Letter Sequence Other |
---|
|
|
MONTHYEARML20137G2431985-08-19019 August 1985 Proposed Tech Spec Changes,Extending Time Needed to Restore Boron Concentration in Cold Leg Accumulator.Safety Analysis & Significant Hazards Consideration Encl Project stage: Other ML20137G2331985-08-19019 August 1985 Application for Amends to Licenses NPF-9 & NPF-17,extending Time Needed to Restore Boron Concentration in Cold Leg Accumulator.Fee Paid Project stage: Request ML20203C4041986-04-17017 April 1986 Proposed Tech Specs,Establishing Lower Limit on Boron Concentration Project stage: Other ML20203C3921986-04-17017 April 1986 Revised Application for Amends to Licenses NPF-9 & NPF-17, Establishing Lower Limit on Boron Concentration. Justification,Safety Analyses & Analysis of Significant Hazards Consideration Encl Project stage: Request 1985-08-19
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20133M5541997-01-13013 January 1997 Proposed Tech Specs Implementing performance-based Containment Leak Rate Testing Requirements of 10CFR50, App J,Option B ML20133D3991997-01-0606 January 1997 Proposed Tech Specs 3/4.6 Re Containment Systems ML20132F0001996-12-17017 December 1996 Proposed Tech Specs,Supplementing Amend Request to Change Surveillance 4.8.2.1.2.e Which Will Achieve Alignment W/ Improved STS SR 3.8.4.8 ML20135B0381996-11-26026 November 1996 Proposed Tech Specs 3.8.2 Re DC Sources ML20134M1541996-11-0101 November 1996 Proposed Tech Specs 3.8.2 Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7591996-10-22022 October 1996 Proposed Tech Specs 3.6.1.5 Re Containment Systems & Air Temp ML20117K1011996-08-29029 August 1996 Proposed Tech Specs,Replacing 960516 Response to Concerns Re Proposed Changes for Diesel Starting Air Sys Surveillance Testing ML20113C7201996-06-21021 June 1996 Proposed Tech Specs 3.9.6,revising Term Lifting Loads to Lifting Force Used in Manipulator Crane TS 3.9.6b.2 & Redefining Auxiliary Hoist Min Capacities ML20112A7571996-05-16016 May 1996 Proposed Tech Specs 3/4.8 Re Surveillance Requirements ML20101H6101996-03-15015 March 1996 Proposed Tech Specs Re Replacement of SGs ML20101C8281996-03-0808 March 1996 Proposed Tech Specs Reflecting Separate Vols for Unit 1 & Unit 2 ML20100R4601996-03-0404 March 1996 Proposed Tech Specs,Deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20097G3911996-02-13013 February 1996 Proposed Tech Specs Re Listing of Core Operating Limit Methodologies for Editorial Correction ML20095E9571995-12-14014 December 1995 Proposed Tech Specs Action Statements & SRs for Dgs, Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8081995-12-12012 December 1995 Proposed Tech Specs,Making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20095B6221995-12-0505 December 1995 Proposed TS SR 4.8.2.1.2.e Re 60-month Battery Testing ML20093L2861995-10-17017 October 1995 Proposed Tech Specs Listings of Core Operating Limit Methodologies ML20098A4631995-09-18018 September 1995 Proposed Tech Specs,Providing Revised Record Pages for LTOP Protection in TS Amend ML20092K4481995-09-18018 September 1995 Proposed Tech Spec Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1571995-09-0101 September 1995 Proposed Tech Specs,Revising TS 3/4.6.5 to Reduce Required Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs 1999-09-13
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205L2431999-04-0505 April 1999 SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) ML20205L2531999-04-0505 April 1999 Boraflex Degradation Analysis ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20210K9281997-08-31031 August 1997 Cycle 12 Startup Rept ML20216B8171997-08-25025 August 1997 Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition 1999-09-13
[Table view] |
Text
'
Attachment I 3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS COLD LEG INJECTION
-LIMITING CONDITION FOR OPERATION 3.5.1.1 Each cold leg injection accumulator shall be OPERABLE with:
- a. The isolation valve open,
- b. A contained borated water volume of between 8022 and 8256 gallons
- c. A boron concentration of between 1900 and 2100 ppm,
! d. A nitrogen cover pressure of between 430 and 484 psig, and j e. A water level and pressure channel 0PERABLE.
