ML20151U187

From kanterella
Jump to navigation Jump to search
Rev 11 to Defueling Water Cleanup Sys. W/Six Oversize Drawings
ML20151U187
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/12/1988
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20151U181 List:
References
TER3525-015, TER3525-015-R11, TER3525-15, TER3525-15-R11, NUDOCS 8808180438
Download: ML20151U187 (79)


Text

Nuclear TER 3ses-ois nsy 11 1

ISSUE DATE j I

@ lTS O wen O wits l

DIVISION l

l TECHNICAL EVALUATION REPORT FOR

[<

Defuelina Water Cleanuo System COG ENG O* D OE '

$ ATE 6/s/88 RTR

  • A DATE M DATE -7 # #f COG ENG MG -

.c l b

b 3

I h

2s 8805100438Oggo 20 DOCUMENT PAGE 1 OF PDR ADOCK O PNV P

s No.

ENuclear htte Technical Evaluation Report for Page 2

?525-015 of 25 Defueling Water Cleanup System Approval Da te Rev.

SUMMARY

OF CHANGE 0 Initial issue, pW 12/84

  1. 1/85 1 Revised to incorporate system design changes and comments on Revision C. ,y 2 Revised to incorporate comments on Revision 1. 1/85 3 Revised to incorporate comments on Revision 2 1/85 4 Revised to reflect addition of relief valves at the 4/85 outlets of the defueling filter canisters, deletion of fuel pool cleanup system boronmeter and correction of minor typographical errors.

5 Revised to correct and clarify description of low level' '

5/85 alarm setpoints for fuel transfer canal.

6 Revised to reflect the potential for operation of e-Pr> 6/85 portions of the DWC Systerr prior to system being fully operational and to incorporate minor editorial change. .

7 Revised to incorporate Dewatering System inputs to DWCS cGP 9/85 and provide a general update of the DWCS TER, 8 Revised to reflect capability to bypass the filter eGW 12/85.

cansiters.

9 Revised to clarify site dose assessment for fuel transfer 1/86 canal / spent fuel pool cleanup system.

10 Revised to incorporate system design changes per ECAs S v' 4/87 3525-86-0313, 0328, 0356, 0377, 0388; 3255-86-0393; 3525-86-0395; 3255-86-0406; 3525-86-0416; 3255-86-0422; 3525-86-0429, 0438; 3525-87-0444, 0450, 0451, 0454, and 0455. In addition, the following modifications were incorporated: 1) "deep suctions," 2) variable post-filter micrcn ratings, 3) use of organic loaded ion exchanger, and 4) the use of deep bed filters (modified knockout

canisters).

E. /

S 11 Revisqd to incorporate system design changes per ECAs 8 7/88 9 3525-86-0322; 3525-87-0467, 0476, 0480; 3525-88-0503, E, 0504; INAs 3525-87-0003, 0017, 0018, 0020, 0024, 0037;

, a 3257-87-0046; and 3525-88-0068 and 0074. Revised to y reflect current defur. ling tools / system which interact y with the DWCS.

b J

3525-015 i

TABLE OF CONTENTS SECTION PAGE

1.0 INTRODUCTION

5 1.1 General 5 1.2 Scope 5 [

2.0 SYSTEM DESCRIPTION 5

. 2.1 General 5 2.2 Quality Classification 6 l

3.0 TECHNICAL EVALUATION

6 l 3.1 General 6 3.2 Postulated System Failurcs 7 I

3.3 Decay Heat Removal 12 3.4 Criticality 12 l 3.5 Boron Ollution 13 ,

3.6 Heavy Load Drops 13 3.7 Radioactive Releases 14 3.8 Operational Improvements 15 3.9 Interface with Defueling Tools 18 4.0 RADIOLOGICAL AND ENVIRONMENTAL ASSESSMENT 19 '

4.1 Off-site Dose Assessment 19 4.2 On-site Dose Assessment 19 4.3 Occupational Expesures 22 5.0 SAFETY EVALUATION 23 5.1 Technical Specifications / Recovery Operations Plan 23 j 5.2 Safety Questions (10 CFR 50.59) 23 9

6.0 REFERENCES

24 Rev. 11/0136P

~3525-015 TABLE OF CONTENTS (Cont'd) l ATTACHMENTS i

1. Division II System Design Description of the Defueling Hater Cleanup Reactor Vessel Cleanup System.
2. Division II System Design Description of the Defueling Water Cleanup Fuel '

Transfer Canal / Spent Fuel Pool Cleanup System.

3. Piping and Instrument Diagram, OHC-Reactor Vessel Cleanup System, GPU Nuclear l Drawing 2)-3525-1430.
4. Fuel Transfer Canal / Spent Fuel Pool Cleanup System, Piping and Instrument Diagram, Bechtel Drawing 2-M74-OHC02.
5. Auxiliary Systems, Piping and Instrument Diagram, Bechtel Drawing 2-M74-OHCO3.
6. Fuel Handling Building, General Arrangement, Bechtel Drawing 2-P0A-6401.
7. Reactor Building, General Arrangement, Bechtel Drawing 2-P0A-1303.
8. DHCS, Coagulant / Filter-Aid Systems, GPU Nuclear Drawing 20-3525-1188.

i i

l i

4 l

i i

1 l

I 4 I i

l j Rev. II/0136P

352S-015

1.0 INTRODUCTION

1.1 General The Defueling Hater Cleanup (DHC) System is designed to remove i.rganic carbon, radioactive ions and particulate matter from the fuel Transfer Canal (FTC), Spent Fuel Pool (SFP) "A" and the Reactor Vessel (RV). The majority of the particulate matter is removed by processing the water through nominal 0.5 or 16 micron rated filter canisters. The low micron rating of the filter canisters assures very low turbidity as well as reduction of the particulate activity in the water. Cartridge type filters with different particle size ratings may be used in place of the filter canisters. In general, therefore, discussions concerning the filter canisters are also applicable to cartridge filters when used as replacements for filter canisters.

Removal of the radioactive ions (i.e., soluble fission products) and/or organic carbon is performed by processing a portion of the filter output through 4 x 4 liners (similar to those in use for EPICOR II) containing zeolite or organic material, or the Submerged Demireralizer System (SDS).

The installation and operation of the DHC System will occur sequentially suc" that portions of the system may be operated prior to completion of the entire system. In addition, partial system operation may require temporary interconnection (s) with other plant systems which are not specifically described in this Technical Evaluation Report (TER). Any such temporary modes of DHC System operation will be implemented in accordance with the safety criteria for the complete DHC System and will be bounded by the safety analyses described herein.

1.2 Scope The scope of this document includes the operation of the DHC System, the components of the DHC System and its interfaces to existing systems and components. This TER also includes special modes of operation of the DHC System used to improve filtration operations. This TER is applicable only during the recovery mode as the DHC System is a temporary system required to support recovery operations and will be removed or reevaluated prior to plant restart. Evaluation of safety concerns related to the filter canisters is not within the scope of this TER and is addressed in Reference 8. Licensing of the ion exchangers for off-site shipments is outside the scope of this TER.

2.0 SYSTEM DESCRIPTION 2.1 General The DHC System is designed to process water from the RV, FTC, SFP, and Dewatering System (DS) holdup tank DS-T-1. The system's major functions are given below.

Rev. II/0136P

3525-015

a. The DWC System filters the water to remove suspended solids down to a nominal 0.5 micron rating. This is done to maintain the clarity of the water.
b. The OWC System removes soluble fission products by demineralization of the water using inorganic zeolites. This is done to reduce the dosa contribution from the water.
c. The OHC System removes organic carbon using specific resins or activated charcoal.

The OHC System is composed of two major subsystems which allow greater processing flexibility during post plenum removal operations. These two subsystems are the RV cleanup system and the FTC/SFP cleanup system. On-line sampling of both subsystems for pH is provided by the system design. On-line sampling for boron concentration and turbidity is provided for the RV cleanup system.

Boron sampling for the FTC/SFP cleanup system will be done according to approved procedures. The detailed system description for the DWC RV cleanup system is provided in Attachment 1.

Attachment 2 provides the detailed system description for the DHC FTC/SFP cleanup system. Also included as Attachments 3 through 8 are the following figures:

Attachment 3 DHC - Reactor Vessel Cleanup System, Piping and Instrument Diagram Attachment 4 Fuel Transfer Canal (FTC)/ Spent Fuel Pool (SFP)

Cleanup System, Piping and Instrument Diagram Attachment 5 Auxiliary Systems Piping and Instrument Diagram Attachment 6 Fuel Handling Building, General Arrangement Attachment 7 Reactor Building, General Arrangement Attachment 8 OHC System Coagulant / Filter-Aid Systems 2.2 Quality Classification The quality classification of the DHC System with exception of the filter canister units, which are not within the scope of this TER, is Important to Safety. Important to Safety as used here is defined in the TMI-2 Recovery Quality Classification List.

3.0 TECHNICAL EVALUATION

S 3.1 General The DWC System is totally contained within areas that have controlled ventilation and area isolation capability. This limits the environmental impact of the system during normal system Rev. II/0136P

3525-015 operations, shutdown or postulated accident conditions. The impact of postulated DHC System failures is provided below on a case-by-case basis.

The system failures evaluated were loss of power, loss of instrumentation / instrument air, filter media rupture, and line breaks. The design of the system is such that none of the events results in unacceptable consequences. Other safety concerns evaluated with respect to operation of the OHC System were decay heat removal, criticality, boron concentration control heavy load drops, and radioactive releases. 9everal system modiric4tions may be used to ensure efficient flitration operations. These system improvements were evaluated for safety concerns, and the evaluations are summarized in Section 3.8. The interface of the DHC System with defueling tools such as the abrasive water jet, plasma arc torch, X-Y Bridge Flush System, etc., is addressed in Section 3.9. No unacceptable consequences were found to result from operation of the DHC System provided that proper administrative controls to prevent boron dilution are maintained.

3.2 Postulated System Failures 3.2.1 Reactor Vessel Cleanup System 3.2.1.1 Loss of Power A loss of power to the entire system would simply shut the system down. A loss of power to the well pumps with an additional failure which results in simultaneous loss of level control in the ton exchangers would result in a flow mismatch. In this case, the system would be automatically shut down untti power is restored. Loss of power to individual components would place that component in its safe mode. An air operated valve, for example, would fall to a position that ensures no damage to other components.

Loss of power to the control panel would cause the loss of all information and fail all control and solenoid operated valves. The system would be shutdown until power is restored.

3.2.1.2 Loss of Instrumentation / Instrument Air loss of a single instrument channel will result in the loss of indication for that channel and, for those channels that have control features, a flow mismatch.

This flow mismatch will result in an automatic shutdown of the affected portion of the system.

Loss of the internals indexing fixture (IIF) level indication system (bubbler) will result in an erroneous level indication which will be noted when compared with a redundant level indication system. Since this system has no control features, no adverse system conditions will result.

Rev. 11/0136P

3525-015 Loss of instrument air will take. the individual components to their fall safe position. Flow mismatches induced by loss of air will result in automatic trips. Loss of air to the IIF level monitoring system will initiate a low air supply pressure alarm and a pump trip on IIF low level.

3.2.1.3 Filt$r Media Rupture A failure of the filter media in the filter canister could potentially release fuel fines to the ion exchange portion of the system and/or the dilution water supply to the coagulant and filter-aid systems. The post filter, located downstream -

of both filter trains in the line to the ion exchangers and dilution water supply, will trap any fuel fines.which would be transported past the filter canisters in the event of filter failure. The post filter is sized to be critically safe. A L gross rupture in a filter canister may be detected by an increase in the post filter differential picssure. Turbidity meters located on the return lines to the RV will aid in the detection of gross filter media rupture try detecting changes in water clarity.

Upon detection of a filter canister filter mkdia rupture the filter trains will be isolated, including isolation of water i supply lines to ex-vessel defueling (i.e., valves DHC-V-357, I 358, 363, and 501 (if installed)) involv@d with the pressurizer defueling system. The ruptured filter will be identified by observing the differential pressure versus flow for each individual canister with flow being recirculated to the RV or maintaining effluent turbidity. A lower l.

differential pressure for a given flow or a higher effluent turbidity will indicate which filter is ruptured. The ruptured canister or canisters and the post-filter cartridge would then be replaced as required and the system restarted.

The DHC System may be operated in a mode that bypasses the filter canisters. During this mode of operation the post filters will be providing the required system filtration upstream of the demineralizers. In order to preclude the rupture of the post filter's filter media when it is providing system flitration, if the post filter differential pressure j

reaches 18 psi, further system operation will be prohibited.

The post filters are designed for a maximum differential i pressure of 45 psi. Even if a rupture of the post filter i media occurred, it is not expected that significant quantitles '

of fuel would accumulate downstream of the filter. This conclusion is based on the following. ,

i o The bypass filtration mode will be used only when the l turbidity is low, during ex-vessel operations as required or to recirculate the RCS as necessary; therefore, it is not expected that significant fuel fines will be lll l Rev. II/0136P l

3525-015 suspended in solution during the bypass operation.

