Other: 0CAN048804, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Informs That No Instances of Circuit Breakers Being Installed in safety-related Applications Identified at Plant, 3F0288-18, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breaker Models DS-206,DSL-206,DS-416,DSL-416 & DS-420, A07039, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Pole Shafts for All Four Breakers Replaced During Recently Completed Refueling Outage, BECO-88-050, Notifies That Westinghouse Circuit Breakers Not in Use or Planned to Be Used in safety-related Applications at Util, in Response to NRC Bulletin 88-001, GO2-88-084, Submits Info as Requested by NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, GO2-88-153, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided, ML17251B046, ML17284A611, ML18152A818, ML20147F998, ML20147G854, ML20148A890, ML20148B666, ML20148K225, ML20148Q724, ML20149M198, ML20150A899, ML20150B182, ML20150B526, ML20150C407, ML20150C743, ML20150D397, ML20151A945, ML20151B202, ML20151E018, ML20151E419, ML20151E868, ML20151G115, ML20151G791, ML20151H779, ML20151H965, ML20151Q920, ML20154D233, ML20154E154, ML20155A456, ML20155E392, ML20196H353, ML20205P688, ML20235J165, ML20235J168, ML20236A614, ML20236A849, ML20236D105, ML20236F547, ML20236S018, ML20247K075, NRC-88-0072, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Subj Circuit Breakers, RBG-27645, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Any Circuit Breakers Subj to Bulletin in Class 1E Svc at Plant, W3P88-0051, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Util Does Not Use Westinghouse Series Ds Circuit Breakers & Not Subj to Insps Requested in Bulletin
|
MONTHYEARML20235S2971987-10-0202 October 1987 Summary of 870923 Meeting W/Westinghouse Re Technical Basis for Westinghouse Recommended Actions,Criteria & Conclusions in to Utils That Use Models DS-416,DSL-416, DS-420,DS-206 & DSL-206 Switchgear in Class 1E Svc Project stage: Meeting ML20236A6141987-10-16016 October 1987 Advises That Util Insp of Reactor Trip Breakers Revealed Catawba Pole Shaft Which Had Welds W/Indications of Cracking.Forwards Informal Technical Communication from Franklin Research Ctr Re Initial Observation Project stage: Other ML20236A8491987-10-16016 October 1987 Forwards I.6177-5-1, Interim Rept on McGuire Reactor Trip Breaker 2B Failure Evaluation & Rcommended Corrective Actions from Westingtonhouse. Rept Explains Mechanical Binding Which Kept Breaker from Opening on 870702 Project stage: Other ML20236D1051987-10-21021 October 1987 Provides Record of 871020 Telcon Between D Hood,D Sellers & V Hodge of NRC & J Mcvicker & Cowne of Bg&E Re Unit 1 480 Volt Circuit Breaker W/Broken Weldment Connecting Ctr Pole Lever to Pole Shaft.Util Exam Results in 860918 Memo Project stage: Other ML20236F5471987-10-23023 October 1987 Documents 871020 Telcon W/Util Re Unit 2 Circuit Breaker Pole Shaft Weld Failure Project stage: Other ML20236F9651987-10-27027 October 1987 Notification of 871103 Meeting W/Util & Westinghouse in Philadelphia,Pa to Discuss Results of Franklin Research Ctr Exam of Cracks in Pole Shaft Welds of Reactor Trip Breaker Project stage: Meeting ML20236S0181987-11-18018 November 1987 Summarizes 871020 Telcon Between NRC & Util Re Two Broken Fillet Welds on Pole Shaft Assembly of Circuit Breaker That Energizes Emergency Fire Protection Pumps for Facility. Photographs Attached to 870710 Memo to NRC Encl Project stage: Other ML20149M1981988-02-16016 February 1988 Advises That Since Util No Longer Operating Reactor Licensee Due to 870430 Shutdown & 870804 Amend,Modifying License DPR-45 to Possess But Not Operate Status,Generic Ltr 88-01 Determined Inapplicable to Facility Project stage: Other 3F0288-18, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breaker Models DS-206,DSL-206,DS-416,DSL-416 & DS-4201988-02-23023 February 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breaker Models DS-206,DSL-206,DS-416,DSL-416 & DS-420 Project stage: Other ML20196H3531988-02-25025 February 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Ds Series Circuit Breakers Installed at Facility Project stage: Other ML20147G8541988-03-0101 March 1988 Responds to NRC Bulletin 88-001 Re Westinghouse Ds Series Circuit Breakers Used in safety-related Applications.Plant Does Not Have Any Westinghouse Ds Series Circuit Breakers Project stage: Other ML20147F9981988-03-0404 March 1988 Submits Response