MONTHYEARML24141A2812024-02-27027 February 2024 Comment (5) E-mail Regarding North Anna Suppl Dseis ML24054A0912024-02-22022 February 2024 Comment (4) E-mail Regarding North Anna Suppl Dseis ML24052A3672024-02-21021 February 2024 Comment (3) E-mail Regarding North Anna Suppl Dseis ML24052A3122024-02-20020 February 2024 Comment (7) of Ari Sandler on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Units 1 and 2 ML24052A2592024-02-16016 February 2024 Comment (2) E-mail Regarding North Anna Suppl Dseis ML24045A0072024-02-14014 February 2024 Comment (6) of Anonymous on North Anna Power Station SLR Draft EIS ML24045A0062024-02-13013 February 2024 Comment (5) of Bettina Rayfield on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0042024-02-0606 February 2024 Comment (3) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24045A0052024-02-0606 February 2024 Comment (4) of Aviv Goldsmith on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML24011A1502024-01-0909 January 2024 Comment (1) of Anonymous Individual on Virginia Electric and Power Company; North Anna Power Station Units 1 and 2; Draft Environmental Impact Statement ML22350A0622022-12-15015 December 2022 Comment (1) of Harmon Curran on Notice of Intent to Conduct Scoping Process and Prepare Supplement to Draft Environmental Impact Statement Virginia Electric and Power Company North Anna Power, Units 1 and 2 ML22339A2412022-11-21021 November 2022 Comment (1) E-mail Regarding North Anna Suppl Scoping ML21298A1412021-10-14014 October 2021 Comment (12) E-mail Regarding North Anna SLR Draft SEIS ML21285A3082021-10-12012 October 2021 Comment (10) E-mail Regarding North Anna SLR Draft SEIS ML21286A7492021-10-12012 October 2021 Comment (12) of Leo J Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7502021-10-12012 October 2021 Comment (13) of Danielle Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7482021-10-12012 October 2021 Comment (11) of Denise Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21285A3232021-10-12012 October 2021 Comment (11) E-mail Regarding North Anna SLR Draft SEIS ML21286A7472021-10-12012 October 2021 Comment (10) on Alex Schefer on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7462021-10-11011 October 2021 Comment (9) of Concerned Citizen on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0112021-10-10010 October 2021 Comment (8) E-mail Regarding North Anna SLR Draft SEIS ML21284A0102021-10-10010 October 2021 Comment (7) E-mail Regarding North Anna SLR Draft SEIS ML21286A7452021-10-0909 October 2021 Comment (8) of Patricia Gordon on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7422021-10-0909 October 2021 Comment (6) of Kate Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7442021-10-0909 October 2021 Comment (7) from Sierra Club on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML21286A7412021-10-0909 October 2021 Comment (5) of William Johnson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21286A7402021-10-0808 October 2021 Comment (4) of Donna Shaunesey on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21284A0122021-10-0808 October 2021 Comment (9) E-mail Regarding North Anna SLR Draft SEIS ML21281A0222021-10-0707 October 2021 Comment (4) E-mail Regarding North Anna SLR Draft SEIS ML21286A7392021-10-0707 October 2021 Comment (3) of John Surr on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21281A0252021-10-0707 October 2021 Comment (6) E-mail Regarding North Anna SLR Draft SEIS ML21281A0232021-10-0707 October 2021 Comment (5) E-mail Regarding North Anna SLR Draft SEIS ML21279A0182021-10-0505 October 2021 Comment (2) E-mail Regarding North Anna SLR Draft SEIS ML21279A0192021-10-0505 October 2021 Comment (3) E-mail Regarding North Anna SLR Draft SEIS ML21277A1372021-09-28028 September 2021 Comment (1) E-mail Regarding North Anna SLR Draft SEIS ML21272A3522021-09-16016 September 2021 Comment (2) of Judy Lamana on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML21245A3892021-09-0101 September 2021 Comment (1) of Eric Hendrixson on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2 ML20332A1182020-11-25025 November 2020 Comment (125) of Shira Futterman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2242020-11-23023 November 2020 Comment (86) of Jean Stokes on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2332020-11-23023 November 2020 Comment (88) of Rayhan Daudani on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2302020-11-23023 November 2020 Comment (89) of Michael Chenkovich on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0572020-11-23023 November 2020 Comment (94) of Alison Kaufmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20330A2342020-11-23023 November 2020 Comment (90) of Paula Chow on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0582020-11-23023 November 2020 Comment (95) of Darius Johnson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20332A0552020-11-23023 November 2020 Comment (92) of Igor Prskalo on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20332A0612020-11-23023 November 2020 Comment (97) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 ML20329A4252020-11-23023 November 2020 Comment (67) of Elena Day on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Correction ML20329A4242020-11-23023 November 2020 Comment (66) of Brenda Finchum on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4232020-11-23023 November 2020 Comment (65) of Jonathan Bransky to Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 ML20329A4212020-11-23023 November 2020 Comment (63) of Cathy Horne on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 2024-02-06
[Table view] |
Text
NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM
No. Section Page Line Comment SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03
- 1. 1.1 1-2 22 The identified page of the EIS states that CLI-22-03 was issued on September 28, 2022. ADD: Tam Tran, Ashley Waldron, Antoinette Walker-Smith Mary Neely
Comment (6)
EIS, Page xix correctly states that CLI-22-03 was issued February 24, 2022, Publication Date:1/8/2024 Citation: 89 FR 960
- 2. 3.2.1.3 3-7 4 The identified page of the EIS states, Section 15.2-223 of the Code of Virginia The Code of Virginia for comprehensive planning appears to be Section 15.2 -2223.
- 3. 3.4.4 3-23 19 The identified page of the EIS lists the following
Reference:
(VEPCO 2020; VDMME 2021-TN8548).
The correct Reference might be (VEPCO 2020; https://www.energy.virginia.gov/geology/Earthquakes.shtml ).
- 4. 3.4.5 3-25 19 The identified page of the EIS states:
Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s and a Storm Water Pollution Prevention Plan (SWPPP) was implemented in 2015 (VEPCO 2020- TN8099).
For clarification a suggestion to split into two sentences:
Regardless, stabilization measures to prevent erosion and sedimentation impacts to the North Anna site and surrounding area have been in place since construction began in the early 1970s. Following VDEQ regulatory review, a Storm Water Pollution Prevention Plan (SWPPP) was re-implemented in 2015 (VEPCO 2020- TN8099).
- 5. 3.5.1.3 3-34 39-40 The identified page of the EIS states:
The sewage treatment plant monitors and discharges treated effluent at internal Outfall 101 in accordance with North Annas VPDES permit.
Perhaps typographical error - t he correct outfall appear s to be Outfall 111.
Page l 1 NORTH ANNA POWER STATION SLR DRAFT EIS COMMENT FORM
No. Section Page Line Comment
- 6. 3.5.2.3 3-39 38-41 No reference was provided for the subsurface monitoring interval spans of the groundwater monitoring wells and piezometers installed at NAPS as part of the Groundwater Protection Program (GWPP), on the identified page of the EIS.
Recommend citing a reference, if one is available.
- 7. Appendix G.9 G-7 37-40 No conclusion related to climate change impacts on environmental resources was provided on the identified page of the EIS.
Page l 2