ML20211C544

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1987
ML20211C544
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/31/1987
From: Benson D, Jones V, Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
87-057, 87-57, NUDOCS 8702200127
Download: ML20211C544 (21)


Text

_ _. .. _

y . . . . _ _

.o' _ .

p. .

4

  • PAGE1

~ ,

1-4 '

s

- OP!RATINC DATA REPORT Docxtr No. 50-280

}- 2/4/87 B 3 s

DATE X 3 J  ?~ CCDIPLETID BY V. H. Jones '.

804-357-3184

TE11 PHONE

~x

_s y .

T STATUS R O,,,,

m s l 6; Rurry Unit #1 _

Notes i

1. Uu.tc Names _ 5
2. Reporting Period . 01-01-87 tn 01-11-R' ' ,,

2441

3. Licensed Thenwal Power (MWt): G' NeSuplate Ratin's (Cross MWe):

i 847.5 4 .

~ 7RR

5. Deaun Electrical Rating (Net MWe): _

B20 _

6. Maximus Dependable Capacity.,(Gross MWe): _e'
7. Maximum Dependable Capacity (fst MWe):

LL

8. If Chsiges Cecur in Capacity Ratisss (Items (NAer 3 Through 7) Since Last '

3-Reportl. Give Reasons: .4 I'

j .

}

A

?A '

9. Power . Level To Which Restricted, If Any (Net Plie): >

s Reasons For Restrictions, If Anyt - /

10. . _A

_, }t '2 Cusmulative

~

Yr.-to-Date This Month 1 123696.0 744.0 '_ 744.0_

11. Bours In Reporting Period 78545.3 0 _, 0
12. Number of Hours Reactor Was Criticai 0 3774.5 0
13. Reactor Reserve Shutdown Hours 0 76854.3 0

Hou9s Generator On-Line 14 *

15. Unit Reserve Shutdown Hours 0 178072858.5 0
16. Cross Thermal Energy Generated (MWR) '

57497918.0 0 0 Cross Electrical Energy Generated (igm)

\

17.

0 0 54521971.0 l J Net Electrical Energy Generated (MWH)

18. 0 62.1%

0 f

19. Unit Service Factor 5 0 65;2%

0

20. Unit Available Tcctor 0 0 57.0 %
s '
21. Unit Capacity Factor (Using MDC Net) 0 55.9 %

, b 0

22. Ucit Capacity Trctor (Using DER Net) O 17.7 %

, O

, 23. Unii' Forced Rate

\

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Durytion of Each): *
  • k 07-14-87
25. If Shut Down At End Of haport Period Estimated Date of Startup:

f Torecast Achieved

26. Units In Test Status (Prior to Commercial Operation):

f INITIAL CRITICALITI IN m A1. E m 1C m

,&,220012797933, ADOCK 05000280 C0tt<ERCIAL OPERATION R

l r' PDR [ (9/77) 1 f

.. ,.. PAGE 2

- OPERATING DATA REPORT DOCKET No. 50-281 DATE 2/4/87 COMPLEIED BY V. H. Tnnon TELEPHONE (804)357-3184 OPERATING STATUS Surry Unit #7 Notes

1. Unit Name
2. Reporting Period: 01-01-R7 tn 01 '41-R7
3. Licensed Thermal Power (MWt): 74d1 4 Nameplate Rating (Gross MWe): R47.S Design Electrical Rating (Not MWe): 7RR 5.

Maximus Dependable Capacity (Gross MWe): R?n 6.

