MONTHYEARML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20195J0781999-06-14014 June 1999 Summary of 990512 Meeting with Util in Rockville,Md Re Licensee Renewal Activities for Calvert Cliffs Nuclear Power Plant.List of Meeting Attendees & Slides Used by NRC & Util Encl ML20206S2841999-05-19019 May 1999 Summary of 990427 Telcon with Util Re Recent Secondary Side SG Insp Activities at Plant,Unit 2.Replacement SGs Are Planned to Be Installed in Spring 2002 for Units 1 & 2 ML20207A3041999-05-18018 May 1999 Summary of 990505 & 10 Telcons with Util Re License Renewal Application on Metal Fatique ML20206U5621999-05-17017 May 1999 Summary of 990428 Meeting with Bg&E in Rockville,Md to Discuss Plant Steam Generator Replacement Projects.List of Attendees & Meeting Handouts Encl ML20204H5911999-03-19019 March 1999 Summary of 990210 Meeting with Bge in Lusby,Md Re License Renewal Activities for Ccnpp,Units 1 & 2 & Use of age- Related Degradation Insps as Outlined in 990202,meeting Announcement.List of Attendees & Slides Encl ML20204H4541999-03-19019 March 1999 Summary of 990216 & 18 Meetings with Util in Lusby,Md Re License Renewal Activities for Plant,Units 1 & 2.List of Meeting Attendees & Summary of RAIs That Were Discussed by Staff with Bge Staff & Info Obtained from Bge Staff Encl ML20202J7131999-01-28028 January 1999 Summary of 990107 Meeting with Util Re Info Provided by Util for Severe Accident Mitigation Alternative (SAMA) Review & Site Audit ML20198K6461998-12-28028 December 1998 Summary of 981202 Meeting with Util in Rockville,Md to Discuss Proposed TS Amend Allowing Installation of Sleeves in Defective SG Tubing in Calvert Cliffs,Units 1 & 2.List of Attendees & Presentations Slides Provided by Licensee Encl ML20198A4201998-12-11011 December 1998 Summary of 981022 Meeting with Util in Rockville,Md to Discuss How Bge Addressed License Renewal Requirements for time-limited Aging Analyses & Generic Safety Issues as Applicable to Environ Qualification ML20198B8351998-12-11011 December 1998 Summary of 980820 Meeting with Util in Rockville,Md to Discuss Progress of NRC Staff Review of Util License Renewal Application & Provide Overview of Proposed Method for Evaluating Performance.List of Attendees & Slides Encl ML20198A2741998-12-10010 December 1998 Summary of 981123 Meeting with Bge Re Review of Plant Records Associated with Chemistry,Allow 600 & Boric Acid Corrosion Insp Programs Relied Upon in Bge License Renewal Application for Plant,Units 1 & 2 ML20195J0391998-11-16016 November 1998 Summary of 980928 Meeting with Util in Rockville,Md Re License Renewal Activities for Plant,Units 1 & 2 & to Provide Rept Card for Both NRC & Util ML20195F3961998-11-13013 November 1998 Summary of 981029 Meeting W/Nei,Bge & Duke Energy Re Status of License Renewal Activities.List of Attendees & Slides Presented by Bge for Status of Calvert Cliffs License Renewal Application Review Encl ML20195D4401998-11-13013 November 1998 Summary of 980813 Meeting W/Bg&E in Rockville,Md to Discuss Bg&E Fire Protection Evaluation,Section 5.10,contained within License Renewal Application.List of Attendees & Presentation Slides Encl ML20195H9311998-11-13013 November 1998 Summary of 980626 Meeting with Bg&E in Rockville,Md Re Bg&E Structures & System Walkdown Program for License Renewal. List of Meeting Attendees & Bg&E Presentation Slides Encl ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20195F9571998-11-13013 November 1998 Summary of 980625 Meeting with Bg&E in Rockville,Md Re Bg&E age-related Degradation & Insp Program for License Renewal. List of Meeting Attendees & Slides Used by Bg&E Encl ML20196A1821998-11-13013 November 1998 Summary of 980624 Meeting with Util in Rockville,Md Re Integrated Plant Assessment