Category:INSPECTION REPORT
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint ML20202H7541998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20199A3941997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970141997-10-14014 October 1997 Insp Rept 50-461/97-14 on 970524-0707.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring ML20151K0191997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure 1999-08-19
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint ML20202H7541998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20199A3941997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970141997-10-14014 October 1997 Insp Rept 50-461/97-14 on 970524-0707.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring ML20151K0191997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure 1999-08-19
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint ML20202H7541998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20199A3941997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970141997-10-14014 October 1997 Insp Rept 50-461/97-14 on 970524-0707.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring ML20151K0191997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure 1999-08-19
[Table view] Category:UTILITY
MONTHYEARIR 05000461/19900221990-11-0202 November 1990 Insp Rept 50-461/90-22 on 901015-19.Violation Noted But Not Cited.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage ML20058A7541990-10-18018 October 1990 Insp Rept 50-461/90-20 on 900924-28.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & QA & QC Programs in Labs IR 05000461/19900151990-08-0303 August 1990 Insp Rept 50-461/90-15 on 900723-27.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Involving Followup on Licensee Actions on Previously Identified Items IR 05000461/19900111990-07-25025 July 1990 Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings IR 05000461/19890281989-10-0404 October 1989 Insp Rept 50-461/89-28 on 890911-15.Violations Noted.Major Areas Inspected:Fire Protection Program,Including Review of Fire Protection Organization,Administrative Controls & Fire Protection Sys Surveillance Test Program IR 05000461/19890251989-08-18018 August 1989 Partially Withheld Physical Security Insp & Allegation Review Rept 50-461/89-25 on 890717-0802 (Ref 10CFR 73.21). Violations Noted.Major Areas Inspected:Security Program Mgt Effectiveness & Review of Allegations IR 05000461/19890241989-08-17017 August 1989 Insp Repts 50-461/89-24 on 890801-04.No Violations Noted. Major Areas Inspected:Radiological Protecction,Radwaste & Transportation Programs Including,Aspects of Licensee Operational Radiation Protection IR 05000461/19890221989-07-27027 July 1989 Insp Rept 50-461/89-22 on 890619-0721.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing Activities Subsequent to Initial Refueling Outage,Areas of Core Performance & Nuclear Engineering IR 05000461/19890181989-07-18018 July 1989 Safety Insp Rept 50-461/89-18 on 890512-0707.Violations Noted.Major Areas Inspected:Previous Insp Findings,Onsite Followup of Written Repts,Allegation Followup,Operational Safety Verification & Monthly Maint Observation IR 05000461/19890211989-07-14014 July 1989 Insp Rept 50-461/89-21 on 890601-23.Violation Noted.Major Areas Inspected:Failure of Reactor Recirculation Pump B Seals & Subsequent Equipment Problems Which Occurred on 890601.Several Weaknesses Identified IR 05000461/19890201989-07-12012 July 1989 Insp Rept 50-461/89-20 on 890627-29.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise & Evaluation of 890601 Emergency Plan Activation IR 05000461/19890191989-06-23023 June 1989 Partially Withheld Safeguards Insp Rept 50-461/89-19 on 890206 & 0522-0607 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers, Access Control - Personnel,Packages & Vehicles & Testing IR 05000461/19890231989-06-21021 June 1989 Enforcement Conference Rept 50-461/89-23 on 890614.Matters Discussed:Apparent Violation of 10CFR50.49,Paragraphs (F) & (G) Re Hydrogen Igniter Field Connections,Instrument Circuits Landed on Terminal Blocks in GE Instrument Racks IR 05000461/19890161989-06-14014 June 1989 Safety Insp Rept 50-461/89-16 on 890227-0303 & 890316-17.No Violations Noted.Major Areas Inspected:Followup on Allegation RIII-87-A-0027,involving Containment Integrity & Inservice Testing Program IR 05000461/19890141989-06-0808 June 1989 Insp Rept 50-461/89-14 on 890316-0530.