Other: 0CAN048804, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Informs That No Instances of Circuit Breakers Being Installed in safety-related Applications Identified at Plant, 3F0288-18, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breaker Models DS-206,DSL-206,DS-416,DSL-416 & DS-420, A07039, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Pole Shafts for All Four Breakers Replaced During Recently Completed Refueling Outage, BECO-88-050, Notifies That Westinghouse Circuit Breakers Not in Use or Planned to Be Used in safety-related Applications at Util, in Response to NRC Bulletin 88-001, GO2-88-084, Submits Info as Requested by NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, GO2-88-153, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided, ML17251B046, ML17284A611, ML18152A818, ML20147F998, ML20147G854, ML20148A890, ML20148B666, ML20148K225, ML20148Q724, ML20149M198, ML20150A899, ML20150B182, ML20150B526, ML20150C407, ML20150C743, ML20150D397, ML20151A945, ML20151B202, ML20151E018, ML20151E419, ML20151E868, ML20151G115, ML20151G791, ML20151H779, ML20151H965, ML20151Q920, ML20154D233, ML20154E154, ML20155A456, ML20155E392, ML20196H353, ML20205P688, ML20235J165, ML20235J168, ML20236A614, ML20236A849, ML20236D105, ML20236F547, ML20236S018, ML20247K075, NRC-88-0072, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Subj Circuit Breakers, RBG-27645, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Any Circuit Breakers Subj to Bulletin in Class 1E Svc at Plant, W3P88-0051, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Util Does Not Use Westinghouse Series Ds Circuit Breakers & Not Subj to Insps Requested in Bulletin
|
MONTHYEARML20235S2971987-10-0202 October 1987 Summary of 870923 Meeting W/Westinghouse Re Technical Basis for Westinghouse Recommended Actions,Criteria & Conclusions in to Utils That Use Models DS-416,DSL-416, DS-420,DS-206 & DSL-206 Switchgear in Class 1E Svc Project stage: Meeting ML20236A6141987-10-16016 October 1987 Advises That Util Insp of Reactor Trip Breakers Revealed Catawba Pole Shaft Which Had Welds W/Indications of Cracking.Forwards Informal Technical Communication from Franklin Research Ctr Re Initial Observation Project stage: Other ML20236A8491987-10-16016 October 1987 Forwards I.6177-5-1, Interim Rept on McGuire Reactor Trip Breaker 2B Failure Evaluation & Rcommended Corrective Actions from Westingtonhouse. Rept Explains Mechanical Binding Which Kept Breaker from Opening on 870702 Project stage: Other ML20236D1051987-10-21021 October 1987 Provides Record of 871020 Telcon Between D Hood,D Sellers & V Hodge of NRC & J Mcvicker & Cowne of Bg&E Re Unit 1 480 Volt Circuit Breaker W/Broken Weldment Connecting Ctr Pole Lever to Pole Shaft.Util Exam Results in 860918 Memo Project stage: Other ML20236F5471987-10-23023 October 1987 Documents 871020 Telcon W/Util Re Unit 2 Circuit Breaker Pole Shaft Weld Failure Project stage: Other ML20236F9651987-10-27027 October 1987 Notification of 871103 Meeting W/Util & Westinghouse in Philadelphia,Pa to Discuss Results of Franklin Research Ctr Exam of Cracks in Pole Shaft Welds of Reactor Trip Breaker Project stage: Meeting ML20236S0181987-11-18018 November 1987 Summarizes 871020 Telcon Between NRC & Util Re Two Broken Fillet Welds on Pole Shaft Assembly of Circuit Breaker That Energizes Emergency Fire Protection Pumps for Facility. Photographs Attached to 870710 Memo to NRC Encl Project stage: Other ML20149M1981988-02-16016 February 1988 Advises That Since Util No Longer Operating Reactor Licensee Due to 870430 Shutdown & 870804 Amend,Modifying License DPR-45 to Possess But Not Operate Status,Generic Ltr 88-01 Determined Inapplicable to Facility Project stage: Other 3F0288-18, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breaker Models DS-206,DSL-206,DS-416,DSL-416 & DS-4201988-02-23023 February 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breaker Models DS-206,DSL-206,DS-416,DSL-416 & DS-420 Project stage: Other ML20196H3531988-02-25025 February 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Ds Series Circuit Breakers Installed at Facility Project stage: Other ML20147G8541988-03-0101 March 1988 Responds to NRC Bulletin 88-001 Re Westinghouse Ds Series Circuit Breakers Used in safety-related Applications.Plant Does Not Have Any Westinghouse Ds Series Circuit Breakers Project stage: Other ML20147F9981988-03-0404 March 1988 Submits Response to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Author Does Not Utilize Any Westinghouse Circuit Breakers,As Identified in Subj Bulletin,In Class 1E Applications at Facility Project stage: Other ML20150B1821988-03-0707 March 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breakers in Class 1E Applications So Bulletin 88-001 Does Not Apply to Plant Project stage: Other ML20148A8901988-03-0707 March 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Unit 1 Has No Westinghouse Ds Circuit Breakers Used in