Process for License Renewal.List of Attendees & Slides Encl ML20151Z5801998-09-0707 September 1998 Summary of 980506 Meeting with Bg&E in Rockville,Md Re Util Proposed Responses to 980213 & 19 NRC Staff Requests for Addl Info on Bg&E License Renewal Feedwater Sys (5.9) & Dfos (5.7).List of Attendees & Util Proposed Responses,Encl ML20237C4651998-08-19019 August 1998 Summary of 980729 Meeting W/Bg&E & Contractor SG Team in Rockville,Md Re Plant,Units 1 & 2 SG Replacement Project. List of Attendees & Viewgraphs Distributed at Meeting Encl ML20236X6501998-07-28028 July 1998 Summary of 980709 Meeting W/Baltimore Gas & Electric Co in Solomons,Md Re Plant Environ Scoping Meetings to Support Review of License Renewal Application.List of Attendees & Presentation Matls Encl ML20249A9271998-06-16016 June 1998 Summary of 980604 Meeting W/Licensee in Rockville,Md to Discuss Replacement of Svc Water Heat Exchanges During Spring 1999 Refueling Outage on Unit 2.List of Attendees & Licensee Agenda Encl ML20247M4981998-05-15015 May 1998 Summary of 980319 Meeting W/Util Re Improved Tss.List of Attendees Encl ML20217K5921998-04-20020 April 1998 Summary of 980407 Meeting W/Util Re Control Room Habitability Issue W/Main Steam Line Break.List of Attendees,Util Presentation Matls & NRC Concept of CR Ventilation Sys Encl ML20216C8991998-04-10010 April 1998 Summary of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20203E0011998-02-12012 February 1998 Summary of 980126 Meeting W/Bg&E Re Plant,Units 1 & 2 Improved Ts.List of Attendees Encl ML20199B4121998-01-20020 January 1998 Summary of 980114 Meeting W/Bg&E in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,improved Tss.List of Attendees Encl ML20198H4011998-01-0505 January 1998 Summary of 971208 Meeting W/Bg&E in Rockville,Md Re Plant Pra.List of Attendees & Viewgraphs Encl ML20197K2121997-12-15015 December 1997 Summary of 971112,13 & 18 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Clarification of Calvert Cliffs Improved Tss.List of Meeting Attendees Encl ML20211L9371997-10-0202 October 1997 Summary of 970827 Meeting W/Bg&E in Rockville,Md Re Reactor Pressure Vessel 10-year Inservice Inspection Project.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20216J9411997-09-10010 September 1997 Summary of 970903 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,service Water Modifications.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20217B1771997-09-10010 September 1997 Summary of 970904 Meeting W/Bg&E in Rockville,Md Re Clarification of Calvert Cliffs Ts,Sections 1.0,2.0,3.1,3.1 & 5.0.List of Meeting Attendees Encl ML20217N9991997-08-21021 August 1997 Summary of 970731 Meeting W/Bge in Rockville,Md Re Severe Accident Mitigation Alternatives Methodology.List of Attendees & Presentation Matl Encl ML20217P0401997-08-21021 August 1997 Summary of 961204 Meeting W/Util in Rockville,Md Re Calvert Cliffs Improved Tss.List of Attendees Encl ML20198F1221997-08-0505 August 1997 Summary of 970730 Meeting W/Bge in Rockville,Md Re Plant Improved Ts.List of Attendees Encl ML20151J5531997-07-31031 July 1997 Summary of 970715 Meeting W/Bge in Rockville,Md Re Matters Related to Operability of SW Sys & SRW ML20148K7771997-06-16016 June 1997 Summary of 970605 Senior Mgt Meeting W/Util in Rockville,Md Re License Renewal Environ Rept (Er) Template Process.List of Participants & Handouts Encl ML20148H2211997-05-27027 May 1997 Summary of 970519 Meeting W/Bge in Rockville,Md to Discuss License Renewal Er Template Process.List of Attendees Encl ML20137W5311997-04-16016 April 1997 Summary of 970408 Meeting W/Util in Rockville,Md to Discuss Responses to Staff 960830 Rai.List of Attendees Encl ML20147G8651997-03-26026 March 1997 Summary of 970226 Meeting W/Bge in Rockville MD to Discuss Util Response to Staff 960830 Rai.List of Attendees & Matls Distributed at Meeting Encl ML20137E3501997-03-24024 March 1997 Summary of 970307 Meeting W/Bge in Rockville MD to Provide Comments on License Renewal Er Template Proposed by Util. List of Meeting Participants Encl 1999-09-08
