MONTHYEARML20216J0681999-09-29029 September 1999 Forwards Rev 3 of AP600 Design Control Document, Incorporating Documentation Changes Resulting from Final Review Performed to Check Consistency of Implementation of Approved Design Change Proposals.With Summary of Changes ML20207G5411999-06-0808 June 1999 Discusses Request Made by Westinghouse on 981109 That Proprietary WCAP-14252,Rev 1,be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20195D5201999-06-0404 June 1999 Discusses Westinghouse Request That Change Pages Submitted on 980921 to WCAP-14292 Be Withheld from Public Disclosure. Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20196G2431999-05-21021 May 1999 Informs That USNRC Has Published in Fr Encl Notice of Proposed Rulemaking Re AP600 Design Certification Rule. Rulemaking Allows Applicants or Licensees to Construct AP600 Std Plant Design by Referencing Design Certification Rule ML20206G5411999-05-0505 May 1999 Forwards Draft Environ Assessment Re Proposed Certification of AP600 Std Plant Design.Environ Assessment Will Be Used as Basis for NRC Finding of No Significant Environ Impact Resulting from Certification of AP600 Design ML20205J3351999-04-0707 April 1999 Informs That USNRC Staff Has Completed Review of Rev 2 of AP600 Design Control Document,Verified That All of Changes in Rev 2 Are Acceptable & Determined That AP600 Dcd,Rev 2, Can Now Be Used in Proposed Design Certification Rule NSD-NRC-99-5827, Forwards Rev 2 to AP600 Design Control Document.Attachment 1 Provides Summary of Changes Made as Part of Mar 1999 Rev to AP600 Design Control Document1999-03-31031 March 1999 Forwards Rev 2 to AP600 Design Control Document.Attachment 1 Provides Summary of Changes Made as Part of Mar 1999 Rev to AP600 Design Control Document ML20205D3051999-03-25025 March 1999 Requests Amend to 920626 Application for Design Certification of AP600,including AP600 Ssar & AP600 Dcd,To Reflect Sale of CBS Commercial Nuclear Business to W ML20203C5481999-02-10010 February 1999 Forwards Rev 1 to AP600 Design Control Document (DCD) for Docket File.Dcd Provides Reference Basis for AP600 Design Certification ML20199H8671999-01-20020 January 1999 Forwards Comments on AP600 Design Control Document,Submitted by Westinghouse ML20199B1121999-01-0707 January 1999 Advises That Info Contained in NSRA-APSL-92-0268 & Containing Presentation Matl Used in 921209-10 Meeting,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20198B4601998-12-14014 December 1998 Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned ML20197G3501998-11-30030 November 1998 Forwards AP600 Design Control Document, Vols 1-12 for Docket File.Submittal Closes Confirmatory Items 1.5-1 & 1.5-2 from Sept 1998 Final SER Re Certification of AP600 Std Design ML20195E9331998-11-0909 November 1998 Requests That Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept, Vols I- Iv,Be Withheld (Ref 10CFR2.790) NSD-NRC-98-5806, Forwards non-proprietary Rev 1 to WCAP-14253 & Proprietary Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept. Proprietary Rept Includes Vols 1-4.Proprietary Info Withheld,Per 10CFR2.7901998-11-0909 November 1998 Forwards non-proprietary Rev 1 to WCAP-14253 & Proprietary Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept. Proprietary Rept Includes Vols 1-4.Proprietary Info Withheld,Per 10CFR2.790 ML20155G9021998-11-0303 November 1998 Advises That Info Contained in 981012 ltr,NSD-NRC-98-5795, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) & Section 103(b) of AEA of 1954,as Amended ML20155G9271998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design.Staff Completed Review of Design & Issued Final Design Approval & FSER on 980903.Without Encl ML20155G7591998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design,Per Discussion at Sept 1997 Meeting.Staff Completed & Issued Final Design Approval of FSER on 980903.Without Encl NSD-NRC-98-5795, Informs That Figures from Rev 0 & Rev 3 of PRA Which Indicate Location of H Igniters Should Be Considered Proprietary.Nonproprietary Versions of AP600 General Arrangement Drawings Were Provided in Rev 7 of Ssar1998-10-12012 October 1998 Informs That Figures from Rev 0 & Rev 3 of PRA