Consequently, it is not expected that large amounts of fuel will normally be found in the post filter, o The holding capacity of the post filter, prior to reaching the maximum pressure differential, is small (approximately 5 lbs.).

o The differential pressure, measured across the post filter, can be used to detect a ruptured post filter media, which would initiate operator action to prevent further accumulation downstream, o If it is necessary to process the post filter effluent through the OHC lon exchangers, it wili be done under the control of a process control plan with adequate provisions to accurately assess the quantity of fuel material deposited on the ton exchange media.

3.2.1.4 Line Break The principal consequences of any line, or hose break in the RV cleanup system are a loss of RV inventory and the spread of contamination in the area of the break. The system is designed to mitigate the consequences of such an incident to the extent possible.

In case of a hose rupture or line rupture downstream of the RV pumps, the system will trip these pumps on IIF low level and alarm at control panels in the control room and Fuel Handling Building (FHB). This could deliver approximately 500 to 1000 gallons of RV water to the area of the break. The potential areas affected would be the Reactor Building (RB), the annulus, and the FHB, each of which has sumps to cor.tain the spill.

Siphoning of RV water could take place if any of the lines connected to the well pump suction or return hoses, or if the hoses themselves, are damaged or ruptured. The two, 4 inch suction connections provided in the Westinghouse work platform will be provioed with two, 3/4 inch holes, or in the case of  ;

the 2 inch deep suction one 3/4 inch hole, drilled 18 inches '

below the water level which will act as siphon breakers. The three 2 inch return lines will be equipped with spargers, which are holes drilled into the pipes. The first holes are drilled 18 inches below the water level which will act as siphon breakers. The sample return line will terminate 18 inches below the water level. Also, isolation valves will be provided in the Westinghouse supplied piping which could be used to manually terminate the siphoning. Therefore, a maximum of approximately 3000 gallons of RV water would spill into the FTC following a hose rupture. Approximately half of this water would be contained in the New Fuel Pit.

Rev. II/0136P

3525-015 The recovery from these events would be accomplished by .

Isolating the ruptured section and replacing the ruptured '

hose / pipe.

3.2.2 Fuel Transfer Canal / Spent Fuel Pool Cleanup System 3.2.2.1 Loss of Power A loss of power to any portion of the system would shut that '

portion of the system down. Loss of power to individual components would place that component in its safe mode. An air operated valve, for example, would fall to a position that ensures no damage to other components.

3.2.2.2 Loss of Instrumentation / Instrument Air .

Loss of a single instrument channel will resJit in the loss of indication for that channel and, for those channels that have control features a flow mismatch. This flow mismatch will result in an automatic shutdown of the affected portion of the -

system.

Loss of either the SFP or FTC level monitoring system w!!) be noted when compared with the other. The readings should normally be the same (within 6-7" due to pressure differential) since both water bodies are in communication via the fuel transfer tubes. Neither system has control features.

Loss of instrument air will take the individual components to their fall safe position. Flow mismatches induced by loss of air will result in automatic trips.

3.2.2.3 Filter Media Rupture j A failure of the filter media in the filter canister could potentially release fuel fines to the ton exchange portion of l the system. Flow may be routed to OWC lon exchanger K-2 or to the SOS both of which have filters upstream to trap migrating fuel fines.

Ion exchanger K-2 has a cartridge type post filter (F-8) upstream of it which is in a critically safe canister and SOS is equipped with two filters in series, both of which have borosilicate glass to control reactivity (see Ref 2). '

Olfferential pressure is measured across the filters to indicate ruptured filter media. The SDS filter bypass is ,

administratively controlled to prevent inadvertent operation. '

4 Upon detection of a filter media rupture in a filter canister the filter trains will be isolated and the ruptured filter will be identified by observing the differential pressure versus flow for each individual canister with flow being Rev. II/0136P

3525-015 recirculated to the fuel pool, or by monitoring effluent turbidity. A lower differential pressure for a given flow or an increased effluent-turbidity will indicate which filter is ruptured. The affected canister or canisters and the SDS

pre-filter vessel or filter canister post filter cartridge would then be replaced as required and the system restarted.

The DWC System may be operated in a mode that oypasses the filter canisters. During this mode of operation the post filters will be providing the required system flitration. In order to preclude the rupture of the post filter's filter media when it is providing system filtration, if the post filter differential pressure reaches 18 psi, further system operation will be prohibited. The post filters are designed for a maximum differential pressure of 45 psi. Even if a rupture of the post filter media occurred, it is not expected that significant quantitles of fuel would accumulate downstream of the filter. This conclusion is based on the following:

o Significant quantitles of fuel are not expected to be found in either the FTC or the SFP, therefore it is not expected that large amounts of fuel will normally be found in the post filter.

o The holding capacity of the filtor, prior to reaching the t maximum pressure differential, is small (approximately '

5 lbs.)

o The differential pressure, measured across the post filter, can be used t'o detect a ruptured post filter '

media, which would initiate operator action to prevent further accumulation downstream.

o If effluent is to be processed through DWC lon exchangers, it will be done under a process control plan which adequately assesses the quantity of fuel material deposited on the ton exchange media. L 3.2.2.4 1ine Break If a rupture occurred in the FTC/SFP cleanup system, the OHC System SFP pumps could deliver FTC and/or SFP water to the RB, the annulus, or the FHB. This action would lower the level in ,

the canal and the pool. A drop of one inch in canal / pool

~

level is approximately equivalent to 1250 gal. A level loss would be detected by redundant level indicating systems, one each for the FTC and SFP, which are provided with low level alarms in the main control room. The low level alarm will actuate at El. 327'-l". Upon receipt of either low level alarm, the system will be manually shut down.

Rev. II/0136P

3525-015 Process water hoses are employed in three services in this system; filter canister inlet / outlet, skimmers to well pumps, and downstream of penetration R-539.

If a filter inlet / outlet hose ruptures, that filter will be isolated and the hose replaced. Hoses connected to the filter canisters are submerged in the SFP, this results in no net water loss.

If a hose connecting the skimmer to the well pumps breaks, then the ability to surface skim will be hampered or lost, but pump capacity will not be diminished as the hose is routed underwater to the pumps and a pump suction supply will continue to be available.

If the hose on the FTC return line downstream of penetration R-539 breaks, then process water will be lost to the RB sump.

The resulting loss in level would be detected and alarmed by the ( pal / pool monitors. Check valves are provided to prevent siphoning the FTC if the hose (or connecting line) breaks.

Furthermore, the normal return path is to the SFP; thus this hose is not normally used. When not in use this hose should be isolated by closing valves to minimize the effect of a hose break.

A break of the FTC pump discharge line which uses penetration R-524 would cause process water to be lost to either the RB or the FHB. The water loss would be detected both by a decrease in the monitored flowrate returned to the fuel pool or FTC and also by the drop in fuel pool and/or transfer canal level.

When the FTC pumps are not in ese, the discharge valves will be closed. This will prevent a siphoning of the FTC when the pumps are not in use.

3.3 Decay Heat Removal Decay heat removal is currently performed by heat loss to ambient.

No change in this mode of operation is required to operate the DHC System. The large exposed surface of the open RV and the FTC will significantly enhance the removal of decay heat.

3.4 Criticality Subcriticality of the core is maintained by a high concentration of boron in the Reactor Coolant System (RCS). Subcriticality of the fuel within the filter canister will be assured by design and is addressed in Reference 8. The design of the FTC/SFP pumps and the RV cleanup pumps do not allow an accumulation of a significant quantity of fuel. The system piping and the post filter have been designed to prevent a possible critical configuration of fuel debris. This is accomplished by restricting the size and Rev. II/0136P 1

3525-015 configuration of components. Furthermore, the post filter will not accumulate significant quantitles of fuel unless filter canister filter media rupture occurs (see Sections 3.2.1.3 and 3.2.2. 3).

Other system components preclude fuel accumulation by the filtration of the water, or the components will have critically safe dimensions.

3.5 Boron 011ution i The only credible means of attaining criticality of the fuel contained in the vessel is through deboration of the RCS water.

The approach described in References 6 and 7 for prevention of l deboration will be followed for operation of the OHC System.

! Specific system evaluations wtth respect to deboration control were i

performed prior to OHC System operation. Boron dilution during i defueling has been addressed in the "Hazards Analysis: Potential l

for Boron Dilution of Reactor Coolant System" (Reference 9).

Other potential dilution events have been evaluated and are protected against by red-tagged isolation barriers when OHC System is shut down for any reason. The X-Y Bridge flush jets are administratively controlled to assure adequate mixing of water sources prior to returning the water to the lower vessel region (approximately elevation 301'). Mixing adequacy is analyzed in Reference 16.

The Y Trolley Flush System obtains its supply from either the OHC System or the RV directly. When using the RV directly, it is connected to a dedicated system with no external interfaces. When connected to the OHC System, it utilizes the same supply and administrative controls as the X-Y Bridge flush jets.

The Cavitating Water Jet operates at high pressure, low flow (12 gpm max.) and can be used at any clevation inside the RV. The cavijet is isolated from the introduction of unborated water by the establishment of triple barrier isolation when the OHC System is shut down.

l 3.6 Heavy Load Drops In-containment load handling will consist of the transfer of the OHC filter canisters from the deep end of the FTC to the FHB via the fuel transfer system. Load handling within the FHB will consist of the movement of SDS lon exchange liners, the OHC System liners, the OHC filter canisters and transfer casks. The heavy load drop analysis for the SDS casks is given in reference 3. The DNC System liners will be moved using the existing casks for the EPICOR II system. The handling of heavy loads in containment and in the FHB is addressed in Reference 11.

The radiological concerns associated with a load drop of the SOS lon exchange liners and the OHC System liners are bounded by the analysts in Reference 4. The radiological concerns associated with I

Rev. 11/0136P

3525-015 -

a load drop of a filter canister are bounded by the accident analysis in Reference 12. These analyses show that the health and safety of public is not endangered as a result of these hypothetical accidents.

3.7 Radioactive Releases The operation and design of the OHC System was reviewed with respect to radiodctive releases. No direct radioactive release paths to the environment exists for the system. Local spillage of contaminated water from the OHC System will result in a local contamination problem. Since the specific activity of the water is essentially that of the FTC and SFP, no significant radioactive releases above those from the open pools can occur when processing pool water. Defueling activities have the potential of significantly increasing the. specific activity of the RV water. To preclude any significant releases during these periods the operating procedures associated with processing RV water shall include requirements to ensure isolation of the system should a line break or massive system leakage occur.

During shutdown of the OHC System filter trains, radiolytic decomposition of the water in the post filters and filter canisters will cause the production of hydrogen and oxygen. In order to prevent the overpressurization of the filter canisters, an ASME Section VIII pressure relief valve is installed S: the outlet pipe from each of the four OHC System filter canisters. The valves provide pressure relief in the event that the isolation valves in the OHC System filter inlet and outlet pipes are closed and  !

pressure builds up within the filter canister as a result of radiolytic decomposition. Radiolytic decomposition of water in the

  • post filters will be minimized by the limited holding capacity of the filters.

The filter canisters should not normally be isolated fcr extended periods; however, if they were, the maximum rate of hydrogen and oxygen generation within the canister based on conservative assumptions is estimated to be 0.029 scf/ day. (Note: later ,

analyses have resulted in a maximum hydrogen generation rate that is approximately a factor of 10 lower). At the higher calculated rate of gas generation, the pressure inside the canister would not reach the canister design pressure (150 psig) for at least 90 days. The relief valve will release the pressure buildup before this pressure is exceeded with approximately 0.3 scf of hydrogen and oxygen released from each canister. The relief valves will continue to relieve pressure at about 15 day intervals, releasing a maximum of about 0.3 scf hydrogen and oxygen per canister per relief. The relief valves discharge to the open volume of the containment above the FTC or to the operating level of the FHB.

Since both of these areas are continuously or regularly vented and ,

since the maximum volume of hydrogen released is small, a buildup l of hydrogen to a combustible concentration is not credible. Any Rev. 11/01369 v m ~ s- y

3525-015 particulate releases during the operation of the relief valves ,

would be bounded by the line breaks discussed in sections 3.2.1.4 and 3.2.2.4.

3.8 Operational Improvements The ONC System is intended to maintain RV water clarity using the filter canisters. During operation of the DWC System, unexpected concentrations of suspended solids have blinded the filters and reduced their performance. To alleviate this problem various modifications may be made to the system. Modifications to the original OWC System installed or planned include: use of filter-alds, use of coagulants, use of cartridge filters, use of series filters and/or demineralizers, cross-connecting RV cleanup pumps and RV filter train inlets, the use of modified knockout canisters as deep bed filters, and the installation of suction tubes taking suction much deeper than originally designed, which allow continued use of the shallow suction and have the provision .

to be backflushed. These modifications will be discussed in further detall in Attachment 1.

3.8.1 Filter Aid Modifications to the OWC System may employ the use of a filter '

aid material, which is added to the filter media in the filter canister. The filter aid is intended to prolong the life of the filter canisters by preventing sinall suspended solids from reaching and plugging the filter media in the canisters.

