESW flow channel check in the Narrative Log.
NA 7.6.4.c IF lake temperature is less than 34qF, THEN REFER TO SOI-P45/49 and PERFORM de-icing operation.
7.6.4.d DIRECT Chemistry to perform the following:
x OBTAIN Tech Spec samples of flow through the RHR Heat Exchangers as required.
x CHLORINATE ESW as required.
NA 7.6.5 Information Tag is Caution Tag is on 1H13-1H13-on the RHR the RHR P601-2 P601-Conductivity Alarm Conductivity Alarm 0-G5 17-G5 window(s) window(s)
THEN REFER TO Placing RHR Conductivity Alarm In Service and VERIFY the actions are complete.
NA 7.6.6 IF the LPCI INJECTION VALVE is 1E12-1E12-open, F042A F042B THEN REFER TO Alternate Shutdown Cooling Data (Attachment 42) and TAKE Post-Start Data Alternate Shutdown Cooling Return Path Startup Data.
7.6.7 PERFORM Independent Verification of the required components for Shutdown Cooling Startup for RHR A(B).
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 105 of 346
NA 7.6.8 IF RPV temperature is less than 200qF, THEN NOTIFY the Unit Supervisior that RHR loop(s) in Shutdown Cooling may be declared operable for LPCI, Suppression Pool Cooling, Shutdown Cooling and Containment Spray Modes.
NA 7.6.9 RPV temperature is less than 200qF
Opposite loop of RHR is available for LoopLoop shutdown cooling B A
THEN PERFORM the following:
7.6.9.a REFER TO Flush of RHR Loop A(B) LoopLoop When in Standby Readiness Mode and B A VERIFY the Opposite loop of RHR has been flushed.
NA 7.6.9.b IF Suppression Pool is NOT transfer quality, THEN REFER TO Flush of RHR A(B)
With CST Water and VERIFY the actions are complete.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 106 of 346
NOTES
x The flow path for the RHR Loop operating in Refuel Mode Shutdown Cooling will be:
- RHR Loop A - Separator Storage Well to Reactor Cavity.
- RHR Loop B - Dryer and Fuel Storage Well to Reactor Cavity.
x This Step can be used during refueling operations as necessary to minimize flow-induced turbulence.
NA 7.6.10 It is desired to Desire to Align Improve Water RHR Shutdown Clarity Cooling Flow to the Upper Pools
THEN PERFORM the following:
7.6.10.a VERIFY the Reactor Vessel Head is removed.
7.6.10.b VERIFY the Upper Pools are filled.
7.6.10.c VERIFY the RHR to Cntmt Pools 1E12-1E12-Spectacle Flange is aligned with the D501A D501B blank removed and the spacer ring installed.
7.6.10.d PERFORM the following as need, 1E12-1E12-UNTIL RHR PUMP FLOW is R603A R603B 7000-7100 gpm AND desired flow to the upper pools is established:
x THROTTLE RHR UPPER POOL 1E12-1E12-COOLING ISOL. F037A F037B
x THROTTLE SHUTDOWN 1E12-1E12-COOLING TO FDW SHUTOFF. F053A F053B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 107 of 346
NA 7.6.10.e Feedwater is aligned to feed the RPV
SHUTDOWN COOLING TO FDW 1E12-1E12-SHUTOFF is closed F053A F053B
THEN OPEN the associated FDW 1B21-1B21-HDR SHUTOFF valve. F065A F065B
NA 7.6.11 RHR UPPER RHR UPPER 1E12-1E12-POOL COOLING POOL COOLING F037A F037B ISOL is open ISOL is throttled
Desired to use the Normal Mode Shutdown Cooling path
THEN PERFORM the following:
7.6.11.a VERIFY the associated FDW HDR 1B21-1B21-SHUTOFF valve is CLOSED. F065A F065B
7.6.11.b PERFORM the following as need, 1E12-1E12-UNTIL RHR PUMP FLOW is R603A R603B 7000-7100 gpm RHR UPPER POOL 1E12-1E12-COOLING ISOL is closed: F037A F037B
x THROTTLE RHR UPPER POOL 1E12-1E12-COOLING ISOL. F037A F037B
x THROTTLE SHUTDOWN 1E12-1E12-COOLING TO FDW SHUTOFF. F053A F053B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 108 of 346
CAUTION
Maintain RHR Shutdown Cooling flow greater than 2575 gpm to ensure that the RHR PUMP A(B) has adequate minimum flow.
NA 7.6.12 Desire to Align Desire to Align 1E12-1E12-RHR Shutdown RHR Shutdown F053A F053B Cooling Flow to the Cooling Flow to the Normal Mode Refuel Mode 1E12-1E12-F037A F037B
LPCI INJECTION VALVE is open 1E12-1E12-F042A F042B
THEN PERFORM the following:
7.6.12.a PERFORM the following as needed to 1E12-1E12-establish RHR PUMP FLOW R603A R603B 2750-3500 gpm, WHILE maintaining desired cooldown rate:
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE. F003A F003B
x THROTTLE OPEN RHR HXS 1E12-1E12-BYPASS VALVE. F048A F048B
NA 7.6.12.b IF aligning RHR Shutdown Cooling Flow to the Normal Mode, THEN PERFORM the following:
7.6.12.b.1 VERIFY the associated FDW HDR 1B21-1B21-SHUTOFF is closed. F065A F065B
7.6.12.b.2 HOLD the SHUTDOWN COOLING TO 1E12-1E12-FDW SHUTOFF in OPEN, UNTIL F053A F053B open.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 109 of 346
7.6.12.b.3 TAKE the LPCI INJECTION VALVE to 1E12-1E12-CLOSED. F042A F042B
NOTE
The flow path for the RHR Loop operating in Refuel Mode Shutdown Cooling will be:
x RHR Loop A - Separator Storage Well to Reactor Cavity.
x RHR Loop B - Dryer and Fuel Storage Well to Reactor Cavity.