Which Indicate Location of H Igniters Should Be Considered Proprietary.Nonproprietary Versions of AP600 General Arrangement Drawings Were Provided in Rev 7 of Ssar ML20154A4091998-09-29029 September 1998 Advises That Certain Info Contained in Westinghouse Ltr NTD-NRC-95-4506,dtd 950713,submitting WCAP-14425,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Figure 3-1 Will Be Placed Into Public Record ML20153G2521998-09-25025 September 1998 Advises That Proprietary Matl Discovered by NRC in NSD-NRC-97-4966 & Proprietary Matl Noted by W in NSD-NRC-98-5772 Will Be Withhheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20153C1001998-09-15015 September 1998 Advises That Matls Re AP600 Notrump Final Validation Rept, WCAP-14807,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended NSD-NRC-98-5788, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided1998-09-15015 September 1998 Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided ML20151X4381998-09-15015 September 1998 Informs That Staff Has Decided to Accept Claim That Info in WCAP-14135,Rev 1 Is Proprietary & Will Be Withheld from Public Disclosure,Per W 980821 & 26 Ltrs ML20151X4041998-09-11011 September 1998 Discusses Revised Tier 2 Info for AP600 Design.Staff Revised Decision on Whether Fire Protection Should Expire at First Full Power Encl ML20151V1711998-09-0808 September 1998 Advises That Info Re Westinghouse AP600 Std Safety Analysis Rept Through Rev 4 & PRA Through Rev 5 Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Disposition of Ssar & PRA Proprietary Info Encl ML20151V2231998-09-0808 September 1998 Informs That NRC Determined That WCAP-14132 Encl in Westinghouse Ltr NTD-NRC-94-4244,dtd 940729 & Marked as Proprietary,Will Be Withheld from Public Disclosure,Per to 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151S9181998-09-0303 September 1998 Advises That Info Marked as Proprietary Re Westinghouse AP600 Design Ltrs Concerning Pxs Scaling & Pirt Closure Rept WCAP-14727,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20239A1481998-09-0303 September 1998 Forwards Notice of Issuance of Final Design Approval & Final SER for AP600.FDA Allows AP600 Design to Be Referenced in Application for Construction Permit or Operating License Under 10CFR50 or Application for Combined License ML20239A3111998-09-0303 September 1998 Forwards Final SER Which Summarizes Staff Safety Review of AP600 Design Against Requirements of Subpart B of 10CF5R52 & Delineates Scope of Technical Details Considered in Evaluating Proposed Design ML20151V8521998-09-0101 September 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse NSD-NRC-98-5781, Informs That W Determined That AP600 FSER Contains No Proprietary Info1998-09-0101 September 1998 Informs That W Determined That AP600 FSER Contains No Proprietary Info ML20151V2201998-08-31031 August 1998 Informs That EPRI Documents, GOTHIC Containment Analysis Package Qualification Rept, GOTHIC Containment Analysis Qualification Manual, & Listed Documents Dtd Sept 1993 Will Be Withheld from Public Disclosure ML20151V8431998-08-31031 August 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20238F3241998-08-31031 August 1998 Advises That AP600 RAI Responses Encl in Westinghouse Ltrs NTD-NRC-95-4598,dtd 951117,as Modified by NSD-NRC-98-5776, Dtd 980826,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20238F5991998-08-31031 August 1998 Refers to W 980821 Revised Response to Insp Rept 99900404/97-01 That Contained All Substantive Info Provided w/DCP/NRC-1074 Ltr.Nrc Will Destroy DCP/NRC-1074,as Requested NSD-NRC-98-5783, Forwards non-proprietary Rev 2 to WCAP-14989, Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys1998-08-28028 August 1998 Forwards non-proprietary Rev 2 to WCAP-14989, Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys NSD-NRC-98-5782, Forwards Corrected Pages 4-28 Through 4-32 to Be Inserted in Rev 2 to non-proprietary WCAP-14953, AP600 Pxs Scaling & Pirt Closure Rept. Pages Were Originally Submitted W/Incorrect Header Which Stated 'W Proprietary Class 2.'1998-08-28028 August 1998 Forwards Corrected Pages 4-28 Through 4-32 to Be Inserted in Rev 2 to non-proprietary WCAP-14953, AP600 