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20195J0781999-06-14014 June 1999 Summary of 990512 Meeting with Util in Rockville,Md Re Licensee Renewal Activities for Calvert Cliffs Nuclear Power Plant.List of Meeting Attendees & Slides Used by NRC & Util Encl ML20206S2841999-05-19019 May 1999 Summary of 990427 Telcon with Util Re Recent Secondary Side SG Insp Activities at Plant,Unit 2.Replacement SGs Are Planned to Be Installed in Spring 2002 for Units 1 & 2 ML20207A3041999-05-18018 May 1999 Summary of 990505 & 10 Telcons with Util Re License Renewal Application on Metal Fatique ML20206U5621999-05-17017 May 1999 Summary of 990428 Meeting with Bg&E in Rockville,Md to Discuss Plant Steam Generator Replacement Projects.List of Attendees & Meeting Handouts Encl ML20204H5911999-03-19019 March 1999 Summary of 990210 Meeting with Bge in Lusby,Md Re License Renewal Activities for Ccnpp,Units 1 & 2 & Use of age- Related Degradation Insps as Outlined in 990202,meeting Announcement.List of Attendees & Slides Encl ML20204H4541999-03-19019 March 1999 Summary of 990216 & 18 Meetings with Util in Lusby,Md Re License Renewal Activities for Plant,Units 1 & 2.List of Meeting Attendees & Summary of RAIs That Were Discussed by Staff with Bge Staff & Info Obtained from Bge Staff Encl ML20202J7131999-01-28028 January 1999 Summary of 990107 Meeting with Util Re Info Provided by Util for Severe Accident Mitigation Alternative (SAMA) Review & Site Audit ML20198K6461998-12-28028 December 1998 Summary of 981202 Meeting with Util in Rockville,Md to Discuss Proposed TS Amend Allowing Installation of Sleeves in Defective SG Tubing in Calvert Cliffs,Units 1 & 2.List of Attendees & Presentations Slides Provided by Licensee Encl ML20198A4201998-12-11011 December 1998 Summary of 981022 Meeting with Util in Rockville,Md to Discuss How Bge Addressed License Renewal Requirements for time-limited Aging Analyses & Generic Safety Issues as Applicable to Environ Qualification ML20198B8351998-12-11011 December 1998 Summary of 980820 Meeting with Util in Rockville,Md to Discuss Progress of NRC Staff Review of Util License Renewal Application & Provide Overview of Proposed Method for Evaluating Performance.List of Attendees & Slides Encl ML20198A2741998-12-10010 December 1998 Summary of 981123 Meeting with Bge Re Review of Plant Records Associated with Chemistry,Allow 600 & Boric Acid Corrosion Insp Programs Relied Upon in Bge License Renewal Application for Plant,Units 1 & 2 ML20195J0391998-11-16016 November 1998 Summary of 980928 Meeting with Util in Rockville,Md Re License Renewal Activities for Plant,Units 1 & 2 & to Provide Rept Card for Both NRC & Util ML20195D4401998-11-13013 November 1998 Summary of 980813 Meeting W/Bg&E in Rockville,Md to Discuss Bg&E Fire Protection Evaluation,Section 5.10,contained within License Renewal Application.List of Attendees & Presentation Slides Encl ML20195F3961998-11-13013 November 1998 Summary of 981029 Meeting W/Nei,Bge & Duke Energy Re Status of License Renewal Activities.List of Attendees & Slides Presented by Bge for Status of Calvert Cliffs License Renewal Application Review Encl ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20195F9571998-11-13013 November 1998 Summary of 980625 Meeting with Bg&E in Rockville,Md Re Bg&E age-related Degradation & Insp Program for License Renewal. List of Meeting Attendees & Slides Used by Bg&E Encl ML20195H9311998-11-13013 November 