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Regional Request,Nrc Compliance Bulletin & Generic Ltr Followup & Monthly Maint Observation IR 05000461/19890171989-05-19019 May 1989 Insp Rept 50-461/89-17 on 890403-27.No Violations Noted. Major Areas Inspected:Field Alterations & Plant Mods & Dedication of commercial-grade Equipment for safety-related Applications IR 05000461/19890031989-05-10010 May 1989 Insp Rept 50-461/89-03 on 890123-26,0227-28 & 0313-0407. Violation Noted.Major Areas Inspected:Maint,Support of Maint & Related Mgt Activities IR 05000461/19890121989-04-14014 April 1989 Insp Rept 50-461/89-12 on 890301-03 & 31.No Violations or Deviations Noted.Major Areas Inspected:Verification That SSER6 Required Remote Shutdown Sys Mods Installed Prior to Startup from First Refueling IR 05000461/19890081989-04-0505 April 1989 Insp Rept 50-461/89-08 on 890127-0316.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Followup of Info Notices & Regional Requests,Refueling Activities & Operational Safety Verification IR 05000461/19890131989-04-0404 April 1989 Insp Rept 50-461/89-13 on 890308-21.No Violations Noted. Major Areas Inspected:Allegation & Associated Issue Re Staffing Provisions for Emergency Response Organization at Plant IR 05000461/19890051989-04-0303 April 1989 Insp Rept 50-461/89-05 on 890119-0323.No Violations Noted. Major Areas Inspected:Review of Programs,Procedures, Observation of Work Activities,Data Review,Mod Activities & Licensee Action on Info Notice 88-003 IR 05000461/19890151989-03-28028 March 1989 Enforcement Conference Rept 50-461/89-15 on 890321.Matters Discussed:Apparent Violation Re Inadequate Licensee Action to Correct & Prevent Recurrence of Previously Identified Environ Qualification Deficiencies ML20236D6511989-03-16016 March 1989 Safety Insp Rept 50-461/89-06 on 890206-0303.Violation Noted:Failure to Perform Adquate Corrective Action on Kynar Butt Splices & Junction Boxes.Major Areas Inspected:Lers,Reg Guide 1.97 Commitments & Torque Switches IR 05000461/19890041989-03-10010 March 1989 Insp Rept 50-461/89-04 on 890103-06,10-20 & 0224.No Violations Noted.Major Areas inspected:fitness-for-duty Issue Involving Senior Manager,Including Adherence W/Licensee Procedures in Determining If Employee Fit IR 05000461/19880301989-02-15015 February 1989 Safety Insp Rept 50-461/88-30 on 881206-890127.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Info Notices & Preparation for Refueling & Refueling Activities IR 05000461/19880251988-10-21021 October 1988 Insp Rept 50-461/88-25 on 880926-1014.No Violations or Deviations Noted.Weaknesses Noted Re Training for non-operating Personnel Performing safety-related Activities.Major Areas Inspected:Generic Ltr 83-28 IR 05000461/19880261988-10-19019 October 1988 Insp Rept 50-461/88-26 on 880926-30.Violations Noted. Major Areas Inspected:Radiological Protection & Radwaste Mgt Programs,Including Organization & Mgt Controls,Internal Exposure Controls & Control of Radioactive Matls IR 05000461/19880201988-10-18018 October 1988 Insp Rept 50-461/88-20 on 880727-28 & 1018.Violations Noted. Major Areas Inspected:Followup on Allegation RIII-87-A-0027 IR 05000461/19880241988-10-0606 October 1988 Insp Rept 50-461/88-24 on 880114-16 & 19-20.No Violations Noted.Major Areas Inspected:Chemistry & Environ Radiological Monitoring Programs,Qa Program,Audits & Appraisals & Changes in Organization IR 05000461/19880211988-09-16016 September 1988 Safety Insp Rept 50-461/88-21 on 880810-0906.Violations Noted.Major Areas Inspected:Onsite Followup of Written Repts of Nonroutine Events,Operational Safety Verification,Monthly Maint & Surveillance Observation & Training Effectiveness IR 05000461/19880181988-08-30030 August 1988 Insp Rept 50-461/88-18 on 880707-28 & 0810-17.No Violations Noted.Major Areas Inspected:Allegations Made by Former Employees of Util Contractor,Employed During Const of Plant, Indicating That Certain Requirements of ASME Code Violated IR 05000461/19880171988-08-11011 August 1988 Insp Rept 50-461/88-17 on 880712-15.No Violations Noted. Major Areas Inspected:Radiological Protection Program & Related Allegations,Including Organization,Mgt Controls & Staffing & External Exposure Controls IR 05000461/19880191988-08-11011 August 1988 Partially Withheld Physical Security Insp Rept 50-461/88-19 on 880725-29 (Ref 10CFR73.21).Major Areas Inspected:Mgt Effectiveness Security Organization,Records & Repts,Testing & Maint,Keys & Combination & Safeguards Contingency Plan IR 05000461/19880141988-07-29029 July 1988 Insp Rept 50-461/88-14 on 880518-0706.Violations Noted. Major Areas Inspected:Action on Previous findings,10CFR21 Rept Followup,Info Notice Followup,Compliance Bulletin Followup & Operational Safety Verification IR 05000461/19880081988-06-17017 June 1988 Insp Rept 50-461/88-08 on 880424-28.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Emergency Response Facility Appraisal,Reviews of Radioactive Release Assessment & Meteorological Info IR 05000461/19880091988-06-0808 June 1988 Insp Rept 50-461/88-09 on 880404-0518.