Pxs Scaling & Pirt Closure Rept. Pages Were Originally Submitted W/Incorrect Header Which Stated 'W Proprietary Class 2.' NSD-NRC-98-5778, Provides Commitment to Include Requested Changes Into AP600 Design Control Document.Discussion W/Vijuk on 980825 Re Disposition of Ltrs DCP/NRC1074,dtd 971016 & DCP/NRC1324,dtd 980403,formalized1998-08-27027 August 1998 Provides Commitment to Include Requested Changes Into AP600 Design Control Document.Discussion W/Vijuk on 980825 Re Disposition of Ltrs DCP/NRC1074,dtd 971016 & DCP/NRC1324,dtd 980403,formalized ML20237E4421998-08-27027 August 1998 Advises That Info Contained in Ltr DCP/NRC-0985,dtd 970821, Sought to Be Withheld,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended NSD-NRC-98-5777, Provides Revised Response to NRC Ltr Re W Requests for Withholding Info Re AP600 PCS Final Data rept,WCAP-14135 & WCAP-141381998-08-26026 August 1998 Provides Revised Response to NRC Ltr Re W Requests for Withholding Info Re AP600 PCS Final Data rept,WCAP-14135 & WCAP-14138 NSD-NRC-98-5776, Forwards Proprietary Revised Response to Ref NRC Ltr Re W Requests for Withholding Info Re AP600 Design Certification Test Program,Notrump Computer Code,Wcobra/Trac Computer Code & Loftran Computer Code.Proprietary Info Withheld1998-08-26026 August 1998 Forwards Proprietary Revised Response to Ref NRC Ltr Re W Requests for Withholding Info Re AP600 Design Certification Test Program,Notrump Computer Code,Wcobra/Trac Computer Code & Loftran Computer Code.Proprietary Info Withheld ML20237E0731998-08-26026 August 1998 Advises That Info in WCAP-14812,revs 1 & 2, Accident Spec & Phenomena Evaluation for AP600 PCS, Will Be Withheld from Public Disclosure ML20238F8031998-08-26026 August 1998 Requests That Proprietary W Revised Response to NRC Ltrs Re Requests for Withholding Info,Be Withheld from Public Disclosure IAW 10CFR2.790 NSD-NRC-98-5774, Informs That W Faxed Last Response Re Afser Open Item 1.1-1 to NRC on 980821.Last of Attachments Supporting Several of Responses Faxed to NRC Over Past Several Days Were Express Mailed to NRC on 980821.Responses Close Subject Open It1998-08-24024 August 1998 Informs That W Faxed Last Response Re Afser Open Item 1.1-1 to NRC on 980821.Last of Attachments Supporting Several of Responses Faxed to NRC Over Past Several Days Were Express Mailed to NRC on 980821.Responses Close Subject Open Item NSD-NRC-98-5773, Responds to Questions Raised in NRC 971022 & s Re Proprietary Info Contained in 970930 Summary of Meeting Held on 970804-15 Concerning Structural Design of AP600.Figure 12-24 of WCAP-14407 Still Considered Proprietary by W1998-08-21021 August 1998 Responds to Questions Raised in NRC 971022 & s Re Proprietary Info Contained in 970930 Summary of Meeting Held on 970804-15 Concerning Structural Design of AP600.Figure 12-24 of WCAP-14407 Still Considered Proprietary by W ML20237E7991998-08-21021 August 1998 Forwards non-proprietary Results of AP600 Design Assurance Review (Dar) That Was Commitment in W Response to NRC Insp Rept 99900404/97-02.Info Should Assist in Closing Nonconformances & Unresolved Item Identified in Insp Rept NSD-NRC-98-5771, Forwards non-proprietary Rev 2 to WCAP-14138, Final Data Rept for PCS Large-Scale Tests,Phase 2 & Phase 3. Submittal Satisfies Verbal Commitment to Revise non-proprietary Version of PCS Final Data Rept Made by W1998-08-21021 August 1998 Forwards non-proprietary Rev 2 to WCAP-14138, Final Data Rept for PCS Large-Scale Tests,Phase 2 & Phase 3. Submittal Satisfies Verbal Commitment to Revise non-proprietary Version of PCS Final Data Rept Made by W NSD-NRC-98-5769, Responds to NRC Ref Ltrs Re W Requests for Withholding Info. Info Provided as Proprietary in Ref 1 Has Either Been Moved from Ssar to Ref 3,which Includes non-proprietary Version of Rept or Made non-proprietary in Current Version of1998-08-21021 August 1998 Responds to NRC Ref Ltrs Re W Requests for Withholding Info. Info Provided as Proprietary in Ref 1 Has Either Been Moved from Ssar to Ref 3,which Includes non-proprietary Version of Rept or Made non-proprietary in Current Version of Ssar NSD-NRC-98-5772, Forwards non-proprietary & Proprietary Info in Response to NRC Ltrs Re W Requests for Withholding Info.Separate Ltr & Affidavit Justifying Proprietary Nature of Info,Encl. Proprietary Info Withheld,Per 10CFR2.7901998-08-21021 August 1998 Forwards non-proprietary & Proprietary Info in Response to NRC Ltrs Re W Requests for Withholding Info.Separate Ltr & Affidavit Justifying Proprietary Nature of Info,Encl. Proprietary Info Withheld,Per 10CFR2.790 1999-09-29