1998 Summary of 980626 Meeting with Bg&E in Rockville,Md Re Bg&E Structures & System Walkdown Program for License Renewal. List of Meeting Attendees & Bg&E Presentation Slides Encl ML20196A1821998-11-13013 November 1998 Summary of 980624 Meeting with Util in Rockville,Md Re Integrated Plant Assessment Process for License Renewal.List of Attendees & Slides Encl ML20151Z5801998-09-0707 September 1998 Summary of 980506 Meeting with Bg&E in Rockville,Md Re Util Proposed Responses to 980213 & 19 NRC Staff Requests for Addl Info on Bg&E License Renewal Feedwater Sys (5.9) & Dfos (5.7).List of Attendees & Util Proposed Responses,Encl ML20237C4651998-08-19019 August 1998 Summary of 980729 Meeting W/Bg&E & Contractor SG Team in Rockville,Md Re Plant,Units 1 & 2 SG Replacement Project. List of Attendees & Viewgraphs Distributed at Meeting Encl ML20236X6501998-07-28028 July 1998 Summary of 980709 Meeting W/Baltimore Gas & Electric Co in Solomons,Md Re Plant Environ Scoping Meetings to Support Review of License Renewal Application.List of Attendees & Presentation Matls Encl ML20249A9271998-06-16016 June 1998 Summary of 980604 Meeting W/Licensee in Rockville,Md to Discuss Replacement of Svc Water Heat Exchanges During Spring 1999 Refueling Outage on Unit 2.List of Attendees & Licensee Agenda Encl ML20247M4981998-05-15015 May 1998 Summary of 980319 Meeting W/Util Re Improved Tss.List of Attendees Encl ML20217K5921998-04-20020 April 1998 Summary of 980407 Meeting W/Util Re Control Room Habitability Issue W/Main Steam Line Break.List of Attendees,Util Presentation Matls & NRC Concept of CR Ventilation Sys Encl ML20216C8991998-04-10010 April 1998 Summary of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee Plans for Inspecting SG Tubing in Upcoming Refueling Outage ML20203E0011998-02-12012 February 1998 Summary of 980126 Meeting W/Bg&E Re Plant,Units 1 & 2 Improved Ts.List of Attendees Encl ML20199B4121998-01-20020 January 1998 Summary of 980114 Meeting W/Bg&E in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,improved Tss.List of Attendees Encl ML20198H4011998-01-0505 January 1998 Summary of 971208 Meeting W/Bg&E in Rockville,Md Re Plant Pra.List of Attendees & Viewgraphs Encl ML20197K2121997-12-15015 December 1997 Summary of 971112,13 & 18 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Clarification of Calvert Cliffs Improved Tss.List of Meeting Attendees Encl ML20211L9371997-10-0202 October 1997 Summary of 970827 Meeting W/Bg&E in Rockville,Md Re Reactor Pressure Vessel 10-year Inservice Inspection Project.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20217B1771997-09-10010 September 1997 Summary of 970904 Meeting W/Bg&E in Rockville,Md Re Clarification of Calvert Cliffs Ts,Sections 1.0,2.0,3.1,3.1 & 5.0.List of Meeting Attendees Encl ML20216J9411997-09-10010 September 1997 Summary of 970903 Meeting W/Baltimore Gas & Electric in Rockville,Md Re Calvert Cliffs Nuclear Power Plant,Units 1 & 2,service Water Modifications.List of Attendees & Copy of Viewgraphs Distributed at Meeting Encl ML20217P0401997-08-21021 August 1997 Summary of 961204 Meeting W/Util in Rockville,Md Re Calvert Cliffs Improved Tss.List of Attendees Encl ML20217N9991997-08-21021 August 1997 Summary of 970731 Meeting W/Bge in Rockville,Md Re Severe Accident Mitigation Alternatives Methodology.List of Attendees & Presentation Matl Encl ML20198F1221997-08-0505 August 1997 Summary of 970730 Meeting W/Bge in Rockville,Md Re Plant Improved Ts.List of Attendees Encl ML20151J5531997-07-31031 July 1997 Summary of 970715 Meeting W/Bge in Rockville,Md Re Matters Related to Operability of SW Sys & SRW ML20148K7771997-06-16016 June 1997 Summary of 970605 Senior Mgt Meeting W/Util in Rockville,Md Re License Renewal Environ Rept (Er) Template Process.List of Participants & Handouts Encl ML20148H2211997-05-27027 May 1997 Summary of 970519 Meeting W/Bge in Rockville,Md to Discuss License Renewal Er Template Process.List of Attendees Encl ML20137W5311997-04-16016 April 1997 Summary of 970408 Meeting W/Util in Rockville,Md to Discuss Responses to Staff 960830 Rai.List of Attendees Encl ML20147G8651997-03-26026 March 1997 Summary of 970226 Meeting W/Bge in Rockville MD to Discuss Util Response to Staff 960830 Rai.List of Attendees & Matls Distributed at Meeting Encl ML20137E3501997-03-24024 March 1997 Summary of 970307 Meeting W/Bge in Rockville MD to Provide Comments on License Renewal Er Template Proposed by Util. List of Meeting Participants Encl 1999-09-08
[Table view] |
Text
__ _____-_ _. - -
a D P--
.[ ~ UNITED STATES i $"- J NUCLEAR REGULATORY COMMISSION '
$' a $" WASHINGTON, D. C. 20555
'% 4,,,(( August 24, 1989 L MEMORANDUM FOR: Bruce A. Boger, Chairman
[. Calvert Cliffs Assessment Panel j FROM: Anthony J. Mendiola, Coordinator Calvert Cliffs Assessment Panel
SUBJECT:
MINUTES FROM BALTIMORE GAS AND ELECTRIC PRESENTATION OF THE CALVERT CLIFFS PERFORMANCE IMPROVEMENT PLAN - 08/04/89 A public meeting was conducted between Baltimore Gas and Electric (BG&E) and j' the NRC staff on August 4, 1989, to accommodate the formal presentation of the Calvert Cliffs N rformance Improvement Plan Implementation Program by BG&E. The
! meeting was held at NRC Headquarters, Rockville, Maryland. A list of attendees is enclosed.
After brief opening remarks by Mr. Boger, NRC and introduction of attendees, Mr. George Creel, BG&E, began the presentation with a outline of the meeting purpose and agenda. Mr. Creel introduced Mr. Chris Poindexter, the new Vice Chairman of BG&E, who made brief remarks on his background and his activities with regard to the Performance Improvement Plan (PIP) and the new PIP Implementation Program (PIPIP). He stated that these were long-term plans, providing leadership for the future of BG&E.
Mr. Creel then continued with a presentation of the PIP objective; to have
" event-free" operation with focused actions on addressing causes of performance decline, complementing improvements currently underway, improve problem resolution and monitor overall progress. He stressed that the PIP was not a short-term plan, and that it is not their intention to stop performance improvement efforts at some future point.
Mr. Robert Denton, BG&E, discussed the Performance Improvement Phases. He outlined Phase 1, the development of the PIP, which resulted in its submittal on April 7, 1989. Phase 2, Implementation of the PIP, the PIPIP, details development of PIP action plans, management and verification. This was detailed in the July 31, 1989 submittal. The development of the PIP was f detailed in three stages, 1) creation of the symptom database, gleaning information on performance from the last two years, 2) arriving at a fixed set of Root Causes which address the symptoms, and 3) development of a plan of corrective actions to address the Root Causes. The root causes were further grouped into three categories, 1) expectations, accountability and i communications, 2) problems correction, and 3) resource allocation. '
Mr. Charles Cruse, BG&E, detailed the action plan progress thus far for Operations and Maintenance, and Engineering areas. For Operations and Maintenance, BG&E has combined operations and maintenance organizations, integrated work activities and adjusted work priorities. For Engineering, system engineers have been moved inside the security area, have had their job description revised, and a training program has been set up. Engineering j planning has been improved and procedure upgrade project is in progress.
