MONTHYEARML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 ML20198Q7181997-10-24024 October 1997 Rev 5 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems ML20137D3601997-03-20020 March 1997 Engineering Self-Assessment Rept ML20129F6991996-10-25025 October 1996 Justification for SPC 1986 LBLOCA Evaluation Model W/Interim Adjustment for Non-Physical Behavior ML20100F2761996-02-13013 February 1996 Rev 0 of Engineering Rept, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves.' ML20116M4021996-02-0101 February 1996 Commitment Matl Change Evaluation Rept 0001 for 941101- 960201 ML20095K5411995-12-18018 December 1995 Nonproprietary Small Break LOCA Analysis Methodology ML20094P7971995-11-22022 November 1995 Rev 0 to CPSES Risk-Based IST Program Risk Ranking Determination Study ML20094P7821995-11-22022 November 1995 CPSES Risk-Based IST Program Risk Ranking Determination Study Summary Rept ML20094P4231995-09-29029 September 1995 Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples ML20085N2911995-06-21021 June 1995 Individual Plant Exam of External Events for Severe Accident Vulnerabilities TXX-9432, Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity1994-12-0909 December 1994 Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity ML20097A3821994-08-19019 August 1994 Individual Plant Exam of External Events,Seismic,Cpses ML20069M8761994-06-10010 June 1994 Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations ML20064M6081994-03-21021 March 1994 Engineering Rept Evaluation of Thermo-Lag Fire Barrier Sys ML20059F5431993-10-0505 October 1993 Engineering Rept, Evaluation of Fir Endurance Test Results Related to Cable Functionality in 1-1/2 & 2 Inch Conduits ML18010B0841993-05-0505 May 1993 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML20127K8121993-01-19019 January 1993 Rev 0,to Evaluation of Unit 2 Thermo-Lag Configurations ML20126G2121992-12-23023 December 1992 Rev 2 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems ML20126C0421992-12-18018 December 1992 Suppl 6 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station ML20126A3621992-12-15015 December 1992 Rev 3 to Receipt,Dispensing,Quality & Insp Requirements for Thermo-Lag Fire Barrier Matls ML18010A9521992-11-30030 November 1992 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML20116C9511992-10-27027 October 1992 Individual Plant Exam Submittal:Comanche Peak Steam Electric Station Vol II:Back-End Analysis ML20115D2241992-09-29029 September 1992 Rev 1 to HI-92880, Criticality SE of Comanche Peak Fuel Storage Facilities W/Fuel of 5% Enrichment ML20127C8291992-09-0808 September 1992 Rev 1 to Interim Engineering Rept, Evaluation of Thermo-Lag Fire Barrier Sys ML20114B8051992-09-0101 September 1992 Suppl 5 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station ML20114C6101992-08-31031 August 1992 Individual Plant Exam Comanche Peak Steam Electric Station Vol 1:Front-End Analysis ML20105A7821992-08-14014 August 1992 Engineering Rept on Thermo-Lag 330-1 Fireproofing Coating Thicknesses Required for 1 & 2 Hour Fire Ratings for Various Structural Steel Members Used by Texas Utils Svcs,Inc ML20105A8471992-08-0606 August 1992 Rev 0 to Comanche Peak Steam Electric Station Unit 2 Engineering Bwip Check Valve 2AF-0083 Failure Investigation ML20116C9621992-07-16016 July 1992 Review of IPE Level 2 Draft Repts for Cpses ML20078H1581992-06-19019 June 1992 CPSES Thermo-Lag Barrier Applications Thermo-Lag Fire Test Conduit & J-Box Test Assemblies. Preliminary Test Results ML20095H2411992-04-13013 April 1992 Validation Efforts for Comanche Peak Steam Electric Station Unit 2 ML20094P3371992-03-26026 March 1992 Control Room Simulator 10CFR55 Certification Initial Rept TXX-9200, RHR Line Summary Rept1992-03-23023 March 1992 RHR Line Summary Rept ML20086E3861991-10-31031 October 1991 Pressurizer Surge Line Transient Justification ML20079D0481991-06-21021 June 1991 Engineering Rept, Testing & Analysis of Commercial-Grade Swing Arms in Borg-Warner Check Valves, June 1991 ML20077E0271991-05-31031 May 1991 Methodology for Reactor Core Response to Steamline Break Events ML20217C4601991-05-31031 May 1991 Reactivity Anomaly Events Methodology ML20073Q8291991-05-17017 May 1991 Small Break LOCA Analysis Methodology ML20084V1401991-03-31031 March 1991 Safety Evaluation for Operation of Comanche Peak Unit 1 W/ Positive Moderator Temp Coefficient ML20079D0571991-03-31031 March 1991 Final Rept on Analysis of Check Valve Swing Arms, Mar 1991 ML20066F4331991-01-31031 January 1991 Draft Analysis of Flow Stratification in Surge Line of Comanche Peak Reactor ML20066L0691990-12-31031 December 1990 Large Break LOCA Analysis Methodology ML20066B2391990-12-31031 December 1990 Control Rod Worth Analysis ML20067B1291990-12-24024 December 1990 Suppl 1 to TUE-1 DNB Correlation ML20062D9041990-11-12012 November 1990 Unit One Loose Parts Monitoring Sys Special Rept 1999-08-06