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20207G5411999-06-0808 June 1999 Discusses Request Made by Westinghouse on 981109 That Proprietary WCAP-14252,Rev 1,be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20195D5201999-06-0404 June 1999 Discusses Westinghouse Request That Change Pages Submitted on 980921 to WCAP-14292 Be Withheld from Public Disclosure. Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20196G2431999-05-21021 May 1999 Informs That USNRC Has Published in Fr Encl Notice of Proposed Rulemaking Re AP600 Design Certification Rule. Rulemaking Allows Applicants or Licensees to Construct AP600 Std Plant Design by Referencing Design Certification Rule ML20206G5411999-05-0505 May 1999 Forwards Draft Environ Assessment Re Proposed Certification of AP600 Std Plant Design.Environ Assessment Will Be Used as Basis for NRC Finding of No Significant Environ Impact Resulting from Certification of AP600 Design ML20205J3351999-04-0707 April 1999 Informs That USNRC Staff Has Completed Review of Rev 2 of AP600 Design Control Document,Verified That All of Changes in Rev 2 Are Acceptable & Determined That AP600 Dcd,Rev 2, Can Now Be Used in Proposed Design Certification Rule ML20199H8671999-01-20020 January 1999 Forwards Comments on AP600 Design Control Document,Submitted by Westinghouse ML20199B1121999-01-0707 January 1999 Advises That Info Contained in NSRA-APSL-92-0268 & Containing Presentation Matl Used in 921209-10 Meeting,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20198B4601998-12-14014 December 1998 Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned ML20155G9021998-11-0303 November 1998 Advises That Info Contained in 981012 ltr,NSD-NRC-98-5795, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) & Section 103(b) of AEA of 1954,as Amended ML20155G7591998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design,Per Discussion at Sept 1997 Meeting.Staff Completed & Issued Final Design Approval of FSER on 980903.Without Encl ML20155G9271998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design.Staff Completed Review of Design & Issued Final Design Approval & FSER on 980903.Without Encl ML20154A4091998-09-29029 September 1998 Advises That Certain Info Contained in Westinghouse Ltr NTD-NRC-95-4506,dtd 950713,submitting WCAP-14425,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Figure 3-1 Will Be Placed Into Public Record ML20153G2521998-09-25025 September 1998 Advises That Proprietary Matl Discovered by NRC in NSD-NRC-97-4966 & Proprietary Matl Noted by W in NSD-NRC-98-5772 Will Be Withhheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151X4381998-09-15015 September 1998 Informs That Staff Has Decided to Accept Claim That Info in WCAP-14135,Rev 1 Is Proprietary & Will Be Withheld from Public Disclosure,Per W 980821 & 26 Ltrs ML20153C1001998-09-15015 September 1998 Advises That Matls Re AP600 Notrump Final Validation Rept, WCAP-14807,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20151X4041998-09-11011 September 1998 Discusses Revised Tier 2 Info for AP600 Design.Staff Revised Decision on Whether Fire Protection Should Expire at First Full Power Encl ML20151V1711998-09-0808 September 1998 Advises That Info Re Westinghouse AP600 Std Safety Analysis Rept Through Rev 4 & PRA Through Rev 5 Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Disposition of Ssar & PRA Proprietary Info Encl ML20151V2231998-09-0808 September 1998 Informs That NRC Determined That WCAP-14132 Encl in Westinghouse Ltr NTD-NRC-94-4244,dtd 940729 & Marked as Proprietary,Will Be Withheld from Public Disclosure,Per to 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151S9181998-09-0303 September 1998 Advises That Info Marked as Proprietary Re Westinghouse AP600 Design Ltrs Concerning