NA 7.6.12.c IF aligning RHR Shutdown Cooling Flow to the Refuel Mode, THEN PERFORM the following:
7.6.12.c.1 VERIFY the Reactor Vessel Head is removed.
7.6.12.c.2 VERIFY the Upper Pools are filled.
7.6.12.c.3 VERIFY the RHR to Cntmt Pools 1E12-1E12-Spectacle Flange is aligned with the D501A D501B blank removed and the spacer ring installed.
7.6.12.c.4 HOLD the RHR UPPER POOL 1E12-1E12-COOLING ISOL in OPEN, UNTIL F037A F037B open.
7.6.12.c.5 TAKE the LPCI INJECTION VALVE to 1E12-1E12-CLOSED. F042A F042B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 110 of 346
7.6.12.d PERFORM the following as needed to 1E12-1E12-establish RHR PUMP FLOW R603A R603B 7000-7100 gpm:
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE. F003A F003B
x THROTTLE OPEN RHR HXS 1E12-1E12-BYPASS VALVE. F048A F048B
NOTE
RPV level can be estimated to be 200 gallons per inch of Reactor Vessel Level.
NA 7.6.13 IF it is desired to Lower Reactor Level to Radwaste, THEN PERFORM the following:
7.6.13.a VERIFY Radwaste System is aligned to receive the flow from RHR.
7.6.13.b VERIFY that the Reactor coolant temperature is less than 140°F.
7.6.13.c THROTTLE the following valves as 1E12-1E12-needed to establish RHR PUMP FLOW R603A R603B 6000-6500 gpm:
x RHR HXS OUTLET VALVE 1E12-1E12-F003A F003B
x RHR HXS BYPASS VALVE 1E12-1E12-F048A F048B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 111 of 346
NA 7.6.13.d IF it is NOT desired to establish a continuous drain down, THEN THROTTLE the following 1E12-1E12-valves as needed to establish RHR R603A R603B PUMP FLOW 4500 gpm:
x RHR HXS OUTLET VALVE 1E12-1E12-F003A F003B
x RHR HXS BYPASS VALVE 1E12-1E12-F048A F048B
NA 7.6.13.e IF using RHR A, THEN TAKE the RHR A TO 1E12-RADWASTE ISOL to OPEN. F049
NA 7.6.13.f IF using RHR B, THEN OPEN the RHR B To Radwaste 1E12-Shutoff Valve. F504
7.6.13.g NOTIFY Radwaste RPV draining is beginning.
CAUTION
Performance of the following step can cause a rapid decrease in RPV level. Discharge flow to Radwaste can drain up to 8/min from the RPV.
7.6.13.h THROTTLE the RHR TO RADWASTE 1E12-ISOL, UNTIL the desired rate of RPV F040 level decrease is achieved, WHILE 1E12-1E12-maintaining RHR PUMP AMPS less R100A R100B than 95 amps.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 112 of 346
NA 7.6.13.i IF continuous drain down is being used, 1E12-1E12-THEN WHILE maintaining RHR R100A R100A PUMP AMPS between 90-95 amps, PERFORM the following as needed to 1E12-1E12-R603A R603B maintain desired heatup AND blowdown rates:
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE F003A F003B
x THROTTLE RHR HXS BYPASS 1E12-1E12-VALVE F048A F048B
x THROTTLE RHR TO RADWASTE 1E12-ISOL F040
NA 7.6.13.j The desired RPV Continuous level is achieved blowdown is no longer required
THEN PERFORM the following:
7.6.13.j.1 HOLD the RHR TO RADWASTE ISOL 1E12-in CLOSE, UNTIL closed. F040
NA 7.6.13.j.2 IF using RHR A, THEN TAKE the RHR A TO 1E12-RADWASTE ISOL to CLOSE. F049
NA 7.6.13.j.3 IF using RHR B, THEN CLOSE the RHR B To 1E12-Radwaste Shutoff Valve. F504 Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 113 of 346
7.6.13.j.4 PERFORM the following as needed to 1E12-1E12-establish RHR PUMP FLOW R603A R603B 7000-7100:
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE. F003A F003B
x THROTTLE RHR HXS BYPASS 1E12-1E12-VALVE. F048A F048B
7.6.13.j.5 PERFORM independent verification of the required components.
NOTE
RPV level can be estimated to be 200 gallons per inch of Reactor Vessel Level.
NA 7.6.14 IF it is desired to Lower Reactor Level to the Suppression Pool, THEN PERFORM the following:
7.6.14.a VERIFY that the Reactor coolant temperature is less than 140°F.