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings & Onsite Followup of Written Repts of Nonroutine Events at Power Reactor Facilities IR 05000461/19880131988-05-31031 May 1988 Insp Rept 50-461/88-13 on 880427-29 & 0511-13.No Violations or Deviations Noted.Major Areas Inspected:To Determine Compliance W/Atws Rule,10CFR50.62,per Temporary Instruction 2500/20 (Module 25020) IR 05000461/19870271988-05-27027 May 1988 Insp Rept 50-461/87-27 on 870810-880429.No Violations or Deviations Noted.Major Areas Inspected:Followup on Allegation RIII-87-A-027 & Licensee Followup Actions to Violations & Unresolved Item Noted in Previous Insps IR 05000461/19880121988-05-18018 May 1988 Insp Rept 50-461/88-12 on 880425-27.No Violations, Deficiencies,Deviations,Exercise Weaknesses or Open Items Noted.Major Areas Inspected:Emergency Preparedness Exercise of Key Functions & Locations During Exercise IR 05000461/19880071988-05-17017 May 1988 Insp Rept 50-461/88-07 on 880321-0415.No Violations or Deviations Noted.Major Areas Inspected:Quality Verification Activities,Qc,Operations Surveillance & Conduct of Control Operations IR 05000461/19880041988-04-28028 April 1988 Insp Rept 50-461/88-04 on 880217-0404.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Nrc Compliance Bulletin Followup,Operational Safety Verification & Training Effectiveness ML20151S9901988-04-21021 April 1988 Partially Withheld Annual Reactive Insp 50-461/88-11 on 880405-08 (Ref 10CFR73.21).Violation Noted.Apparent Noncompliance Noted.Major Areas Inspected:Review of Licensee Reported Security Event on 880404 IR 05000461/19880061988-04-21021 April 1988 Insp Rept 50-461/88-06 on 880314-18,28-31 & 0406.No Violations Noted.Major Areas Inspected:Mod Process & Associated Quality Verification Process & Followup of Previous Inspector Identified Problems IR 05000461/19880021988-04-13013 April 1988 Insp Rept 50-461/88-02 on 880115-0406.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previously Identified Item & Review of Startup Test Results IR 05000461/19880051988-03-31031 March 1988 Safety Insp Rept 50-461/88-05 on 880224-26.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Program Including,Organization & Mgt Controls,Qualifications & Training,Solid Radwaste & Transportation Activities IR 05000461/19880031988-02-26026 February 1988 Safety Insp Rept 50-461/88-03 on 880111-0217.Violation Noted.Major Areas Inspected:Info Notice & Generic Ltr Followup,Onsite Followup of Written Repts of Nonroutine Events at Power Reactor Facilities & Operational Safety IR 05000461/19870391988-01-24024 January 1988 Insp Rept 50-461/87-39 on 871125-880111.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Ie Bulletin Followup,Operational Safety Verification,Monthly Maint & Surveillance Observations IR 05000461/19870401988-01-0505 January 1988 Insp Rept 50-461/87-40 on 871208-09 & 16.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Available Facility Space & Layout,Communication & NRC Computer Compatibility IR 05000461/19870351987-12-29029 December 1987 Insp Rept 50-461/87-35 on 871005-1120.Violations Noted.Major Areas Inspected:Qa Program Verification,Maint & Followup of Inspector Identified Problems IR 05000461/19870381987-12-22022 December 1987 Partially Withheld Physical Security Insp Rept 50-461/87-38 on 871130-1204 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Plan/Implementing Procedures, Security Organization & Program Audit & Physical Barriers 1990-08-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19983011998-10-0909 October 1998 NRC Operator Licensing Retake Exam Rept 50-461/98-301(OL) Administered to One Applicant Requesting SRO License on 980831-0904.Applicant Passed Operating Retake Exam But Not Issued SRO License to Operate Plant IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20237E6641998-06-0505 June 1998 EN-98-044:informs Commission That NRC Intends to Exercise Enforcement Discretion & Not Issue Citation or Propose Civil Penalty for Four Violations of Maint Rule.Ltr Describing Action Will Be Issued on or About 980612 ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19973131998-03-24024 March 1998 NRC Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205.Exam Results:Exam Was Administered to Two RO & Seven SRO Applicants.Five SRO & Two RO Applicants Passed All Portions of Exam & Two SRO Applicants Failed ML20217D8511998-03-20020 March 1998 EN-98-014:informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.2 of Enforcement Policy & Not Issue NOV to Il Power Co for Several Violations Associated W/Loss of Shutdown Cooling Event on 980213 IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint 1999-09-30
[Table view] |
Inspection Report - Clinton - 1988007 |
---|
|
|
Text
- ._. - _ _ __ - _ _ _ _ - _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ . .__ _ _ _ __ __ _
,. ,; ,
. *
. .
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-461/88007(DRS)
Docket No. 50-461 License No. NPF-62 Licensee: Illinois Power Company 500 South 27th Street Decatur, IL 62525 Facility Name: Clinton Nuclear Power Station, Unit 1 Inspection At: Clinton Site, Clinton, Illinois InsoectionCopucted: March 21 through April 15, 1988 Inspectors: e (A 4 / /Z,)7 '
am Leade D'a te v h ongiov Gt a / 7 il Date U
'
R. Mendez Date*
/2/f7E
,
R. N. Sutphin #1 /7,/f88
/pproved By: t Operational Programs Section s, Chief Date
/7 NN'
Inspection Summary Inspection on March 21 through April 15, 1988 (Report No. 50-461/88007(DRS))
Areas Inspected: Special, unannounced team inspection assessing the effectiveness of the licensee's Quality Verification (QV) organizations (TI 2515/78). Areas reviewed included specific QV activities, Quality Control, C&I, Operations surveillances, and conduct of control room operation Results: Of the areas inspected, no violations or deviations were identifie PDR ADOCK 05000461 Q nnn
_J
4 e g ,
e
.
DETAILS Persons Contacted W. C. Gerstner, Executive Vice President D. P. Hall, Vice President J. S. Perry, Manager, Nuclear Program Coordination A. M. MacDonald, Director, Nuclear Program Assessment J. W. Wilson, Manager, Clinton Power Station R. E. Campbell, Manager, Quality Assurance R. D. Freeman, Manager, Nuclear Station Engineering J. A. Miller, Manager, Scheduling and Outage Management F. A. Spangenberg, Manager, Licensing and Safety R. F. Shaller, Assistant Manager, Operations J. Greenwood, Manager, Power Supply J. A. Fertic, Director, Quality Systems and Audits J. D. Weaver, Director, Licensing G. L. Baker, Supervisor, Quality Systems K. A. Baker, Supervisor, I&E Interface All of the above persons attended the exit meeting on April 15, 1988.
The inspectors contacted other licensee management and staff during the course of tne inspection, including members of the QA, Operations, C&I, and Nuclear Training Department . Introduction The team inspection at the Clinton Power Station (CPS) assessed the licensee's quality verification (QV) organizations' ability to identify, solve, and prevent significant deficiencies in functional areas encompassing plant operations. The inspection also assessed line management's ability to ensure that identified deficiencies were dealt with promptly and completely. The functional areas primarily reviewed were operations and C&I (control and instrumentation), although the inspection was not limited to these areas. The details and results of the review are discussed in the paragraphs below. In addition, specific activities performed by the QV organizations were reviewed to aid in assessing the overall QV involvement in plant operations. A discussion of the results from this review follow . QV Activities The inspectors reviewed several specific activities and programs associated with the licensee's QV organizations. The review included programmatic discussions with Quality Assurance (QA) management and staff, and direct observation of QV activitie The objective was to assess the performance and impact of the more formal and routine QV processes on plant operation. Results from the discussions and observations follo i
- _ ____ _. _
'
. .
.
.