Pxs Scaling & Pirt Closure Rept WCAP-14727,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20239A3111998-09-0303 September 1998 Forwards Final SER Which Summarizes Staff Safety Review of AP600 Design Against Requirements of Subpart B of 10CF5R52 & Delineates Scope of Technical Details Considered in Evaluating Proposed Design ML20239A1481998-09-0303 September 1998 Forwards Notice of Issuance of Final Design Approval & Final SER for AP600.FDA Allows AP600 Design to Be Referenced in Application for Construction Permit or Operating License Under 10CFR50 or Application for Combined License ML20151V8521998-09-0101 September 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20151V2201998-08-31031 August 1998 Informs That EPRI Documents, GOTHIC Containment Analysis Package Qualification Rept, GOTHIC Containment Analysis Qualification Manual, & Listed Documents Dtd Sept 1993 Will Be Withheld from Public Disclosure ML20151V8431998-08-31031 August 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20238F5991998-08-31031 August 1998 Refers to W 980821 Revised Response to Insp Rept 99900404/97-01 That Contained All Substantive Info Provided w/DCP/NRC-1074 Ltr.Nrc Will Destroy DCP/NRC-1074,as Requested ML20238F3241998-08-31031 August 1998 Advises That AP600 RAI Responses Encl in Westinghouse Ltrs NTD-NRC-95-4598,dtd 951117,as Modified by NSD-NRC-98-5776, Dtd 980826,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20237E4421998-08-27027 August 1998 Advises That Info Contained in Ltr DCP/NRC-0985,dtd 970821, Sought to Be Withheld,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20237E0731998-08-26026 August 1998 Advises That Info in WCAP-14812,revs 1 & 2, Accident Spec & Phenomena Evaluation for AP600 PCS, Will Be Withheld from Public Disclosure ML20237C4801998-08-20020 August 1998 Informs That Staff Will Withhold from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended, Presentation Matl from 970212-14 ACRS Meeting Encl in W Ltr NSD-NRC-98-5744 Dtd 980803,until Policy Matter,Clarified ML20237D4391998-08-18018 August 1998 Confirms Phone Conversation Between NRC & W Re Submittal of Final Portions of Documentation Necessary to Complete Review & Issue Final SER & Final Design Approval for AP600 ML20236V6671998-07-30030 July 1998 Advises That Info Contained in WCAP-14601,rev 2,submitted in Westinghouse Ltr NSD-NRC-98-5712,dtd 980616 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20236V8621998-07-30030 July 1998 Informs That Proprietary Info Encl in Westinghouse Ltr NSD-NRC-98-5736,dtd 980713 Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20236U7811998-07-29029 July 1998 Advises That WCAP-14270,rev 1, AP600 LP Integral Sys Test Facility Scaling Rept, Encl in Ltr NSD-NRC-98-5718,dtd 980619 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20236U7831998-07-29029 July 1998 Informs That Certain Info in AP600 Ssar,If Proposed for Change That Refs AP600 Std Design,Will Require Prior NRC Approval Before Proposed Change Can Be Implemented.Tier 2* Info for AP600 Design & Staff Decision Encl ML20236U8131998-07-29029 July 1998 Advises That WCAP-14471,rev 0, Steam Condensation Events at Osu AP600 Facility Submitted in Ltr NSD-NRC-96-4661,dtd 960306 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20236V0511998-07-29029 July 1998 Informs That AP600 Boron Dilution Transient Analysis Encl in Westinghouse Ltrs NSD-NRC-96-4792,dtd 960808 & NSD-NRC-98-5739,dtd 980720 & Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790 ML20236V0411998-07-28028 July 1998 Discusses Return of Proprietary Matl to Westinghouse Docketed Under AP600 Design Review.Proprietary Documents Listed in Encl 1 Removed from AP600 File & Returned for Disposition or Retention ML20236T3101998-07-22022 July 1998 Discusses W 941031 Submittal by Ltr (NTD-NRC-94-4330) of AP600 Notrump Core Makeup Tank Preliminary Validation Rept & Requests That Info Be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld from Public ML20236T4091998-07-22022 July 1998 Informs That Info Related to Wgothic lumped-parameter & Distributed Parameter Nodalization of AP600 & Wgothic Heat Sink & Flow Path Description Including Areas,Thickness & Evaluations Will Be