Letter Sequence Request |
---|
EPID:L-2020-SLE-0000, Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement
Results
Other: ML20246G698, ML20258A284, ML20269A465, ML20274A111, ML20274A198, ML20307A177, ML20322A052, ML20337A022, ML20351A388, ML21025A340, ML21181A186, ML23062A466, ML24206A043
|
MONTHYEARML20246G6982020-08-24024 August 2020 Appendix E: Applicant'S Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 Project stage: Other ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20274A1112020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Letter to Applicant Project stage: Other ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice Project stage: Other PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review Project stage: Other ML20317A2062020-11-12012 November 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20324A6792020-11-13013 November 2020 Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6802020-11-13013 November 2020 Comment (2) from Luther Jones on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6812020-11-13013 November 2020 Comment (3) from Frederick Gerloff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6822020-11-13013 November 2020 Comment (4) from Keith Scott on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6832020-11-13013 November 2020 Comment (5) from Joseph Sucha on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6852020-11-14014 November 2020 Comment (6) from Thomas Owens on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6862020-11-14014 November 2020 Comment (7) from Nancy Ashberry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0512020-11-14014 November 2020 Comment (8) of Lisa Hicks-Thomas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0532020-11-15015 November 2020 Comment (9) of Martin Blough on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0542020-11-16016 November 2020 Comment (10) of Michael Hamby on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0572020-11-16016 November 2020 Comment (11) of Lauren Lopez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0582020-11-16016 November 2020 Comment (12) from Melissa Haley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20329A4392020-11-17017 November 2020 Pamunkey Consultation Request_North Anna Power Station_17NOV20 Project stage: Request ML20325A0602020-11-17017 November 2020 Comment (13) of Terry Clouthier on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0652020-11-18018 November 2020 Comment (17) of Tommy Flynn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1242020-11-18018 November 2020 Comment (42) of Edmond Longest on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1202020-11-18018 November 2020 Comment (41) of Robert Fleshman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1182020-11-18018 November 2020 Comment (40) of Donald Sharp on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1172020-11-18018 November 2020 Comment (39) from Carl Aimee Newcomb of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1152020-11-18018 November 2020 Comment (38) of Eric Hendrixson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1132020-11-18018 November 2020 Comment (37) of Shawn Williams on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1122020-11-18018 November 2020 Comment (36) from Robert George on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1112020-11-18018 November 2020 Comment (35) of Greg Boutchyard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1102020-11-18018 November 2020 Comment (34) of Terrance Perrone on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1092020-11-18018 November 2020 Comment (33) of Adam Perry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1072020-11-18018 November 2020 Comment (32) of Angela Baker on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1052020-11-18018 November 2020 Comment (31) from Carl Eng on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1042020-11-18018 November 2020 Comment (30) of David Strole on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1012020-11-18018 November 2020 Comment (28) from Ralph Joyce on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0972020-11-18018 November 2020 Comment (27) from Jenna Brown on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0942020-11-18018 November 2020 Comment (26) from J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0752020-11-18018 November 2020 Comment (24) of Richard Zuercher on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1032020-11-18018 November 2020 Comment (29) of Steven Eisenrauch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0612020-11-18018 November 2020 Comment (14) of Kevin Cordray on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0622020-11-18018 November 2020 Comment (15) from Jason Evans on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0632020-11-18018 November 2020 Comment (16) of Tracy Gill on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0662020-11-18018 November 2020 Comment (18) from Jim Norvelle on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0712020-11-18018 November 2020 Comment (20) of Harold Vaughan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0922020-11-18018 November 2020 Comment (25) of J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0742020-11-18018 November 2020 Comment (23) of Andrew Moncol on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0732020-11-18018 November 2020 Comment (22) of Sarah Marshall on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0722020-11-18018 November 2020 Comment (21) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request 2020-11-14
