Summary of 970408 Meeting W/Util in Rockville,Md to Discuss Responses to Staff 960830 Rai.List of Attendees Encl
ML20137W531
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/16/1997
From: Scott Flanders
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9704180136
Download: ML20137W531 (6)


Text

__ _ -_ _- .- - - - -

p p ua 3- 4 UNITED STATES s* g' NUCLEAR REGULATORY COMMISSION

% g

  1. April 16, 1997 ORGANIZATION: Baltimore Gas and Electric

SUBJECT:

SUMMARY

OF MEETING WITH BALTIMORE GAS AND ELECTRIC COMPANY (BGE) ON BGE LICENSE RENEWAL ACTIVITIES On April 8,1997, the Nuclear Regulatory Commission (NRC) staff met with representatives of BGE in Rockville, Maryland to discuss BGE's responses to the staff's August 30, 1996, request for additional information (RAI).

Attached is a list of the meeting attendees. The intent of the meeting was to 1 provide the staff with an opportunity to request clarification or provide comment on selected BGE RAI responses. The meeting focused on the RAI responses for the main feedwater, structure, and component suoports technical reports. It should be noted, that BGE intends to submit revised technical reports that address several of the staff's RAI. As a result, the meeting focused only on the RAI responses which contained technical issues that could I be reviewed independent of the revised technical reports. Once the revised  !

technical reports are submitted, the staff will review the reports to assure  ;

that all of the questions raised in the staff's RAI have been adequately '

addressed.

Several issues were discussed during the meeting. The most noteworthy issue  !

involved crediting design features to dismiss potential aging effects from i further review. BGE noted that there are certain design features that were l

included in the original design of some structures and components for the i purpose of preventing the environment necessary for certain aging effects to occur. In such cases, BGE does not consider the aging effect to be plausible because the design feature prevents the necessary environment from occurring.

The staff acknowledged BGE's discussion on design features, however, the staff noted that some process needs to be established to ensure that these design i features remain functional and in place because the removal or failure of a design feature could lead to a conducive environment for a potential aging effect to occur. BGE stated that many of the design features are currently documented in the final safety analysis report (FSAR). The staff noted that not all design features relied on to assist in the aging effect plausibility determination are included in the FSAR. The staff noted that this is an issue l that is also being discussed as part of the NRC regulatory guide development.

At the conclusion of the meeting, the staff informed BGE that it may send i another RAI to supplement some of the RAI questions and responses discussed '/

during the meeting. The staff noted that if another RAI is 1: sued, it would /

be the last RAI until after the revised reports were submitted.

hf)f ao022 NRC HLE CENTER COPY 9704180136 970416 PDR ADOCK 05000317 P PDR _

i l

l l

l BGE provided an update of its submittal schedule. BGE intends to submit seven j reports in May, the five revised reports and two new reports. BGE is I currently in the process of preparing 20 other technical reports and intends to complete its submittal of technical reports by the end of the 1997 summer.

i Original signed by:

Scott C. Flanders, Project Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation 9

Docket Nos. 50-317, 50-318

Attachment:

Attendance List DOCUMENT NAME: A:\BG . TS To ric'ive a copy of thle document,inpi at i the boa: "C" = Copyfwidiout attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE PM:PDLR I////lE AD:PDLRp/( yy l NAME SFLANDER:Ag()/ PTKU0 li DATE 04/ //,/9T/ 04/ th /97 0FFICIAL RECORD COPY

i I

BGE provided an update of its submittal schedule. BGE intends to submit seven reports in May, the five revised reports and two new reports. BGE is currently in the process of preparing 20 other technical reports and intends to complete its submittal of technical reports by the end of the 1997 summer.

- If cott C. Flanders,--Fivaec Manager License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos. 50-317, 50-318 I

Attachment:

Attendance List

=,.

i e

! Mr. Charles H. Cruse Calvort Cliffs Nuclear Power Plant l Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 l

l CC:

l President Mr. Joseph H. Walter Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland i 175 Main Street Engineering Division Prince Frederick. MD 20678 6 St. Paul Centre l

Baltimore. MD 21202-6806 l D. A. Brune. Esquire l General Counsel Kristen A. Burger. Esquire

Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre
Baltimore MD 21203 Suite 2102 l

Baltimore MD 21202-1631 Jay E. Silberg. Esquire Shaw. Pittman. Potts and Trowbridge Patricia T Birnie. Esquire-l 2300 N Street. NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition i P.O. Box 33111 Mr. Terrence J. Camilleri, Director. Baltimore. MD 21218  ;

NRM Calvert Cliffs Nuclear Power Plant Mr. Larry Bell l 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-47027 5700 Brainerd Road 1 Chattanooga, TN 37411-4017 l Resident Inspector j c/o U.S. Nuclear Regulatory j Commission P.O. Box 287 St. Leonard, MD 20685 l

Mr. Richard I. McLean l Administrator - Radioecology l Department of Natural Resources 580 Taylor Avenue Tawes State Office Building B3 Annapolis, MD 21401 1 Regional Administrator. Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia. PA 19406 ,

l l

l l

- j

\

L ATTENDANCE LIST l NRC MEETING WITH BALTIMORE GAS-AND ELECTRIC April 8. 1997 c

l N_@E ORGANIZATION" l

I 1. Scott Flanders NRC/NRR/DRPM/PDLR

2. Hai-Boh Wang NRC/NRR/DRPM/PDLR
3. Peter Penn BGE
4. Scott Newberry NRC/NRR/DRPM/PDLR  !
5. Barry Tilden BGE i
6. John Rycyna BGE
7. l Barth W. Doroshuk BGE <
8. Robert'L. Tucker BGE  !

o 9. Wan C. Liu NRC/NRR/DRPM/PDLR l j- 10. Bob Pratto NRC/NRR/DRPM/PDLR j 11. -Tricia Heroux for EPRI i

i I

I

(

l t

l l

0 l

! Attachment

IListribution:

Hard Copy

'Contralifile/DocketiFile, PUBLIC PDLR R/F ACRS E-MAIL SCollins/AThadani (SJC1/FJM)'

RZimmerman (RPZ)

TMartin (TTM)

MSlosson (MMS)

PTKuo (PTK)

SFlanders (SCF)

ADromerick (AWD)

HBWang (HXW1)

SNewberry (SFN)

WLiu'(WCL2)

RPrato (RJP2)

WDean (WMD)

LDoerflein (LTD)

JStewart (JCSI)

RWessman (RHW)

SStrosnider (JRS2)

SDroggitis (SCD)

SPeterson (SRP)

Glainas (GCL)

BMorris (BRM)

JMoore/EHoller (JEM/EJH)

GHolahan (GMH)

GMizuno (GSM)

BSheron (BWS)

GBagchi (GXB1)