-
. Condition Reports (CRs) are used by the licensee to identify, report, and correct conditions adverse to qui.lity. The assigned plant department is responsible for developing and implementing documented resolution to the deficiency. TN QA department is directly involved in the process when the deficiency is quality classified. The inspectors reviewed numerou.s CRs during the course of the inspection, and considered the CR process to be a conservative approach in identifying and resolving ccnditions potentially adverse to quality, The corrective action trend analysis of non-hardware deficiencies is performed under the direction of the QA department. Corrective action documents, such as CRs, LERs, NRC violations, and audit findings, are trended by assigning each a deficiency code. The trend data is analyzed weekly over a three month period to determine if a potential adverse trend exists. Upon closure of a corrective action document, the root cause is verified correct and entered in the trend analysis. The inspectors were concerned that by trending on a problem rather than the root cause, the potential existed to miss adverse trends. In addition, the inspectors questioned if the trend period of three months was an adequate length of time. The licensee had discussed similar concerns with other NRC staff recently, and stated that efforts were continuing to improve methods of trending and root cause analysis which would increase the effectiveness of these programs at CP A critique is an informal meeting conducted by the licensee subs'equent to an identified problem. Participants include persons directly involved in the activities being performed when the problem was identified and the associated department management. Informal discussions of the root cause, and immediate and long term corrective actions take place. A critique report is generated; corrective actions are generally tracked and documented using a C The inspectors attended a critique meeting (see Paragraph 7) and reviewed numerous reports during the course of the inspection. The concept of critiques was considered to be an effective method of identifying root causes, and appeared to be a beneficial process at CP Implementation of the process was successful in evaluating problems and determining the appropriate actions to resolve and prevent r'ecurrence of problem Two of the more formal QA programs implemented at CPS are QA audits and QV surveillances. When deficiencies are observed during these activities, they are documented as audit findings and CR Corrective action responses are required to be documented by the applicable department and reviewed by QA. The inspectors observed an audit and surveillance being performed during operations surveillance testing in the control roo During the observation of a limited scope audit, the inspectors noted that the auditors had not verified that an impact matrix was being used as part of the tes In accordance with the licensee's instructions, certain activities require that an impact matrix be completed prior to performance of the test. The requirement covered
-
.-- .- - - - . - . ..
.- .
. .
this particular test; however, an impact matrix did not exist. A critique was subsequently held by the licensee (see Paragraph 7).
Discussions with the QA department indicated that not all auditors were aware of the requirements or their applicability. Prior to the conclusion of this inspection, the licensee revised the audit checklists to include additional guidance concerning impact matrices, and completed QA staff training (required reading) on the impact matrix instructio A QV surveillance of an operations surveillance was also observed by the inspectors. The inspectors noted that one of the two QV surveillants was licensed at CPS. Problems in the conduct of control room operations and in completing the prerequisites for the test, were observed by both the inspectors and the QV surveillants (see Paragraph 7). The test was halted, then successfully completed the following day. The QV team imediately documented their observations in an Operations Monitoring Repor The inspectors generally found that the two programs discussed above were adequate and had a positive impact on plant operations. The QA staff technical expertise was sufficient for performing their tasks. Discussions with the licensee indicated that experts from other departments are occasionally borrowed to perform QA task The licensee established an Operations Monitoring Program in March 1986. The program is somewhat unstructured, consisting of goals and objectives, rather than requirements and procedures. A small Ops Monitoring group exists under the direction of the QA department; however, all QA staff can document observations in an Ops Monitor report. The concept is simply to monitor and report conditions observed, and to provide feedback to plant managemen When problems are identified in an Ops Monitor report, comments and resolution are generally documented by the applicable department management. The inspectors accompanied an Ops Monitor during a control room observation. The Monitor was knowledgeable and thorough in the activities and documentation being monitored. Based on observations, discussions, and review of reports, the inspectors concluded that the program and its implementation was effective and beneficial to the quality of plant operation . Quality Control The inspectors examined QC functions performed by the licensee's QV staff, and several problem areas identified by LERs, CRs, and trend reports. A discussion of the review follows.
l Hold points are inserted in work instructions by Quality Engineering personnel. Nine CRs, written during the period from September 3, 1987, to February 25, 1988, were reviewed by the inspectors. The CRs documented missed hold points with several root causes. An increasing frequency of occurrences was noted; however, the trend was associated with outage work. The licensee's trending program identified the deficiencies as a potential adverse tren Corrective actions included retraining personnel and rewriting work l
- _ _ _ - _ _ _ _ _ . _ _ _ . _ _ _ ,__ __ _--_ _ _ _ _ _ _ _ _ _ _ . _
.
.
.
.
. .