Withheld,Per 10CFR2.790(b)(5) & 103(b) ML20236T1691998-07-22022 July 1998 Advises That Proprietary Matl Encl in NSD-NRC-96-4700,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)5) & Section 103(b) of AEA of 1954,as Amended ML20236T1361998-07-22022 July 1998 Advises That Info Contained in TRs WCAP-12945-P-A & WCAP-14747,respectively Submitted in Ltr NTD-NRC-95-4406, Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954,as Amended ML20236T0591998-07-22022 July 1998 Informs That Staff Plans to Return NSD-NRC-96-4762, NSD-NRC-96-4763,NSD-NRC-96-4790,... Transmittals to Westinghouse W/O Proprietary Determination,Due to Info Being Provided in Documents Submitted at Later Date ML20236S9841998-07-22022 July 1998 Informs That Staff Plans to Return NSD-NRC-94-4246, NSD-NRC-94-4327 & NSD-NRC-94-4318 Transmittals to Westinghouse W/O Proprietarty Determination,Due to Info Being Provided in Documents Submitted at Later Date ML20236S9621998-07-22022 July 1998 Advises That Info in NSD-NRC-97-5424 on AP600 Passive Containment Cooling Sys Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20236S9321998-07-22022 July 1998 Advises That Info in on AP600 Large Scale Test Facility Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20236S9131998-07-22022 July 1998 Informs That WCAP-14776 (Rev 2) Encl in Westinghouse Ltr NSD-NRC-97-5202,dtd 970620 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1601998-07-22022 July 1998 Informs That Encl Table,Associated W/Westinghouse AP600 Ltrs,Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1511998-07-22022 July 1998 Informs That Matl Encl in NTD-NRC-94-4215 & NTD-NRC-95-4436, Marked as Proprietary,Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1431998-07-22022 July 1998 Informs That Encl Table Associated W/Westinghouse AP600 Design Ltrs Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1321998-07-22022 July 1998 Informs That Matls Documented in Encl Table,Associated W/Westinghouse AP600 WCAPs Submitted in Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended 1999-06-08
[Table view] |
Text
_ _ - _ _ _ . - . _ ._ - - - - - - - ~ ~
~~p;-Q~
^
fuogk 3 2 4 8.3 l p UNITED STATES !
~
'j g NUCLEAR REQULATORY COMMISSION WAsHINuTON, D.C. sese6-coM December 4, 1997 k*.... '
Mr. Nicholas J. Liparuk, Manager '
, Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation t
P.O. Box 355 Pittsburgh, PA 15230
SUBJECT:
OPEN ITEMS ASSOCIATED WITH CHAPTER 3.2 OF THE AP600 SAFETY EVAf.UATIOh' itEPORT (SER)
Dear Mr,
' Liparulo:
9 The Civil Engineering and Geosciences Branch (ECGB) of the Division of Engineering has provided an SER for Chapter 3.2. However, the SER contained some open items. These open items have been extracted from the SER and can been found in the enclosure to this letter, in addition, the staff has previously identified an open item relative to the quality group classifica-
+
tion of a portion of the Chemical and Control System inside containment. This issue was ;
identified as Open item 230.140F in a letter to Westinghouse dated October 16,1997. Although ~
this item will be discussed in Section 5.2.1.1 of the SER, resolution of the item is also needed to
- achieve an acceptable conclusion in SER Chapter 3.2. '
4 Ycu have requested that portions of the information submitted in the June 1992, application for design certification be exempt from mandatory public disclosure. While the staff has not .
completed its review of your request in accordance with the requirements of 10 CFR 2.790, that portion of the submitted information is being withheld from pub!ic disclosure pending the staff's final determination. The staff concludes that these follow on questions do not contain those portions of the information for which exemption is sought. However, the staff will withhold this letter from public disclosure for 30 calendar days from the date of this letter to allow Wes'ing-house the opportunity to verify the staffs conclusions, if, after that time, you do not request that all or portions of the information in the enclosures be withheld from public disclosure in accor-dance with 10 CFR 2.790, this letter will be placed in the Nuclear Regulatory Commission Public Document Room.