The filter aid material is introduced as a low solids slurry into the filter by two methods: Body feed method, which is a continuous, low flow rate injection of the slurry into the process water upstream of the filter canisters, or precoat  ;

method, which consists of an initial batch of high flow rate (accelerated) body feed delivered to the filter also by way of

, the process stream. Continuous body feed may be used after the initial precoat, or the two methods may be used independently. The material currently considered for use as a filter aid is diatomaceous earth.

The use of diatomaceous earth as the filter aid material in the DWC System has been evaluated and the following safety i concerns were identified and are addressed below:  !

o criticality control  ;

o catalytt operation  ;

Filter aid systems use water to form a slurry of the filter '

aid material. The water used will have a minimum boron i cor. centration of 4350 ppm to prevent unacceptable dilution of boron in the RV, and will come from SPC-T-4 or from the '

effluent of DHC-F-5.

1 Rev. 11/0136P

3525-015 To determine the criticality safety consegunnces of using diatomaceous earth as a filter aid material, an evaluation was performed to assess the moderating ability of diatomaceous earth. Olatomaceous earth is primarily S102 (approximately 907.), and its moderating ability was found to be significantly less than that of water. Based on this result, it was concluded that the addition of diatomaceous earth to a defueling canister does not present a criticality concern during use, storage or shipment of the canister.

The results of the above evaluation are also applicable to the situation where diatomaceous earth becomes intermixed with the fuel within the RCS. That is, since diatomaceous earth is a poor moderator, when compared to water, the addition of diatomaceous earth to the RCS will not cause unacceptable increases to the RCS neutron multiplication. Diatomaceous earth has shown no propensity to remove or absorb boron during previous reactor coolant filtration operations and will not, therefore, cause a decrease in the reactor coolant boron concentration.

In the event of a filter canister rupture, the OWC System post filter will collect filtered material, diatomaceous earth, or filter media that is carried through the failed canister. The post filter is inherently critically safe by design, thus no criticality safety concern exists within the post filter.

The use of diatomaceous earth as a filter aid material will not inhibit the performance of the catalyst in the defueling canisters. 01atomaceous earth is inert and thus would not chemically react with the catalyst. Additionally, the very characteristics and consistency of diatomaceous earth which make it an ideal filter aid material, that is, its porosity under wet and dry conditions, prevent it from isolating the catalyst from generated hydrogen and oxygen, even if the diatomaceous earth were to settle on the catalyst retainer screens or on the catalyst matarial.

Other materials may also be used as a filter aid. However, prior to their use the materials will be reviewed to ensure that there are no unacceptable effects on the defueling canisters or the RCS.

3.8.2 Coagulants The use of coagulants in the reactor coolant is intended to prolong the operating life of the filter canisters by coagulating the colloidal suspension in the water into larger particles. The formation of these larger particles will allow the material to be collected in the filter canister without plugging the filter media, thereby prolonging the operating life of the filter canisters. Coagulants may be added in the process path upstream of the filters.

Rev. II/0136P

A 3525-015 L The specific chemicals to be used for this option have criteria which must be met in order to be introduced to the RCS and defueling canisters. The safety issues which must be addressed before a coagulant can be used include as a minimum:

3 o effect on neutron multiplication, o precipitation of soluble boron, o effect on boron detection capability, o adherence to technical necification requirements for RCS water, and

o effect on operaollity of the canister catalyst material.

! For the coagulants used to date, References 13, 14, and 15 address the safety issues identified above to show that their use would not adversely impact previous evaluations or RCS water specifications.

3.8.3 Cartridge Filters l If cartridge filters are used in the DHC System they will ,

serve as either a replacement for or an enhancement to the filter canisters.

1 The cartridge filter to be used will have critically safe 1 dimensions (diameter <8 inches). A single cartridge filter i

cannot contain a mass ~of fissile material in a critical arrangement, hence neutron poison is not required in the cartridge filters. Disposal of the cartridge filters will be in accordance with approved procedures.

Schematically, the cartridge filter would replace or be in series with the filter canisters. Cartridge filters may be used in the RV cleanup system and the FTC/SFP cleanup system.

Thus if the cartridge filter media falls, a filter located i downstream of the cartridge filter will trap fuel material l before it reaches the DWC System or SOS ton exchangers.  !

Cartridge filter fatture will be detected and mitigated in the same manner as a filter canister failure.

The OHC System can be configured to bypass the ion exchangers. This would eliminate the safety concern associated with the transport of fuel to the post filter or ,

- the ion exchangers, since the process water would be returned directly to the RV or the FTC/SFP. However, filter media could in this case be transported to the RV after a postulated gross filter failure. An earlier study (Reference 10) has

, demonstrated that foreign material (e.g., cartridge filter media) which cannot intermix with the fuel in such a manner as to become interstitially dispersed within the fuel, can be '

added to RV without causing a criticality concern.

I Rev. 11/0136P ,

i i

3525-015 3.8.4 Series Filters DHC RV manifold piping may be modified to allow the two filters in the train to be used in-series with the required instrumentation to monitor Pe individual filters. This modtfication would allow use of two different filters in series (i.e., one as a "roughing" filter and the second as a polishing filter).

3.8.5 Series Ion Exchangers Piping in the FHB has been modified to allow series operation of the two DHC RV cleanup ton exchangers. This nodification allows the water being processed to be demineralized by the first ion exchanger to remove gross activity before passing through the second organic carbon removing "lon exchanger."

The non-zeolite media will be tested prior to use, to ensure it does not alter RCS grade specifications for water chemistry. In the case of activated carbon, the media is borated before placing in service to prevent its removing boron from the flowstream.

3.8.6 RV Filter Train Cross-Connects This modification will allow use of either pump with either or both filters trains, to increase system flexibility.

3.8.7 Deep Suction The suction tubes for both A and B pumps have been tee'd to allow use of shallow and/or deep suction and extended to reach elevation 297' in the RV annulus, allowing better circulation and filtration during RCS processing. Excessive vessel drain-down is prevented by siphon breakers located 18" below the water level (327'-6") as noted in 3.2.1.4. Boron dilution concerns have been controlled administratively. Fuel pickup has been limited by the installation of an 850 micron screen with appropriate backflushing capabilities and appropriate l administrative controls.

3.8.8 Other Modifications Other system modifications may be made to the DHC System without revising this TER provided that the safety concerns associated with the changes are bounded by approved licensing documents.

3.9 Interface with Defueling Tools The known chemistry and intended high quality (e.g., low turbidity and isotopic concentrations) makes DHC System water ideal for use as process water for some of the defueling tools. Additionally an operational advantage for using the DWC System as a source of Rev. II/0136P

3525-015 process water is that no new water will be introduced to the RV, thus additional makeup and letdown monitoring of the RV will not be required. The ability to detect a deboration event is reduced when l

using defueling tools because OWC System water is returned to the lower head adjacent to the remaining fuel. However, due to the low

' probability of a dilution event occurring in this configuration, the ove;*all probability of a deboration event falls within the

, acceptable range of risk as described in the Hazards Analysis l (Reference (9). Originally, when the DHC System was installed, water was returned to the IIF. Presently, when the Automated Cutting Equipment and Cavitating Water Jet System tooling is used, the water is returned to the lower head region in the vicinity of the remaining fuel, t

Presently, a number of tools / systems have been identified which l

will use the DHC System as a source of process water. The l tools / systems currently identified are the abrasive water jet (ADMAC pump), the cavitating pulsating water jet system, the multiple jet / vacuum retractor flushing pump, and various flush systems associated with the Automated Cutting Equipment System (e.g., Plasma Arc Torch, X-Y Bridge Flush System, the Y Trolley flush System). The OHC System will also be used to supply water to various ex-vessel defueling operations, such as pressurizer defueling, and to filter the same water as it returns to the RV.

l Other tools or uses may be identifled in the future which will use l the OHC System as a process water source without revising this TER, l provided safety concerns are bounded by approved licensing I

documents.

4.0 RADIOLOGICAL AND ENVIRONMENTAL ASSESSMENT 4.1 Off-Site Dose Assessment Operation of the DHC System could reduce the off-site doses which would result if the system were not available. Without operation of the ONC System specific activity of the water in the pools would slowly increase. This could lead to an increase in the local airborne concentration available for release via the plant ventilation system. However, operation of the DHC System will maintain the reactor and fuel pool water at very low specific activity, thereby minimizing this as a potentiel releA:e source.

Since the source available for release from the SOS during processing of accident water from the RB basement greatly exceeds that available from the OHC System, the off-site dose analysis provided in the SDS TER (Ref. 4) bounds those of the DHC System. '

l 4.2 On-Site Dose Assessment 4.2.1 Reactor Vessel Cleanup System The potential exists that defueling may significantly increase the specific activity in the RV water. This could possibly j occur during defueling through disturbance of the core l

l l Rev. II/0136P i

3525-015 debris. Material greater than nominal 0.5 microns would be captured in the system filters, either through use of 0.45 micron filter canisters or 25 micron filter canisters which have been precoated. In the latter case, some material greater than 0.5 micron may be passed through the filter until an adequate layer of precoat is built up. The soluble fission ,

products, particularly ceslum-137 and strontium-90, would be removed by processing through the associated ion exchange media. The filter canisters are located underwater at a depth greater than four feet in the RB and, therefore, do not represent a radiological problem. As indicated earlier (see Section 3.2.1.3 and 3.2.2.3) it is not expected that i significant quantities of fuel will accumulate in the post

filters. Consequently, the post filters are not expected to l be a radiological hazard. However, if the dose rates from these filters begin to increase, appropriate measures (e.g.

shielding, personnel relocation) will be taken to ensure acceptable dose rates to personnel. The water to be processed is piped through a RB penetration to the ion exchange media at 20 to 60 gpm (max 30 gpm/lon exchanger) depending on the l specific activity of the RV water. These process lines and I the liners for the ion exchange media represent potential radiological hazards.

(

To assess the radiological hazards, the dose rates from DHC System piping and components during operation were evaluated.

Sources in the water were assumed to be fuel particles and dissolved radioactive materials. The design basis concentrations of these sources are 1 ppm susper.ded solids and a concentration of soluble materials equivalent in dose rate to 0.02 uC1/ml of cesium-137. During operation at the design basis concentrations, the dose rate from a long 3" diameter unshielded hose is 0.2 milltrem/ hour at a distance of 2 feet.

During defueling operations both the solubles and suspended solids concentrations in the water may increase. To assess increases in dose rates during upset water conditions, a combination of a 20 curie cesium-137 spike and an t instantaneous release of approximately 35 lb of suspendable l fine debris to the RV volume is postulated, A long 3" l diameter hose carrying water at the resulting concentrations

! would result in a dose rate of 9 milltrem/ hour 2 feet from the hose. Process lines which are downstream of the filters do not contain the suspended solids con'centrations postulated for the upset water conditions. A 3" diameter hose downstream of the filters would produce a dose rate of 2 millirem / hour at a distance of 2 feet, due to the soluble radioactive materials remaining in the water.

Shielding of lines upstream of the filters may be used to reduce dose rates in areas of personnel occupancy, l

Rev. II/0136P l

\

l l )

1 '

l t (

3525-015 l

i Dose rates from solubles are based on the specific activity of l ceslum-137. Other isotopes which may contribute significantly l to gamma dose rates are cesium-134 and antimony-125. The I cesium-134 concentration is normally an order of magnitude less than that of cesium-137. Antimony-125 is not removed by the OHC Systcm ion exchangers with a reliable decontamination >

factor. However, the dose rate'for antimony-125 is less than that of ceslum-137 for a given concentration. If antimony-125 in the OHC System becomes a significant dose contributor to workers, the reactor coolant may be processed through the EPICOR II system in a batch processing mode. Batch processing will be used because chemical adjustment of the coolant is required. EPICOR II will remove the antimony-125 with a satisfactory decontamination factor.

Three zeolite ion exchangers are needed to handle the flow from the OHC System. Two are needed for the RV cleanup system i to provide a 60 gpm flowrate through the ton exchangers. One i is used for FTC/SFP cleanup. SOS may also to be used for l FTC/SFP cleanup.

The shielding requirements for the DHC System liners were based on a homogentzed 500 curie source in a 4 x 4 liner, similar in construction to those used for EPICOR II. Since change-out of liners will be based on radiation level, and since the 500 curie loading is conservatively high (actual loading should be approximately 100 curles, see Section 4.3),

the calculated shielding requirement is considered acceptable.  ;

The contact dose rate on the side of the liner for a homogen12ed 500 curie source is approximately 185 rem /hr. The l

lir.ers are shielded to limit the shleid contact dose rate at I the side and on top of the liner to a maximum of 5 milltrem/hr. The concrete floor reduces the dose rates on lower elevations to less than 5 milltrem/hr. Shielded dose rates represent an upper bound, and would not pose any undue operational constraints if actually attained.

Other DHC System components not specifically discussed above i will be shleided as necessary.

I.

If hoses or piping in the OWC System break, water will be released in the RB or the THB. This water may contain suspended fuel particles and dissolved radioactive materials.