[Table View] |
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24141A2812024-02-27027 February 2024 Comment (5) E-mail Regarding North Anna Suppl Dseis ML24054A0912024-02-22022 February 2024 Comment (4) E-mail Regarding North Anna Suppl Dseis ML24052A3672024-02-21021 February 2024 Comment (3) E-mail Regarding North Anna Suppl Dseis ML24052A3122024-02-20020 February 2024 Comment (7) of Ari Sandler on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Units 1 and 2 ML24052A2592024-02-16016 February 2024 Comment (2) E-mail Regarding North Anna Suppl Dseis ML24045A0072024-02-14014 February 2024 Comment (6) of Anonymous on North Anna Power Station SLR Draft EIS ML24045A0062024-02-13013 February 2024 Comment (5) of Bettina Rayfield on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0052024-02-0606 February 2024 Comment (4) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0042024-02-0606 February 2024 Comment (3) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML22339A2412022-11-21021 November 2022 Comment (1) E-mail Regarding North Anna Suppl Scoping ML21298A1412021-10-14014 October 2021 Comment (12) E-mail Regarding North Anna SLR Draft SEIS ML21285A3082021-10-12012 October 2021 Comment (10) E-mail Regarding North Anna SLR Draft SEIS ML21286A7492021-10-12012 October 2021 Comment (12) of Leo J Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7502021-10-12012 October 2021 Comment (13) of Danielle Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7482021-10-12012 October 2021 Comment (11) of Denise Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7472021-10-12012 October 2021 Comment (10) on Alex Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21285A3232021-10-12012 October 2021 Comment (11) E-mail Regarding North Anna SLR Draft SEIS ML21286A7462021-10-11011 October 2021 Comment (9) of Concerned Citizen on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0112021-10-10010 October 2021 Comment (8) E-mail Regarding North Anna SLR Draft SEIS ML21284A0102021-10-10010 October 2021 Comment (7) E-mail Regarding North Anna SLR Draft SEIS ML21286A7452021-10-0909 October 2021 Comment (8) of Patricia Gordon on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7422021-10-0909 October 2021 Comment (6) of Kate Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7442021-10-0909 October 2021 Comment (7) from Sierra Club on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7412021-10-0909 October 2021 Comment (5) of William Johnson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21286A7402021-10-0808 October 2021 Comment (4) of Donna Shaunesey on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0122021-10-0808 October 2021 Comment (9) E-mail Regarding North Anna SLR Draft SEIS ML21281A0252021-10-0707 October 2021 Comment (6) E-mail Regarding North Anna SLR Draft SEIS ML21286A7392021-10-0707 October 2021 Comment (3) of John Surr on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21281A0232021-10-0707 October 2021 Comment (5) E-mail Regarding North Anna SLR Draft SEIS ML21281A0222021-10-0707 October 2021 Comment (4) E-mail Regarding North Anna SLR Draft SEIS ML21279A0182021-10-0505 October 2021 Comment (2) E-mail Regarding North Anna SLR Draft SEIS ML21279A0192021-10-0505 October 2021 Comment (3) E-mail Regarding North Anna SLR Draft SEIS ML21277A1372021-09-28028 September 2021 Comment (1) E-mail Regarding North Anna SLR Draft SEIS ML21272A3522021-09-16016 September 2021 Comment (2) of Judy Lamana on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21245A3892021-09-0101 September 2021 Comment (1) of Eric Hendrixson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML20332A1182020-11-25025 November 2020 Comment (125) of Shira Futterman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0572020-11-23023 November 2020 Comment (94) of Alison Kaufmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0612020-11-23023 November 2020 Comment (97) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20332A0562020-11-23023 November 2020 Comment (93) of Lee Katz on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20332A0582020-11-23023 November 2020 Comment (95) of Darius Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0552020-11-23023 