Maximus Dependable Capacity (Net MWe): ?R1

! 7.

i 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: ,

4. Power Level To Which Restricted, If Any (Net We):
10. Reasons For Restrictions, If Any: .

This Month Yr.-to-D..e Cunmulative 744.0 744.0 120576.0

11. Bours In Reporting Period 0 0 78110.8
12. Number of Hours Reactor Was Critical 0 0 328.0
13. Reactor Reserve Shutdown Hours 0 0 76840.4 14 Hours Generator on-Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 179792473.6
16. Cross Thermal Energy Generated (NWH) 0 0 58327824.0
17. Cross Electrical Energy Generated (WR) 0 0 55285524.0
18. Net Electrical Energy Generated (WH) 0 0 63.7%
19. Unit Service Factor 0 0 63.7%
20. Unit Available Factor 0 0 58.9 %
21. Unit Capacity Factor (Using MDC Net) 0 0 58.2 %
22. Unit Capacity Factor (Using DER Net) 100.0 100.0 13.6%
23. Unit Forced Rate 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each);

02-20-87

15. If Shut Down At End Of Report Period Estimated Date of Startup:

Forecast Achieved

26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY C0t'MERCIAL OPERATION (9/77)

, e , , , . - . .- .. - , ,, . . , , - - - . . , . - , , , , . . , ~ - - , . , , - . _ . . , , , - . . . - . . . . , , . , , _ . . - _ . , - , ..__..,.._r

I PAGE 3 WIT SHUIDOWS AND F0WER REDUCTIONS DOCKET NO. 50-280 un1T iwa Surry 1 DATE 2/5/87 CONFLETED BY V. H. Jones REP 0ur Howru January 1987 TEursus l

l e -

- 2; "c ' .t "*=* LICENSEE g.

- 2

]jj EVENT g ,{

{j CAUSE & 00RRECTIVE ACTION TO NO. DATE E

  • g j= 2 jgg REPORT # =0 go FREVENT annansur 8

t 86-09 12-10-86 S 744.0 H I The decision was made to perform the  ;

scheduled Snubber / Maintenance outage early in order to allow a precautionary Main i Feedwater piping inspection as a result of pipe rupture in Unit #2.

l 4

1 1 i

l 1

1 2 3 4 i4 F: Forced Reason: Methods Exhibit C - lastructione S: Scheduled A - Epigment Failure (Explain) 1 - Messel for Freparation of Data B - Maintenance or Test 2 - Meanal Scres. Entry Sheets for Licensee j

j C - Refueling 3 - Anteentic Scres. Event Report (IEL) File j D - Petulatory Raetriction 4 - Other (Explain) (MURBC 0161) l ,

E - Operator Training & Liceses Enemination 3 F - A ministrative Exhibit 1 - Some Source

C - Operational Error (Englein) l (9/77) M - Other (Explata)

tatt suurDOWNS AND POWER REDUCT10mg nnerov no. 50-281 Um1T Nasa Surry 2 DATE 2/5/87 courin ED BY V. H. Tones REPOnI NONTH January 1987 TEIN NOME

e "e *=, ;t LICENSEE g, g ,,

NO. DATE h 2;j j jjj EVENT j, j jj CAUSE & c0RRECTIVE ACTION TO g  ; jgg REr0er , ,o ga rnEVENr REcummENr

! 8 A 3 LER-86/020 Unit was shutdown for refueling outage which 86-07 12-09-86 F 744.0 commenced 10-04-86.

Reactor trip by low-low S/G level in "C" S/G caused by "C" MS trip valve closing.

Shortly after the reactor trip the 18" suction line to "A" Main Feed Pump ruptured due to pipe wall erosion / corrosion.

"C" MS trip valve will be completely

' overhauled prior to startup. Condensate and feed piping will be examined and all l

' piping below acceptance criteria will be replaced.

l l

l 1

I l

1 3 4 1 2 Methods Exhibit C - Instructione 4'

F: Forced Reason for Preparation of Data A - Equipment Failure (Emplain) 1 - Mesmaal

$3 Scheduled 2 - Mannaal Scram. Entry Sheets for Licensee B - M-intenance or Test Event Report (LER) File C - Ra h ling 3 - Automatic Scram.