Class 1E Application.Unit 2 Reactor Trip & Bypass Breakers Insp Initiated Per Info Notice 87-035 Project stage: Other ML20150A8991988-03-0909 March 1988 Provides Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Determined That Westinghouse Series Ds Circuit Breakers Not Employed at Plant.Insp Required by Bulletin Not Applicable to Plant Project stage: Other ML20150C4071988-03-11011 March 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Determined That Westinghouse Type Ds Circuit Breakers Not Used at Plant Project stage: Other BECO-88-050, Notifies That Westinghouse Circuit Breakers Not in Use or Planned to Be Used in safety-related Applications at Util, in Response to NRC Bulletin 88-0011988-03-15015 March 1988 Notifies That Westinghouse Circuit Breakers Not in Use or Planned to Be Used in safety-related Applications at Util, in Response to NRC Bulletin 88-001 Project stage: Other ML20148B6661988-03-16016 March 1988 Responds to 880205 NRC Compliance Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Westinghouse Ds Series Circuit Breakers Not Used in Class IE Svc at Plant Project stage: Other NRC-88-0072, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Subj Circuit Breakers1988-03-24024 March 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Subj Circuit Breakers Project stage: Other ML20148K2251988-03-25025 March 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Two Reactor Trip Breakers & Two Reactor Trip Bypass Breakers Subj to Bulletin Used at Millstone Unit 3.Main Pole Shaft Weld Insps Completed by 880225 Project stage: Other ML20151G7911988-03-28028 March 1988 Confirms That Westinghouse Ds Breakers Not Used at Facility, Per IE Bulletin 88-001, Defects in Westinghouse Circuit Breakers Project stage: Other W3P88-0051, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Util Does Not Use Westinghouse Series Ds Circuit Breakers & Not Subj to Insps Requested in Bulletin1988-03-29029 March 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Util Does Not Use Westinghouse Series Ds Circuit Breakers & Not Subj to Insps Requested in Bulletin Project stage: Other ML20151A9451988-03-30030 March 1988 Responds to IE Bulletin 88-001 Re Westinghouse Ds/Dsl Circuit Breakers.Ref Components Not Utilized at Facility Project stage: Other 0CAN048804, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Informs That No Instances of Circuit Breakers Being Installed in safety-related Applications Identified at Plant1988-04-0101 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Informs That No Instances of Circuit Breakers Being Installed in safety-related Applications Identified at Plant Project stage: Other RBG-27645, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Any Circuit Breakers Subj to Bulletin in Class 1E Svc at Plant1988-04-0404 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Any Circuit Breakers Subj to Bulletin in Class 1E Svc at Plant Project stage: Other ML20151B2021988-04-0404 April 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Insp of All Westinghouse DS-415 Reactor Trip & Bypass Breakers Completed on 880308 & Results Encl Project stage: Other ML18152A8181988-04-0505 April 1988 Responds to IE Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Type Ds Breakers Used at Plant Project stage: Other ML17251B0461988-04-0707 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Plant Does Not Have Westinghouse Circuit Breakers Subj to Bulletin Project stage: Other ML20151H7791988-04-0707 April 1988 Informs That Westinghouse Ds Circuit Breakers Not Utilized in Any 1E Application at Plant But Used in non-1E Applications & Will Be Included in Util Preventive Maint Program Project stage: Other ML20148Q7241988-04-0707 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Models DS-206,DSL-206, DS-416,DSL-416 or DS-420 Breakers in Class 1E Circuits at Hatch Project stage: Other ML20151E4191988-04-0808 April 1988 Responds to 880205 NRC Bulletin 88-01 Re Defects in Westinghouse Circuit Breakers for Facilities.Westinghouse Ds Series Circuit Breakers Not Used at Plants.Other Provisions of Bulletin Do Not Apply to Plants Project stage: Other ML20151E8681988-04-11011 April 1988 Forwards Response to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers in Class 1E Svc.All Required long-term & short-term Insps Completed Project stage: Other GO2-88-084, Submits Info as Requested by NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers1988-04-11011 April 1988 Submits Info as Requested by NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers Project stage: Other ML20151G1151988-04-13013 April 1988 Ack Receipt of in Response to NRC Bulletin 88-001 Re Westinghouse Circuit Breakers.Plant Does Not Use or Plan Use of Circuit Breakers,Therefore Matter Closed Project stage: Other ML20151H9651988-04-13013 April 1988 Responds to NRC Bulletin 88-001, Deficiencies in Westinghouse Circuit Breakers. Bulletin Addresses Deficiencies Exclusive to Westinghouse Ds/Dsl