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
h /
1 I
REACTOR COOLANT SYSTEM COLD HYDROSTATIC TEST REPORT ER-ME-01 REVISION 1 t
AUGUST 18,-1988
. \
4 a
TU ELECTRIC COMANCHE PEAK ENGINEERING
~'
PREPARED BY s/lid
/ A d
l i 'Zf $
e 8808290245 880923 PDR ADOCK0500g45 A
i
. . _ _ . . ...m__. , , _ _ _ . . _ . . . . _ _ _ _ _ . _ , . _ . , _ _ _ _ , _ _ , _ _ . - , . , . . _ _ _ _ _ . . _ . . , _ . _ _ _ _ _ _ _ _ . . , . . , _ _ . _ . _ . . . _ _ - _ _
, _g_
i Procedure / Code Requirement (s)
CP-QAP-12.2, Paragraph 2.3 states in part:
"Pressure tests shall be documented with a Pressure Test Data Package which shall include...a Pressure Test Data Sheet, applicable drawings marked to show the test boundaries..."
CP-QAP-12.2, Paragraph 4.0 states in part:
"No leaking shall be allowed at all welded joints, connections, base metal repairs involving welding, and all regions of high stress."
ASME Section III, NA-4420 states in part that, "proce-dures shall include appropriate quantitative or qualita-tive criteria for determining that important activities have been accomplished."
Confirmatory Action Verify through a records review of all RCS Cold Hydro-static Test documentation that test isometrics were appropriately highlighted and annotated and the vendor spool sketches identifying welded base metal repairs and welds were attached.
Item 3 Some test isometrics indicate with notes written in red ink that no welded base metal repairs were present.
After review of applicable installation documentation and spool packages, base metal repairs involving welding a were identified. These base metal repair welds identi-fied are located in the regions of circumferential butt welds. These base metal repair welds were made at the spool fabricator's shop and at the CPSES site.
Additionally, three of these test isometrics contained conflicting notes written in black ink indicating base metal repairs were located as shown. However, spool documentation packages verify that the base metal repairs identified by black ink were cosmetic and did not include welding. These repairs did not violate the minimum design wall thickness as delineated in the design specifications and ASME Section III. >
Procedure / Code Requirement (s)
ASME Section III NX-6121 and NX-6224 state in part, respective'ly :
"All joints, including welded joints shall be ...
exposed for examination during the test"
. . -s-h
" ... all joints, connections, and regions of high stress ... shall be examined for leakage."
Inspection of non-welded base metal repairs is not required by NX-2000 and NX-4000 during the hydro.;tatic test.
Confirmatory Action Dete rmine through a fabrication, installation and hydrostatic test records review where all welded base metal repairs are located and initiate appropriate retesting for repairs involving welding that are located outside the inspection zone of any field or shop welds.
Item 4 -
The "Pressure Data Sheet Attachment" was the cover sheet used by B&R ASME Quality Control to document inspector acceptance of a specific portion of the ASME hydrostatic test. Although not addressed in any of the applicable B&R/ construction procedures, the data sheet was used to document the individual acceptance of a specific portion of the system hydrostatic test by the applicable B&R ASME Quality Control inspector and ANI. The Pressure Data Sheet Attachment lists the following categories and compliance statement:
Area (boundary)
Prints (applicable isometrics which del aeate the area / boundary)
Inspectors (B&R ASME Quality Control)
Lead / Alternate Inspectors
. "All welded joints, connections, base metal re' pairs involving welding, and all regions of high stress as shown on attached ISos have been hydrostatic tested and found acceptable."
B&R QCI ANI Procedure / Code Requirement (s)
CP-QAP-12.2, Paragraph 4.1 states in part, "Upon comple-tion of the pressure test the quality control inspector shall complete the Quality Checklist and check either the accept or reject space and sign and date the form."
Confirmatory Action No action for this item is required. The Pressure Data Sheet Attschment was used by B&R as the basis of accep-tance for signing the Quality Checklist. The Quality Checklist is the acceptance of the Hydrostatic Test in accordance with CP-QAP-12.2.
- 2. All base metal repair . welds were located in the inspection zone of a shop or field circumferential butt weld inspected during the hydrostatic test weld inspection.