7.6.14.b NOTIFY Radiation Protection of the following:
x A Suppression Pool evolution will be conducted which may affect suppression pool water level and/or activity.
x Surveys should be performed for Containment 599 elevation to evaluate the radiological impact of the evolution.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 114 of 346
7.6.14.c THROTTLE the following valves as 1E12-1E12-needed to establish RHR PUMP FLOW R603A R603B 6000-6500 gpm:
x RHR HXS OUTLET VALVE 1E12-1E12-F003A F003B
x RHR HXS BYPASS VALVE 1E12-1E12-F048A F048B
7.6.14.d THROTTLE the following valves as 1E12-1E12-needed to establish RHR PUMP FLOW R603A R603B 4500 gpm:
x RHR HXS OUTLET VALVE 1E12-1E12-F003A F003B
x RHR HXS BYPASS VALVE 1E12-1E12-F048A F048B
7.6.14.e WHILE maintaining RHR PUMP AMPS 1E12-1E12-less than 95 amps, R100A R100B THROTTLE the RHR HXS DUMP 1E12-1E12-VALVE, UNTIL the desired rate of RPV F011A F011B level decrease is achieved.
7.6.14.f WHEN the desired RPV level is 1E12-1E12-achieved, F011A F011B THEN HOLD the RHR HXS DUMP VALVE in CLOSE, UNTIL closed.
7.6.14.g PERFORM the following as needed to 1E12-1E12-establish RHR PUMP FLOW R603A R603B 6900-7100 gpm:
x THROTTLE RHR HXS OUTLET 1E12-1E12-VALVE F003A F003B
x THROTTLE RHR HXS BYPASS 1E12-1E12-VALVE F048A F048B Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 115 of 346
7.6.14.h PERFORM independent verification of the required components.
NA 7.6.15 IF desired to raise Reactor Water Level Using Condensate Transfer and Storage Water, THEN PERFORM the following:
7.6.15.a REFER TO Flush Valve Operation and 1E12-OPEN the SHTDN COOLING SUCT F315 HDR FLUSH SUPPLY valve.
7.6.15.b WHEN the desired Reactor water level 1E12-is achieved, F315 THEN REFER TO Flush Valve Operation and CLOSE SHTDN COOLING SUCT HDR FLUSH SUPPLY valve.
7.6.15.c PERFORM independent verification of the required components.
7.6.16 WHEN desired to shutdown RHR, THEN PERFORM the following:
7.6.16.a CONFIRM Lowering Reactor Level to Radwaste is NOT in progress.
7.6.16.b CONFIRM Lowering Reactor Level to the Suppression Pool is NOT in progress.
7.6.16.c CONFIRM Raising Reactor Water Level Using Condensate Transfer and Storage Water is NOT in progress.
Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12 Section 7.6
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 116 of 346
7.6.16.d GO TO Shutdown Cooling Shutdown to Standby Readiness.
END OF SECTION Instruction Number:
PERRY NUCLEAR POWER PLANT SOI-E12
Title:
Use Category:
RESIDUAL HEAT REMOVAL SYSTEM In-Field Reference Revision: Page:
71 341 of 346
ATTACHMENT 42 - Alternate Shutdown Cooling Data Page 1 of 1
NOTE
The LOOP column indicates what must be verified for specific sections/steps.
Shutdown Cooling Loop: Loop A ___ Loop B ___
Pre-Start Data:
Parameter Instrument Reading Loop 1E12-R601, Pt 1(red) A RHR IN to HXTR 1E12-R601, Pt 2 (dark green)
B 1E12-R601, Pt 5 (magenta) A RHR H2O DISCH 1E12-R601, Pt 6 (orange)
B Drywell Avg. Temperature D23ED033 (1D23-R210A(B))
Reactor Bulk Water Temp. (1)
Post-Start Data:
1E12-R601, Pt 1(red) A RHR IN to HXTR 1E12-R601, Pt 2 (dark green) B
1E12-R601, Pt 5 (magenta) A RHR H2O DISCH 1E12-R601, Pt 6 (orange)
B RHR Pump Flow 1E12-R603A A 1E12-R603B B
Drywell Avg. Temperature D23ED033 (1D23-R210A(B))
Reactor Bulk Water Temp. (1)
instrument for this parameter. Record which instrument was used in the instrument column.
Forward the original to the Responsible System Engineer, PNED/SES
Forward a copy to the System Design Engineer, PNED/DES
Forward a copy to the Lead Engineer, Piping Analysis, PNED/DES.
OT-3701-G43_00 1_RO Rev 0
JOB PERFORMANCE MEASURE SETUP SHEET
System: G43 -Suppression Pool Makeup System Time Critical: No Alternate Path: No Applicability: RO/SRO Safety Function: 5 -Containment Integrity Setting: Simulator Validated: 7minutes
References:
EOP-SPI 3.2 Rev 1 Tasks: 002-503- 05- 01 Initiate SPMU Task Standard: Initiate SPMU per EOP -SPI 3.2 Required Material: EOP-SPI 3.2, SPMU Initiation K / A Data: 295030 - Ability to operate and/or monitor the following as they apply to Low Suppression Pool Water Level : EA1.04Suppression pool make-up system: Mark-III. Importance: RO 4.0/ SRO 4.0
- 1. Setup Instructions: Reset simulator to a power IC. Insert Malfunctions PC04 to 35%,
h13p60118ad3 to OFF, h13p60118e2 to ON, mv011e12f0001 to FAI, ry02_g43k1 to FAI, and ry02_g43k2 to FAI. Insert Remote Function LP03 to OUT. Place simulator in RUN and allow SP level to lower to < 17.8. Take a snapshot.( For 2017 ILO Exam, reset to IC no other actions needed)
- 2. Location / Method: Simulato r / Perform
- 3. Initial Condition: The P lant is at rated power. A leak in the LPCS Suppression Pool Suction line is causing Suppression Pool level to lower. All attempts to stop the leak have failed. The US has entered EOP -2 Primary Containment Control for lowering Suppression Pool level.