Type Circuit Breakers & Outlines Specific Insps to Be Performed Project stage: Other ML20205P6881988-04-20020 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Circuit Breakers Subj to Bulletin Installed in Plant Project stage: Other ML20155E3921988-06-0909 June 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit breakers.Sixty-six of sixty-seven Breakers Required New Pole Shafts Due to Failure of Welds to Meet Bulletin Requirements Resulting from Insp Project stage: Other ML20150C7431988-06-28028 June 1988 Forwards Arvin/Calspan Investigation of Trip Breaker Failure..., Explaining Mechanical Binding Which Caused Failure on 870702 Project stage: Other ML20150B5261988-06-30030 June 1988 Informs That All Class 1E DS-416 Breakers Now in Use Comply W/Nrc Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers Project stage: Other ML20150D3971988-07-0505 July 1988 Advises That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other GO2-88-153, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided1988-07-13013 July 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided Project stage: Other ML20151E0181988-07-14014 July 1988 Advises That Util 880407 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other ML20151Q9201988-08-0202 August 1988 Informs That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other ML20154E1541988-09-0909 September 1988 Advises That 880408 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other ML20154D2331988-09-0909 September 1988 Informs That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory & No Further Reply Necessary Project stage: Other ML20155A4561988-09-29029 September 1988 Requests Addl Info Re Util 880908 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Response Requested within 70 Days of Ltr Date Project stage: Other ML17284A6111988-11-18018 November 1988 Advises That Util 880411 & 0713 Responses to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers Satisfactory Project stage: Other ML20235J1651989-02-17017 February 1989 Provides Final Response to NRC Bulletin 88-001, Defects in Westinhouse Circuit Breakers. Alignment Check Specified in 871201 Submittal Satisfactorily Performed During Installation of Replacement Pole Shaft in Breakers Project stage: Other ML20235J1681989-02-17017 February 1989 Advises That 880314 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers Satisfactory. Westinghouse Ds Series Circuit Breakers Not Used in safety-related Applications at Plant Project stage: Other ML20247C7191989-05-15015 May 1989 Forwards Supplemental Response to NRC Bulletin 88-001 Re Westinghouse Series Ds Circuit Breakers.Insp Info Corrected Project stage: Supplement 1988-03-07
[Table View] |
Similar Documents at Byron |
|---|
|
Text
&&
/
\\ Commonw:alth Edison m
.\\
__ d 72 West Adams Street, Chicago, Illinois l
/ %ddress Reply to: Post Office [ToTT6T L/ Chicago, Illinois 60690 0767 May 15, 1989 Mr.
A.
Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Byron Station Units 1 and 2 Supplemental Response to NRC Bulletin No. 88-01 NRC Docket Nos. 50-454/455, TACS 65955/65956
References:
(a) NRC Bulletin No. 88-01, dated February 5, 1988.
(b) W.E. Morgan letter to A.B. Davis, dated April 8, 1988.
(c) W.E. Morgan letter to A.B. Davis, dated June 27, 1988.
(d) M.H. Richter letter to A.B. Davis, dated February 9, 1989.
Dear Mr. Davis Reference (a), addressed to all holders of operating licenses or construction permits for nuclear power reactors, provided information on Westinghouse series DS circuit breakers and safety concerns associated with their use.
Addressees using these breakers in Cler: 1E service were requested to perform and document inspection of the welds on the pole shafts and inspection of the alignment in the breaker closing mechanism.
This letter corrects the DS circuit breaker inspection information previously reported for Byron Station in Reference (d), and provides the current status of the breaker inspections following the completion of the recent Byron Unit 2 refuel outage.
1 Reference (d), which provided a status of the breaker inspections at the conclusion of the Fall 1988 Refuel Outage for Byron Unit 1, incorrectly reported that the total number of assigned (in-service) breakers was 78 instead of 86.
The 8 breakers which were omitted from the total were the reactor trip / bypass breakers (4 breakers per unit).
As reported in Reference (b), the reactor trip /bypasr breakers for both units had initially been inspected within the 30 day period requested by Reference (a).
These initial inspections revealed the reactor trip / bypass breakers had marginal pole shaft 8905250020 890515
[
PDR ADOCK 0500 {
/ //
g 161989 o
i 1
welds requiring reinspection at 200 cycles.
The Unit I reactor trip / bypass breakers were reinspected and the pole shafts were replaced during the Unit I refueling outage (Fall 1988), which was the first refueling outage for the unit following the-issuance of Reference (a).