i 8908310124 890824 PDR ADOCK 05000317 fp P PNU
[
I
i l., %
Bruce A. Boger August 24, 1989 1
Mr. Richard Olson, BG&E, addressed.the PIP Implementation Program (PIPIP). He l discussed the basic construction of the PIPIP, its relation to the PIP and the 1 associated Root Causes. An example was discussed in detail how a symptom was identified, connected to a set of root causes, through the PIP, and finally tracking with the PIPIP verification process. He further outlined the appendixes to the PIPIP, discussing the PIP summary status report and histograms. j The NRC asked several questions in order to clarify points during the symptom example discussion. These questions involved the differences between the l :
various Root Causes and why they seem somewhat similar. Eventually, Mr. Olson ,
reiterated the entire PIP construction process in more detail, discussing the '
supervisory and engineering support. Further discussion was held on the list ;'
' of Root Causes, and how the final list was determined.
Mr. Olson then discussed the PIP verification nrocess. This process consists I of three steps, 1) implementation verification, 2) management feedback verification, and 3) effectiveness verifict.cion. in the area of effectiveness verification, BG&E would use the vertical slice inspection techniques through the use of four assessment and inspection types,)1) events analysis, management 3 design and quality and implementation assurance, processes, and 2) self-
- 4) maintenance / operations interface and support. He stressed that BG&E expects to see improvements and would adjust the PIPIP as necessary to get positive results.
Mr. Creel summarized the presentation by discussing BG&E resource allocations.
To types of resources would be used, one to create the new programs, and the second to maintain those programs. Verification would be performed by vertical slice audits, performance objective reviews, and the BG&E Nuclear Program Plan.
The PIP /PIPIP would remain flexible and would not consider a checklist. He further stated that the PIP is a long-term performance improvement plan, and would be institutionalized at Calvert Cliffs.
Upon completion of the presentation, the NRC asked how recent managerial changes would be reflected in the PIP. When asked how far down the chain of command the PIP was communicated, BG&E stated that their managers have been conducting
" focus" meetings with small groups and meeting routinely with groups at lunch and at shift meetings.
After closing remarks by Mr. Poindexter and Mr. Boger, the meeting was adjourned.
Anthony J. Mendiola, Coordinator l
Calvert Cliffs Assessment Panel
Enclosure:
As stated
[BG&E1] .
DISTRIBUTION:
PDR Central Files 0 -
glA AD RI r/f AMendiola A en io'la:ah JDyer, EDO JPartlow 2 /89 SVarga WKane, RI
14 n .
CALVERT CLIFFS ASSESSMENT PANEL MEETING AUGUST 4, 1989 LIST OF ATTENDEES CCAP MEMBERS ORGANIZATION l Bruce Bogerf NRR/DRP(CCAPCHAIRMAN)
L Robert Capra NRR/DRP
- Peter Drysdale DRS, Region I Robert Gallo DRS, Region I Maureen Hunemuller NRR/DLPQ David Limroth Anthony Mendiola DRP, NRR/DRPReg (ion ICCAPCOORDINATOR)
Scott McNeil NRR/DRP Len Prividy DRS, Region I Lowell Tripp DRP, Region I BG&E MEMBERS Charles Cruse BG&E Richard Olson. BG&E Chris Poindexter BG&E, Vice Chairman George Creel BG&E, VP - Nuclear R. E. Denton BG&E Marvin Bowman BG&E Bruce Montgomery BG&E Harvey Reed BG&E, Associate General Counsel John Fuoto BG&E Ray Lewis BG&E Bill McCaughey BG&E OTHER NRC Vincent Pritchett DRP, Region I James Partlow ADP/NRR 1
, Steven Varga DRP/NRR 'l Jim Dyer EDO j Tom Madden- OCA j John Kopeck GPA/PA OTHER ATTENDEES Thomas Magetty Maryland DNR Daniel Shea Bishop, Cook, Purcell and Reynolds Thomas Doriah Doub, Muntzing & Glasgow Liz Bowie Baltimore Sun ,
Kirsten Burger Office of People's Counsel, PSC 1 Mick Rood States News Pat Milano Engineering Division, PSC i