to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Author Does Not Utilize Any Westinghouse Circuit Breakers,As Identified in Subj Bulletin,In Class 1E Applications at Facility Project stage: Other ML20150B1821988-03-0707 March 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Plant Does Not Use Westinghouse Circuit Breakers in Class 1E Applications So Bulletin 88-001 Does Not Apply to Plant Project stage: Other ML20148A8901988-03-0707 March 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Unit 1 Has No Westinghouse Ds Circuit Breakers Used in Class 1E Application.Unit 2 Reactor Trip & Bypass Breakers Insp Initiated Per Info Notice 87-035 Project stage: Other ML20150A8991988-03-0909 March 1988 Provides Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Determined That Westinghouse Series Ds Circuit Breakers Not Employed at Plant.Insp Required by Bulletin Not Applicable to Plant Project stage: Other ML20150C4071988-03-11011 March 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Determined That Westinghouse Type Ds Circuit Breakers Not Used at Plant Project stage: Other BECO-88-050, Notifies That Westinghouse Circuit Breakers Not in Use or Planned to Be Used in safety-related Applications at Util, in Response to NRC Bulletin 88-0011988-03-15015 March 1988 Notifies That Westinghouse Circuit Breakers Not in Use or Planned to Be Used in safety-related Applications at Util, in Response to NRC Bulletin 88-001 Project stage: Other ML20148B6661988-03-16016 March 1988 Responds to 880205 NRC Compliance Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Westinghouse Ds Series Circuit Breakers Not Used in Class IE Svc at Plant Project stage: Other NRC-88-0072, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Subj Circuit Breakers1988-03-24024 March 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Subj Circuit Breakers Project stage: Other ML20148K2251988-03-25025 March 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Two Reactor Trip Breakers & Two Reactor Trip Bypass Breakers Subj to Bulletin Used at Millstone Unit 3.Main Pole Shaft Weld Insps Completed by 880225 Project stage: Other ML20151G7911988-03-28028 March 1988 Confirms That Westinghouse Ds Breakers Not Used at Facility, Per IE Bulletin 88-001, Defects in Westinghouse Circuit Breakers Project stage: Other W3P88-0051, Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Util Does Not Use Westinghouse Series Ds Circuit Breakers & Not Subj to Insps Requested in Bulletin1988-03-29029 March 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Util Does Not Use Westinghouse Series Ds Circuit Breakers & Not Subj to Insps Requested in Bulletin Project stage: Other ML20151A9451988-03-30030 March 1988 Responds to IE Bulletin 88-001 Re Westinghouse Ds/Dsl Circuit Breakers.Ref Components Not Utilized at Facility Project stage: Other 0CAN048804, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Informs That No Instances of Circuit Breakers Being Installed in safety-related Applications Identified at Plant1988-04-0101 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Informs That No Instances of Circuit Breakers Being Installed in safety-related Applications Identified at Plant Project stage: Other RBG-27645, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Any Circuit Breakers Subj to Bulletin in Class 1E Svc at Plant1988-04-0404 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Does Not Utilize Any Circuit Breakers Subj to Bulletin in Class 1E Svc at Plant Project stage: Other ML20151B2021988-04-0404 April 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers.Insp of All Westinghouse DS-415 Reactor Trip & Bypass Breakers Completed on 880308 & Results Encl Project stage: Other ML18152A8181988-04-0505 April 1988 Responds to IE Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Type Ds Breakers Used at Plant Project stage: Other ML17251B0461988-04-0707 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Plant Does Not Have Westinghouse Circuit Breakers Subj to Bulletin Project stage: Other ML20151H7791988-04-0707 April 1988 Informs That Westinghouse Ds Circuit Breakers Not Utilized in Any 1E Application at Plant But Used in non-1E Applications & Will Be Included in Util Preventive Maint Program Project stage: Other ML20148Q7241988-04-0707 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Models DS-206,DSL-206, DS-416,DSL-416 or DS-420 Breakers in Class 1E Circuits at Hatch Project stage: Other ML20151E4191988-04-0808 April 1988 Responds