The specific activity of the OHC System water will be maintained as low as possible, so that personnel access to the spill area will not always be precluded, however, a CWC-RCS spill may present personnel access problems due to high beta dose rates. After the removal of the spilled water, the area may require decontamination to reduce loose surface contamination to acceptable levels. Thus there are no safety concerns associated with the breakage of DHC System hoses or pipes, 1

Rev. 11/0136P l '

1

3525-015 4.2.2 Fuel Transfer Canal / Spent Fuel Pool Cleanup System The fTC/SFP cleanup system processes water through the DWC lon exchanger K-2 or S05. The water in the pools will be maintained by this system at .01 to .02 uC1/ml of equivalent cesium-137, excluding antimony. A flowpath to EPICOR II via the F.CBT's is provided to remove antimony-125 in the event that high antimony-125 levels are encountered. These are significantly lower concentrations than water processed by SDS. The analysis provided in Section 4.2.1 for normal dose rates from the RV cleanup system bounds the dose rates from  ;

the FTC/SFP' cleanup system during normal operation.

j The accident analysis provided in the SDS TER, Reference 4 bounds the doses possible from the FTC/SFP cleanup system in the event of an accident.

4.3 Occupational Exposures '

Operation of the DWC System will reduce the occupational exposure during defueling operations by maintaining low specific activities in the FTC, SFP and RV. The DHC System is designed to maintain the maximum ceslum-137 concentration in the water to between .01 and

.02 uCi/ml. This will result in a contribution to general area dose rates of 10 to 20 millirem /hr from the water.

) It is estimated that approximately 42, 4x4 liners each loaded with 4 52 curies of ceslum-137 will be required for the RV cleanup j

system. The occupational dose to workers during each change-out is estimated to be less 0.1 man-rem. Therefore the total accumulated .

dose for change out of the estimated 42. 4x4 liners is 4.2 man-rem.

The following table provides an estimate of the man-hours and man-rem associated with the installation, operation, maintenance, ,

modification, and removal of the in-containment and FNB portions of  ;

the OHC System. These estimates are based upon current man-hour  ;

projections.

IN-CONTAINHENT Activity Man-Hours Dose Rate (mR/hr) Man-Rem Installation ?200 30 66 Operation 1200 30 36 Maintenance 85 30 2.5 Modifications 1600 20 48 Removal 1000 30 30 Rev. 11/0136P

3525-015 FUEL HANDLING BullDING Activity Man-Hours Dose Rate (mR/hr) Man-Rem -

Installation 34,400 0.3 10.3 Operation 26,280 0.3 7.9 Maintenance 8,600 0.3 2.6 Removal 17,200 0.3 5.2 The current total man-rem attributable to the operation, maintenance, and modification of the OWC System, as a whole, is approximately 208 man-rem. This figure does not include man-hour or man-rem values for interface with defueling tooling discussed in Sections-3.8 and 3.9.

5.0 SAFETY EVALUATION 5.1 Technical Specifications / Recovery Operations Plan No additional Technical Specifications / Recovery Operations Plan

]

changes are required to install and operate the DHC System.

5.2 Safety Questions (10 CFR 50.59) 10 CFR 50, Paragraph 50.59, permits the holder of an operating license to make changes to the facility or perform a test or ,

experiment, provided the change, test, or experiment is determined -

not to be an unreviewed safety question and does not involve a  !

modification of the plant technical specifications.

A proposed change involves an unreviewed safety question if:

a. The possibility of occurrence or the consequences of an accident or malfunction of equipment important to safety '

previously evaluated in the safety analysis report may be increased; or

b. The possibility for an accident or malfunction of a different  !

type than any evaluated previously in the safety analysis report may be created; or

c. The margin of safety, as defined in the basis for any technical specification, is reduced.

The ONC System does not increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in a safety analysis report, The system failures evaluated are presented in section 3.2 of this report. No failures of the DNC System were found which would increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety. In

, addition, operation of the OHC System will be performed under 1

Rev. II/0136P 4

3525-015 1

strict administrative procedural control to further ensure safe operation. The procedures used for operation of the DWC system

. will be reviewed and approved prior to use in cccordance with

. Technical Specification 6.8.1.

The possibility of an accident or malfunction of a different type than previously evaluated in the safety analysis report is not ,

created by the installation and operation of the OWC system. The DWC system is essentially a 11guld radwaste system utilized to  !

maintain clarity and low specific activity in the RV, FTC, and SFP water. As such, the possibility of an accident or malfunction is '

of the same type as previously evaluated for other liquid radwaste systems.  !

Operation of the ONC system does not result in a reduction in the margin of safety as defined in the bases for the Technical Specifications. Liquid effluents will not be released to the  :

environment directly from OWC system operations. The effluents from operation of the DWC system will be returned to the sources in order to maintain proper water levels. Any gaseous effluents resulting from DWC system operations will traverse existing gaseous effluent flow paths. The gaseous effluents will be less than those i generated during processing of the water from the RB basement by SDS. The results of the radioactive release analysis presented in the SDS TER therefore bound the releases from the ONC system.

Since no change in the maximum permissible concentrations or the instrument configuration or setpoints specified in Appendix 8 of '

the Technical Specifications was required for 505 operation, and since the OWC system operation is bounded by the SDS operation, no changes are required for DHC system operation, Based on the above, the installation and operation of the DWC i system does not present an unreviewed safety question as defined in 10 CFR 50.59.  ;

6.0 REFERENCES

1. Recovery Program System Description, 50-3526-004, Auxiliary Building Emergency Liquid Cleanup System (EPICOR II), GPU Nuclear Letter 4410-87-L-0075 dated May 14, 1987.  ;

1

2. Technical Evaluation Report (TER-3527-006) for the Submerged  ;

Demineralizer System, Revision 5. GPU Nuclear Letter 4410-87-L-0125 dated September 28, 1986. ,

l 3 Letter from G. K. Hovey, GPU, to 8. J. Snyder, NRC, dated September i 30, 1981, "Control of Heavy Loads". GPU Nuclear Letter LL2-81-0227. '

4. Same as Reference 2.
5. Safety Evaluation Report (SER) for the Refurbishment of Fuel Pool "A", Revision 1. June 1983, GPU Nuclear Letter 4410-83-L-0156 dated July 29, 1983.

Rev. 11/0136P l

3525-015

6. SER for Removal of the THI-2 Reactor Vessel Head, Revision 5 GPU Nuclear Letter 4410-84-L-0014 dated March 9, 1984.
7. SER for the Operation of the IIF Processing System, Revision 3, GPU Nuclear letter 4410-85-L-0112 dated May 17, 1985.  ;
8. TER for Defueling Canisters, Revision 2, GPU Nuclear Letter f 4410-86-L-0037 dated March 6, 1986.
9. Hazards Analysis: Potential for Boron Ollution of Reactor Coolant i System, Revision 2 September 1985.
10. Report on Limits of Foreign Materials Allowed in the THI-2 Reactor Coolant System During Defueling Activities, 15737-2-N09-002, '

Revision 1, September, 1985.

11. SER for Heavy Load Handling Inside Containment, Revision 3 GPU Nuclear Letter 4410-86-L-0084 dated June 2, 1986.
12. SER for N fueling of the THI-2 Reactor Vessel, Revision 10, GPU Nuclear Letter 4410-86-L-0049 dated May 15, 1986.
13. SER for the Addition of Coagulants to the Reactor Coolant System. -

GPU Nuclear Letter 4410-86-L-0213 dated December 15, 1986,

14. Use of Coagulants, GPU Nuclear Letter 4410-86-L-0216 dated December  !

31, 1986.

15. Criticality Safety Evaluation for Congulants, GPU Nuclear Letter ,

4410-87-L-0021 dated February 20, 1987.

16. Mixing Analysis for Deboration Scenarlos, GPU Nuclear memorandum dated April 26, 1988, Gaithersburg, DE0E-1380, File: 0295/10450.

I l

Rev. 11/0136P

3525-015 ATTACHMENT 1 SYSTEM OESCRIPTION DEFUELING WATER CLF' s ($ TEM REACTOR VESSEL C 'a * ('s T W l

1 l

1 l

)

3525-015 ATTACHMENT 1 TABLE OF CONTENTS 4

SECTION PA_G{  !

l 1.0 DESIGN DESCRIPTION 3.0 1.1 Summary 3.0 1.2 References 3.0 I 1.3 Detailed System Description 7.0 1.4 System Performance Characteristics 12.0 1.5 System Arrangement 14.0  ;

1.6 Instrumentation and Control 15 0 1.7 System Interfaces 18.0~

1.8 Quality Assurances 18.0 2.0 SY3 TEM LIMITATION. SETPOINTS, AND PRECNJTIONS 19.0 2.1 Limitations 19.0 ,

2.2 Setpoints 19.0  !

2.3 Precautions 2C.0 '

3.0 OPERATION 1 21.0 3.1 Initial fill 21.0  !

3.2 Startup 21.0 3.3 Normal Operations 22.0  ;

3.4 Shutdown 22.0 I 3.5 Draining 22.0 3.6 Refilitng 23.0 3.7 Infrequent Operations 23.0 3.8 Transient Operations 24.0 4.0 CASUALTY EVENTS AND RECOVERY PROCEDURES 24.0 4.1 Loss of Power 24.0 4.2 Loss of Instrumentation / Instrument Air 24.0 4.3 Filter and Hose Break 26.0 4.4 Line and Hosa Break 25.0 Rev. 11/0136P 1

=-

- _> 1 3525-015 ATTACHMENT-1 TABLE OF CONTENTS (Cont'd)

-SECTION PAGE 5.0 SYSTEM MAINTENANCE 26.0

-6.0 TESTING 26.0 6.1 Hydrostatic Testing 26.0 "

6.2 Leak Testing 26.0 6.3 Iristrument Testing 26.0 7.0 HUMAN FACTORS 26.0 8.0 MAXIMUM ALLOWABLE AP AT GIVEN FLONRATES 28.0 ,

Rev. 11/0136P

____.________ _ ._ __.__- _m__.

3525-015 ATTACHMENT 1 1.0 DESIGN DESCRIPTION 1.1 Summary The Reactor Vessel (RV) cleanup system is a temporary 11guld processing system which is designed to process water contained in the RV. .The system's major functions are:

a. To filter the water contained in the RV to-remove suspended solids above a nominal .5 micron rating. This is done to maintain the clarity of the water.
b. To remove soluble fission products and organic carbon from'the RV by demineralization of the water. This is done to keep the-equivalent Cs-137 concentration less than .02 uC1/m1, excluding antimony and, thus, reduce the dose rate controlled by batch processing of RV water at the Reactor Coolant Bleed Tanks (RBCTs).

1,2 References

1. Planning Study, Defueling Water Cleanup System, Document No.

TP0/TM1-046. .

2. Technical Plan, Defueling Water Cleanup System, Document No.

TP0/TMI-047.

3. Divisicn :. System Design Dese 7 tion, Defueling Water Cleanup System, Document No. 2-R72-D'.
4. Bechtel Drawing 2-M74-DHC ' Derueling Water Cleanup (DWC)

Reactor Vessel Cleanup System, 4a. GPU Nuclear Orawing 20-3525-1430, DHC-Resctor Vessell Cleanup System.

5. Bechtel Drawing 2-M74-DHC02, Defueling Water Cleanup (DHC)

Fuel Transfer Canal / Spent Fuel Pool Cleanup System.

6. Bechtel Drawing 2-M74-DWC03, Defueling Water Cleanup (OWC)

Auxiliary Systems.

7. Bechtel Draw'ag 2-P0A-6401, General Arrangement Fuel Handling Building Plan El. 347'-6".
8. Bechtel Drawing 2-P0A-1303, General Arrangement Plenum Removal Reactor Building.
9. Drawing Change Notice Nos. 2026-30-3 and 4, flow Diagram Spent Fuel Cooling and Decay Heat Removal.
10. Burns and Roe Drawing No. 2026, Flow 01agram Spent Fuel Cooling and Decay Heat Removal. ,

Rev. 11/0136P

3525-015 -I ATTACHMENT 1 I

11. Division System Design Description for Spent Fuel Pool / Fuel Transfer Canal Cleanup System,- Document No. SD DHC02, i
12. Instrument Index, Document No. 15737-2-J16-001.

12a. DHC Instrument List,.4220-IMP-3525.01.

13. Design Engineering Valve List, Document No. 15737-2-P16-001.
14. Standard for Piping Line Specifications for GPU Nuclear Corporation TMI Unit _2 Standard 15737-2-P-001.
15. Mechanical Equipment List, Document No. 15737-2-M16-001.
16. Bechtel Piping Isometrics
a. 2-P60-DHC-01-DHCS - Pumps P-2A&B, P-3A&B,_P-4A&B, and Miscellaneous Details,
b. 2-P60-DHCO2-DHCS - Reactor Vessel Filter Trains A & S -

Inlet Manifold Piping,

c. 2-P60-DHCO3-DHCS - Reactor Vessel Filter Trales A & B -

Cdtlet Manifold Piping.

d. 2-P60-DHC05-DHCS - Reactor Vessel Filter Train Sample Lines
e. 2-P60-DHC06-DHCS - Discharge Piping from Sample Boxes No.