procedures to clarify hold point requirements. QV involvement was well documented and addressed by the CR proces Corrective actions were effective, as evidenced by the sharp decline of deficiencies in this area, Bolt torque problems were identified by four CRs in November 198 Problems associated with torquing included changes in load requirements, following procedures, and missed hold points. The issues were resolved by perfonning engineering evaluations and stressing procedure complianc CR-1-87-09-010, dated August 26, 1987, documented an improper filter change out on AR/PR equipment (radiation monitor). The corrective action included establishing a consistent AR/RP controls policy and assigning work to six qualified sys, tem operator CR-1-88-03-016, dated March 4,1988, identified that an incorrectly sized resin trap screen mesh had been installed. The licensee determined that the specification was in erroc. An engineering evaluation concluded that the existing strainers could be used until the proper strainers were acquired and installed. The corrective actions included correcting the specification and revising the drawin The results from the review of the problems discussed above indicate that the licensee was effective in identifying deficiencies and trends, and resolving the issues. The use of CRs for documenting and correcting problems was an effective QV mechanism. Corrective actions were appropriate; no significant trends were identifie . Control and Instrumentation (C&I)
The inspectors assessed the effectiveness of QV personnel, including the responsible C&I management, in identifying recurring problems, determining root causes, and taking the appropriate corrective actions to solve problems and prevent recurrences. The following documents were used during the review:
LER 87004, January 21, 1987: Actuation of Division I ECCS due to a hydraulic surge during the restoration of a pressure transmitte LER 87014, March 15, 1987: Actuation of Division of III ECCS caused by technician error when refilling a level transmitte *
LER 87022, April 7, 1987: Actuation of Division III ECCS during the restoration of a level instrumen LER 87024, May 1, 1987: Isolation of the Reactor Water Cleanup System (RWCU) caused by flow perturbations while venting a RWCU transmitte LER 87026, May 11, 1987: Actuation of Division III ECCS while returning a level instrument to servic . ..
- - = _ . .- _ _ _ _ _. ._ _ . . _ ._ - _ . _ .
t .
.
.
. .
LER 87052, September 2, 1987: Isolation of the RCIC system whil C&I technicians were investigating spur!nus signals on a transmitte '
LER 87063, November 22, 1987: Improper valve lineup after testing involving a transmitte CR-1-88-01-063, February 25, 1988: Improper lineup of test and vent valves for a level transmitter identified prior to a surveillanc Each of the documents reviewed involved the restoration of a transmitter on a pressure sensitive line, and licensee procedures CPS 8801.06,
"Operation of Local Panel Calibration Stations," and CPS 8801.12," Local Mounted Instrument Valve Operation." The root causes were attributed to personnel error and/or procedural deficiency. Through review of this recurring issue and discussions with C&I management, the following observations were made: Regarding LERs 87004, 87014, 87022, 87024, and 87026, the root causes were correctly identified as personnel error and inadequate procedures. In each case, the technician lacked the proper guidance on how to perform the task due to procedural deficiencies. The technicians recehed training on the causes of hydraulic surges in pressure sensitive lines and were made aware of the potential for a ,
surge during restoration of a transmitter. The corrective actions taken by the licensee were effective. An ESF actuation due to a hydraulic surge has not occurred since May 198 LER 87052 resulted from an isolation of the RCIC system while troubleshooting for the cause of erratic Division II RCIC steam flow indication. This event is not related to the previous actuations discussed above, since the procedure was adequate and the work was supervise ; LER 87063 was a result of an improper post-test valve lineu During a response time test, a C&I technician had manipulated the root valve of the pressure transmitter to provide double valve protection from the pressure boundary. The valve manipulation was not in accordance with the current version of the procedure. The "
valve position was not verified subsequent to the completion of the test, thereby leaving the reactor pressure vessel instrument isolated. Discussions with C&I management indicated that the procedure for locally mounted transmitters had been revised a few days prior to the performance of the test, and that the technician had used the superseded procedure. The licensee stated that significant procedure changes were routinely discussed with C&I personnel; however, in this particular case, the technician was not aware of the revision. This event appears to be an isolated cas The inspectors noted that, in general, communications between line management and technicians was adequat ; The cause analysis for CR-1-88-01-063 was not completed by the licensee prior to the end of the inspection period. Discussions with the licensee indicated that the valve misalignment was unrelated to LER 8706 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ . _- . _ _ _ _ _ _ _ - _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - _
- r .
.
. .