November 2020 Comment (92) of Igor Prskalo on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20330A2252020-11-23023 November 2020 Comment (87) of Jean Stokes on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2342020-11-23023 November 2020 Comment (90) of Paula Chow on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2302020-11-23023 November 2020 Comment (89) of Michael Chenkovich on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2332020-11-23023 November 2020 Comment (88) of Rayhan Daudani on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2242020-11-23023 November 2020 Comment (86) of Jean Stokes on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4252020-11-23023 November 2020 Comment (67) of Elena Day on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Correction ML20329A4242020-11-23023 November 2020 Comment (66) of Brenda Finchum on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4232020-11-23023 November 2020 Comment (65) of Jonathan Bransky to Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4212020-11-23023 November 2020 Comment (63) of Cathy Horne on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 2024-02-06
[Table view] |
Text
Page 1 of 1 SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Tam Tran, Robert Elliott, Joseph McManus, Antoinette Smith-Walker, Mary Neely As of: 11/27/20 11:32 AM Comment (138) Received: November 23, 2020 Publication Date: 11/3/2020 Status: Pending_Post PUBLIC SUBMISSION CITATION 85 FR 69665 Tracking No. 1k4-9k98-gdk8 Comments Due: November 23, 2020 Submission Type: API Docket: NRC-2020-0234 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Comment On: NRC-2020-0234-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Document: NRC-2020-0234-DRAFT-0138 Comment on FR Doc # 2020-23463 Submitter Information Name: Natalie Pien Address:
20644 GLEEDSVILLE RD LEESBURG, VA, 20175 Email: natcpien1@gmail.com Submitter's Representative: Senator John Bell Organization: Sierra Club, Great Falls Group Government Agency Type: State Government Agency: Virginia General Assembly General Comment See attached file(s)
Attachments Lake Anna Nuclear Power plant license extension https://www.fdms.gov/fdms/getcontent?objectId=0900006484971a28&format=xml&showorig=false 11/27/2020
My name is Natalie Pien, 20644 Gleedsville Rd., Leesburg, VA. I oppose the license renewal for extending Dominion Energy Virginia two nuclear power plants at North Anna. The Nuclear Regulatory Commission must conduct a current full and thorough Environmental Impact Statement, not a Generic EIS, on North Anna to evaluate:
- 1. Long term storage of nuclear waste.
- 2. The condition of the reactor foundation, liners, electrical cables, etc.
- 3. If the aging reactors can withstand another earthquake.
The Nuclear Regulatory Commission must uphold and assert its authority to the safety standards set forth.
A license renewal will enable these reactors, which have almost reached its 40 year design lifetime, to operate another 80 years! This is unacceptable. This is dangerous. The 2011 earthquake created an event that exceeded the reactor design basis. The geologic fault causing the earthquake hasnt disappeared. The plant never should have been sited there and extending the license to operate is irresponsible. Plus, the issue of safe disposal of nuclear waste still remains unresolved.
After the Fukushima accident, the NRC required reactor owners to conduct studies to revise and update the seismic hazard profiles. The North Anna reactor ranks third in vulnerability.
The NRC must prove that these reactors can operate safely during the 80 years Dominion has requested. Specifically, the NRC require:
Safety, Safety, Safety - what has been done to upgrade the reactor and systems to make it presently safe?
Before consideration of a license renewal of North Anna, a current full and thorough new Environmental Impact Statement (EIS) should be required What seismic upgrades have been made since the 2011 earthquake?
Has there been a thorough analysis of the storage waste equipment and surrounding area?
What new equipment and parts have been replaced and when?
No generic EIS should be allowed. North Anna is unique as it sits on a fault line and the earthquake exceeded its design limits.
What is the proof that North Anna reactors can withstand another earthquake?
What is the current condition of the original reactor foundations, liners, electrical cables, etc.?
What new security measures have taken place?
When have the inspections been performed since the COVID pandemic?
What new training has taken place to assure the inspectors are current in their skills and knowledge?
Since the North Anna region has significantly grown with development since 1978, 1980 what measures have been taken for evacuation?
What is the condition of the earthen dam?
What shortcuts and alternatives have been used to substitute for the standard practice?