APPLICABILITY: MODES 1, 2, and 3*.
ACTION:
- a. With one accumulator inoperable, except as a result of a closed isolation valve or boron concentration less than 1900 ppm, re- .l store the inoperable accumulator to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following
! 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
l
- b. With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- c. With one accumulator inoperable due to boron concentration less than 1900 ppm and:
- 1) the volume weighted average baron concentration of the three limiting accumulators 1900 ppm or greater, restore the
!. inoperable accumulator to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of l the low boron determination or be in at least HOT STANDBY r within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- 2) the volume weighted average boron concentration of the three limiting accumulators less than 1900 ppm but greater than 1500 ppm, restore the inoperable accumulator to OPERABLE
[
status or return the volume weighted average boron concentra-I-
" Pressurizer pressure above 1000 psig.
l McGUIRE - UNITS 1 and 2 3/4 5-1 Amendment No. (Unit 1)
Amendment No. (Unit 2) 8604210150 860417 PDR ADOCK 05000369 p PDR
EMERGENCY CORE COOLING SYSTEMS LIMITING CONDITION FOR OPERATION ACTION: (cont'd) tion of the three limiting accumulators to greater than 1900 ppm and enter ACTION c.1 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the low boron determination or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- 3) The volume weighted average boron concentration of the three limiting accumulators 1500 ppm or less, return the volume weighted average boron concentration of the three limiting accumulator to greater than 1500 ppm and enter ACTION c.2 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the low boron determination or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.1.1.1 Each cold leg injection accumulator shall be demonstrated OPERABLE:
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
- 1) Verifying the contained borated water volume and nitrogen cover pressure in the tanks, and
- 2) Verifying that each cold leg injection accumulator isolation valve is open,
- b. At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume not resulting from normal makeup by verifying the boron l-concentration of the accumulator solution;
- c. At least once per 31 days when the RCS pressure is above 2000 psig by verifying that power to the isolation valve operator is disconnected by removal of the breaker from the circuit; and
- d. At least once per 18 months by verifying that each accumulator isolation valve opens automatically under each of the following conditions:
- 1) When an actual or a simulated RCS pressure signal exceeds the P-11 (Pressurizer Pressure Block of Safety Injection)
Setpoint,
- 2) Upon receipt of a Safety Injection test signal.
4.5.1.1.2 Each cold leg injection accumulator water level and pressure channel shall be demonstrated OPERABLE:
McGUIRE - UNITS 1 and 2 3/4 5-2 Amendment No. (Unit 1)
Amendment No. (Unit 2)
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS
- a. At least once per 31 days by the performance of an ANALOG CHANNEL OPERATIONAL TEST, and
- b. At least once per 18 months by the performance of a CHANNEL CALIBRATION.
McGUIRE - UNITS 1 and 2 3/4 5-2a Amendment No. (Unit 1)
Amendment No. (Unit 2)
3/4.5 EMERGENCY CORE COOLING SYSTEMS BASES 3/4.5.1 ACCUMULATORS The OPERABILITY of each Reactor Coolant System (RCS) accumulator ensures that a sufficient volume of borated water will be immediately forced into the reactor core through each of the cold legs in the event the RCS pressure falls below the pressure of the accumulators. This initial surge of water into the core provides the initial cooling mechanism during large RCS pipe ruptures.
The limits on accumulator volume, boron concentration and pressure ensure
~
that the assumptions used for accumulator injection in the safety analysis are met. The use of "the three limiting accumulators" refers to the combination of the three accumulators which would inject the minimum volume weighted average boron concentration assuming the accumulator of highest concentration (the fourth) spills out the bro (Inser r Nem - atto CAsc/ pope-) gen RCS pipe.