Management involvement in assuring quality in this functional area was evident. Line supervisors are required by procedure CPS 1502.03 to evaluate at least three work activities per week, and complete a task performance checklist. Discrepancies with procedures and problems with personnel Mhich are generated by the checklists are brought to the attention of management. Weekly briefings are held with department personnel to discuss procedure changes and plant conditions. Licensee QV in this functional area appeared to be effective in determining root cause and resolving significant problems. Line management expressed a genuine interest in the activities and performance of their staf . Operations - Surve111ances The inspectors examined recurring problems in the areas of missed surveillances and channel checks. The involvement of QA and QV personnel, and responsible management in identifying and preventing Tzchnical Specification (TS) violations was assessed. The following rWcoments were used during the review:
'
LER 87008, September 29, 1986, to April 8,1987: Channel check of containment high pressure isolation instrumentation was not performed on the proper instrument. During the review of this event, the licensee determined that four additional channel checks in surveillance procedure CPS 9000.01 had not been performe LER 87015, March 9,1987: RCIC steam tunnel timers were not tested due to inadequate functional check procedure. As a result of the deficiency, the licensee identified two additional deficiencies in the area of functional testing through an expanded scope QA audit (Q38-87-14) of TS surveillance requirement i LER 87032, June 4, 1987: Post maintenance test required by 1S 4.6.4.1 was not performed for containment isolation valve IVR001A. Operations personnel did not verify surveillance requirements prior to entry into Mode LER 87035, July 22, 1987: Surveillance procedure CPS 9911.75 did ,
'
not identify all requirements of TS 3.12.2 in area of Land Use Censu LER 87044, September 22, 1986, to June 4, 1987: Procedural channel check rec.uirements for the Average Power Range Monitors (APRMs) were not sufficiently thorough to satisfy TS Table 4.3.1.1- LER 87046, July 29, 1987: Violation of TS Table 4.3.7.11-1 requirements for functional testing of a monitor since September 26, 1986, due to the deletion of radwaste isolation trip testing from the procedure. During the critique of the event, the licensee identified several other violation *
LER 87049, August 19, 1987: TS required channel checks were not performed on the APRM flow biased power percent flow channel. In addition, the rod pattern low power set point channel functional test checklist was not performed.
l
\
_____.______ _ _ _ _ _ _
-
r _
.
. .
LER 87051, August 28, 1987: Channel functional checks were not performed on the Rod Pattern Control System, rod withdrawal limiter high power setpoint test. The licensee determined that the functional checks were not being performed at the required interval LER 87054, September 16, 1987: TS violation due to failure to track and perform a chemistry surveillanc LER 87061, October 14, 1987: A channel check of the containment pressure high trip function was missed due to an omission from the surveillance procedure by a licensed operato LER 87069, E 5er 3, 1987: TS Table 3.3.2-1 violation on failure to enter LC0 . )N statement due to inoperable transmitters not included in HPCS response time test surveillanc CR-1-88-04-019 and LER 88010, April 1, 1988: Operator failed to perform surveillances required by CPS 9000.01D002 for an entire shift. Preliminary investigation by the licensee attributes personnel error "mental lapse" as the root caus The above events were the result of one or more of three deficiencie The root causes were categorized as: (1) licensed operator personnel error, (2) procedures deficient in TS equipment operability requirements, and (3) the lack of a surveillance procedure to meet TS Section 4 require-ments. To assess licensee QV effectiveness in identifying and preventing deficiencies in this area, the inspectors reviewed several audits performed by the QA departmen In 1987, four audits , Q38-87-14, Q38-87-28, Q38-87-44, and Q38-87-61, were conducted to verify that unit operators were complying with TS. During QA audit Q38-87-44, May 19 through June 18, 1987, the licensee identified several examples where TS surveillance requirements were not addressed within the Master List of Surveillances (MLS). This l
deficiency was the root cause of several LERs discussed above. As a j result, the licensee committed to a 100% verification of the MLS against
'
. TS, to ensure that procedurcs exist for all required surveillances. The QA department was tasked with the responsibility for the verification program, to be completed within two years through their biennial review of procedures. The biennial reviews should identify inadequate procedure The inspectors reviewed future schedules for audits in the area of TS compliance, and determined that the scope and frequencies of the audits were adequate. Discussions with the licensee indicated that when recurring problems exist, the frequency of audits in that area are increased. The changes in audit schedules to react to problems are generally accomplished through verbal comunication In October 1987, in response to the high frequency of personnel errors, the licensee instituted a site wide program to reduce the increasing number of reportable events. The LER Reduction Plan encouraged individuals to have a greater awareness of their own actio.1s and the consequences thereo The goal was to motivate employees to achieve a zero initiation rate for preventable LERs. Management involvement at all levels was mandate Since the initiation of this program, LERs attributed to personnel error have dramatically decreased. Additional corrective actions included implementing a tracking system (a status board in the control room) for
_
. _ - _ . _ _ _ _ _ _ _ _ - _
-
,'s .
.