J D - Regulatory Restriction 4 - Other (Explain) (NUREC 0161) i E - Operator Training & License Enamination 5 Bahibit 1 - Same Source j F - Administrative C - Operational Error (Explain)

(9/77) H - Other (Emplain) l

PAGE 5 ATERME DAILY INIT poler LITEL Docker 30. 50-280 l UNIT Surry 1 Dart 2/6/87 COMPLETED BY V. H. Jones IELEPHONE (804) 357-3164 mNrn January 1987 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I n 17 0 2 n 18 0 3 n 19 0 4 n 20 0 5 n 21 0 6 0 22 0 7 0 23 0 8 0 24 0 0 25 0 9

10 0 26 0 0 27 0 11 0 28 0 12 0 29 0 11 0 30 0 14 0 31 0 15 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting r.onth. Compute to the nearest whole megswatt.

(9/77) 1

' ' PAGE 6 f

AVDAM DAILY UNIT POWOL LEVEL DOCKET 100 50-281 UNIT  % rry 9 DATE 7/6/R7 COMPLETED BY V H Tnnne TELEPHONE (804) 357-3I84 MONn Tanuary 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 0 1 0 18 0 2 0 19 0 3 0 9

0 20 0 4 ,

21 0 5 0 0 22 0 6

7 0 23 0 h 0 24 0 8

25 0 9 0 26 0 10 0 0 27 0 11 28 0 12 0 0

13 0 29 0

0 30 14 0

0 31 15 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole negawatt.

(9/77) j

t PAGE 7

SUMMARY

OF OPERATING EXPERIENCE MONTH / YEAR January 1987 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT ONE 01-01-87 0000 This reporting period begins with the unit at CSD on RHR.

01-29-87 2010 Completed RCS fill and vent.

01-30-87 2240 Bubble in pressurizer.

01-31-87 2400 This reporting period ends with the unit at CSD on RHR with "C" RCP running.

' 'I ill ___ _ _ _ _ _ _ _ . . _ _

,_ PAGE 8

SUMMARY

OF OPERATING EXPERIENCE MONTH / YEAR JANUARY 1987 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT TWO 01-01-87 0000 This reporting period begins with the unit at CSD -

on RHR.

01-31-87 2400 This reporting period ends with the unit at CSD on RHR.

i

- _ ,_. - , , , - - - - , - , - . _ _ . _ , , _ - . - . . . . . , - - . . _ . . _ , . . - - - ,_ . . . . ~ - _ - ~ , -

-9 e PAGE 9 I-FACILITY CHANGES REQUIRING NRC APPROVAL MONTH / YEAR IANUARY,1987

\

NONE DURING THIS PERIOD li ig ii ii -

7 .' A

~

PAGE 10 1

_ FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH / YEAR JANUARY 1987 .

NONE DURING THIS PERIOD

TEST AND EXPERIMENTS REQUIRING NRC APPROVAL MONTH / YEAR JANUARY 1987 NONE DURING THIS PERIOD ~

l r o.

PAGE 12 i.

TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL l MONTH / YEAR JANUARY 1987 4

4 NONE DURING THIS PERIOD i

1 J

i.

t 4

4 I

4 l

l l

l l

l l

l l

l' 4

b

. , . ~ - . - _ . - - . . - , _ - . - - - _ . ,

'PAGEI3 i' '- l =. '

g-OTHER CHANGES, TEST AND EXPERIMENTS MONTH / YEAR JANUARY 1987 NONE DURING THIS PERIOD i

i I

l l

t I

k i

f l

l T

l l

1 I~

(

l i

1

PAGE 14 VIRGINIA P0k'ER SURRY P0k'ER SIATION CHEMISTRY REPORT January 19 87

~

UNIT NO. 1 UNIT NO. 2 ANALYSIS MAX. MIN. AVG. MAX. MIN. AVG.

~I -2 -1 f' .16

-3 7,g,-3 g_p7 -3 Gross Radioact. , uCi/ml 5.01 1.90 1.75 0.0 0.0 0.0 0.0 0.0 0.0 Suspended Solids, ppa Gross Tritium, uCi/ml (1) (1) (1 ) -- (1) -- (1) -- (1)-

(1) (1) -- (1) --- (1)-- (1) -- (1) --

IodineI3I. uCi/mi _

(1) -- (1) --

/I l31 (1) ( 1 ) ---

(1)- (1) --

I .

