Requests Necessary Action Be Taken to Issue Encl Task Order, Continuing Exercise Support to NRC Operations Ctr, Electronic Transmission of Plant Parameters During Exercises, for Contract NRC-05-86-170
ML20237D658
Person / Time
Site: Zion, 05000000
Issue date: 03/11/1987
From: Priebe R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Edgeworth P
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20235G519 List: ... further results
References
CON-NRC-05-86-170, CON-NRC-5-86-170, FOIA-87-737 NUDOCS 8712240108
Download: ML20237D658 (4)


Text

.3.,,2

' ' *- 0-diMi'22h-gini.;.im,,,c,2 .hbsmais;3i,s;;daydj,l2,bsdA$;Gn;j.2Sid$;d;jhUd 11

3

.j .

i l . /**'% UNITED STATES j / f,,

NUCLEAR REGULATORY COMMISSION i

,, y 7, r, y WASHINGTON. O. C. 20555 i

(9 S l -

I

\.....+/ March 11, 1987 MEMORANDUM FOR: Paul J. Edgeworth, Project Officer Technical Contracts Branch Division of Contracts Office of Administration a

dj FROM: Ray F. Friebe, Project Manager g Incident Response Branch Division of Emergency Preparedness and Engineering Response

) Office of Inspection and Enforcement

't

!i

SUBJECT:

CONTRACT FOR TECHNICAL ASSISTANCE FOR 1 EMERGENCY RESPONSE - NRC-05-86-170 i

Please take the necessary action to issue the enclosed Task Order, " Continuing q

!i Exercise Support to NRC Operations Center, Electronic Transmission of Plant Parameters

' ),

j.:j During Exercises". This effort has been reviewed by IRM. Should additional informa-

)b Ji

1 tion be required, please contact H. Michael Hawkins (x24145) or myself (x24333).

Ray F. Priebe, Project Manager l

Incident Response Branch

" Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

Enclosure:

Task Order L]

Lt cc: J. ;. :_' : , %

j]

G. Eysymontt, IRM m

g ld i' _ _

t

(

1 t

li l1 i

} -

l\

8712240108 871210 PDR FDIA

'1 SHDLLY B7-737 PDR t

a _- ._. . . . ..u - ,- ___:. _ .._-. .__= __- -

bg > Y' g'N M C 6 L h M L k [ .i.D M ;g.a gsih N $ ; d j g3 d g;$?g,d @ M d i,b n [

^

j.* ,

ENCLOSURE i

Title:

Continuing Exercise Support to NRC Operations Center,

(])

L j '

Electronic Transmission of Plant Parameters During Exercises i

g 1 A. Description J

This Task Order is being issued under work area 1 of Contract NRC-05-86-170. A requirement has been identified to provide i3 for electronic transmission of plant parameters, including if possible, thermal-hydraulic, radiological, and meteorological data, during selected Full-scale exercises involving the NRC Operations Center. The first opportunity involving participation by NRC incident response. personnel is the second Federal Field Exercise (FFE-2) being conducted in conjunction with the full-scale exercise at Zion Nuclear Power Station 23-

.' 25 June 1987.

l .

B. Statement of Work i

Three phases of the work have been identified -

1) investigative

?,

2) implementation
3) exercise performance y

th*/ The following tasks have been identified in-this' effort:

l 1) Identify the parameters that are suitable for transmission 1 from Zion station to NRC Headquarters during the exercise.

j The parameters should be as close to the list of' parameters j for ERDS as is possible. Coordinate this list with NRC and 3 Commonwealth Edison Company (CECO). Parameters will be j ,

selected from those available on only one CECO computer system.