4 NRC RECErgs enmr 9901200167 971204 PDR ADOCK 05200003 E- _
PDR
l
)
l g., i!
d Mr. Nicholas J. Liparulo 2- December 4, 1997 ,
9
' H Ji - if you have any questions regarding this matter, you may contact me at (301) 415-1132.-
Sincerely, q l
1
- original signed by: }
-t Joseph M. Sebrosky, Project Manager -
Standardization Project Directorate i Division of Reactor Prowam Management i Office of Nuclear Reactor Regulation "
J l
Docket No.52-003 w
Enclosure:
As stated J
cc w/ encl: See next page DISTRIBUTION:
- Enclosure to be bold for 30 days
- Docket File PDST R/F TQuay )
- PUBLIC TKenyon WHuffman l JSebrosky. DScaletti JNWilson WDean,0-5 E23 ACRS (11) JMoore,0-15 B18 HBrammer,0-7 H15 DOCUMENT NAME: A: ECGB_32.RAI To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure E" = Copy iwith cttachment/ enclosure "N" = No copy l:
OFFICE - PM:PDST:DRPM i ECGB:DE lE D:PDST:CRPM ] l s NAME JSebrosky'sg ,PfYJ HBrammer'///6' TQuayM DATE's 1219/97 (/ 12/3 /97 12/4 /W// JOR OFFICIAL RECORD COPY
- w ,
ii r.
3 e
k ,.d-2 m :
k h. ' .Y
2
,, -:j
+3 41 ,y. ._. , . . , . _
)
Mr. Nmholas J. Liparuto Docket No.52-003 i Westinghouse Electric Corporation AP600 cc: Mr. B. A. McIntyre Ms. Cindy L. Maag - !
Advanced Plant Safety & Licensing Advanced Plant Safety & Licensing :*
Westinghouse Electric Corporation Westinghouse Electric Co,poration Energy Systems Business Unit Energy Systems Business Unit :
- P.O. Box 35f Box 355
- Pittsburgh, P 15230 Pittsburgh, PA 15230 [
Enclosure to be dis . 'ded to the following addressees after the result of the proprieta;y evaluation is received tro., Westinghouse:
Mr. Russ Bell Ms. Lynn Connor !
Senior Project Manager, Programs DOC-Search Associates ,
Nuclear Energy institute- Post Office Box 34 1776 i Street, NW Cabin John, MD 20D18 l Suite 300 t Washington, DC 20006 3706 Mr. Rob, t H. Bechholz GE Nuclear Energy -
Dr. Craig D. Sawyer, Manager 175 Curtner Avenue, MC-781 Advanced Reactor Programs San Jose, CA 95125 GE Nuclear Energy 175 Curtner Avenue, MC 754 Mr. Stor~ g Franks i San Jose, CA 95125 U.S. Department of Energy NE 50 Barton Z. Cowan, Esq. 19901 Germantown Road Eckert Seamans Cherin & Mellott Germantown, MD 20874 600 Grant Street 42nd Floor s Pittsburgh, PA 15219 Mr. (.harles Thompson, Nuclear Engineer !
AP600 Certification Mr. Frank A. Ross NE 50 U.S. Department of Energy, NE-42 19901 Germantown Road .
Office of LWR Safety and Technology Germantown, MD 20874 4
19901 Germantown Road Germantown, MD 20874 Mr. Ed Rodwell, Manager PWR Design Certification - ,
Electric Power Research Institute 3412 Hillview As enue t Palo Alto, CA 94303 d
t
. y 7
9
} .
i
_ ,- _.a.,_..___ a.,._ .- _ -. . . . _ - . _ _ . .