The results of the inspections on the Unit I reactor-trip / bypass breakers were. reflected in the breaker inspections reported in Reference (d).
In addition, Reference (d) incorrectly reported that the number of assigned breaker inspections was 42 instead of 3 9. E Three (3) of-the reported breaker inspections had been performed on unassigned (spare) breakers.
Therefore, Reference (d) should have reported
'that'39 of the 86 assigned circuit breakers had "short-term" and "long-term" inspections performed as defined in Reference (a).
These " revised" inspection results have been used to calculate the totals presented in this letter.
It should be noted that the listing of the inspected breakers in Reference (d) was accurate.
Byron Unit 2 has recently completed its first refueling outage since the issuance of Reference (a).
Twenty-nine (29) assigned breakers (which included the 4 Unit 2 reactor trip / bypass breakers) had "short-term" and "long-term" inspections performed, as defined in Reference-(a), during the refuel outage.
The inspections, performed on Westinghouse DS-206 and DS-416 circuit breakers, included the welds for the three main pole levers, the four welds on the pole shaft, and a direct check of the alignment of the breaker closing mechanism. A list of the circuit breakers which were inspected is attached.
The results of the inspections are presented below.
TYPE 411 IYPE 206 No. of breakers inspected 6
23 No. of breakers which had pole shafts 6
23 replaced due to welds No. of breakers requiring corrective action 0
0 for alignment Weld deficiencies included porosity problems and failure to meet the required size criteria.
Following maintenance, aliganent was verified to be acceptable for all 29 breakers.
At this time, 68 of the 66 assigned circuit breakers have been inspected. The progress of the inspections is ahead of the schedule previously presented in References (b) and (c).
As reported in Reference (c),
l the unassigned (spare) breakers will have inspections performed prior to being placed in service.
Satisfactory completion of all Reference (a) related inspections is tracked by the "480 VAC DS 206/416 Breaker Critical Inspection items Log Book", which is maintained by the Electrical Maintenance Department at Byron Station.
a
g y
f,,'- !L L
l i
~ Please address any questions that you or your staff may have concerning.this response to this office.
Respectfully, l
h+
M.H. Richter Nuclear Licensing. Administrator rf/9001k8 ces Document Control Desk Resident Inspector - Byron Subscribe 6 and Suo Lo 7:::::::: ::::::::::::::,
befq/ me this
/
dayh "0FFICIAL SEAL" of f I '04 1989L LEllA F. MAYO b
0f
,5 Notary Public, State of Illinois; I'
/
'M c~~).
N L:y Commission Expires 4/25/93)'>
n
.otary Public U
l CIRCUIT BREAKERS INSPECTED FOR NRC BULLETIN 88-01 DURING BYRON STATION UNIT 2 REFUELING OUTAGE 1 l
Ereaker Number Description Breaker Type 1.
2RD05EA Reactor Trip Breaker DS 416 2.
2RD05EB Reactor Trip Breaker DS 416 3.
2RDOSEC Reactor Trip Breaker DS 416 4.
2RD05ED Reactor Trip Breaker DS 416 5'
5.
2AP26E 231X-2B Manual DS 206 6..
2AP21E 231X-3A Manual DS 206 7.
2AP25E 231X-3B Manual DS 206 8.
2VD01CA 231X-3D Electrical DS 206 9.
2DC03E 231X-4B Manual DS 206 8-10.
2AP05E 231Z-2D Electrical DS 416 11.
2AP93E 231Z-3A Manual DS 206 l-12.
OSXO3CC 231Z-3B L.S.
DS 206 13.
OSXO3CD 231Z-3C L.S.
DS 206 14.
OSXO3CC 2312-4B H.S.
DS 206 15.
OSX03CD 2312-4C H.S.
DS 206 16.
2AP24E 232X-2B Manual DS 206 17.
2AP23E 232X-3A Manual DS 206 18.
2AP27E 232X-3B Manual DS 206 i
19.
2VD01CB 232X-3D Electrical DS 206 20.
2VA08CA 232X-4A Electrical DS 206 l
21.
2DC04E 232X-4B Manual DS 206 22.
2T006P 232X-5A Electrical DS 206 23, 2AP28E/2AP32E 232X-5B Manual DS 206 II l
24.
2AP06E 232Z-2D Electrical DS 416 25.
2AP92E 2322-3A Manual DS 206 26.
OSX03CG 232Z-3B L.S.
DS 206 27.
OSX03CH 232Z-3C L.S.
DS 206 28.
OSX03CG 232Z-4B H.S.
DS 206 i.
29.
OSXO3CH 232Z-4C H.S.
DS 206 (1587z/28z-3)