I and No. 2 to Penetration R-537.

f. 2-P60-DHC07-OHCS - Samples Lines Upstream and Downstream of Ion Exchangers.
g. 2-P60-DHC08-DHCS - Forwarding Pumps P-6 and P-7, Suction and Discharge Piping.
h. 2-P60-DHC09-DHCS - Forwarding Pumps P-6 and P-7, Discharge Piping.
1. 2-P60-DHC10-DHCS - Supply Piping to Ion Exchangers K-1 and K-2, Supply and Discharge Piping for Post Filter F-8.
j. 2-P60-DHC11-DHCS - Supply Piping to Ion Exchangers K-1, K-2 and K-3.
k. 2-P60-DHC12-DHCS - Borated Hater Flush Piping from SPC-T-4.
1. 2-P60-DHC15-DHCS - Nitrogen Supply Piping to SPC-T-4 and Drying Station.

Rev. 11/0136P

3525-015 ATTACHMENT 1

m. 2-P60-DHC17-DHCS - Miscellaneous Piping Details.
n. 2-P60-DHC18-DHCS - Miscellaneous Piping Details.
o. 2-P60-DHC19-DHCS - Sample Panel No.1, Fuel Handling Building.
p. 2-P60-DHC20-DHCS - Sample Box No. 2, Fuel riandling Building.
q. 2-P60-DHC21-DHCS - Sample Panel No. 2, Otain and Return to Spent Fuel Pool A.
r. 2-P60-DHC22-DHCS - Air Supply Piping 1etails.
19. ECA No. 3525-84-0041, Definition of the re'ueling Hater Cleanup System.
20. ECA No. 3245-84-0034, Defueling Hater J1eanup System Penetration Modification.
21. ECA No. 3527-84-0042, SDS Tie-in tc DHCS.
22. Bechtel Area Piping Drawings
a. 2-P70-DHC02 - Instrument Air Manifolds and Hose Routings for DHCS - Reactor and Fuel Handl'ng Building.
b. 2-P70-DHCO3 - DHCS Hose Network Reactor Building Plan El. 347'-6".
c. 2-P70-DHC04 - DHCS Hose N,twork Fuel Handling Building Plan El. 347'-6".
d. 2-P70-DHC05 - DHC System Hose Network Sections and Details.
e. 2-P70-DHC06 - Process Hose Schedule - Reactor and Fuel Handling Building.
f. 2-P70-DHC07 - DHCS - Filter-Aid Feed Piping.

fl. GPU Nuclear 20-3525-1188 - DHCS Coagulant / Filter-Aid

, Systems.

g. 2-P70-DHC08 - DHCS - Filter Precoat Piping.
h. 2-P70-CLD01 - Canister Loading and DecontaminTtion System, Fuel Handling Building.
23. TER 3527-016 - THI-2 Division Technical Evaluation Report for Defueling Canisters.

Rev. 11/0136P

3525-015 ATTACHMENT 1

24. ECA No. 3525-85-0304, DHCS RV Filtration Manifold Modification.
25. ECA No. 3525-86-0313, Abrasive Water Jet System Design.
26. ECA No. 3525-86-0328, DHCS Body Feed Tie-in Modification.

l-

27. ECA No. 3525-86-0356, DHCS Filter-Aid Feed Systein.
28. ECA No. 3525-86-0377, DHCS Filter-Ald Feed System Electrical Additions in the Fuel Handling Building.
29. ECA No. 3525-86-0388, DHCS Filter-Ald Feed Precoat System.
30. ECA No. 3255-86-0393, Pressurizer Spray Line Defueling Connections.
31. ECA No. 3525-86-0395, Tie-in of Cavitating/ Pulsating Water Jet System Pump Suction DHCS.
32. ECA No. 3255-86-0406, Pressurizer Defueling System Tle-in Connections (not currently implemented).
33. ECA No. 3525-86-0416, DHCS - DHC-K-1/DHC-K-3 Piping Modifications.
34. ECA No. 3255-86-0422, Pressurizer Defueling System Tle-in Connections.

3

35. ECA No. 3525-86-0429, DHC RV Filter Train 'A' Hodifications (not currently implemented).
36. ECA No. 3525-87-0444, Reactor Building and Fuel Handling i Building DHCS Armored Hose Replacement.

i

37. ECA Ho. 3525-87-0450 DHC Filter-Ald Hodifications. l
38. ECA No. 3525-87-0451 DHC RV Cleanup System Hodifications.
39. ECA No. 3525-87-0454, Cragulant Addition to DHCS.
40. ECA No. 3525-87-0455, Use of DHCS Effluent Hater for the Coagulant / Filter-Ald Systems.

i

41. Design Criteria, DC-3525-86-004, Processing Through DHCS Using Coagulants.
42. ECA No. 3525-87-0467, DHCS Coagulant / Filter-Aid 'B' System Electrical.
43. ECA No. 3525-87-0476, Transfer Canal / Fuel Pool Tle-in to Reactor Vessel Filtration.

Rev. 11/0136P

3525-015

. ATTACHMENT 1

44. ECA No. 3525-87-0480, DHCS Coagulant / Filter Aid 'B' System.
45. ECA No. 3525-87-0482, DHC Forwarding Pumps Exhaust Modification.
46. MMA 3525-87-0003, DHCS Reactor Vessel Suction Modification.
47. MMA 3525-87-0017, DHCS Hose Replacement Hodification.
48. MMA 3525-87-0018, Air Dryer for.DHC Forwarding Pumps
49. HMA 3525-87-0020, DHCS - Reactor Vessel Cleanup Suction Flush Modifications.
50. MMA 3525-87-0023, Installation of Throttling Valves on the DHCS Return Lines.
51. MMA 3525-87-0024, DHCS Coagulant Addition Isolation Valves.
52. MMA 3525-87-0037, Flush Water to the Coagulant Addition Metering Pumps.
53. MMA 3525-87-0046, CLD System Installation from DHCS.
54. MMA 3525-88-0068, DHC IX Forwarding Pumps Changeout.
55. MMA 3525-88-0074, DHC Crossconnect (DHC-V-385) Isolation.

1.3 Detailed System Description 1.3.1 Description The RV cleanup system is a liquid processing system which will process water from the RV. The system is shown schematically on Drawing 2D-3525-1430 and 2D-3525-1188, and associated Drawings 2-M-74-DHC02 and 2-H74-DHC03. (NOTE: Some valves identified herein hava been given an instrument designator-as well as a valve number. When this occurs, the instrument designator is shown in parentheses after the valve number.)

The system has two submersible type pumps (deep well pumps),

P-2A and 28, which are housed in wells and located in the fuel storage pit in the shallow end of the Fuel Transfer Canal (FTC) in the Reactor Building (RB). Each' pump has a 220 gpm capacity and will process 200 gpm from the RV and recirculate 20 gpm. The suction from the RV is through the Westinghouse work platform via pipes which connect the nozzles provided on the work platform to the wells.

The system has four particulate filters, F-1, 2, 3, and 4, each capable of filtering a flow of 100 gpm. The filters are composea of sintered metal filter media which is contained in Rev. 11/0136P

3525-015 ATTACHMENT 1 modified fuel canisters. These filters are capable of removing debris, mainly fuel fines (UO2 ) and core debris (Zr02 ), down to a 0.5 micron rating. Since the canisters contain fuel fines, they are designed to prevent a criticality condition from existing when they have been loaded. Also, the filters are submersed in the transfer canal to provide the appropriate radiation shielding.

The filtration portion of the system is divided into two trains; each train contains two filter canisters. This allows the system to filter 200 or 400 gpm from the RV. A coagulant may be injected into the process flow by either STRANCO unit /Moyno Pump (DHC-P-12A/B / 13A/8) at either pump discharge. The pumps are connected to the filters trains by a length of 4" hose which will allow the required contact time between coagulant and the waste stream. Filter-aid may be injected at the inlet to each individual filter canister.

A filter is used until the differential pressures reach a predetermined setpoint. At this point, the system is shutdown and then, after a waiting period (approximately 5 minutes), it is restarted. The differential pressure is noted and if it returns to a low value, the system will be run again to the pressure setpoint. This process is repeated until the differential pressure at restart reaches a value near the shutdown setpoint. When this occurs within one hour, the train is shutdown and the filter (s) are replaced.

Loaded canistcrs are expected to generate small quantities of oxygen and hydrogen gas due to radiolysis of water. Pressure relief valves R-4, R-5, R-6, and R-7 are provided on the filter canister outlet lines upstream of their isolation valves. Their purpose is to prevent overpressuring the filter canist-- when isolated due to the small quantitles of H2 cnd 02 produced (approximately 0.029 ft3/ day).

Once the water has been filtered, all, or a portion of, the flow can be returned to the RV. The amount of water returned is controlled by remotely adjusted valves V015A and 8 (HV30A and B). Each of these lines will connect, via flexible hoses, to the separate inlet nozzles on the work platform. A sparger has been placed on each return line to maintain a positive pressure in the attached hoses.

That portion of the flow not returned directly to the vessel l .

i can be further processed to remove soluble fission products or organic carbon, used as make-up/dllution water for the coagulant / filter-aid systems or to flush Q ep suction screens. The flow from the pumps, which passes through a single line to the ion exchangers, is automatically controlled by remotely adjusted flow control valve V084 (FV-10). There is a post filter, F-5, located in that line to ensure that, in j Rev. II/0136P 4 l

3525-015 ATTACHMENT 1 case of a failure of a filter canister, significant quantity of fuel fines cannot reach.the ion exchangers. The loading on the post filter is expected to be minimal and, as such, they will be standard disposable cartridge type filters.

Bypass lines are installed on both filter trains. The bypass.

line will allow the filter canisters in a train to be bypassed, and allow direct routing of water to the post filter and ion exchangers or recirculation of the RV without flitration.

Two lon exchangers, K-1 and K-3, are dedicated for use in this system. Each of these ion exchangers can handle the normal 30 gpm flow. The ion exchange media is a bed of zeolite resin which will remove the Cs-137 and Sr-90, or a media (possibly organic) to remove organic carbon. Any media used will be tested to ensure it does not alter Reactor Coolant System (RCS) chemistry adversely. In the case of activated charcoal, the media is boron saturated prior to placing the exchanger in-service. The two lon exchangers provide flexibility in operation so that one can be taken out of service without interrupting normal flow. The ion exchange media'is contained in a 4 x 4 High Integrity Container (HIC). The ton exchangers may be operated independently singly or in parallel, or dependently in series.

The level in each lon exchanger is maintained by regulating the flow out of the ion exchanger to match the inflow. The outflow is regulated by a throttling contfoi valve V029 or V266 (LV 45 or 72), which is located downstream of an air driven reciprocating diaphragm pump P-6 or 8. This valve automatically throttles in response to changing level in the ion exchanger. The maximum system flow rate is 30 gpm per 4 x 4 liner. The pumps head-flow characteristics can be changed by adjusting the air pressure to the pumps. The air supply to '

the pumps has been modified to included a dessicant type air dryer, and pump exhausts have been manifold and routed to a floor drain to prevent contamination due to ruptured diaphrams. Post filter F-6 is located downstream of these pumps to prevent the migrt lon of any resin fines. The water is returned from here to the RV via flexible hoses.

Sample points are provided upstream and downstream of each filter train. These samples are routed to sample box 1, a glove box located in the FHB. The glove box has a self contained blower and HEPA filter which discharge to the FHB ventilation system. Sample points are also provided downstream of ion exchangers K-1 and K-3 (upstream sample is filter effluent sample point). These outlet samples are routed to sample box 2, a laboratory hood located in the Fuel Handling Building (FHB). The hood is connected to combination blower /prefilter, HEPA filter package S-2 and discharges to l 1

Rev. 11/0136P

3525-015 ATTACHMENT 1 the FHB atmosphere. The S-2 inlet dampers should be adjusted to maintain a 100 to 140 feet / minute face velocity at the sample box 2 hood.

This system provides the operator with the capability to periodically monitor the effectiveness of the system. Also, the turbidity of the effluent from the filters is constantly monitored by nephelometers and displayed at the local control panel. The radiation levels of the ion exchange influent and the boron concentration and pH of the ion exchange effluent are also co stantly monitored and displayed at the local control panel.

Several inlets have been provided on the Defueling Hater Cleanup (DHC) System through which borated water can be gravity fed from the standby reactor pressure control system-storage tank to operate the filter-aid and coagulant systems, in addition to filling and backflushing the system. The CLD booster pump (CLD-P-1) may also be used as an aid in filling and backflushing the system. The system will be backflushed when radiation levels in the piping are determined to be excessive and prior to maintenance or as required to remove debris from suction screens.

A path to allow flow to the reactor coolant bleed tanks is provided to allow for system inventory reduction. Also, batch processing to remove Sb-125 will be performed by EPICOR-II from a RCBT as required. This flow path uses a portion of the submerged demineralizer system. This path is located downstream of the OHC lon exchangers, and, as such, this flow does not pass through the Submerged Demineralizer System (SDS) lon exchange vessels.

1.3.2 System Components P-2 A/B Reactor Vessel Cleanup Pumps Type: Vertical Submersible Deep Well Pump Model: Goulds VIS 9AHC/2 Material: Stainless Steel Bowl and shaft with a bronze impeller Motor: Franklin Electric 25 hp, 460 Volt, 3 phase Rating: 264 FT TDH at 220 gpm Minimum Flow: 20 gpm F-1/2/3/4 Reactor Vessel Filters Type: Pleated Sintered metal media Model: Pall Trinity special product contained in a critically safe canister Rating: 0.5 or 16 micron Nominal Removal Rating Flow: 100 gpm Rev. II/0136P

3525-015 ATTACHMENT l' F-5/6 Filter Canister Post Filter and DWC Post Filter Type: Disposable Cartridge Model: Filterite No. 921273 Type 18M503C-304-2-FADB-C150 Rating: 0.45 micron to 30 micron nominal removal rating Flow: 20 to 60 gpm K-1/3 Ion Exchangers Type: Zeolite resin or other approved media contained in a 4'x4' HIC-Model: Nuclear Packaging 50 ft 3 Enviralloy Demineralizer/ HIC Flow: 30 gpm P-6/8 Forwarding Pumps Type: Air driven double diaphragm pump Model: B.A. Bromley Heavey Metal Pump Model No. H25 or Harren Rupp Sandpiper Model SA2-A Rating: 60 feet TOH at 60 gpm PSV R-4, R-5, R-6, and R-7 Relief Valves Model: Anderson Greenwood No. 83MS46-4L Orifice Area: 0.049 in2 Set Pressure: 130 psig Sample Box 1 Type: Glove Box Mfgr. Labconco Model: No. 50002, Radioisotope Glove Box Material: Fiberglass-reinforced polyester Built-in Blower: 115 volt,,l/15 HP, variable speed Filters: Inlet Prefilter, outlet HEPA filter Dimensions: 50" x 30" x 37" Sample Box 2 Type: Laboratory Hood Mfgr: Labconco Model: No. 47810, Radioisotope-47 Laboratory Hood Material: 316 stainless steel Dimensions: 47" x 29" x 59" Recommended Face Velocity: 100-140 ft/ min.

i i

l 1

Rev. 11/0136P j l

i

3525-015 ATTACHMENT 1 S-2 Sample Box 2 Filtration Module Mfgr: General Dynamics Reactor Plant Services Model: PF8(H)-1000 Filters? Prefilter and HEPA filter i

Blower: 230 VAC, 5 HP, 20_ AMP, 3450 rpm Rated Capacity: 1000 CFM DHC-P-12 A/8 Coaquiant Unit Mfgi: STRANCO Model: Polyblend LO PB12-0.2 Capacity: 4 to 40 cph (dilcted, activated polyner)

OHC-P-10A/B and DHC-P-13A/8 Filter-Ald and Coaqu14 nt Booster Pumps Type: Progressing Cavity Pump Model: Hoyno 6M2CDQAAA Motor: 3/4 HP, 115/230 VAC Capacity: 4 to 30 gph OHC-P-10C/D Filter-Aid Pumps Type: Progressing Cavity Pump Model: Hoyno 6M3-CDQ-AAA Motor: 3/4 HP, 115/230 VAC Capacity: 15 to 82 gph OHC-U-32A/B, 33A/B, and 34A/B Static Mixers Mfgr: Chemineer, Inc.

Model: Kenics 2.5KMS3 or 3KMS3 Material: 304 or 304L Stainless with 150# Flanged Connections for instrumentation, valves, piping, and equipment detalls, see References 12, 13, 14 and 15 respectively.

1.4 System Performance Characteristics l

The system is designed to function in any of the modes of operation shown in Table 1.

Rev. 11/0136P l

1

_ _ _ , _ . _ ,. _ _, m - , - , - -- --

3525-015 ATTACHMENT 1 TABLE 1 REACTOR VESSEL CLEANUP SYSTEM OPERATIONAL CONFIGURATIONS FILTER FLOW (GPM) ION EXCHANGER FLOW (GPM)

(Return to (Return to e Reactor Vessel) Reactor Vessel)

/ 400 (200) 0 400 (200) 30 400 (200) 60 (0) 30 (0) 60 NOTE
When using coagulant'and filter-aid, flowrate is generally limited to a maximum of liOO gpm per filter canister.

In service and the above filter flows should be adjusted accordingly. '

(Numbers in brackets indicate flow if only one train is in operation.)

1 l

Rev. 11/0136P l

3525-015 ATTACHMENT 1 The operational mode is determined by the particulate and radioactive concentrations in the RV. If.the visibility in the RV is sufficient to allow defueling operations to continue, and the NTU level is below S (see Section 2.3), a train with a bypass line may be run at a reduced flow to allow processing of the water through the ion exchangers (30 gpm each) without using the filter canisters. The choice of one or both lon exchangers is based on the equivalent C-137 concentration in the RV.

If the visibility deteriorates,'such that defueling operations cannot continue, or if the NTU level exceeds 5, processing through the ion exchangers should be discontinued, and filtration through the filter canisters should be initiated and continued until defueling operations can resume and the NTU level is below 5.

Filtration would be done by either adjusting the valve line-up in the bypassed train or by starting the other train, or by performing both of the above.

As the filters load up, the pressure differential across the filter train increases. As the differential pressure increases, the flow rate may be maintained constant by manually adjusting remote valves V015A and V0158 (HV-30A and 308).

1.5 System Arrangement Well pumps P-2A and 28 are located in the fuel storage pit of the Unit 2 Reactor Bldg. These pumps are housed in wells which are located in this pit. The wells are connected by pipe.to the Westinghouse work platform. The pump discharge is routed through a 4" hose to the f1 Iter canisters via a skid mounted manifold which is located above the water level of the canal. The filter isolation valves are also located on the skid. The filter canisters are in racks which are submerged in the fuel transfer canal. The manifold is connected to the inlet and outlet of the filters via coded hoses. The filter canister inlet-hoses are substantially longer than the outlet hoses to allow contact time between the filter-aid and waste /coaquiant stream, if used. The inlet and outlet connections are coded to prevent mis-connection of the hoses. The outlets from the filters return to the manifold from where the water is routed back to the vessel or to the ton exchange system for further processing. '

The coagulant addition systems, P-12A/B and P-13A/8, are located on elevation 347'-6" of the RB, west of the Fuel Transfer Canal. They are connected to the system via hoses attached to OHC-V-288A or 8, the injection point on the P-2A or 8 discharge. The filter-aid i systems are located on elevation 347'-6" of the RB near the incore instrument service area, and may be connected to the individual ,

l injection points at the manifold outlet piping to each of the l filter canisters via hoses.

l l

Rev. 11/0136P

3525-015 ATTACHMENT 1 The ion exchangers are located behind appropriate shielding in the FHB. The water that has been demineralized is. pumped back to ~1ts source or to one of the RBCTs by air driven pumps which are located near the ton exchangers.

Sample box 1 is at the southeast end of the spent fuel pool A.

Sample box.2 is on the DHC System platform near the DHC lon exchangers.

The system uses the following existing penetrations which have been modified for their temporary function.

Modified

. Penetration No. System Function R-542 Decay Heat Backflush/ Borated Hater Supply R-546 Radwaste Disposal Flow to Ion Gas Exchangers R-553 Radwaste Disposal Return from Reactor Coolant Ion Exchangers Liquid R-537 R.B. Emergency Spray Sampling and Core Flooding Return r

R-545B&C Spares Sampling R-5540 Instrument Air Instrument Air to LOCA Dampers Supply to DHC For further location and arrangement information see References 7, 8 and 16.

1.6 Instrumentation and Control 1.6.1 Controls The majority of system control is handled remotely from two (2) control panels which are located in the FHB. This is due to the fact that much of the system is located in the RB which has limited access. The RV cleanup pumps do have local hand switches to shut the pumps down.

Filtered water flow back to the RV is monitored by the -

operator and adjusted by remotely controlled valves V015A and V015B (HV30A and B). The flow to the ion exchangers is controlled automatically by flow control valve V084 (FV-10),

which seeks to maintain flow to the ion exchangers at the selected setpoint.

Rev. 11/0136P

3525-015 ATTACHMENT 1 Return flow to the RV from the ion exchangers is controlled automatically by control valves V029 and V266 (LV 45 and 72).

Each valve responds to a changing level in its associated ion exchanger, which is sensed by a "bubbler" type of level measuring device. This level is maintained between a high and low setpoint in the ton exchanger. The forwarding pumps' head-flow characteristics can be changed as needed by manually adjusting the air pressure to the pumps. This control scheme maintains the inflow equal to the outflow in the ion. exchanger.

For further information on the instrumentation, refer to the Instrument Index (Reference 12).

1.6.2 Power The pump motors are supplied with 480V power through a motor control center which is energized by an existing unit substation located in the Auxiliary Building. 120 VAC power will be supplied from the control panel or local sources.

1.6.3 Monitoring Monitoring equipment is provided to evaluate the performance of the system and to aid in proper operation of the system.

The discharge pressure of the submersible well pumps is monitored (PI-4A and 4B) to determine if the pump is operating correctly and also to provide another indication that the pump is operating. ,

In order to determine the degree of filter loading, the primary filter canisters and the secondary post filters are equipped with remote indication of differential pressure across the filters (DPI-5A, 58 and 33). The differential pressure across the canisters will be used to determine-when the filters are loaded to capacity.

Flow in the filter train and the ion exchanger loop is monitored (FI-7A, 78 and 10) to ensure that inflow to the RV equals the outflow. This is important to insure that the level in the RV remains constant. Also, the flow to each ton exchanger is integrated by a local device (FQI76 and 77) to i

determine the loading on each lon exchanger.

The process fluid condition; are monitored to determine the effectiveness of the system. The turbidity level in the fluid is monitored (AI 43A and 438) prior to its return to the source. Also, the capability to obtain grab samples of process fluid has been provided for at several locations in the system. The radiation levels in the process fluid are 1 continuously monitored upstream of the ion exchangers (RE-9).  !

A high radiation alarm (RAH-9) is also provided. This will 1

Rev. 11/0136P

3525-015 ATTACHMENT 1 alert the operator to the need of processing at a higher rate. The pH and boron concentration are monitored downstream of the ion exchangers (AE 11 and 17). This assures the operator that the proper boron concentration is maintained in the return flow.

The high and low level trip conditions in the ion exchangers alarm to the local control panel located in the FHB. This is don 2 to ensure that the operator is aware of this condition so that the proper evaluation of-the system condition that caused-

' the level mismatch can be made. T,1e operator will isolate the ion exchanger portion of the system during this event.

In line flow indicators are provided in the return line from the Sample Boxes to the RV. Their purpose is to confirm that flow exists through the sample box piping and, therefore, provide a means of assuring.that a representative sample has been taken by showing that there has been flow long enough to flush out the stagnant water.

1.6.4 Trips and Interlocks The RV cleanup well pumps, P-2A/B, are provided with low level setpoint trips, and alarm LAL-2A, to ensure that the pumps do l not operate under potential cavitation conditions. Also, a  !

low level in an ion exchanger will trip its forwarding pump <

and terminate flow from that ton exchanger. Additionally, a  !

high level _in the ion exchanger would terminate flow to that l lon exchanger by closing its inlet valve, and also would stop 1 its forwarding pump. These trips are taken from a bubbler l level probe in the ton exchangers. A low level in the Internals Indexing Fixture (IIF) will trip pumps P-2A and P-28.

Locally mounted toggle switches are provided near the ion exchanger to disable the level switches to allow for filling and draining of the ton exchangers. An alarm at the local control panel alerts the operator when the level switches are disabled.

The RV cleanup well pumps, P-2A/B are equipped with interlocks to prevent them from being started during a low level condition. Additionally, either a high or a low level in the

, ion exchangers prevents the valve upstream of the icin exchangers from being opened and prevents the restart of the air driven forwarding pumps. This will ensure that the exchangers are not overfilled and a?so that any flow mismatch

' condition is properly evaluated by the operator prior to restart of the system.

For trip setpoints, see Section 2.2.

Rev. 11/0136P

. ~.

3525-015 ATTACHMENT 1 1.7 System Interfaces Those systems interfacing with the DNC are as follows:

a. Standby Reactor Pressure Control System Use: Provide a source of borated water for backflushing, filling and the filter-aid / coagulant systems Tle-in: A single connection from SPC-T-4 downstream of SPC-V-1 to several poincs in system
b. Submerged Demineralizer System Use: Provide a path to the reactor coolant bleed tanks Tle-in: Downstream of CN-V-IX-32 near 1 1/2" jumper from downstream of lon exchanger post filters.
c. Instrument Air System Use: Provide source of instrument air to equipment in the RB and FHB.

Tie-in: From existing Instrument Air supply to LOCA dampers or Spent Fuel Pool Gate Seals.

1

d. Service Air System Use: Provide a source of service air to the Forwarding Pumps P-6 and P-8.

Tie-in: Service Station 87 plus another station if needed

e. FHB Ventilation System Use: Receive sample box 1 ventilation Tie-in: 4 inch diaceter hose station at southeast end of FH8 1
f. Canister Loading and Decontamination System Use: Provide borated water for system fill / flush.

Tie-in: At Va',ves OHC-V321. V322, and V323 NOTE: CLO spray ring now supplied by SPC-T-5 and CLD-P-2, no interconnection with DHC exits.

1.8 Quality Assurance The defueling water cleanup system is classified according to the l safety functions of its parts. There are three classifications in i this system:

l

a. Portions of the system associated with lon exchange processing are considered to be e radioactive waste processing system; therefore, these portions of the system shall be subject to the quality assurance guidelines contained in NRC Regulaf.ory Guide 1.143.

l

b. The filter canisters are classified as nuclear safety related I and are designed to prevent a condition that could result in a  !

return to nuclear criticality of the fuel retained in the  !

filters.  !

Rev. 11/0136P i

\

3525-015 ATTACHMENT 1

c. The remaining portions of the system are subject to the BNAPC non-safety-related quality assurance program.

The THI-2 Recovery QA Plan will be appilcable for work performed on site.

2.0 SYSTEM LIMITATIONS, SETPOINTS AND PRECAUTIONS 2.1 Limitations The system is flow limited to 200 gpm through each filter train, 400 gpm total, and 30 gpm through each lon exchanger, 60 gpm through the ton exchanger loop.

The main filter can!sters are limited to a maximum allowable psid which is flowrate dependent as read on DPI-5A/B (see graph Section 8.0). This allows a maximum of 60 psi differential across the filter media including friction losses in the piping and hoses at-design flows.

At 55 psid, an alarm on the local control panel will alert the operator to monitor filter pressure differential closely.

The filter canister post filter (F-5) is limited to 18 psid. At this point, an alarm on the control panel will inform the operator to stop the flow through the post filter and investigate. The ton exchanger post filter (F-6) is limited to 45 psid.

The ion exchanger post filter is considered full and ready for change out when either the maximum pressure differential is reached or when the performance (flow) drops 207. below design flow.

2.2 Setpoints OPSH 5 A/B trips the alarm at 55 psid across the filter' canisters.

ASL 17 trips the alarm at a Icw Boron concentration of 4850 ppm.

DPSH 33 trips the alarm at 18 psid across the filter canister post filter.

RC-LIS 103 trips alarms and pumps at hign IIF level of 327'-9" and a low IIF level of 327'-3".

RIS-9 trips the alarm at a high radiation reading of 0.9 mR/hr.

LSL 45/72 and LSH 45/72 trip the ion exchange loops at t 3" from the nortral operating level. (NOTE: Low level is 10" from top of IX, High level is 4" from top of IX.)

l Rev. II/0136P

_.____..______________.__u

3525-015 ATTACHMENT 1 LIS 2A/B trips alarm LAL-2A when a decreasing level of 320'-6 1/2" is reached in the well, and trips pumps 2A/B when a decreasing level of 317'-6 1/2" is reached in the well. (The pumps are tripped when the water is approximately l'-0" above the pump suction).

For additional setpoint information, refer to Reference 12, 2.3 Precautions Due to the number of quick disconnect couplings, extra care should be taken to ensure that the couplings are properly connected and that they are connected in the proper locations. This precaution will help prevent a loss of RV inventory.

The portion of the startup procedures concerning the well pumps should be strictly adhered to to prevent the rapid filling of an empty manifold. This situation could cause a harmful pressure wave to develop which has the potential to damage the filter media.

Also, during initial startup, a siphon must be established in the suction of the well pumps. This will be done by filling and venting the piping and by slowly starting the system.

The filter canisters operate by a surface filtration method, and their efficiency increases as a cake is built up on the surface of the media. Therefore, the build up of this cake is an important part of the flitration process. The canister life expectancy may be increased by the injection of a coagulant and/or filter-aid into the waste stream upstream of the filters. To prevent the migration of fines to the post filter, the ton exchange portion of the system should not be started until a cake has begun to be formed on the media. This can be verified by observing the turbidity of the filter effluent. When the filter train is started up, there will be an initial turbidity spike caused by smaller particles passing through the media. As the cake is built, these particles are stopped and the turbidity decreases. Once the turbidity reaches a level of 5 NTU or less, the ion exchange portion of the system can bc started. To prevent the breakdown of the cake, the system should not be started or stopped unnecessarily.

Due to the radioactivity in the water, the system should be carefully drained and flushed prior to any maintenance work.

Double isolation has been provided foi in the system design to separate borated and nonborated water supplies.

Periodicaily the face velocity across the sample box 2 hood should be checked to verify it is within the range of 100 to 140 feet / minute. If the face velocity is too low the S-2 inlet dampers should be readjusted accordingly.

, Rev. 11/0136P

3525-015 ATTACHMENT 1 3.0 OPERATIONS 3.1 Initial Fill The system is filled initially by borated water from the standby reactor coolant pressure system through the backflushing system provided (see section 3.7). The filters.are filled to the inlet and outlet manifolds and the ion exchangers are filled until they reach their normal operating level. The suction piping from the IIF to well pumps 2A/B should be filled as much as possible.

To initially fill the OWC ion exchangers K-1 and K-3 the level switches must be blocked out. This is accomplished by placing.the block-out toggle switch, for the ton exchanger to be filled, in the proper position. This will allow isolation valve V025 or V250 to be opened. Once the ion exchanger is filled to the operating level, the level switches are returned to operation by returning the block out toggle switch to its original position. As a reminder to the operator, an alarm is activated at the control panel when the level switches are blocked out.

3.2 Startup Prior to startup, valve alignment must be checked to verify that the process water for each filter train and the ton exchanger loop is taken from and returned to the RV. If coagulant and filter-aid are to be used, the appropriate filter canister inlet and bypass valves are to be opened and the respective filter canister outlet valves are to be closed. The well pumps P-2A/B are isolated by the remote isolation valves V004A/B (HV27A/B) and manual isolation valves V370A/B, while the manifold inlets are isolated by manual isolation valves V372A/B. Therefore, the appropriate manual isolations must be opened. The ton exchanger loop is isolated by the remote isolation valves V025 and V260, and the control valves V029 and V266 (LV45 and LV72) in the ion exchanger loop. The ,

return lines to the source are isolated by the remote control '

valves V015A/B (HV 30 A/B). For initial startup, valves V016 A/B should be closed. The well pumps are started and placed on minimum recirculation flow. The pump isolation valve V004A or B (HV27A or B) for one filter train is slowly opened to allow any trapped air to escape through the automatic vent valves. Once the isolation valve is fully opened, the return valve V015 A/B (HV30A/B) is throttled open to obtain flowrate. During initial startup, the l globe valve V016 A/B is opened slowly untti 200 gpm through the train is obtained. Following initial startup, valves V016A/B will remain in these positions, and startup will be initiated by slowly opening valve V004A/B (HV27A/B) with valve V015A/B (HV 30A/B) throttled open. Flow is then adjusted to desired flowrate by adjusting valve V015A/B (HV 30A/B). If coagulant and filter-ald are being used, their injection is initiated followed by the I opening of the appropriate filter canister outlet valves and the '

closing of the bypass valves.

1 i

Rev. II/0136P I

~3525-015 ATTACHMENT 1 The ton exchange system is brought into' service only when the turbidity, as monitored by the in line nephelometer, AE-43 A/B or by sample results, reaches an acceptably low level (i.e. 5 NTU).

The ion exchanger (s) should always be brought to normal operating level prior to operation of this portion of the system.

If the ion exchanger is at low level, it should be filled with borated water from the back flush system (see Section 3.7). At-this time, the inlet isolation valve V025 or V260 is opened. The air pressure to the ton exchanger forwarding pump is. manually adjusted to the pressure required to maintain the flow rate chosen. The air supply solenoid valve V154 or V262 is then opened which will start the pump and lower the level li. the ton exchanger to the point where the level control valve will close. This level is above the isolation low level. Flow is slowly started to the ton exchanger by opening the flow control valve until the desired ion exchanger flow rate is obtained. The proper flow of water will be returned to the source automatically as the level control for the ion exchanger adjusts the downstream control valve to regulate the outflow.

The sample box 2 filtration module inlet dampers should be adjusted to create a 140 feet per minute face velocity across sample box 2.

3.3 Normal Operation Normal operation of the system is in one of the modes shown in Table 1 of Section 1.4. The mode of operattor. chosen is based on the particulate and radioactivity concentrations in the Reactor Vessel.

3.4 Shutdown The steps to bring the system to a shutdown condition are basically the reverse of the startup procedure. The' ion exchanger (s) flow would be brought to zero slowly by remote operation of the upstream flow control valve (s). As the level in the ton exchanger (s) drops, flow from the forwarding pumps is terminated by the closure of the control valve downstream of the pump. Either (depending on system operation) of the isolation valves from the flitration trains to the ton exchanger is then closed, and the solenoid valve for the air supply to the forwarding pump is closed. The filtration trains are shut down one at a time by stopping coagulant / filter-ald injection, if applicable, and closing the flow return control valve (s) and then shutting down the pump (s) and closing the pump l 1 solation valves. '

3.5 Oraining i I

There is a low point drain which can drain both flitration train l manifolds and part of the ion exchange loops to the fuel transfer canal. A manual block-out switch is provided which will deactivate Rev. 11/0136P 1

3525-015-~

ATTACHMENT 1 the ion exchanger. level switches. This allows the ion exchangers to be pumped out to the reactor coolant bleed tanks via the connection provided.

3.6 Refilling The fully drained systens can be refilled in the same manner.that the system was initially filled. A partially drained system can be refilled by using either the back flush system (see section 3.7) or the well pumps (see section 3.2).

3.7 Infrequent Operations Flushing of the system may be performed when the internal contamination level gets high or prior to internal-maintenance work. The system is shutdown (see Section 3.4) prior to flushing.

One flushing option allows a gravity flush from SPC-T-4. Borated water is stored in the charging water' storage tank, SPC-T-4, ,

located at the 347 ft. elevation in the FH8. This tank is connected to the DHC System. If desired, the CLO booster pump (CLD-P-1) may be used to assist in backflushing. Either filter train may be flushed without stoppinn flow through the other.

Flushing may be accomplished by opening one of the inlet valves from the flushing system (depending on which portion of +5e system is to be flushed) and then opening the drain valve to the fuel transfer canal. After sufficient time has been allowed to flush the system, the drain valve is closed and then the inlet valve is closed. The suction screens may be flushed individually using borated water from SPC-T-4 and CLD-P-1, or by directing the other train effluent to the flush piping. The system is then restarted following the procedures in Section 3.2.

The ion exchangers may be operated in series, with the first containing the normal zeolite media for removal of cesium and strontium, while the second is loaded with activated charcoal to remove organic carbon, or some other unspecified media. In the case of activated charcoal, the media is borated prior to use to prevent deboration of processed fluids. In the case of any other nedias which may be used, testing will be performed prior to use, to ensure these media have no adverse impact on RCS chemistry or specifications.

System inventory can be decreased as needed by diverting the return flow from the ion exchangers through the lines provided to the Reactor Coolant Bleed Tanks. Also, the water can be routed to the ROBT as required for processing through EPICOR to remove Sb-125 or other contaminants not removed by DHC lon exchangers.

i Rev. II/0136P

3525-015 ATTACHMENT 1 3.8 Transient Operations The only effects of anticipated transients (e.g., loss of pumps, valve misoperation, or loss of controls) are a mismatch of flows from and to the RV. More water can be removed from the source than is replaced by a failure to control. level in the ton exchangers.

In the worst case where level control in the ton exchangers, while operating in-parallel,-is lost, the source outflow will exceed the inflow by a maximum of 60 gpm. This situation can be detected by flow instrumentation in the return line and by a decreasing level in the RV.

4.0 CASUALTY EVENTS AND RECOVERY PROCEDURES 4.1 Loss of Power A loss of power to the entire system would simply shut the system down. A loss of power to the well pumps with an additional failure which results in simultaneous loss of level control in the ton exchangers would result la a flow mismatch. In this case, the system would be automatically shut down until power is restored.

Loss of power to individual components would place the comr,vnent in its safe mode. An air operated valve, for example, would fall to a position that ensures no damage to other components.

Loss of power to the control panel would cause the loss of all information and fail all control and solenold operated valves. The system would be shutdown until power is restored.

4.2 Loss of Instrumentation / Instrument Air Loss of instrumentation would hamper operations but no adverse conditions would r9sult and the system could be safely shut down until the problem is resolved.

Loss of a single instrument channel will result in the loss of indication for that channel anJ, for those channels that have control features, a flow mismatch. This flow mismatch will result in an automatic shutdown of the affected portion of the system.

I Loss of instrument air will take the ind!'.idual components to their fail safe position. Loss of the IIF level indication system (bubbler) will result in an arroneous level indication which will be noted when compared with a redundant level Indication system.

Flow mismatches induced by loss of air will result in automatic trips. Loss of air to the IIF level monitoring system will initiate a low air supply pressure alarm and a pump trip on IIF low level, a

Rev. 11/0136P

J 3525-015.

