September 10, 1997 LICENSEE:
Baltimore Gas and Electrie Company i
FACILITY:
Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2
SUBJECT:
SUMMARY
OF SEPTEMBER 4, 1997, MEETING REGARDING CALVERT CLIFFS IMPROVED TECHNICAL SPECIFICATIONS z
On December 4,1996, Baltimore Gas and Electric Company (BGE), submitted a license amendment request to convert the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Current Technical Specifications to the Improved Technical Specifications (ITS).
On September 4, 1997, the U.S. Nuclear Regulatory Commission (NRC) and BGE held a meeting at One White Flint North, Rockville, Maryland, to discuss clarification of the Calvert Cliffs Technical
{
S)ecifications, Sections 1.0, 2.0, 3.1, 3.1, and 5.0.
Enclosed is a list of tie meeting attendees.
Among items discussed, the NRC requested BGE to clarify and discuss the Calvert Cliffs fuel oil system, gravimeter analysis of fuel oil, clarification between sediment and particulate testing, and justification of the 92 days interval between testing for impurities on its own merits, or reteining the NUREG frequency of every 31 days.
BGE will arovide justification for the i
Standard Technical Specification deviations Jased on current licensing basis, I
system design, or operational constraints.
During August 1997, NRC received Calvert Cliffs Revisions 3 and 4 to the license amendment request to convert to the ITS.
Revision 3 reflected the l
removal of a proposed change to the ITS for a Battery inspection Program.
Revision 4 transmitted BGE responses to NRC comments on ITS Sections 2.0, 3.1, 3.5, and 3.9.
BGE assured NRC that additional responses would be forthcoming in mic-September 1997.
Sincerely, t
ORIGINAL SIGNED BY G. VISSING FOR:
Alexander W. Dromerick, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
\\
Enclosure:
List of Attendees
\\
cc w/ enc 1:
See next page DOCUMENT NAME: G:\\CCl-2\\MTGSUM.9-4 To receive a copy of this document, indicate in the box:
"C" = Copy without attachment / enclosure "E" = Copy with attachment /en, closure "N" = No copy v
OfflCE ISBtADPR
[E PMPpJLijj/
l LA PDI 1 M l
D941 1/ i-(
[
DtDRft %
l 2
MME MLReardorg/rs @ / f R ADgMcf Slittle "
Wadr)M(A)
Mer V e
DATE 09/c//v7 09/ 9 /97 09/ 9 /97 09/ Q /97 1](/lF/97
/
Offic al Record Copy 1
'~
= "188 n M8u817 H.H,,IH,.H.H.IH.
g o,
mL g d 68 % g
.7-bt UNITED STATES
[
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 202H001
=
September 10, 1997 LICENSEE:
Baltimore Gas and Electric Company FACit.lTY:
Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2 l
SUBJECT:
SUMMARY
OF SEPTEMBER 4, 1997. HEETING REGARDING CALVERT CLIFFS l
IMPROVED TECHNICAL SPECIFICATIONS On December 4, 199G, Baltir,ure Gas and Electric Company (BGE), submitted a license amendment request to convert the Calvert Cliffs Nuclear Power Plant.
Unit Hos. I and 2 Current Technical Specifications to the Improved Technical Specifications (ITS).
On September 4, 1997, the U.S. Nuclear Regulatory l
Commission (NRC) and BGE held a meeting at One White Flint North, Rcckville, Maryland, to discuss clarification of the Calvert Cliffs Technir,1 Specifications Sections 1.0, 2.0, 3.1, 3.1, and 5.0.
Enclosed is a lis6 of the meeting attendees.
Among items discussed, the NRC requested BGE to clarify and discuss the Calvert Cliffs fuel oil system, gravimeter analysis of fuel oil, clarification between sediment and particulate testing, and justification of the 92 days interval between testing for impurities on its own merits, or retaining the NUREG frequency of every 31 days.
BGE will
)rovide justification for the Standard Technical Specification deviations aased on current licensing basis, system design, or operational constraints.
During August 1997, NRC received Calvert Cliffs Revisions 3 and 4 to the license amendment request to convert to the ITS.
Revision 3 reflected the removal of a proposed change to the STS for a Battery inspection Program.
Revision 4 transmitted BGE responses to NRC comments on ITS Sections 2.0, 3.1, 3.5, and 3.9.
BGE assured NRC that additional responses would be forthcoming in mid-September 1997.
Sincerely,
)m b
/
- )
Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - I/II Office-of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosure:
List of Attendees cc w/ encl:
See next page
=
e
)
i Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant j
Unit Nos. I and 2 cc:
l President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of P;blic Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre 1
Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire j
Baltimore Gas aho Electric Company Maryland People's Counsel j
P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2101 Baltimore, MD 21202-1631 i
Jay E. Silberg, Esquire Shaw, Pittman, Potts and 1rowbridge Patricia T. Birnie Esquire 2300 N Street, NW Co-Director i
Washington, DC 20037 Maryland Safe Energy Coalition 4
P.O. Box 33111 i
Mr. Thomas N. Pritchett, Director Baltimore, MD 21218 NRM t
Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donate 11 i
1650 Calvert Cliffs Parkway NRC Technical Training Center
'Lusby, MD 20657-4702 5700 Brainerd Road ResidentLinspector i
c/o U.S. Nuclear Regulatory Mr. Charles H. Cruse Commission Vice President - Nuclear Energy P.O. Box 287-Baltimore Gas and Electric Company St. Leonard, MD 20685
- Calvert Cliffs Nuclear Power-Plant 1650 Calvert Cliffs Parkway Mr. Richara 1. McLean Lusby, MD 20657-4702 i
Administrator - Radioecology-Department of Natural Resources 580 Taylor Avenue
-Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of. Prussia, PA 19406 r
yn g, m er ww-----v
LIST OF ATTENDEES BALTIM0RE GAS AND ELECTRIC COMPANY CALVERT Cliffs NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 SEPTEMBER 4, 1997 11 1!!!2 Oraanization
~
Alexander Dromerick NRR/PDI-l John Volkoff BGE-CCNPP Ray Schiele BGE-CCNPP Dick Clark NRR/PDI-2 Mary Lynn Reardon NRR/TSB Ed Tomlinson NRR/TSB Bob Tjader NRR/TSB Craig Harbuck HRR/TSB
.1
Meetina Sumary Distribution E-Mail Hard Cooy S. Collins /F. Miraglia
'Dochet File R. Zimmerman (RPZ)
PUBLIC B. Boger PD#1-1 Reading l
A. Dromerick OGC S. Little ACRS T.-Martin W. Beckner(SLM3)
(WDB)
J l
R. Clark cc:
Licensee & Service M. Reardon (MLR2)
List E. Tomlinson (EBT)
T..Tjader C. Harbuck(TRT)
L. Doerflein(CCH)
, RI B. McCabe (BCH)
PMHS (Meeting Announcement Coordinator)
=
s