Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Insp of All Westinghouse DS-415 Reactor Trip & Bypass Breakers Completed on 880308 & Results Encl
ML20151B202
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/04/1988
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-001, IEB-88-1, TAC-65955, TAC-65956, NUDOCS 8804080094
Download: ML20151B202 (3)


Text

,-

D'*

Alabama Power Company 600 North 18th Street Post Of fice Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 L

Alabama Power nio ce r sident the sotAh3rn ekurc sptem April 4, 1988 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 NRC Bulletin 88-01:

Defects in Westinghouse Circuit Breakers

[ TACS 65955/65956 ]

NRC Bulletin 88-01 was issued on February 5,1988 informing licensees of safety concerns with Westinghouse Type OS circuit breakers. Licensees were requested to expeditiously inspect all Westinghouse DS-416 reactor trip and bypass breakers within thirty days of receipt of the bulletin and submit a letter of confirmation of completion of the inspections within sixty days.

The inspections were to be performed using the criteria given in NRC Bulletin 88-01.

Alabama Power Company has performed all required short and long-term inspections on the Joseph M. Farley Nuclear Plant, Units 1 and 2, reactor trip and bypass breakers. The inspections were completed on March 8,1988 and the results are attached.

1 \\

i 8804080094 880404 PDR ADOCK 05000348 Q

DCD

.y 5-U. S. Nuclear Regulatory Comission

. April 4, 1988 ATTN: Document Control Desk Page Two

{'.

4 If there are any questions, please advise.

Respectfully submitted, ALABAMA POWER

,MPANY l4 R. P. Mcdonald RPM /RGW:mhf-D22 Attachment SWORN TO AND SUBSCRIBED BEFORE ME

//

j cc: Mr. L. B. Long Dr. J. N. Grace TH S AY

//pri/

, 1988 Mr. W. H. Bradford Q

SO Mr. E. A. Reeves f)

Notiry(gblic My Mommission Expires: 9-/[~h[

i

't I

r

. - - -,,, - -,, - - -..,..., - - - -.. _ - - -, -. - -. ~,.

  • 2 ATTACHfiENT Breaker Type:

Westinghouse DS-416 Breakers Inspected: Four Reactor Trip Breakers (two per unit)

Four Bypass Breakers (two per unit)

Results of Inspection:

Unit 1 a) Both reactor trip breakers passed criterion 6.1.1 (short-term inspection) and criterion 7.0 (long-term inspection),

b) Both bypass breakers failed criterion 6.1.1.

Cri terion 6.1.2 was applied and the breakers passed this criterion.

Both breakers passed criterion 7.0 (long-term inspection).

Corrective Action: The number of cycles on the Unit 1 bypass breakers will be monitored in accordance with criterion 6.2.2.

The pole shaf ts will be replaced when an adequate supply of pole shaf ts are obtained.

Unit 2 a) Both reactor trip breakers failed criteria 6.1.1 and 6.1.2.

Reactor trip breaker "B" f ailed criterion 7.1.

New pole shaf ts were installed in both breakers before the breakers were returned to service. The breakers were reinspected and passed criterion 6.1.1 (short-term inspections) and criterion 7.0 (long-term inspections),

b) Both bypass breakers f ailed criterion 6.1.1.

Bypass breaker "B" f ailed criterion 6.1.2.

A new pole shaf t was installed on Unit 2 bypass breaker "B" before returning the breaker to service. Bypass breaker "B" passed criteria 6.1.1 and 7.0 with the new shaf t installed. Bypass breaker "A" was subjected to criterion 6.1.2 af ter failure of criterion 6.1.1.

Bypass breaker "A" passed criteria 6.1.2 and 7.0.

Corrective Action:

The number of cycles on Unit 2 bypass breaker "A" will bc nonitored in accordance with criterion 6.2.2.

The pole shaf t will be replaced when an adequate supply of pole shaf ts are obtained.