- 4. Initiating Cue: The Unit supervisor directs you the Reactor Operator to initiate SPMU per EOP -SPI 3.2.
Start Time: End Time:
Candidate:
OT-3701-G43_00 1_RO Rev 0
JPM BODY SHEET
Standard: Performer obtains or simulates obtaining a ll materials, procedures, tools, keys, radi os, etc before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Step 1
1.0 VERIFY the following keylock switches are in AUTO:
- SUPR POOL MAKE-UP A LOGIC G43-S6
- SUPR POOL MAKE-UP B LOGIC G43-S8
Standard: The Operator locates correct switches on H13-P601 and verifies in AUTO.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 2
2.0 IF a LOCA signal is present, THEN GO TO Step 5.0 of this instruction.
Standard: The Operator verifies no LOCA signal present and proceeds to Step 3.0.
Instructor Cue: If asked, NO LOCA signal present.
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-G43_00 1_RO Rev 0
Step 3
NOTE Placing SPMU test keylock switches in TEST with the SPMU mode switch in AUTO will automatically open SPMU shutoff valves when a Suppression Pool low -low level condition exists.
3.0 AT H13-P869, PLACE SUPR POOL MAKEUP A FULL FLW TEST PERM keylock switch in TEST. G43-S13
Critical Step: Operator places G43-S13 in TEST.
Instructor Cue: None
Notes: Switch G43-S13 is located on East wall of Simulator SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 4
4.0 AT H13-P868, PLACE SUPR POOL MAKEUP B FULL FLW TEST PERM keylock switch in TEST. G43-S12
Critical Step: Operator places G43-S12in TEST.
Instructor Cue: None
Notes: Switch G43-S12 is located on East wall of Simulator SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-G43_00 1_RO Rev 0
Step 5
5.0 PERFORM Steps 6.0 and 7.0 in any order with the prioritybeing a division that has electric power readily available
NOTES
- Normally BOTH divisions of SPMU are initiated. If Division 2 SPMU is successful and alternate power is required to initiate Division 1 SPMU, then it is NOT required to initiate Division 1 SPMU as the SPMU would be completed prior to being able to complete the next step.
- Division 3 to Division 1 480 Volt Crosstie, ONI-SPI C-6 provides temporary power to Initiate Suppression Pool Makeup. When power is needed to a component the infield operator needs to be notified so actions to power the component can be completed.
6.0 IF required to Initiate Division 1 SPMU,THEN PERFORM the following:
6.1 IF AC power is lost to Division 1 480 Volt AC busses AND Bus EF E-1 is energized,THEN REFER TO Division 3 To Division 1 480 Volt Crosstie, ONI-SP I C-6 concurrently with this procedure to apply power to Division 1 480 Volt AC busses.
6.2 ARM AND DEPRESS the SUPR PL MAKE -UP A MANUAL INITIATION pushbutton. G43-S5
Critical Step: Operator Arms and Depress es G43 -S5.
Instructor Cue: None
Notes: Step 6.1 is N/A.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-G43_00 1_RO Rev 0
Step 6
6.3 CONFIRM the following valves are OPEN:
- SUPR PL MAKE-UP A FIRST SHUTOFF. G43-F030A
- SUPR PL MAKE-UP A SECOND SHUTOFF. G43-F040A
Standard: The Operator confirms G43-F030A and G43 -F040A open.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-G43_00 1_RO Rev 0
Step 7
NOTES
- Normally BOTH divisions of SPMU a re initiated. If Division 1 SPMU is successful and alternate power is required to initiate Division 2 SPMU, then it is NOT required to initiate Division 2 SPMU as the SPMU would be completed prior to being able to complete the next step.
- Division 3 to Division 2 480 Volt Crosstie, ONI-SPI C-7 provides temporary power to Initiate Suppression Pool Makeup. When power is needed to a component the infield operator needs to be notified so actions to power the component can be completed.
7.0 IF required to Initiate Division 2 SPMU,THEN PERFORM the following:
7.1 IF AC power is lost to Division 2 480 Volt AC busses AND Bus EF E-1 is energized, THEN REFER TO Division 3 To Division 2 480 Volt Crosstie, ONI-SP I C-7 concurrently with this procedure to apply power to Division 2 480 Volt AC busses.
7.2 ARM AND DEPRESS the SUPR PL MAKE -UP B MANUAL INITIATION pushbutton. G43-S7
Critical Step: Operator Arms and Depress es G43 -S7.
Instructor Cue: None
Notes: Step 7.1 is N/A.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-G43_00 1_RO Rev 0
Step 8
7.3 CONFIRM the following valves are OPEN:
- SUPR PL MAKE-UP B FIRST SHUTOFF. G43-F030B
- SUPR PL MAKE-UP B SECOND SHUTOFF. G43-F040B
Standard: The Operator confirms the SPMU valves are open and that suppression pool level is rising.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-G43_00 1_RO Rev 0
Step 9
NOTE Division 3 to Division 1 480 Volt Crosstie, ONI-SPI C-6 provides temporary power to isolate flow to the upper pools. When power is needed to a component the infield operator needs to be notified so actions to power the component can be completed.
8.0 IF the CNTMT POOLS SUPP ISOL valve is OPEN, THEN ISOLATE flow to the upper Pools as follows: G41 -F100 8.1 IF AC power is lost to Division 1 480 Volt AC busses AND Bus EF E-1 is energized, THEN REFER TO Division 3 To Division 1 480 Volt Crosstie, ONI-SPI C -6 concurrently with this procedure to apply power to Division 1 480 Volt AC busses.
8.2 VERIFY CLOSED CNTMT POOLS SUPP ISOL. G41-F100
Critical Step: Operator closes G41 -F100.
Instructor Cue: None
Notes: Step 8.1 is N/A.
Terminate the JPM.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Terminating Cue: Reports to Unit Supervisor that EOP -SPI 3.2 is complete and SPMU is in progress.
Evaluation Results: SAT_____ UNSAT_____
End Time:
OT-3701-G43_00 1_RO Rev 0
JPM CUE SHEET
- The Plant is at rated power.
CONDITIONS:
- A leak in the LPCS Suppression Pool Suction line is causing Suppression Pool level to lower.
- All attempts to stop the leak have failed.
- The US has entered EOP-2 Primary Containment Control for lowering Suppression Pool level.
IN IT IA T ING CUE: The Unit Supervisor directs you the Reactor Operator to initiate SPMU per EOP-SPI 3.2.
OT-3701_M25_502 Rev 0
JOB PERFORMANCE MEASURE SETUP SHEET
System: M25/M26 Control Room Ventilation and Emergency Recirc System Time Critical: No Alternate Path: Yes Applicability: RO/SRO Safety Function: 9-Radioactivity Release Validated Time : 19Minutes
References:
SOI-M25/26 Rev. 24, ARI-H13-P904- 0002Rev 1 1, NOP -OP-1002Rev 12, &
Cyc-14 T/O EPY-M25- 005 Required Material: SOI-M25/26, Control Room HVAC And Emergency Recirculating System Task: 037-532- 01- 01 Shift from (Manual) EMERG RCIRC to NORM 037-524- 01- 01 Respond to Alarms Task Standard: Shift Control Room HVAC from Emergency Recircto NORMAL and respond to low flow alarm.
K/A: 290003 -A2. 03 Ability to (a) predict the impacts of the following on the CONTROL ROOM HVAC; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Initiation/reconfiguration failure. Importance: RO 3.4 SRO 3.6
- 1. Setup Instructions: Reset simulator to any IC with M25A running in ER and M25B S/D to Secured Status. (For 2017 ILO Exam, reset to IC 64) Insert Schedule file JPM-M25-502.sch and verify Event file JPM -M25-502.evt loads. A cknowledge alarms. Place a Yellow Switch Cap s on M25 B Supply Fanand M26 B Emergency Recirc Fan.Provide Operator with Yellow copy of SOI -
M25/26.
- 2. Location / Method: Simulator / Performance
- 3. Initial Condition: Control Room Ventilation is running in Emergency Recirc for a monthly Div. 2 diesel run, which is now complete. CRHVAC Supply Fan B is tagged out to replace a broke n belt.
- 4. Initiating Cue: The Unit Supervisor directs you,the Reactor Operator,to shift Control Room Ventilation to NORMAL.
Start Time : Stop Time :
Candidate:
OT-3701_M25_502 Rev 0
JPM BODY SHEET
Standard: Performer obtains or simulates obtaining all mater ials, procedures, tools, keys, radios, etc before performing task.
Standard: Performer follows management expectations with regards to safety and communication standards.
Step 1
SOI-M25/26, Control Room HVAC And Emergency Recirculating System
7.6 Shifting From EMERG RCIRC To NORM
7.6.1 IF the CONT RM HVAC A INBD SUPP DMPR is closed, THEN PERFORM Reset of Emergency Recirculation Auto Initiation.
M25-F020B 7.6.2 IF the CONT RM HVAC B INBD SUPP DMPR is closed, THEN PERFORM Reset of Emergency Recirculation Auto Initiation.
M25-F020A 7.6.3 IF the electric heater is in service, THEN PERFORM the following:
Standard: Steps 7.6.1, 7.6.2, and 7.6.3 are N/A.
Instructor Cue: None.
Notes: None.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701_M25_502 Rev 0
Step 2
7.6.4 PLACE both of the following in NORM:
Critical Step: Operator places M25-S7 in NORM.
Instructor Cue: None.
Notes: Operator shouldplace M25 -S8 in NORM, as this causes multiple B side dampers to realign. However, w ith M25B train S/D, placing & M25-S8 in NORM will not have any effect and is not Critical.
About 60 seconds after placing S7 in NORM, CONT RM HVAC RETURN FAN A, M25 -C002A will alarm on Low Flow.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 3
7.6.1 CONFIRM components are in the proper configuration in accordance withthe appropriate attachment:
- Train A in Operation and Train B Shutdown(Attachment 5)
Standard: Operator commences verifying component lineup.
Instructor Cue: If asked to report positions of M24-F051A & F051B, - Both open.
Notes: Return Fan low flow annunciator ( P904- 02-A1) willalarm while operator is verifying component lineup.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701_M25_502 Rev 0
Step 4
ARI-H13-P904- 0002-A1
1.0 CAUSE OF ALARM 1.1 Flow through CONT RM HVAC RETURN FAN A, M25-C002A, less than 24,000 CFM, as sensed byM25-N700A, when fan is running 4.0 SUBSEQUENT OPERATOR ACTIONS 4.1 DETERMINE 0M25 flow. M25-K120A 4.2 REFER TO SOI-M25/26 and SHIFT toHVAC Train B in the desired operatingmode.
Standard: Operator reviews ARI and suggests course of action.
Instructor Cue: If Operator requests flow data from NLO, respond, Flow is 20,000 CFM.
If Operator asks NLO about M25-F110A, report it does not appear to be full open.
If Operator does not suggest a course of action, ask wha t they recommend.
Notes: Per the ARI, the Operator should shift to the B train in the NORMAL mode. However, since B train Supply and Emergency Recirc fans are tagged out, the shift cannot occur. In this instance, shifting A train back to Emergency Recircmode will solve the problem as ER Mode stops the Return Fan.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701_M25_502 Rev 0
Step 5
SOI-M25/26, Control Room HVAC And Emergency Recirculating System
7.5 Shifting From NORM Or SMOKE CLEAR To EMERG RCIRC
7.5.1 PLACE both of the following inEMERG RCIRC:
Critical Step: Operator places M25-S7 in EMERG RCIRC.
Instructor Cue: None
Notes: Operator shouldplace M25 -S8 in EMERG RECIRC, as this causes multiple B side dampers to realign. However, with M25B train S/D, placing & M25-S8 in EMERG RCIRCwill not have any effect and is not Critical.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 6
7.5.2 CONFIRM components are in the proper configuration in accordance withthe appropriate attachment:
- Train A in Operation and Train B Shutdown(Attachment 5)
Standard: Operator commences verifying component lineup.
Instructor Cue: If asked to report positions of M24-F051A & F051B, - Both Closed.
Notes: None
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701_M25_502 Rev 0
Step 7
ATTACHMENT 5 - Config uration with Train A in Operation and Train B Shutdown
Train A Components M25-S7 & S8 Position NORM EMERG SMOKE RCIRC CLEAR CONT RM HVAC RETURN FAN A, M25-C002A ON OFF ON
Critical Step: Operator stops Return Fan A.
Instructor Cue: If Operator does not stop Return Fan A or doesnt suggest a course of action, ask what they recommend.
If Operator contacts NLO to ask if Return fan is still running, inform Operator that the Return fan is running.
Notes: During confirmation of components the operator should notice that the Return Fan failed to stop and M25-F110A damper is in mid-position and should inform evaluator that he is taking the fan control switch to STOP.
Per NOP-OP-1002, Conduct of Operations, Step 4.10.3 Automatic System Response Versus Manual Actions:
- 5. If automatic actions fail to occur when required, it is the responsibility of the operator to take manual actions to perform the system or component function. Pump or component auto start failures are examples where operators are expected to take manual action.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701_M25_502 Rev 0
Step 7
7.5.3 IF train is being shifted due to anemergency condition,THEN TAKE the following to CLOSE:
7.5.4 Control Room Controom relative humidity retiveumidity is 70% is unknown TAKEhe CONT RMMGRC M - M -
ONT toR D D
Standard: Steps 7.5.3 and 7.5.4 are N/A.
Instructor Cue: None
Notes: Operator will check humidity on ICS.
Terminate the JPM
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Terminating Cue: A Train of Control Room Ventilation is running in Emergency Recirc and Return Fan A is shutdown.
Evaluation Results: SAT_____ UNSAT_____
End Time:
OT-3701_M25_502 Rev 0
JPM CUE SHEET
- Control Room Ventilation is running in Emergency Recirc for a monthly CONDITIONS: Div. 2 diesel run, which is now complete.
- CR HVAC Supply Fan B is tagged out to replace a broken belt.
IN IT IA T ING CUE: The Unit Supervisor directs you,the Reactor Operator,to shift Control Room Ventilation to NORMAL.
OT-3701-D51_303_RO Rev 0
JOB PERFORMANCE MEASURE SETUP SHEET
System: D51 Seismic Monitoring System Time Critical: Yes Alternate Path: No Applicability: RO/SRO Safety Function: 2-Reactor Water Inventory Control Setting: Plant (non-RRA)
Validated Time: 25Minutes
References:
ONI-D51 Rev 20 SOI-P72 Rev 9 Required Material ONI-D51 -Earthquake Attachment 3 Task: 029-502- 01- 04 Operate Plant Underdrain Pumps 276-504- 01- 01 Monitor the Service Water System Operation 277-508- 01- 01 Monitor ESW System Operation Task Standard: Perform outside inspection for earthquake damage and shutdown Underdrain Pumpper ONI -D51 Attachment 3.