to 880205 NRC Bulletin 88-01 Re Defects in Westinghouse Circuit Breakers for Facilities.Westinghouse Ds Series Circuit Breakers Not Used at Plants.Other Provisions of Bulletin Do Not Apply to Plants Project stage: Other ML20151E8681988-04-11011 April 1988 Forwards Response to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers in Class 1E Svc.All Required long-term & short-term Insps Completed Project stage: Other GO2-88-084, Submits Info as Requested by NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers1988-04-11011 April 1988 Submits Info as Requested by NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers Project stage: Other ML20151G1151988-04-13013 April 1988 Ack Receipt of in Response to NRC Bulletin 88-001 Re Westinghouse Circuit Breakers.Plant Does Not Use or Plan Use of Circuit Breakers,Therefore Matter Closed Project stage: Other ML20151H9651988-04-13013 April 1988 Responds to NRC Bulletin 88-001, Deficiencies in Westinghouse Circuit Breakers. Bulletin Addresses Deficiencies Exclusive to Westinghouse Ds/Dsl Type Circuit Breakers & Outlines Specific Insps to Be Performed Project stage: Other ML20205P6881988-04-20020 April 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Circuit Breakers Subj to Bulletin Installed in Plant Project stage: Other ML20155E3921988-06-0909 June 1988 Responds to NRC Bulletin 88-001 Re Defects in Westinghouse Circuit breakers.Sixty-six of sixty-seven Breakers Required New Pole Shafts Due to Failure of Welds to Meet Bulletin Requirements Resulting from Insp Project stage: Other ML20150C7431988-06-28028 June 1988 Forwards Arvin/Calspan Investigation of Trip Breaker Failure..., Explaining Mechanical Binding Which Caused Failure on 870702 Project stage: Other ML20150B5261988-06-30030 June 1988 Informs That All Class 1E DS-416 Breakers Now in Use Comply W/Nrc Bulletin 88-001 Re Defects in Westinghouse Circuit Breakers Project stage: Other ML20150D3971988-07-0505 July 1988 Advises That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other GO2-88-153, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided1988-07-13013 July 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Results of Reinsp of Nine Breakers After Removal of Spring Provided Project stage: Other ML20151E0181988-07-14014 July 1988 Advises That Util 880407 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other ML20151Q9201988-08-0202 August 1988 Informs That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other ML20154E1541988-09-0909 September 1988 Advises That 880408 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory Project stage: Other ML20154D2331988-09-0909 September 1988 Informs That Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers, Satisfactory & No Further Reply Necessary Project stage: Other ML20155A4561988-09-29029 September 1988 Requests Addl Info Re Util 880908 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Response Requested within 70 Days of Ltr Date Project stage: Other ML17284A6111988-11-18018 November 1988 Advises That Util 880411 & 0713 Responses to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers Satisfactory Project stage: Other ML20235J1651989-02-17017 February 1989 Provides Final Response to NRC Bulletin 88-001, Defects in Westinhouse Circuit Breakers. Alignment Check Specified in 871201 Submittal Satisfactorily Performed During Installation of Replacement Pole Shaft in Breakers Project stage: Other ML20235J1681989-02-17017 February 1989 Advises That 880314 Response to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers Satisfactory. Westinghouse Ds Series Circuit Breakers Not Used in safety-related Applications at Plant Project stage: Other ML20247C7191989-05-15015 May 1989 Forwards Supplemental Response to NRC Bulletin 88-001 Re Westinghouse Series Ds Circuit Breakers.Insp Info Corrected Project stage: Supplement 1988-03-07
[Table View] |
Text
. _ _ _ _.
a 1901 Gratet Street, St. Louis Donald F. Schnell Vee Presdent April 11, 1988 U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555-ULNRC-1752 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT DEFECTS IN WESTINGHOUSE CIRCUIT BREAKERS _(TACS 6_5955f65956)
Reference:
NRC Bulletin Number 88-01, dated February 5, 1988 NRC Bulletin 88-01 required licensees using Westinghouse series DS circuit breakers in Class lE service to perform and document inspection of the welds on the pole shafts and inspection of the alignment in the breaker closing mechanism.
All of the required long term and short term inspections have been completed and the results are documented in the r.htachments to this letter.
If you have any questions concerning this information, please contact me.
Very truly yours, s
Donald F.
Schnell WEK/pkm Attachments gg\\\\
)
r SSR"!J!il**$g3 ip D
Mah>g Aadress: P.O. Box 149. St Louis. MO 63166
.J
~
STATE OF MISSOURI )
)
SS CITY OF ST. I4UIS )
4
't a
Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Vice Presidenc-Nuclear and an officer of Union Electric Company; that he han read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
\\
By D3ha
,.c ne Vice President Nuclear SUBSCRIBED and sworn to before me this
//b day of
,198f.
A u s Ana BARBARA J. PFAFy n e
i hatARY FUBdC, $1 ATE C; Mts$0VRt gy gcW4S10N EXPtRES AfRil Ik UI
- l.
ST Louts COUNTY i
l l
1 l
h i
4 cc Gerald Charnof f, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N.
- Street, N.W.
Washington, D.C.
20037 Dr. J. O. Cermak CFA, Inc.
4 Professional Drive (Suite 110)
Gaithersburg, MD 20879 R.
C.
Knop Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RR$1 Steedman, Missouri 65077 Tom Alexion (2)
Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 Manager, Electric Department Missouri Public Service Commission P.O.
Box 360 Jefferson City, MO 65102
Attachmsnt 1 ULNRC-1752 NRC Bulletin 88-01 I_nspectlon_ o,f West _inghouse_ Circuit Breakers NRC Bulletin 88-01 required the inspection of Westinghouse series DS circuit breakers used in Class lE service.
Inspection of the welds on the pole shafts and of the alignment in the breaker closing mechanism were to be completed and transmitted to the NRC witin 1) 30 days of completion of the short-term inspections and 2) 30 days of completion of the long-term inspections.
The short-term and long-term inspections have been completed at the Callaway Plant and the results are documented herein.
There are eight (8) Westinghouse DS-416 reactor trip breakers at the Callaway Plant; 2 main trip breakers, 2 bypass trip breakers, and 4 spares.
These breakers were disassembled and inspected to the requirements described in bulletin 88-01.
Additionally, four replacement shafts were inspected.
The results of these inspections are documented in Attachment 2 and summarized below:
1)
All breakers required or will require corrective action due to the pole shaf t welds not meeting one or more of the weld acceptance cr iteria.
All breakers currently in use meet the 6.1.2 criteria, as a minimum.
(Shafts meeting G.l.2 criteria are acceptable for up to 4000 cycles with inspections after every 200 cycles of operation.)
2) 2 replacecent shafts failed acceptance criteria for replacements and were rejected.
3)
All of the breakers were inspected for mechanical misalignment, with no failures noted.
Those breakers in use which have a shaf t that failed criteria 6.1.1 but passed criteria 6.1.2 will be replaced at the next available opportunity.
Union Electric concurs with the position on weld porosity acceptance criteria as discussed in Westinghouse's letter to the NRC dated March 1,1988 ( NS-NRC-88-3314).
This letter noted that weld porosity was considered to be a secondary ef fect to weld f atigue strength and that a qualified weld inspector would easily be able to identify and evaluate a weld with high porosity.
As such, the NRC criteria is too stringent and the Westinghouse criteria should be considered as an acceptable inspection method.
Page 1 of 2
The staf f time to per form the requested inspections, corrective actions, and associated operability testing is as follows:
!!aintenance Electricians 224 manhours Planning & Scheduling 60 manhours Level III Welding Incpector 50 manhours Maintenance Engineering 80 manhours Welding Engineering and other Management Personnel 15 manhours Page 2 of 2
C INSPECTION RESULTS b
POLE SHAFT ASSEMBLY Weld 1 Weld 2 Weld 3 Weld 4 Weld 6 Weld 7 l
c s
2 6
i u
i M
N
~~
[ }
p5 ~
UC )
(
Q Weld 5
)
r WELD INSPECTION ALIGNMENT 1? ELD NUMBER SIZE LENGTH FUSION CRACKS POROSITY OF REMARKS BREAKER RTB "BYA", S7N 02YN051B-3, Work Request W106916 Accepted per 6.1.2 Wald 1 3 /16-k 1k" Accept Accept Accept Accept Meets criteria 6.1.1 Wald 2 NYI33 1k" Accept Accept Accept Accept Failed criteria 6.1.1, met 6.1.2 Wald 3 3/16" 1 1/16" Accept Accept Accept Accept Meets criteria 6.1.1 f
Wald 4 3f16 1 5/16" Accept Accept Accept Accept Meets criteria 7.1 Wild 5 N/A N/A Accept N/A N/A Accept Meets criteria 7.1 exception Wald 6 7/32 1 3/16" Accept Accept Accept Accept Meets criteria 6.1.1 i
3/1o -
Weld 7 5/32 1 1/16" Accept Accept Accept Accept Meets criteria 7.1 r
Shaft rejected and was replaced with shaft S/N 880-132-7 RTB "B" S/N 02YN051B-4, Work Request W110204 (NMR 88100066)
~ Wald 1 1/8" ik Accept Accept Accept Accept Meets criteria 7.1 Umid 2 1/8" Ik Accept Accept Accept Accept Failed criteria 6.1.1, met 6.1.2 1
Vald 3 1/8" 1 1/8 Accept Accept Accept Accept Failed criteria 6.1.1, met 6.1.2 Wald 4 1/8" 1 5/16 Accept Accept Accept Accept Meets criteria 7.1 Wild 5 N/A N/A Accept N/A N/A Accept Meets criteria 7.1 extension Wild 6 (1/8" 1 1/8 Accept Accept Accept Accept Failed criteria 6.1.1 and 6.1.2 i
W21d 7 1/8" 1 3/16 Accept Accept Accept Accept Meets criteria 7.1 l
t i
i Page 1 of 6 ATTACHMENT 2 t
- ~... _
r-----
,-c, g,,-,.,-,,,,-g,,, -,,.,-
.,__.w_----
-_---_,--.,,,n,
-.=-,,--
n rg
_-,--,.,-w
INSPECTION RESULTS POLE SHAFT ASSEMBLY Weld 1 Weld 2 Weld 3 Weld 4 Weld 6 Weld 7
~
~
s 2
i i
C 6
i m
L
=
=
t..
~
~
at;) Weld 5 Q
)
r WELD INSPECTION ALIGNMENT WELD NUMBER SIZE LENGTH FtJSION CRACKS POROSITY OF REMARKS BREAKER RTB "BYB" S/N 02YN051B-2, Work Request W110207 Accepted per 6.1.2 Wald 1 5/32" 15/16" Accept Acceot Accept Accent Meets criteria 7.1 W2ld 2 $33 1 5/32 Acceot Accept Accept Accept Failed criteria 6.1.1, met 6.1.2 Wald 3 5/32" 1 1/16" Accept Accept Accept Accept Failed criteria 6.1.1, met 6.1.2 Wald 4 1/8" 1 1/16" Accept Accept Accept Accept Meets criteria 7.1 Wald 5 N/A N/A Accept N/A N/A Accept Meets criteria 7.1 exception Weld 6
"$/I6 15/16" Accept Accept Accept Accept Failed criteria 6.1.1, met 6.1.2 _
Wald 7 ldt32 1 1/16" Accept Accept Accept Accept Meets criteria 7.1 Spare Breaker S/N 02YN0583-2 Work Request W431904 Accepted per 6.1.2 1/8 -
Wald 1 3/16" 1"
Accent AcceSt Accent Accent Meets criteria Wald 2 h)16" 1"
Accept Accept Accept Accept Failed criteria 6.1.1 meets 6.1.2 Wald 3 Nf16" 15/16" Accept Accept Accept Accept Failed criteria 6.1.1. meets 6.1.2 W31d 4 5/32" 1"
Accept Accept.
Accept Accept Meets criteria 7.1 W21d 5 N/A N/A Accept N/A N/A Accept Meets criteria 7.1 exception Vald 6 5{p$6' 1"
Accept Accept Accent Accept Failed criteria 6.1.1, meets 6.1.2 lid -
W2ld 7 5/32 15/16 Accent Accent Accent Accept Meets criteria 7.1 Page 2 of 6 ATTACHMENT 2
INSPECTION RESULTS POLE SHAFT ASSEMBLY Weld 1 Weld 2 Weld 3 Weld 4 Weld 6 Weld 7
~
~
r r--
r E,
3 4
Fy 6
i 6
=
=
~
E L
Lr : =
Q
- 80) Weld 5
)
WELD INSPECTION ALIGNMENT UELD NL'MBER SIZE LENGTH FUSION CRACKS POROSITY OF REMARKS BREAKER Spare Breaker S/N 02YN058B-1 Work Request W106919 (NMR 88100067) Shaft Reiected Not inspected due to failure of #6 Wald 1 Not inspected due to f ailure of 86 Wald 2 Not inspected due to f ailure of 86 Wald 3 Noeinseect,a N ~ s u i n.,
4, #6 Wild 4 Not inseected due en fuluvo nr u U21d 5 Failed criteria 6.1.1 and 6.1.2 Wald 6 (1/8" Not inspected due to failure of #6 Wald 7 Spare Breaker S/N 02N058B-3 Accepted per 6.1.2 Wald 1 1/8" 7/8" Accept Accept Accept Accept Meets criteria 7.1 Failed criteria 6.1.1, met 6.1.2 Weld 2 1/8" 1"
Accept Accept Accept Accept Celd 3 3/16" 1\\"
Accept Accept Accept Accept Meets criteria 6.1.1 Wald 4 3/16" 1"
Accept Accept Accept Accept Meets criteria 7.1 Meets criteria 7.1 exception Weld 5 N/A N/A Accept N/A N/A Accept Failed criteria 6.1.1, met 6.1.2 W21d 6 1/8" l"
Accept Accept Accept Accept U21d 7 1/8" 7/8" Accept Accept Accept Accept Meets criteria 7.1 o
Page 3 of 6 ATTACHMENT 2
INSPECTION RESULTS POLE SHAFT ASSEMBLY Weld 1 Weld 2 Weld 3 Weld 4 Weld 6 Weld 7
~
r r~
c 6-.
Fy i
3 4
4
~
a C j
/
- g.,
~~
~~
.R Q
8C;) Weld 5
~
r-~ ]
WELD INSPECTION ALIGNMENT WELD NUMBER SIZE LENGTH FUSION CRACKS POROSITY OF REMARKS BREAKER Shaft Rejected and Was Replaced RTB "A" S7N 02YN0513-1. Work Request W110205 (NMR 88I00054) With Shaf t From SA'02YN058B-2 Not inspected due to failure of #7 Uald 1 Not inspected due to failure of #7 Wald 2 Not inspected due to failure of #7 Wild 3 Not inspected due to failure of #7 Wald 4 Not inspected due to failure of #7 Wald 5 Not inspected due to failure of #7 Wald 6 Failed 7.1 Wald 7 41/8 reject Replacement 32' Spare Breaker S/N 02YN058B-4, Work Request W110206 (NMR 88I00072)
Shaft Rejected,
~ Wald 1 1/8" 7/8 Accept Accept Accept Accept Me.:ts criteria 7.1 Wald 2
< 1/8" 15/16" Accept Accept Accept Accept Failed criteria 6.1.1 and 6.1.2 Wald 3
( 1/8" 3/4" Accept Accept Accept Accept Failed criteria 6.1.1 and 6.1.2 L/6 -
U21d 4 3/16" 3/4" Accept Accent Accept Accept Failed criteris 6.1.1.snd 6.1.2 Wald 5 N/A N/A Accept N/A N/A Accept Meets criteria 7 i exception Weld 6 1/8" 11/16" Accept Accept Accept Accept Failed criteria 6.1.1 and 6.1.2 L/o -
Cold W21d 7 3/10 3/8" St3rt &
Accent Accent Accent Filled criteria 7.1 stop Page 4 of 6 ATTACHMENT 2
INSPECTION RESULTS POLE SHAFT ASSEMBLY 4
l l
Weld 1 Veld 2 Weld 3 Weld 4 Weld 6 Weld 7
~
r
,^ ;
7 c
^
i I
6 I.
b
,i g
=
" (
Lu =
Weld 5
)
r WELD INSPECTION ALIGNMENT WELD N1'MBER SIZE LENGTH F1)SION CRACKS POROSITY OF REMARKS BREAKER 1
Replacement Shaft S/N 880-132-6 Shaft Accepted - Meets Criteria Weld 1 Accept Accept Accept Accept Accept N/A Meets 7.1 Weld 2 Accept Accept Accept A: cept Accept N/A Meets 6.1.1 Wald 3 Accept Accept Accept Accept Accept N/A Meets 6.1.1 l
W21d 4 Accept Accept Accept Accept Accept N/A Meets 7.1 Wild 5 N/A N/A Accept N/A N/A N/A Meets 7.1 exception Wald 6 Accept Accept Accept Accept Accept N/A Meets 6.1.1 W21d 7 Accept Accept Accept Accept Accept N/A Meets 7.1 Replacement Shaft S/N 880-132-7, Shaft Accepted - Meets Criteria Vald 1 Accept l Accept Accept Accept Accept N/A Meets 7.1 Wild 2 Accept Accept Accept Accept Accept N/A Meets 6.1.1 U21d 3 Accept Accept Accept Accept Accept N/A Meets 6.1.1 Wald 4 Accept Accept Accept Accept Accept N/A Meets 7.1 W21d 5 N/A N/A Accept N/A N/A N/A Meets 7.1 exception W.1d 6 Accept Accept Accept Accept Accept N/A Meets 6.1.1 aid 7 Accept Accept Accept Accept Accept N/A Meets 7.1 Page 5 of 6 ATTACHMENT 2
I e
INSPECTION RESULTS i
l POLE SHAFT ASSEMBLY Weld 1 Weld 2 Weld 3 Weld 4 Weld 6 Weld 7 bd c, 7-/
cc t
d 1
e 5
i
+
w i
1 L
C j t.,
Y Q
ex;) Weld 5
)
r 1
WELD INSPECTION ALIGhMENT 1.rE1.D NUMBER SIZE LENGTH FUSION CRACKS POROSITY OF REMARKS 4
BREAKER Replacement Shaft S/N 880-132-1, hKR 88100059 Shaft Rejected and Returned to Westinghouse i
Wald 1 1/8" 1 5/16" Accept Accept Accept N/A Meets criteria 7.1 t7 eld 2 1/8" 1 3/8" Accept Accept Accept N/A Failed criteria 6.1.1, met 6.1.2 l
Unid 3 1/8" ik" Efkht Accept Accept N/A kk*kt N h d" see 4,T Y 8
W2ld 4 1/8" 1 3/16" Accept Accept Accept N/A Meets criteria 7.1 j
Wald 5 N/A N/A Accept N/A N/A N/A Meets criteria 7.1 exception 17 eld 6 1/8" 1 3/16" Accept Accept Accept N/A Failed criteria 6.1.1, met 6.1.2 l
Vald 7 3/16 1 5/16" Accept Accept Accept i N/A Meets criteria 7.1 J
Replacement Shaft S/N 880-132-2, NMR 88100059, Shaft Rejected and Returned to Westinghouse
~ Unid 1 1/8" th" Accept Ae:ept Accept N/A Meets criteria 7.1 l
Wald 2 1/8" 1 7/16" Accept Accept Accept N/A Failed criteria 6.1.1, met 6.1.2
)
U21d 3 1/8" 1 9/16" Accept Accept Accept N/A Failed criteria 6.1.1, met 6.1.2 I
Wald 4 1/8" 1 3/8" Accept Accept Accept N/A Meets criteria 7.1 Wald 5 N/A N/A Accept N/A N/A N/A Meets criteria 7.1 exception l
I Wald 6 1/8" ik" Accept Accept Accept N/A Failed cri:eria 6.1.1, met 6.1.2 co start and stop l
Wald 7 3/16 1 3/8" Acceptr Accept Accept N/A
I l
Page 6 of 6 ATTACHMENT 2 l
1
___