The accumulator power operated isolation valves are considered to be
" operating bypasses" in the context of IEEE Std. 279-1971, which requires that bypasses of a protective function be removed automatically whenever permissive conditions are not met. In addition, as these accumulator isolation valves fail to meet single failure criteria, removal of power to the valves is required.
The limits for operation with an accumulator inoperable for any reason except an isolation valve closed minimizes the time exposure of the plant to a LOCA event occurring concurrent with failure of an additional accumulator which may result in unacceptable peak cladding temperatures. If a closed isolation valve cannot be immediately opened, the full capability of one accumulator is not available and prompt action is required to place the reactor in a mode where this capability is not required.
3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS The OPERABILITY of two independent ECCS subsystems ensures that sufficient emergency core cooling capability will be available in the event of a LOCA assuming the loss of one subsystem through any single failure consideration.
Either subsystem operating in conjunction with the accumulators is capable of supplying sufficient core cooling to limit the peak cladding temperatures within acceptable limits for all postulated break sizes ranging from the double ended break of the largest RCS cold leg pipe downward. In addition, each ECCS subsystem provides long-term core cooling capability in the recirculation mode during the accident recovery period.
With the RCS temperature below 350 F, one OPERABLE ECCS subsystem is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor ard the limited core cooling requirements.
MCGUIRE - UNITS I and 2 8 3/4 5-1
The allowed down time for the accumulators are variable based upon boron concentration to ensure that the reactor is shutdown following a LOCA and that any problems are corrected in a timely manner. Suberiticality is assured when boron concentration is above 1500 ppm, so additional down time is allowed when concentration is above 1500 ppm. A concentration of less than 1900 ppm in any single accumulator or as a volume weighted average may be indicative of a problem, such as valve leakage, but since reactor shutdown is assured, additional time is allowed to restore boron concentration in the accumulators.
l l
i l
l l
I I
I I
i l
ATTACHMENT 2 JUSTIFICATION AND SAFETY ANALYSIS The proposed supplemental changes to the McGuire Technical Specifications would introduce a lower limit for the volume weighted average in the three limiting accumulators at 1500 ppm boron. This concentration would maintain shutdown of the reactor at zero power, K = 1.0, all control rod assemblies out, including a 1% uncertainty (FSAR Table 4.3.2-2). The action for a boron concentration of less than 1500 ppm would be to restore concentration to greater than 1500 ppm within one hour and enter the action for volume weighted average boron concentration in the 1500 - 1900 ppm range or proceed to Hot Shutdown. The existing Specification would allow this excursion for one hour, and once concentration is restored, shutdown is assured.
The probability of a LOCA during accumulator down time is small, thus the one hour window without assured shutdown is acceptable. When boron concentration is above 1500 ppm, shutdown is assured and the boron has served its purpose. Additional boron adds to the margin.
The proposed changes to the bases are to clarify the use of the "three limiting accumulators" and provide the reasoning behind the specification's Action statements with regards to the variable allowed times based upon the boron concentration.
I I
ATTACHMENT 3 ANALYSIS OF SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10 CFR 50.91, this analyses provides a determination that the proposed amendment to the Technical Specifications does not involve any signi-ficant hazards consideration, as defined by 10 CFR 50.92.
The proposed amendment would not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed change would allow increased time with the boron concentration in the cold leg accumulators below 1900 ppm but greater than 1500 ppm. The change would not affect any accident mechanisms regarding probability of an accident since no hardware changes are made, and the consequences are unaffected since the same volume of water is injected for cooling purposes and the boron assures reactor shutdown follow-ing a LOCA.
- 2) Create the possibility of a new or dif ferent kind of accident from any accident previously evaluated. No hardware changes are made to create any i new failure or accident sequences. The boron concentration in the water will assure reactor shutdown thus preventing a return to criticality af ter a LOCA.
- 3) Involve a significant reduction in a margin of safety. While the shutdown margin following a LOCA may be reduced if a LOCA vere to occur with the boron concentration lower than 1900 ppm but greater than 1500 ppm, the in-crease in allowed time does not significantly affect the margin of safety.
Based upon the preceding analyses, Duke Power Company concludes that the proposed amendments do not involve a significant hazards consideration.