Provides Record of 871020 Telcon Between D Hood,D Sellers & V Hodge of NRC & J Mcvicker & Cowne of Bg&E Re Unit 1 480 Volt Circuit Breaker W/Broken Weldment Connecting Ctr Pole Lever to Pole Shaft.Util Exam Results in 860918 Memo
ML20236D105
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/21/1987
From: Hood D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-65954, TAC-65955, NUDOCS 8710280022
Download: ML20236D105 (3)


Text

- _ - _ _ _ _. _ _

Lh L

j UNITED STATES

]f

?,

NUCLEAR REGULATORY COMMISSION

5 j

WASHINGTON, D. C. 20555 l

  • t

,6 OCT 211987 Docket Nos.:

50-317 and 50-318 i

i LICENSEE:

Baltimore Gas and Electric Company

' FACILITY:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2

SUBJECT:

RECORD OF TELEPHONE DISCUSSION REGARDING CIRCUIT BREAKER FAILURE (TACS 65954/65955)

On October 20,'1987, members of the NRC-(D. Hood, D. Sellers and V. Hodge)-

called J. McVicker and S. Cowne of Baltimore Gas and Electric Company (BG&E) to discuss the Calvert. Cliffs Unit-1480 volt circuit breaker with a broken weldment connecting the' center pole lever to the pole shaft. Results of BG&E's examination are described in a September 18, 1986 memorandum (same as-i enclosure 2 of-0. Hood memorandum, " Notice of Meeting with Westinghouse Re-

'garding Class. IE Switchgear Models: DS-416, DSL-416, DS-420,.DS-206 and DSL 206," dated September 21, 1987, Docket Nos. 50-369 and 50-370).

BG&E responded to the following NRC questions:

Q.

When was the failure first discovered?

A.

September 2, 1986 Q.

Breaker type and service?

A.

Westinghouse Model DS-206 used in Class IE service for.the Unit 1 Control Room Habitability (Air Conditioning) System Q.

How detected?

A.

During routine maintenance Q.

How did breaker last perform?

A.

Broken weld did not affect breaker performance

.Q.

How many DS breakers are used at the facility?

A.

About 400 DS-206 breakers for both units.

Also use some 05-416 breakers.

Believe all of these to be Class IE.

Q. -Any other similar weld failures?

A.

None Q.

What is used for reactor trip breakers?

A.

GE AKs Q.

Why was a pole shaft removed from another breaker and sent along with the failed pole shaft to Materials Engineering and Analysis Unit for evaluation?

A.

It had bad appearing welds but was evaluated to be suitable for service.

8710200022 871021 POR ADOCK 05000317.

f P

PDR 1

-P-OCT 211987 Q.

Number of operating cycles at time of failure?

A.

Not known.

Breaker had operated for more than 2 years.

Failure probably happened in the first few cycles because it was an aged weld.

Fatigue was evidenced only in part of the weld associated with lack of fusion.

Q.

Any other reports on failed weld?

A.

Non conformance report 90386 and Maintenance Request 090286. Also Westinghouse reply by letter from E. Goslin and G. Steinel to J. McVicker dated November 17, 1986.

Will send copies (see enclosure).

\\b\\

Darl S. Hood, Project Manager Project Directorate II-3 Division of Reactor Projects, 1/II

Enclosure:

As stated cc:

J. McVicker, BG&E S. Cowne, BG&E J. Jelovich, W G. Steinel, C See next page

> 5 If 25li PD#11-3/DRP-I/II PD#11-3/DRP-I/II DHood/mac DHood, Acting PD 10/ u /87 10/

/87 71

ij c

MEETING

SUMMARY

DISTRIbUTION i.

OCT 211987

,M D6'ckEEFilii'?e, NRC Participants V*" N RCPDR "'""" 'O '

O. Hood e*

L PDR D. Sellers NSIC V. Hodge PRC System PD#I-1 Rdg f

S. McNeil-l A. Toalston l

T. Peebles, RII S., West K. Naidu J. Richardson Project Manager D. Hood M. Duncan B. Kolostyak W. Troskoski (MNBB 6113) 0GC-Bethesda ACRS (10) l G. Lainas OTHERS bec: