Summary of 890804 Public Meeting W/Licensee in Rockville,Md for Util Presentation of Performance Improvement Plan
ML20246F739
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/24/1989
From: Anthony Mendiola
NRC - CALVERT CLIFFS ASSESSMENT PANEL
To: Boger B
NRC - CALVERT CLIFFS ASSESSMENT PANEL
References
NUDOCS 8908310124
Download: ML20246F739 (3)


Text

__ _____-_ _. - -

a D P--

.[ ~ UNITED STATES i $"- J NUCLEAR REGULATORY COMMISSION '

$' a $" WASHINGTON, D. C. 20555

'% 4,,,(( August 24, 1989 L MEMORANDUM FOR: Bruce A. Boger, Chairman

[. Calvert Cliffs Assessment Panel j FROM: Anthony J. Mendiola, Coordinator Calvert Cliffs Assessment Panel

SUBJECT:

MINUTES FROM BALTIMORE GAS AND ELECTRIC PRESENTATION OF THE CALVERT CLIFFS PERFORMANCE IMPROVEMENT PLAN - 08/04/89 A public meeting was conducted between Baltimore Gas and Electric (BG&E) and j' the NRC staff on August 4, 1989, to accommodate the formal presentation of the Calvert Cliffs N rformance Improvement Plan Implementation Program by BG&E. The

! meeting was held at NRC Headquarters, Rockville, Maryland. A list of attendees is enclosed.

After brief opening remarks by Mr. Boger, NRC and introduction of attendees, Mr. George Creel, BG&E, began the presentation with a outline of the meeting purpose and agenda. Mr. Creel introduced Mr. Chris Poindexter, the new Vice Chairman of BG&E, who made brief remarks on his background and his activities with regard to the Performance Improvement Plan (PIP) and the new PIP Implementation Program (PIPIP). He stated that these were long-term plans, providing leadership for the future of BG&E.

Mr. Creel then continued with a presentation of the PIP objective; to have

" event-free" operation with focused actions on addressing causes of performance decline, complementing improvements currently underway, improve problem resolution and monitor overall progress. He stressed that the PIP was not a short-term plan, and that it is not their intention to stop performance improvement efforts at some future point.

Mr. Robert Denton, BG&E, discussed the Performance Improvement Phases. He outlined Phase 1, the development of the PIP, which resulted in its submittal on April 7, 1989. Phase 2, Implementation of the PIP, the PIPIP, details development of PIP action plans, management and verification. This was detailed in the July 31, 1989 submittal. The development of the PIP was f detailed in three stages, 1) creation of the symptom database, gleaning information on performance from the last two years, 2) arriving at a fixed set of Root Causes which address the symptoms, and 3) development of a plan of corrective actions to address the Root Causes. The root causes were further grouped into three categories, 1) expectations, accountability and i communications, 2) problems correction, and 3) resource allocation. '

Mr. Charles Cruse, BG&E, detailed the action plan progress thus far for Operations and Maintenance, and Engineering areas. For Operations and Maintenance, BG&E has combined operations and maintenance organizations, integrated work activities and adjusted work priorities. For Engineering, system engineers have been moved inside the security area, have had their job description revised, and a training program has been set up. Engineering j planning has been improved and procedure upgrade project is in progress.

i 8908310124 890824 PDR ADOCK 05000317 fp P PNU

[

I

i l., %

Bruce A. Boger August 24, 1989 1

Mr. Richard Olson, BG&E, addressed.the PIP Implementation Program (PIPIP). He l discussed the basic construction of the PIPIP, its relation to the PIP and the 1 associated Root Causes. An example was discussed in detail how a symptom was identified, connected to a set of root causes, through the PIP, and finally tracking with the PIPIP verification process. He further outlined the appendixes to the PIPIP, discussing the PIP summary status report and histograms. j The NRC asked several questions in order to clarify points during the symptom example discussion. These questions involved the differences between the l :

various Root Causes and why they seem somewhat similar. Eventually, Mr. Olson ,

reiterated the entire PIP construction process in more detail, discussing the '

supervisory and engineering support. Further discussion was held on the list  ;'

' of Root Causes, and how the final list was determined.

Mr. Olson then discussed the PIP verification nrocess. This process consists I of three steps, 1) implementation verification, 2) management feedback verification, and 3) effectiveness verifict.cion. in the area of effectiveness verification, BG&E would use the vertical slice inspection techniques through the use of four assessment and inspection types,)1) events analysis, management 3 design and quality and implementation assurance, processes, and 2) self-

4) maintenance / operations interface and support. He stressed that BG&E expects to see improvements and would adjust the PIPIP as necessary to get positive results.

Mr. Creel summarized the presentation by discussing BG&E resource allocations.

To types of resources would be used, one to create the new programs, and the second to maintain those programs. Verification would be performed by vertical slice audits, performance objective reviews, and the BG&E Nuclear Program Plan.

The PIP /PIPIP would remain flexible and would not consider a checklist. He further stated that the PIP is a long-term performance improvement plan, and would be institutionalized at Calvert Cliffs.

Upon completion of the presentation, the NRC asked how recent managerial changes would be reflected in the PIP. When asked how far down the chain of command the PIP was communicated, BG&E stated that their managers have been conducting

" focus" meetings with small groups and meeting routinely with groups at lunch and at shift meetings.

After closing remarks by Mr. Poindexter and Mr. Boger, the meeting was adjourned.

Anthony J. Mendiola, Coordinator l

Calvert Cliffs Assessment Panel

Enclosure:

As stated

[BG&E1] .

DISTRIBUTION:

PDR Central Files 0 -

glA AD RI r/f AMendiola A en io'la:ah JDyer, EDO JPartlow 2 /89 SVarga WKane, RI

14 n .

CALVERT CLIFFS ASSESSMENT PANEL MEETING AUGUST 4, 1989 LIST OF ATTENDEES CCAP MEMBERS ORGANIZATION l Bruce Bogerf NRR/DRP(CCAPCHAIRMAN)

L Robert Capra NRR/DRP

- Peter Drysdale DRS, Region I Robert Gallo DRS, Region I Maureen Hunemuller NRR/DLPQ David Limroth Anthony Mendiola DRP, NRR/DRPReg (ion ICCAPCOORDINATOR)

Scott McNeil NRR/DRP Len Prividy DRS, Region I Lowell Tripp DRP, Region I BG&E MEMBERS Charles Cruse BG&E Richard Olson. BG&E Chris Poindexter BG&E, Vice Chairman George Creel BG&E, VP - Nuclear R. E. Denton BG&E Marvin Bowman BG&E Bruce Montgomery BG&E Harvey Reed BG&E, Associate General Counsel John Fuoto BG&E Ray Lewis BG&E Bill McCaughey BG&E OTHER NRC Vincent Pritchett DRP, Region I James Partlow ADP/NRR 1

, Steven Varga DRP/NRR 'l Jim Dyer EDO j Tom Madden- OCA j John Kopeck GPA/PA OTHER ATTENDEES Thomas Magetty Maryland DNR Daniel Shea Bishop, Cook, Purcell and Reynolds Thomas Doriah Doub, Muntzing & Glasgow Liz Bowie Baltimore Sun ,

Kirsten Burger Office of People's Counsel, PSC 1 Mick Rood States News Pat Milano Engineering Division, PSC i

______ _ _ . _ _ _ _