- 3. No vendor base metal repair welds existed on the primary loop piping.
- 4. The notes written on the test isometrics (BRPs) which stated, "no major base metal RPSs could be located," were correct (considering 2. above).
- 5. Fabricator documentation, relative to base metal repair welds, had been adequately reviewed to identify the subject areas.
- 6. Integrally welded attachments were consistently identified and located on the hydrostatic test isometric. The hydrostatic test isometrics and attached supporting documentation adequately iden-tify the areas within the test boundary that were required to be inspected.
This review verified that the pre Cold Hydrostatic Test documentation review and test package preparation performed by B&R was completed and adequate.
IV.
SUMMARY
As a result of TU Electric's assessment of the RCS Cold Hydrostatic Test the following conclusions to those actions required by NE-19869 are provided. Those actions identified are represented below by the following five objectives.
Obiective il Determine the extent to which the Unit 1 RCS Cold Hydrostatic Test demonstrated system integrity and satisfied
, applicable ASME Code technical requirements.
- Conclusion The CPSES RCS Cold Hydrostatic Test was completed by Brown and Root and TU Electric Startup utilizing procedures which meet the requirements of ASME Section III, 1980 Edition through the Summer 1981 Addenda and therefore which were adequate to control the activities. The RCS cold hydro-static test documents (e.g., hydrostatic test isometrics, B&R installation documentation, and applicable Code Data Reports) were initiated, developed, processed and maintained in accordance with Quality Assurance Programs / Manuals which were accredited under the auspices of the ASME. Addition-ally, the activities performed by B&R, to satisfy the requirements of ASME Section III, were monitored, verified or witnessed by an Authori:ed Nuclear Inspection Agency representative. The RCS cold hydrostatic test records and related documentation as delineated in Section III.F of this repert provide the necessary assurance chat the hydrostatic test was completed and inspected adequately.
1
1 i
Obiective #2 Determine the extent to which procedures controlling the Unit 1 RCS Cold Hydrostatic Test provided necessary guidance l for preparation, conduct, and reviews of the test.
Conclusion 1
The TU 43actric assessment of Hydrostatic Testing Related Procedaxe+, is discussed in Section III.D of this engineering l report the confirmatory actions for this portion of the assessment verified that the pre Cold Hydrostatic Test documentation review and test package preparation including the test isometrics performed by B&R were completed and were ;
adequate. The RCS cold hydrostatic test records and related documentation also provide the necessary assurance that the hydrostatic test was completed and inspected adequately.
Therefore, the procedures were adequate in that the activity was completed satisfactorily.
Obiective #3 Determine the extent to which QC personnel performing acceptance inspections were qualified to conduct those inspections.
Conclusion As described in Section II of this report, the certification records of each of the thirty-one (31) inspectors utilized for the hydrostatic test program have been evaluated in detail and did not reveal any matters of concern regarding <
qualification or certification.
, Obiective #4
- dentify and propose resolution of any potentially discrep-ant conditions.
Conclusion Attachmont 3 of this report provides a list of Deficiency Report (DR) or Nonconformance Report (NCR) numbers noted during the review. Each of the identified DRs and NCRs aru cAosed and the resolution did not result in any additional testing.
Obiective d5 Identify any areas where program enhancements could contrib-ute more d,efinitive and comprehensive test packages.
s conclusion The procedures involved have been changed such that conver-sion of data packages is no longer required. Our current procedures require the as-issued ERP drawings to identify base metal repairs involving welding, untested vendor welds, and permanent attachment welds. It !s no longer necessary to mark up ERP drawings for use during hydrostatic testing.
Also, the procedures now require that QC inspector and AN1' sign off on the applicable BRP drawing to document their examination of the inspection points noted on the subject drawing.
0 1
e a y e
_. .-.-t,_ m - - . , , , ,.- _-_ , _ . , , , -
' PcgG 1 of 1 d
l Attachment 3 MISCELIJdiEOUS DOCUMENTATION HIGHLIGHTS NOTED DURING THE ASSESSMENT
- 1. A copy of NCR 12573S is contained in the test package. This NCR identifies that BRPs RC-1-RB-029, 031, 032 and 033 were not included in the test package. The NCR was dispositioned "use as is" because the plug and cap welds shown on those four BRPs were also shown and highlighted on BRP-RC-1-520-001.
- 2. BRP-CS-1-RB-025 has a portion of piping not highlighted in yellow as being in the test boundary. This condition was identified and retested per NCR 14575.
- 3. The following Deficiency Reports (DRs) and Nonconformance Reports (NCRs) were issued as a result of the conducted assessment.
DR C-88-03177 DR C-88-03178 DR C-88-03179 DR C-88-03180 DR C-88-03181 DR C-88-03190 NCR 88-09482 l NCR 88-09483 O
O y
.