K/AData: 203000Knowledge of the effect that a loss or malfunction of the following will have on the RHR/LPCI: Injection Mode: -K6.10, Component cooling water systems IR 3.0 / 3.1.
219000 Ability to (a) predict the impacts of the following on the RHR/LPCI: Torus/Suppression Pool CoolingMode; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: -A2.15 Loss of, or inadequate, heat exchanger cooling flow IR 3.3/ 3.4
- 1. Setup Instructions: Provide Operator with a copy of ONI -D51 Attachment 3
- 2. Location / Method: Plant / Simulation
- 3. Initial Condition: OBE Earthquake has occurred; Five minutes ago, the Unit Supervisor entered ONI-D51.
- 4. Initiating Cue: The Unit Supervisor directs you as a Pla nt Operator to perform Attachment 3 of ONI-D51. This JPM is Time Critical
Start time End time
Operator
OT-3701-D51_303_RO Rev 0
JPM BODY SHEET
Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing task.
Standard: Performer follows management expectati ons with regards to safety and communication standards.
Step 1
ONI-D51 -Earthquake Attachment 3 - Outside Actions 3.0 PROCEDURE
NOTE The first ESW Inspection is required to be completed within 30 minutes of an OBE.
3.1 ESW Inspection 3.1.1 OBSERVE the following for possible indication of intake structure, intake tunnel or discharge tunnel damage:
- ESW forebay level
- ESW forebay water clarity
- Discharge tunnel entrance water level
Critical Step: Operator performs ESW inspection within 30 minutes.
Instructor Cue: ESW Forebay level is approximately 1 foot lower than recorded on Rounds thismorning. Other conditions are as-found Notes: ESW forebay level gauge is under north steps in ESW pumphouse. ESW forebay inspection must be done north of the screens. Service Water Weir markings are in 1 foot increments. ( Water level is n ormally 18 t o 24 over the weir).
Operator should inform the Control Room when ESW inspection done.
SAT ___ UNSAT ___
Comment(s): Time Complete for Time Critical Step ___________________
OT-3701-D51_303_RO Rev 0
Step 2
3.1.2 CONTACT Engineering if any indication of blockage is noted.
3.1.3 REPEAT the inspection in Step 3.1.1 within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter UNTIL Engineering has determined the inspections are no longer necessary.
Standard: Operator contacts Engineering to report lower forebay level.
Instructor Cue: Respond as Engineering
Notes: None.
SAT ___ UNSAT ___
Step 3
NOTE Underdrain Pumps, P72-C001E, is controlled from Underdrain Pump Local Control Station H51-P338E at Unit 1 Aux. Boiler Bldg. Elev. 620'.
3.2 Underdrain Pump Shutdown 3.2.1 PERFORM the following:
- VERIFY UNDERDRAIN PUMPS control switch in OFF P72-C001E
- VERIFY all Temporary Underdrain Pumps are shutdown at the local control panels.
Critical Step: Operator simulates placing the P72-C001E in OFF, and verifying all temporary underdrain pumps are shutdown.
Instructor Cue:
- Initially, P72 -C001E is in AUTO.
- P72-C001E Switch in OFF (when operator simulates placing in OFF)
- Temporary underdrain pumps are shutdown.
Notes: Terminate the JPM.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-D51_303_RO Rev 0
Terminating Cue: Operator completes ESW inspection within 30 minutes, and placed Underdrain Pump switch in OFF.
Evaluation Results: SAT_____ UNSAT_____
End time
OT-3701-D51_303_RO Rev 0
JPM CUE SHEET
- OBE Earthquake has occurred; CONDITIONS:
- Five minutes ago, the Unit Supervisor entered ONI -D51.
IN IT IA T ING CUE: The Unit Supervisor directs you as a Pla nt Operator to perform Attachment 3 of ONI-D51.
This JPM is Time Critical
OT-3701-P54_003_RO Rev 0
JOB PERFORMANCE MEASURE SETUP SHEET
System: Fire Protection Time Critical: No Alternate path: No Applicability: RO/SRO Safety Function: 8 - Plant Service Systems Setting: Plant (RRA)
Validated: 28minutes
References:
SOI-P54 (WTR) Rev 23 Task Standard: Initiate Deluge manually on Main Transformer C and Isophase Bus Duct per SOI -P54(WTR)
Task #: 286-511- 04- 04 Perform Manual Initiation of Transformer, Isophase Bus Duct, or Hydrogen Seal Oil Deluge System Required Material: SOI-P54 (WTR), Fire Pr otection System -Water Section 7.2 K / A Data: 600000 AK1.02 Knowledge of the operation applications of the following concepts as they apply to Plant Fire On Site: Fire Fighting 2.9 / 3.1 AA1.08Ability to operate and / or monitor the following as they apply to Pla nt Fire On Site:Fire fighting equipment used on each class of fire 2.6 / 2.9
- 1. Setup Instructions: When operator requests, provide operator with copy of SOI -
P54(WTR).
- 2. Location / Method: Plant / Simulation
- 3. Initial Condition: A fire has been r eported in C phase of the Main Transformer. The US has entered ONI-P54, FIRE. The Main Transformers and main generator have been deenergized.