,, 2) Obtain from Zion station personnel all necessary plant j information to permit conversion and interpretation of 1 transmitted plant parameters, and provide this information

? to NRC incident response personnel in useable note-pad

), format. Example: the plant vent effluent activity'may be d in " cpm": the contractor should provide all conversion data jy and plant procedures to permit calculation of a release rate in Curies per second if desired by Operations Center m* personnel. No computer-based work (other than text editing) will be required.

i kl 3) Provide assistance to CECO personnel in extracting data o: from the FFE-2 scenario; prepare the data for transmission 4 from CECO to the. Ops Center. Data shall be transmitted at '

T one minute intervals during the scenario for days 1 and 2.

a, (cv 1

f

.j

a bd M A m E.v D 5(,'d 2# " :' "..m , q"

  • y ". ,..

" 4~1 h a- ihbili.:.;.LL5AEA .

I a

l '

- i,

) Work shall includa:

< {

' 1 Reaching agreement with CECO regarding data transmission  !

protocol and data formats (b

Preparation of test da: 3 hat can be used for implementation debugging including tests of data transmission) without cor..:n for its secrecy.

Reaching agreement with CECO regarding access to its data transmission facilities from time to time for implementation debugging.

Prior to the FFE, a demonstration of data transmission and an FFE Dry-run exercise will also be conducted. The date for the demonstration of data transmission will be mutually agreed

, by the contractor, CECO, and NRC.

4) Investigate, recommend, and implement a suitable hardware / software environment for the NRC Headquarters-located functions of this system. These functions shall include:

Receiving data transmissions from CECO.

i j

  • Storing data in a database or file system which can j supply data to the display functions.

.i  ;

ij

  • Displaying data to users concurrently at three 1coations j

ll in the Operations Center, with printing capability at g

two of them; and, in addition, at the cognizant NRC q'- Regional Office, with printing capability.

t i

I The display functions shall include:

.I

  • Columnar screen displays of parameters vs time, in pre-defined, single-screenful groupings, with the most i

recent column on the right. These displays will be

)1 j updated with newly received data automatically (without )

user input). The only user control will be the i selection of the parameter grouping to be displayed.

Users will not be able to select the time range to be q displayed.

.a Printout showing all data received in each minute

.j update, with most recent data on the bottom.

N{

  • X-Y plotting of one or two parameters (on Y-axis) vs j

time (on X-axis). Users will specify the parameter (s)

and the time range.

1 Printing of X-Y plots generated by users. Printing j using either characters or dot graphics is acceptable.

l 1

1O .

' 2 l

d a

't 3

1

.dk; '

&MILi.LAuML:u.w.vdkw 2ud.L 2 mas:1::.u%Ciut il2.Wau4Wh:ss.u.8&dau.2;DM.M i j 5) The contractor shall' provida support service during a dezonstratien 4j' .. -

of data transnissica prior to tha FFE Dry-run. The contractor shall j also provide support service during the FFE Dry-run and the FFE

'j- exercise at both the site and the NRC Operations Center to ensure 1 operability of the system.

h' 6) Training shall be provided for up to six users. The trainees can be assumed to have had some work-related experience in using IBM-compatible

'~j Personal Computers. The training shall be initiated no later than one j week prior to the FFE Dry-run and continue until'the FFE exercise.

Suitable user documentation shall be provided so that the trained users can use the display functionc of the system without further 1 contractor assistance.

. ) .
7) Software and system management procedures utilized during the FFE-2 l

~

shall be documented so that an experienced computer specialist could )

,- re-establish the capabilities of this system for a subsequent NRC l exercise. 1 l

C. Period of Performance j q -

j The task shall commence upon award and be completed by August 15, U 1987. .

. _4

j D. Reporting d

/ Monthly report requirements shall be in accordance with Paragraph F.1.1 ,

of the basic contract.  !

3

!I E. Estimated Level of Effort: 60 Man-days

[#

~

Mi "

F. Government Furnished Equipment ,

NRC will provide most equipment and software products required for q'

development, training, demonstrations, and live usage. The contractor is authorized to expend funds not to exceed $1,000.00 for "off-the-shelf" '

L software, and miscellaneous, small-cost, hardware components, e.g, cables  !

and connectors, u l s

1 y

q u

G a

?D 3

i 1

A

.;)

_ ._ . . n -. - ,7 - > -.  % << - -l,