I MEMORANDUM FOR:
Paul J. Edgeworth, Project Officer Technical Contracts Branch Division of Contracts Office of Administration a
dj FROM:
Ray F. Friebe, Project Manager g
Incident Response Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
- )
't
!i
SUBJECT:
CONTRACT FOR TECHNICAL ASSISTANCE FOR 1
EMERGENCY RESPONSE - NRC-05-86-170 i
Please take the necessary action to issue the enclosed Task Order, " Continuing q
!i Exercise Support to NRC Operations Center, Electronic Transmission of Plant Parameters
' ),
j.:j During Exercises".
This effort has been reviewed by IRM.
Should additional informa-
)b tion be required, please contact H. Michael Hawkins (x24145) or myself (x24333).
Ji
- 1 Ray F. Priebe, Project Manager Incident Response Branch l
Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
Enclosure:
L]
Task Order Lt j]
cc:
J. ;.
G. Eysymontt, IRM mg ld i'
t
(
1 tli l1 i;}
l\\
8712240108 871210 PDR FDIA SHDLLY B7-737 PDR
'1 ta _-
..u
_.._-..__= __-
bg >
g'N M C 6 L h M L k [.i.D M ;g.a gsih N $ ; d j g3 d g;$?g,d @ M d i,b n [
Y'
^
j.
- ENCLOSURE i
(])
Title:
Continuing Exercise Support to NRC Operations Center, Lj Electronic Transmission of Plant Parameters During Exercises i
g 1
A.
Description J
This Task Order is being issued under work area 1 of Contract NRC-05-86-170. A requirement has been identified to provide i
for electronic transmission of plant parameters, including if 3
possible, thermal-hydraulic, radiological, and meteorological data, during selected Full-scale exercises involving the NRC Operations Center.
The first opportunity involving participation by NRC incident response. personnel is the second Federal Field Exercise (FFE-2) being conducted in conjunction with the full-scale exercise at Zion Nuclear Power Station 23-25 June 1987.
l B.
Statement of Work i
Three phases of the work have been identified -
- 1) investigative
?,
- 2) implementation
- 3) exercise performance th*/
The following tasks have been identified in-this' effort:
y l
- 1) Identify the parameters that are suitable for transmission 1
from Zion station to NRC Headquarters during the exercise.
j The parameters should be as close to the list of' parameters j
for ERDS as is possible.
Coordinate this list with NRC and 3
Commonwealth Edison Company (CECO).
Parameters will be j
selected from those available on only one CECO computer system.
- 2) Obtain from Zion station personnel all necessary plant j
information to permit conversion and interpretation of 1
transmitted plant parameters, and provide this information
?
to NRC incident response personnel in useable note-pad
),
format.
Example: the plant vent effluent activity'may be d
in " cpm": the contractor should provide all conversion data j
and plant procedures to permit calculation of a release y
rate in Curies per second if desired by Operations Center m
personnel.
No computer-based work (other than text editing) will be required.
i kl
- 3) Provide assistance to CECO personnel in extracting data o:
from the FFE-2 scenario; prepare the data for transmission 4
from CECO to the. Ops Center.
Data shall be transmitted at T
one minute intervals during the scenario for days 1 and 2.
a, (cv 1
f
.j
h a-ihbili.:.;.LL5AEA bd M A m E D 5(,'d 2#
" ' " m, q" y ".,.. 4~1
.v a
I l
a i
- )
Work shall includa:
{
1 Reaching agreement with CECO regarding data transmission protocol and data formats (b
Preparation of test da: 3 hat can be used for implementation debugging including tests of data transmission) without cor..:n for its secrecy.
Reaching agreement with CECO regarding access to its data transmission facilities from time to time for implementation debugging.
Prior to the FFE, a demonstration of data transmission and an FFE Dry-run exercise will also be conducted.
The date for the demonstration of data transmission will be mutually agreed by the contractor, CECO, and NRC.
- 4) Investigate, recommend, and implement a suitable hardware / software environment for the NRC Headquarters-located functions of this system.
These functions shall include:
Receiving data transmissions from CECO.
ij Storing data in a database or file system which can j
supply data to the display functions.
.i ij Displaying data to users concurrently at three 1coations ll in the Operations Center, with printing capability at j
g two of them; and, in addition, at the cognizant NRC q'-
Regional Office, with printing capability.
t The display functions shall include:
i I
.I Columnar screen displays of parameters vs time, in pre-defined, single-screenful groupings, with the most i
recent column on the right.
These displays will be
)1 updated with newly received data automatically (without
)
j user input).
The only user control will be the i
selection of the parameter grouping to be displayed.
Users will not be able to select the time range to be q
displayed.
.a Printout showing all data received in each minute
.j update, with most recent data on the bottom.
N{
X-Y plotting of one or two parameters (on Y-axis) vs j
time (on X-axis).
Users will specify the parameter (s) and the time range.
1 Printing of X-Y plots generated by users.
Printing j
using either characters or dot graphics is acceptable.
l 11O 2
l d
a
't 3
1
&MILi.LAuML:u.w.vdkw 2ud.L 2 mas:1::.u%Ciut il2.Wau4Wh:ss.u.8&dau.2;DM.M i
.dk; j
- 5) The contractor shall' provida support service during a dezonstratien 4j' of data transnissica prior to tha FFE Dry-run. The contractor shall j
also provide support service during the FFE Dry-run and the FFE
'j-exercise at both the site and the NRC Operations Center to ensure 1
operability of the system.
h'
- 6) Training shall be provided for up to six users. The trainees can be assumed to have had some work-related experience in using IBM-compatible
'~j Personal Computers. The training shall be initiated no later than one j
week prior to the FFE Dry-run and continue until'the FFE exercise.
Suitable user documentation shall be provided so that the trained users can use the display functionc of the system without further 1
)
contractor assistance.
- 7) Software and system management procedures utilized during the FFE-2 l
shall be documented so that an experienced computer specialist could
)
~
re-establish the capabilities of this system for a subsequent NRC exercise.
1 l
C. Period of Performance q
j j
The task shall commence upon award and be completed by August 15, U
1987.
. _4
- j D. Reporting d
/
Monthly report requirements shall be in accordance with Paragraph F.1.1 of the basic contract.
3
!I E. Estimated Level of Effort: 60 Man-days
[#
~
M F. Government Furnished Equipment i
NRC will provide most equipment and software products required for q'
development, training, demonstrations, and live usage. The contractor is authorized to expend funds not to exceed $1,000.00 for "off-the-shelf" '
L software, and miscellaneous, small-cost, hardware components, e.g, cables and connectors, u