- 4. Initiating Cue: The Unit Supervisor directs you as the Field Supervisor to initiate deluge on the C Main Transformer.
Start Time: End Time:
Candidate:
OT-3701-P54_003_RO Rev 0
JPM BODY SHEET
Standard: Performer obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc before performing t ask.
Standard: Performer follows management expectati ons with regards to safety and communication standards.
Step 1
SOI-P54(WTR), FIRE PROTECTION SYSTEM - WATER
2.0 PRECAUTIONS AND LIMITATIONS
2.5 When any Main Transformer Deluge System is initiated for the purpose of combating a fire, the Isophase Bus Duct Deluge shall also be initiated.
2.16 The Deluge Systems of the three Main Transformers AND two Startup Transformers shall be aligned to support manual initiation only.
Standard: The Operator reviews SOI-P54(WTR) and determines deluge must be manually initiated.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-P54_003_RO Rev 0
Step 2
7.2 Emergency/Manual Deluge Initiation (Transformer, Isophase Bus Duct, and Hydrogen Seal Oil)
NOTES
- Attachment 14 contains a li sting of the components used in this section.
- The following section may be performed by the Fire Brigade, Fire Protection Personnel, Operators or other individuals as required.
- When any Main Transformer Deluge System is initiated for the purpose of combati ng a fire, the Isophase Bus Duct Deluge shall also be initiated.
Standard: The Operator determines that the Isophase Bus Duct Deluge shall also be initiated.
Instructor Cue: None
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-P54_003_RO Rev 0
Step 2
7.2.1 VERIFY OPEN the (C Main Transformer deluge ) system SupplyIsolation Valve.
Critical Step: Operator refers to Attachment 14to obtain correct valve number and simulates opening the C Ma in Transformer Supply Isolation valve.
Instructor Cue:
- As Operator is opening valve, The Supply Isolation Valve stem is extending.
- The Supply Isolation Valve is Open.
- If asked, no flow noise is heard.
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 3
7.2.2 OPEN the ( C Main Transformer) Manual Initiation Valve door at the associated deluge valve.
Standard: Operator simulates breaking door seal and simulates opening Man ual Initiation Valve door.
Instructor Cue: None
Notes: When operator simulates opening valve door, show picture #1of Manual Initiation Valve.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-P54_003_RO Rev 0
Step 4
7.2.3 PULL the ( C Main Transformer) valve forward.
Critical Step: Operator refers to Attachment 14to obtain correct valve number and simulates opening the C Main Transformer Manual Initiation valve.
Instructor Cue:
- The Manual Initiation Valve is Open.
- If asked, flow noise is heard when BOTH the Supply Isolation and the Manual Initiation Valves are opened.
Notes: When operator identifies Manual Initiation Valve enclosure, show Picture #1 of Manual Initiation Valve.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 5
7.2.1 VERIFY OPEN the (Isophase Bus Duct deluge ) system SupplyIsolation Valve.
Critical Step: Operator refers to Attachment 14 to obtain correct valve number and simulates opening the Isophase Bus Duct Su pply Isolation valve.
Instructor Cue:
- As Operator is opening valve, The Supply Isolation Valve stem is extending.
- The Supply Isolation Valve is Open.
- If asked, no flow noise is heard.
Notes: None SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-P54_003_RO Rev 0
Step 6
7.2.2 OPEN the ( Isophase Bus Duct) Manual Initiation Valve door at the associated deluge valve.
Standard: Operator simulates breaking door seal and simulates opening Manual Initiation Valve door.
Instructor Cue: None
Notes: When operator simulates opening valve door, show picture #2of Manual Initiation Valve.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Step 7
7.2.3 PULL the ( Isophase Bus Duct) valve forward.
Critical Step: Operator refers to Attachment 14to obtain correct valve number and simulates opening the Isophase Bus Duct Manual Initiation valve.
Instructor Cue:
- The Manual Initiation Valve is Open.
- If asked, flow noise is heard when BOTH the Supply Isolation and the Manual Initiation Valves are opened.
Notes: When operator identifies Manual Initiation Valve enclosure, show Picture #2 of Manual Initiation Val ve.
SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
OT-3701-P54_003_RO Rev 0
Step 8
7.2.4 IF Manual-Electric Initiation is desired, THEN BREAK the glass on the Manual Release Station for the associated deluge system.
Standard : Step 7.2.4 is N/A as Manual -Electric Initiation is not available.
Instructor Cue: None
Notes: Terminate JPM SAT ___ UNSAT ___
Comment(s): ________________________________________________________________
Terminating Cue: Manual deluge on Main Transformer C and the Isophase Bus Duct has been initiated per SOI -P54 section 7.2.
Evaluation Results: SAT_____ UNSAT_____
End Time
OT-3701-P54_003_RO Rev 0
Picture # 1
OT-3701-P54_003_RO Rev 0 Picture # 2
OT-3701-P54_003_RO Rev 0
JPM CUE SHEET
- A fire has been reported in C phase of the Main Transformer.
CONDITIONS:
- The US has entered ONI-P54, FIRE.
- The Main Transformers and main generator have been deenergized.
IN IT IA T ING CUE: The Unit Supervisor directs you as the Field Supervisor to initiate deluge on the C Main Transformer.
- 10 -