REFERENCE QUAD-CITIES NEC ULAT POWER STATION UNIT' 1 LICENSE DPR-29 APPENDIX A SECTION 1 0. A.2, 3 2.A AND 6 6. A.3 WHILE CONDUCTING
' ROUTINE SURVEII. LANCE C ALIBRATION ON THE ' UNIT 1 MAIN STEAM LIhE FLOW SWITC HES, TWO SWITC HES WERE FOUND TO HAVE DRIFTED BEYOND THE TECH I
SPEC LIMIT.
ThE SET POINT EQUIVALENT TO.120 PERCENT FLOW IS 100 PSID DPIS 1-2 G1-2C TRIP ' AT 104 PSID DPIS 1-2 G1-2D TRIP AT 102 PSlD. -
1 ikh n Stil ACm;b r.nVe; BEEN RECALIBRATES N J KALIVIANAKIS