I
< i Open hems Associated with Chapter 3.2 210.234F Open Hem from Section 3.2.1 Solamic Classification l
i
, Positions C.1 and C.4 in RG 1.29 state that the pertinent quality assurance requirements of Appenduc B to 10 CFR Part 50 should be applied to all activities affecting the safety-related ,
functions of (1) all Seismic Category I 88Cs, and (2) those portions of SSCs covered under Posibons C.2 and C.3. Sections 3.2.2.3,3.2.2.4, and 3.2.2.5, and Table 3.21 of the 88AR state that 10 CFR 50, Appendix 5 applies to all AP600 Equipment Class A, B, and C (A8ME Class 1, ,
2, and 3), SSCs, which are all classified as Seismic Catopory 1. The staff concdudes that this is en acceptable commitment to Hem (1) above. However, the 88AR does not appear to address item (2). To satisfy Position C.4 in RG 1.29, the pertinent quality assurance roedroments of Appendix B to 10 CFR Part 50 should be applied to all Seismic category ll 88Cs. A cr,mmitment to this effec; should be added to Section 3.2.1.1.2 and Table 3.2-1 of th) 88AR. This was DSER r Open hem 3.2.1 1. In a telephone conferonos call on August 21,19g7, Westinghouse agreed to submit their response to this issue. Therefore, pendinc submittal of an acceptable response in the SSAR, Open hem 3.2.1 1 remains open. .
210.235F Open item from Section 3.2.2 Quality Group Classification :
The staff's review of the information in Section 3.2.2, Table 3.21, Table 3.2 3, and app;icable P&lDs of the bSAR has concluded that Quality Group classifications for the majority of the AP600 SSCs are consistent with the guidelines in RG 1.26, and are, therefore, acceptable. The status of one remaining unresolved DSER open item is discussed below.
e Safety Classificatio, of Passive Core Cooling System (PXS)
Section 3.2.2.5, Table 3.2 3, and P&lDe in Figures 6.3-1 and 6.3-2 of the SSAR collectively identify the following portions of the PXS as AP600 Class C (QG C and ASME Class 3):
e ti.e accumulators and vesselinjection piping system up to the ASME Class 1 check valves; e the vessel injection piping system from the in containment refueling water storage tank (IRWST) to the ASME Class 1 check valves; and a the injection piping system from the containment sump to the vessel injection piping coming from the IRWST.
All of the above systems and components perform an emergency core cooling function i following postulated design basis events. RG 1.26 recommends that such systems be classified as QG B (ASME Class 2), in the December 22,1992 and June 27,1994 responsta to G210.1 and 210.29 respectively, Westinghouse stated that the basis for ;
classifying these systems and components as QG C is that: t e QG C is essentially equivalent to QG B, except that it has less stringent construction .
inspection and inservice inspection rules; Enclosure
- - - - . - -._L ~. , r,--l~,. - ._,_i...-__,.,,c...,.,,_---_ - , , . ., ,La-a,,.-e, ,,.n + n, ,,,-,,,,-,e.i .,_.n r,-- ,
4
. 2- ,
e - all of these systems and components are located inside containment, therefore, activity releases are contained; e minor leakage does not affect the functional performance of these systems and f components; e there is contkvsous water level monitoring of the accumulators and IRWST that detects leaks; and 1
After evaluating the four items above, the staff concluded that the classifications of the PXS and components identified in the first paragraph above can satisfy the guidelines in RO 1.26 if the QG C classification remains and a commitment is made in the 63/,R that, during construction, portions of these systems will be Inspected to ASME Class 2 (QG 2) tulos. The basis for this staff position is that the enhanced quality of the items inspected to ASME Class 2 rules is sufficient to satisfy the guidelines of RG 1.26, ..nd the features described in the first four items above are sufficient to allow the less stringent in service inspection rules of ASME Class 3 (QG C). This was DSER Open item 3.2.21. In a meeting on July 25,1995, Westinghouse proposed to resolve this issue by revising SSAR Subsection 3.2.2.5 to state that for AP600 Class 3 lines that provide an ECCS function, the welds will be required to be spot radiographed. The staff has determined that this commitment will result in a piping system whose construction is somewhat enhanced.
However, the staff believes that the weld quality for ECCS needs to be consistent with the systems safety functions. Therefore, the butt welds in ECCS piping should be examined in accordance with the rules of ASME Section ill, ND-5222, using only the full radiography option. The commitment to fully radiograph welds is made in SSAR Section 3.6.3 2 for the ASME Class 3 accumulator discharge piping as a part of the staff's evaluatica of the leak before break issne. This is discussed in Gection 3.6.3.5 of this chapter. Therefore, the staff's position is that in order to provide reasonable assurance that the affected systems will perform their safety function when required, SSAR Section 3.2.2.5 should be revised to provide a similar commitment for the remaining of the ECCS welds in the !
systems that are listed in Section 3.2.2.5. Therefore, DSER Open item 3.2.2-1 remains open.
k P