U-600304, Forwards Preliminary Analysis of Clinton Power Station Hydrogen Control Sys

From kanterella
(Redirected from ML20198B702)
Jump to navigation Jump to search
Forwards Preliminary Analysis of Clinton Power Station Hydrogen Control Sys
ML20198B702
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/04/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20198B707 List:
References
U-600304, NUDOCS 8511070172
Download: ML20198B702 (1)


Text

U- 600304 N88-85 (11 -04 )-L 1A.120

~

/LLIN0/S POWER 00MPANY IP CLINTON POWIR STATION P.o. BOX 678. CLINTON. ILLINOIS 61727 November 4, 1985 Docket No. 50-461 Mr. Harold R. Denton, Director Office of Nucicar Reactor Regulation U.S. Nucicar Regulatory Commission Washington, DC 20555

Subject:

Clinton Power Station Unit 1 Hydrogen Control, License Condition #5 Preliminary Analysis

Dear Mr. Denton:

In accordance with the requirements of 10CFR50.44(c)(3)(vii)(B), '

Illinois Power Company (IP) hereby submits the attached preliminary analysis of the adequacy of the Clinton Power Station (CPS) system for -

control of hydrogen. IP believes that this analysis provides a satisfactory basis for an NRC staff determination that CPS is safe to operate at full power.

IP looks forward to meeting with appropriate NRC reviewers to discuss this analysis at your earliest convenience.

Sincerely yours, _,

f' F.A.Sfangebrg Manager - Licensing and Safety KAB/cke ,

i' Attachment cc: B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III, USNRC 7 Illinois Department of Nuclear Safety CO 3, ' D l A