. -
tracking short term LCOs and surveillances, to assist the licensed operator Licensee QV in this area appeared to be effective in determining root cause and resolving significant problems which resulted in LER Management involvement in reducing the number of reportable events was eviden . Conduct of Control Room Operations The inspectors accompanied QA personnel and observed two operations surveillance tests being performed in the control room. The results from observing the QA activities are discussed in Paragraph 3. The following is a discussion of operations activities during the testing: On April 6,1988, operations was perfonning an APRM channel functional test per procedure CPS 9031.12. The inspectors observed that an impact matrix was not being used as required by Standing Order PMS0-03 This instruction required that certain surveillances must be evaluated for irapact on plant equipment, and that a surveillance impact matrix be completed prior to test performance and attached to the test package. The event prompted a critique which was conducted on April 7,198 The discussions indicated that the operations staff was aware of the requirement, but does not always comply with it because of their familiarity with routine operations surveillance Impact assessments were generally perfonned on more complex sur-veillances and 100% compliance was required from all other departments, further discussions revealed that the PMS0 did not reflect current practices, and that not all control room copies of the standing orders were up to date. The result of the critique was that when a procedure becomes overburdensome, it should be changed rather than not complied with. Since PMS0-030 was, in part, a commitment to the NRC, the Resident Inspector Office was notified of the licensee's intent to revise it. The inspectors had no further concerns regarding this issue. The critique process appeared to be effective, in that, the operations staff discussed the issue in depth, the possible resolutions, and the immediate actions to be taken to prevent recurrenc On April 7, 1988, the inspectors accompanied a QV surveillance team to the control room to observe operations performing an IRM channel functional test (per procedure CPS 9031.14). The plant was in Mode 4 (cold shutdown); control rod withdrawal blocks were in place due to instrument air being tagged out the night before, causing the scram valves to be open and the scram discharge valves to fail shut (volume above the high level setpoint). Clearing the rod blocks was a prerequisite to the test and, since this could not be achieved under the existing conditions, the test could not be performed. This indicated a weakness in test planning and scheduling. The fact that the test was not appropriate under the existing plant conditions was not recognized during the snift turnover meeting which had taken place earlier that day. Further, the shift supervisor had not
. . -- . -- --. - . . . - - -
,
-
- .
,
recognized in his review that the test could not be performed, and had approved the test procedure for.use. Subsequently, there appeared to be considerable confusion in the control room when
- performance of the test was attem At one point, the Line Assistant Shift Supervisor (LASS)pte , after discussions with other
'.j licensed operators, made the decision to clear th< rod blocks by moving the mode switch on the miitaRen notion that this would have no adverse consequence. (In fact, this action would have resulted in a scram signal.) At no time, evin though there was uncertainty
- on how to proceed, did the contrc1 oom operators seek assistanc Due to numerous other activities 3n the control room, the action was not carried out immediately. Ever.tt ally (af ter about one hour), the LASS discovered his error and term hated the test. It appeared that the relatively straightforward contiict in plant conditions should have been detected and dealt with 4 one of the numerous steps in the scheduling, planning, and perfo,1 nance process. On April 8, 1988, the test was restarted (approximately 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> after the initial attempt),
and was subsequently complete The QV surveillance team observed the activities on both days and documented their observations in Ops Monitor reports. According to the April 7 report, the following observations were mad (1) The tagout of the instrument air was not initially identified as a restraint to perfonning the tes (2) The LASS made the "suggestion" to move the mode switch to the STARTUP/ HOT STBY position to see if that would remove the rod blocks. The suggestion was made without fully realizing the operational impact and without consulting the appropriate procedures and drawings. Moving the mode switch would have resulted in a scram signal (and a potential LER) under the current plant condition (3) The operation status board did not indicate that instrument air was out of service, considering the operational impac In addition, the April 8 report documented the following problems.
l (1) The test package did not reflect the fact that the test had
- been stopped on April 7 l
l (2) Two of the three prerequisites completed on April 7, were not reverified when the test was restarted on April 8.
l (3) Other documentation problems were identified in control room logs and journal The inspectors concurred with the QV surveillants' observations, and considered the Ops Monitor reports to be very thorough in describing
, the sequence of events and identifying deficiencies. The operations
! department will be responding to both reports as a matter of routin l
- . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _
_ _ _ _ _ _ _ .
,
... .
.
As a result of the observations, the circumstances surrounding the testing, and discussions with operations management, the inspectors were concerned with the quality of activities performed in the control room. The identified problems should be reviewed by the licensee and action taken to preclude further occurrences of this type . The inspectors recommended that management attention and involvement be increased in the area od/ control room operations. It was evident that licensed operator percornal errorc. resulting in LERs have been reduced, as discussed in Paragraph 6. However, the conduct of surveillance testing can be irnproved, thus improving the quality of operations and preventing potential LERs. This can be achieved through increased awareness by management of control room activities and a better understanding of the causes for personnel erro . Exit Interview The inspecters met with the licensee representatives (denoted in Paragraph 1) on April 15, 1988. The inspectors summarized the scope and finaings of the inspection. The licensee acknowledged the statements made by the inspectors. The inspectors also discussed the likely informational content of the inspection report with regard to documents or processes raviewed by the inspectors during the inspection. The licensee did not identify any such documents / processes as proprietar I
!
11