(1)- (1) (1) -- (1) 19.5 (1) 3.1 (1) 9.4 __

Hydrogen, ec/kg 1.10 104 1.07 --- --

Lithium, ppa 438 392 399 400 385 393 Boron-10, ppm

  • 1.6 (1) 0.605 0.215 (1) 0.010 0.005 0.005 0xygen, (DO) , ppa 0.008 0.001 0.004 0.006 0.001 0.002 Chloride, ppm 6.11 5.57 6.00 5.85 5.74 5.78 pH @ 25 degree Celsius
  • Boron-10 = Total Boron X 0.196 RDUdtXS: (1) Ecth units are at 0% power for an inspection mintenance outage.

S 6

1 ;r PAGE 15 UNIT 1 FUEL HANDLING DATE January 1987 NEW OR DATE NUMBER OF NEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING SHIPMENT # RECEIVED PER SHIPMENT # # ENRICHMENT CASK ACTIVITY LEVEL i

NONE DUILING THIS P BRIOD i

l l

99 l .

I y----- - - - - ,.,.--..------.,re-w~~,,--.v~w,.v.-.m.---...m.,_..

PAGE 16 r

UNIT 2 FUEL HANDLING DATE January 1987 NEW OR DATE NUMBER OF NEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING SHIPMENT # RECEIVED PER SHIPMENT i i ENRICHMENT CASK ACTIVITY LEVEL NONE DUF ING THIS P :RIOD

'~ #

-l.

t PAGE 17 L

PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR MONTH / YEAR JANUARY 1987 NONE DURING THIS PERIOD 3

l l

I i

  • PAGE 18

. .f DESCRIPTION OF PERIODIC TEST WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH / YEAR JANUARY 1987 NONE DURING THIS PERIOD l

l l

i t

VINGINIA ELECTHIC AND POWER COMI'ANY Ricinwonn,Vinoix1A 20261 February 13, 1987 Vera Passinant Nectuan OPERATIONE U. S. Nuclear Regulatory Commission Serial No.87-057 Attention: Document Control Desk N0/PML:vlh Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of January 1987.

Very truly yours, 424 W. L. Stewart Enclosure cc: U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.

Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station 1

,y

7 POW 34-04 VIRGINIA ELECTRIC AND POWER COMPANY ,

SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 87-01 APPROVED: /) art /I _ ]eam 1TATION MANAGER l

i

?. .* .,

v. . g SECTION PAGE Operating Data Report - Unit No. I 1 Operating Data Report - Unit No. 2 2 Unit Shutdowns and Power Reductions - Unit No.1 3 Unit Shutdowns and Power Reductions - Unit No. 2 4 Average Daily Unit Power Level- Unit No.1 5 Average Daily Unit Power Level- Unit No. 2 6 i

Summary of Operating Experience - Unit No. I 7 Summary of Operating Experience - Unit No. 2 8 Facility Changer Requiring NRC Approval 9 Facility Changes That Did Not Require NRC Approval 10 Tests and Experiences Requiring NRC Approval 11 Tests and Experiments That Did Not Require NRC Approval 12 Other Changes, Test and Experiments 13 Chemistry Report 14

! Fuel Handling - Unit No. I 15 Fuel Handling - Unit No. 2 16 Procedure Revisions That Changed the Operating Mode Described in the FSAR 17 Description of Periodic Test Which Were Not Completed Within the Time Limits Specified in Technica1 Specifications. 18

,- . ,w- - - - - ---,,.,-

a y - --,vn -n,- -, --+ -- --

,, , , . , ,, .e. , _ , ,c_-.. ,, , , -.g ,- , , , , .,-.. , - - , ,_-m.,., , , , . . , - , , -,.a-. ,,