Confirms Phone Conversation Between NRC & W Re Submittal of Final Portions of Documentation Necessary to Complete Review & Issue Final SER & Final Design Approval for AP600
ML20237D439
Person / Time
Site: 05200003
Issue date: 08/18/1998
From: Collins S
NRC (Affiliation Not Assigned)
To: Cummings W
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9808260185
Download: ML20237D439 (4)


Text

-

August 18, 1998-Mr. W. E. Cummings, General Manager New Plant Projects Division -

Energy Systems Business Unit.

i Westinghouse Electric Company

{

P.O. Box 355 l

Pittsburgh, Pennsylvania 15230-0355 l

SUBJECT:

COMPLETION OF THE AP600 REVIEW

Dear Mr. Cummins:

This letter is to. confirm the phone conversation between Westinghouse and the NRC regarding the submittal of the final portions of documentation necessary for the NRC to complete its review and issue its Final Safety Evaluation Report and the Final Design Approval for the AP600. Mr. Vijuk and Mr. McIntyre represented Westinghouse on the phone call. Mr. Quay and I represented the NRC.

'Your letter of August 11,1998, indicated that the Final Design Approval (FDA) is needed by Westinghouse very early in September 1998 so that Westinghouse can submit a viable proposal to Hungary for the Paks nuclear station. The phone call discussed the schedule and status of key

. AP600 submittals need to support granting an FDA as requested. The submittal dates were listed in the attached fax sent to the NRC on August 11,1998. The dates listed reflected extensive

- discussions with NRC the previous day. I want to emphasize that these dates must be met in order i

for the NRC to meet Westinghouse's request for an expedited FDA.

Sincerely, l

original signed by:

Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No.52-003

Enclosure:

As stated

{f: [:] ({((h[

cc: See next page

\\

i DISTRIBUTION-Docket File' PDST R/F SCollins/FMiraglia,0-5 E7 S

PUBLIC LCallan,0-16 E15 JRoe

'O i

DMathews t; g TQuay

.TKenyon-L WHuffman

. JSebrosky DScaletti JNWilson DOCUMENT NAME: A:AP600 TLC. SUM Te secohre e cow of this document,indcote in the bou "C' = Copy without attachmen,enclosur "E* = Copy with attachment / enclosure

'N' = No copy OFFICE D:PDST:DRPM l

D:PDST l

D: $ R / y l l

l NAME TRQuay: TYh JWRoe L

-($/C'oTins I

DATE 3/J198 6 /n/96 G\\'68 9908260185 990819 PDR ADOCK 05200003 A

PDR J

t

' Mr. W. E. Cummins Docket No.52-003 Westinghouse Electric Company AP600 cc:

Mr. H. A. Sepp Mr. Russ Bell -

Advanced Plant Safety & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 i Street, NW P.O. Box 355.

Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Mr. B. A. McIntyre Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34

. Energy Systems Business Unit Cabin John, MD 20818 P.O. Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs i

Mr. Sterling Franks GE Nuclear Energy U.S. Department of Energy 175 Curtner Avenue, MC-754 NE-50 San Jose, CA 95125 19901 Germantown Road Germantown, MD 20874 Mr. Robert H. Buchholz GE Nuclear Energy Mr. Frank A. Ross 175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42 San Jose, CA 95125 Office of LWR Safety and Technology.

19901 Germantown Road Barton Z. Cowan, Esq.

L Germantown, MD 20874 Eckert Seamans Cherin & Mellott 600 Grant Efreet 42nd Floor Mr. Charles Thompson, Nuclear Engineer Pittsburgh, PA 15219 AP600 Certification NE-50 Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Electric Power Research Institute 3412 Hillview Avenue Mr. Robert Maiers, P.E.

Palo Alto, CA 94303 Pennsylvania Department of Environmental Protection i

Bureau of Radiation Protection l-Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 1

1

's August 11,1998 AP600 FINAL SUBMITTAL STATUS SSAR, REVISION 24 Shipped to the NRC on Friday, August 7. Incorporates staff comments and ITAAC dnven changes.

SSAR REVISION 25 Based on staff comments received by COB Friday, August 14,1998 on Revision 24 Revision 25 will be provided to the staff on Wednesday, August 19,1998 TIER 1, REVISION 6 Delivered to One White Flint on Monday, August 3. Editonal comments received from staff August 3,4,5 and 11. Due to physical relocation of several NRC branches, not all comments

- have been received. but are expected by COB, Wednesday, August 12,1998. Revision 7 can be provided by Friday, August 14,1998 provided the comments received continue to be editorial. Revision 7 contains eighteen pages at this time.

PRA, REVISION 12 1

{

Provided to staff, July 24,1998. Three comments received from staff, two of which required a change to the document. Revision 13 will be shipped by Thursday, August 13,1998

)

incorporating these final staff comments. Revision 13 contains 3 pages.

. WCAP 14807, "NOTRUMP Final Validation Report for AP600" in response to an ACRS comment, Westinghouse agreed to correct two equations in Section 1.7. We also agreed to revise Table 1.17-1 to reflect NOTRUMP model limitations. These changes are in production and will be provided to the staff by Thursday, August 13,1998.

SECURITY DESIGN DISCUSSIONS Revision 6 to the Security Design Report and revision 3 of the Secunty Design Vulnerability analysis were provided to the staff on June 30.1998. The changes to these reports and the plant design were in response to ACRS concerns raised in their Second Interim Letter of May 27,1998 and discussed with the Committee dunng their meeting on June 17-18. Two telephone calls have been held with the PSGB reviewer, including one on August 7, and his issues have been addressed The reviewer's next availability window is August 13-14, 1998.

c'49BAM wPP/ August 12,1998 l

1

~

'; 0 0 LOO *390d 10101 **

j i

Revisions to the Security Design Report and Security Design Vulnerability Analysis have been l

l express mailed to the NRC and should be received on August 12,1998, which supports the reviewer's schedule.

WESTINGHOUSE RESPONSES TO STAFF NEGATIVE PROPRIETARY EVALUATIONS A large number of proprietary evaluations covering the time penod February 14,1992 to May 5.1998 have been received over the past several months, the most recent on July 21. These evaluations are being processed. As a result of discussions with NRC management.

Westinghouse will provide proper proprietary documentation for the, proprietary material supporting the AP600 design certification review by August 21,1998. The responses will be provided as they are developed. Providing the nonproprietary docuinents will not constrain issuing the AP600 FSER or FDA.

l i

i I

l 0749B AM WPF/Auguu 12.1995