ATTACHMENT'1 On the loss of instrument air, level control in the ion exchangers.

would be lost; however, the lon exchanger inlet isolation valve (V025 and V260) would fail to the closed position. Also, the level control valves, V029 and V266 (LV45 and LV72), will fall to the closed position to prevent siphoning of the ion exchanger.

4.3 Filter Media Rupture A failure of the filter media in the canister could potentiallyL release fuel fines to the ion exchange portion of the system. .A' post filter is located downstream of both filter trains in the line I to the ion exchangers. This filter will trap any fuel fines which '

would be transported past the filter' canisters in the event of filter failure. The. post filter is designed to be critically. safe i and is sized so that a small accumulation of debris will increase I the differential pressure to the alarm setpoint. Also, the nephelometers in the return.line would alert the operator to a )

j possible media rupture since the turbidity vould increase rapidly.

The recovery procedure is to isolate the filter trains and find the ruptured. filter by observing the differential pressure versus flow

, or monitoring effluent turbidity for each individual canister. .

Lower differential pressure for a given flow or higher effluent '

turbidity will Indicate that this filter is ruptured. That canister or canistere and the post filter cartridge would be replaced and.the system restarted.

l The system may be operated in a mode that bypasses the filter I canisters. During this mode of operation, the filter canister post filter will be providing the required system filtration. In order to preclude the rupture of the post filter's filter media during operation, the maximum differential pressure that will be permitted across the post filter will be 18 psid. The post filters are i designed for a maximum differential pressure of 45 pstd.

4.4 Line and Hose Break The consequences of any line and hose break are a loss of RV I inventory and the spread of contamination. The system has been  !

designed to mitigate the consequences of such an incident to the i extent possible. '

In case of a hose rupture or line rupture, downstream of the RV pumps, P-2A and 28, the system is equipped to trip these pumps on the IIF low level and alarm to the control panel. This event could deliver approximately 500 to 1000 gallors of RV water to the area of the break. The poter,tial areas affected would be the RB and the FHB, each of which has either a sump, or drains to the Auxillary Building sump to contain the spill.

l I

Rev. 11/0136P j i

t,

z -

3525-015 ATTACHMENT 1 If a suction pipe to the well pumps or a return hose to the RV should rupture, a siphoning of RV. water would take place. The two 4 inch suction connections provided in the Westinghouse work platform are provided with two 3/4 inch holes, or in the case of the 2 inch deep suction, one 3/4 inch hole, drilled 18 inches below the water level which will act as a siphon breaker (s). The three 2 inch return lines are equipped with spargers, which are simply holes drilled into the pipes. The first holes are drilled 18 inches below the water level which will act as a siphon breaker.

The sample return line is terminated 18 inches below the water level. Therefore, a maximum of approximately 3000 gallons of RV water would spill into the fuel transfer canal following a hose rupture. Approximately half of this water would be contained in the New Fuel Pit.

l The recovery from these events would be accomplished by isolating i the ruptured section and replacing the ruptured hose /ptpe.

5.0 SYSTEM MAINTENANCE The maintenance procedures are the recommended practices and intervals as l described by the equipment vendors.  !

6.0 TESTING l

6.1 Hydrostatic Testing Piping and hose will be hydrostatically pressure tested. Testing of hose will be done after couplings have been attached. Pipe will be tested outside the buildings.

6.2 Leak Testing All accessible connections will be initial service leak tested f aft 3r the pip;ng is asscmbled, i 6.3 Instrument Testing ,

All instruments will be calibrated by vendors prior to j installation. Complete electric / pneumatic loop verification will be done during start-up. Calibration will then be maintained by the Plant Maintenance Department.

7.0 HUMAN FACTORS filter canister hoses are coded for quick identification of inlet versus outlet.

Extensive use of hoses is made, especially in the RB, allowing quick instailation and use of existing radiation shielding. Hoses which are expected to be frequently disconnected are equipped with quick disconnect couplings for ease of removal and replacement, and positive identification to preclude incorrect connections.

Rev. II/0136P

3525-015 ATTACHMENT 1 i The following human factors guidelines have been incorporated into the .l design of the DHC System control panel: ,

o The panel includes all controls and displays required for normal operation.

o Displays provide immediate feedback that the system has responded appropriately to an operator's action.

o Controls and displays are laid-out for a left to right flow path. I o Himic lines are used to clarify flow paths. j o Control devices are mounted 3 to 6 feet above the floor, o Each control device has a name plate.

o Light bulbs are replaceable from the front of the panel, o Recorders are grouped on the right side of the panel away from the  ;

flow path. '

i o Adjustments to recorders and controllers can be performed from the I front of the panel.

I J

l l

1 Rev. 11/0136P

. _ _ _ - - - . _ _ _ _ _ _ _ - _ _ _ - _ - . _ _ _ - - -- - - --- - l

l 1

f

]

3525-015 ATTACHMENT 1 8.0 MAXIMUM ALLOWABLE AP AT GIVEN FLOWRATES l

Maximus Allowable AP at Given Flowrates .

-1 ..

g_ ,g g . .= - i. . _.*

-. t ,, y, g ,

-. . i*:,:t .- ']::-~ ; =E -_F - .

-i.~._%

- " * ~ " "

- .... , ' . . . _::'".' ."".  :~._* a'=-** * [T"* ."J"' """-

T,

- . E% =~- _-ai .E6 $ *==. - = * " ' .. " .

a =

-  :=r- ---'.-

-9 -- .

,_-.-:__ _ r.-- =_=~P. .'

--  ;. _ j .

s n--

-:- n .-

_.,,;_- = __ n . :-: .rw.

.:- f

. ~* _a.->-

"M = -- i

--- =u w..

-- - - . 5

.. ;__._--$r-+

=.: : ru =.__ x.=::: _li5=.._ 4. c. _ ,

- _J -

. i W f""# "_ ,, ___i_ , "".==1.- r== _ _; ' * * * - - _ _

-./i,g-=.:f""=:"l:

,- =

_..._,-r=-

_ _ l, s.-i .

3 d 1

= e- r _-- . _ _

.=. ,

=._._i-- . . -4 c.___. _.

e. ,w . _ - - ._- .E ,

i

- ~_-~- \ -_ _.,, . _ -

. . . . ;lll;=

J

--_ _ _ -. ~ . g _ _._

.-'='"-1 ? . __- -T g

..._-._.Y i . . -

-  ?""""P".** __

e

-q ,:i__---:

g - --

-m

__x: .. __ --

5

_.._ _ _ , - _ _ _ - y--- -

3  : ,

r- >-.-

e.i.

._ _-_ _ se N .__ . _ . . _ . -

=.._:_.<._-.-_==r. :

r _. - >=_ _ -

c,-w_-- a.

\:-

= , =_-we_=_ -=_t-m g

- - ._x _.. -.__ _._ -.  % ,

\- --2____.

g :;4

--_ .--1__

4 __

3

-_ M

_._- g v- '

i 3 4 '

,,6 l

.=-=_.

. ~_

\..__x \_ . .

+ -

- ~_.- _

, g;_ _ _ .

_ _ _ ~

-N .

N -_

e.4 C-

.---------- _-- 3

8. -

i ya- ;b __, __- .___ _ _ _N. __.

__-- x._ _

_ . . 3_ . _ wm _.. __._ _

_.._.____.x_

___ _ _m .

m__ :_. _.e __

-+

3 m _

y

-=- 1 -_ ==g- - _x x- _ =;

7 -- _ _ _ , -

- _ _ _ . s_

_--_=___ _ _ _ _ _ _ __ _.

. .""~ -

.I'_

u

.__ ,_=== ____ ,___

.__1 t m _ t- -*-

--y==-+- -

g J- __. - -.

__ a : --- :

2 5 3 3 R R t l _-

=r-____. ._

_-_. __==1-_ _. , , , , , , . . , ,

7 -- . _ - _.__

i . s . . I :.= , - - y . . . . = w w w.cro = n=1; .__

Rev. 11/0136P

7525-015 l

ATTACHMEldT 2 SYSTEM DESCRIPTION DEFUELING WATER CLEANUP SYSTEM FUEL TRANSFER CANAL / SPENT FUFL POOL CLEANUP SYSTEM l

1 l

l l

l I

i l

l I

3525-015

. ATTACHMENT 2 TABLE OF CONTENTS SECTION PAGE 1.0 DESIGN DESCRIPTION 3.0 1.1 Summary 3.0 1.2 References 3.0 1.3 Detailed System Description 6.0 1.4 System Performance Characteristics 11.0 1.5 System Arrangement 13.0 1.6 Instrumentation and Control 14.0 1.7. System Interfaces 15.0 1.8 Quality Assurances 16.0 2.0 SYSTEM LIMITATION, SETPOINTS, AND PRECAUTIONS 17.0 2.1 Limitations 17.0 ,

2.2 Setpoints 17.0 2.3 Precautions 18.0 3.0 OPERATIONS 19.0 3.1 Initial Fill 19.0 3.2 Startup 19.0 3.3 Normal Operations 20.0 3.4 Shutdown 20.0 3.5 Draining 20.0 3.6 Refilling 20.0 3.7 Infregeent Operations -21.0 3.8 Transient Operations 21.0 4.0 CASUALTY EVENTS AND REC 0VERY PROCEDURES 21.0 4.1 Loss of Power 21.0 4.2 Loss of Instrumentation / Instrument Air 21.0 4.3 Deleted 22.0 4.4 Filter and Hose Break 22.0 4.5 Line and Hose Break 22.0 R6v. II/0136P I

'3525-015

ATTACHMENT 2 TABLE OF CONTENTS (Cont'd)-

SECTION PAGE f

5.0 SYSTEM MAINTENANCE 23.0 6.0 TESTING 23.0 6.1 Hydrostatic Testing 23.0 6.2 Leak Testing 23.0 .

6.3 Instrument Testing 23.0-j 7.0 HUMAN FACTORc 24.0 i

i. >

j  !

4 i

b

]

k 1

i t

Rev. 11/0136P

]

l i

3525-015 ATTACHMENT 2 1.0 DESIGN DESCRIPTION 1.1 Summary The Fuel Transfer Canal (FTC)/ Spent fuel Pool (SFP) cleanup system is a temporary 11guld processing system which is designed to process water contained in the SFP and/or the FTC. The system's major functions are:

a. To filter the water contained in the SFP and/or the FTC to remove suspended solids above a nominal .5 micron rating.

This is done to maintain the clarity of the water,

b. To remove soluble fission products from the SFP or the FTC by demineralization of the water. This is done to keep the equivalent Cs-137 concentration less than .02 uCl/m1, excluding antimony, and thus reduce the dose rate contribution of the water. Also, a flowpath to EPICOR II via the Reactor Coolant Bleed Tanks (RCBTs) is provided to remove Sb-125 in the event that high Sb-125 levels are encountered.

1.2 References

1. Planning Study, Defueling Water Cleanup System Document No.

TP0/TMI-046.

2. Technical Plan, Defueling Water Cleanup System Document No.

TP0/TMI-047.

3. Olvision I, System Design Description, Defueling Hater Cleanup  ;

System Document No. 2-R72-OHC01. ,

4. Bochtel Drawing 2-M74-OHCO', Defueling Water Cleanup (OHC) l Reactor Vessel Cleanup System P&IO.

4a. GPU Nuclear Drawing 20-3525-1430, OHC-Reactor Vessel Cleanup 1 System.

l S. Bechtel Drawing 2-M74-OHCO2, Defueling Water Cleanup (OHC) l Fuel Transfer Canal / Spent Fuel Pool Cleanup System P&IO.

6. Bechtel Drawing 2-M74-0PC03, Defueling Water Cleanup (OHC)

Auxiliary Systems P&lO. 1 1

7. Bechtel Drawing 2-POA-6401, General Arrangement Fuel Handling i Building Plan El. 347'-6".
8. Bechtel Drawing 2-P0A-1303, Gener6 Arrangement Plenum Removal Reactor Building.
9. DCN No. 2026-30-2, Flow Olagram Spent fuel Cooling and Decay Heat Removal.

1 l

1 Rev. 11/0136P

P 3525-015 ATTACHMENT 2

10. Burns and Roe Drawing No. 2026, Flow Diagram Spent Fuel Cooling and Decay Heat Removal.
11. GPU Nuclear Drawing No. 2R-950-21-001 P&lD Composite Submerged Demineralizer System.
12. TMI-2 Recovery Division System Design Description for Submerged Demineralizer. System, Document No. SD 3527 rg'*;. ,

. 13. Division System Design Description for Reactor Vessel Cleanup i System, Document No. 15737-2-M72-DHC01.  ;

14. Instrument Index, Document No. 15737-2-J16-001, 1

14a. DHC Instrument Ltst, 4220-IMP-3525.01.

15. Design Engineering Valve List Document No. 15737-2-P16-001.
16. Mechanical Equipment List, Document No. 15737-2-M16-001.
17. Standard for Piping Line Specifications. Document No.

15737-2-P-001.

18. Bechtel Piping Isometrics
a. 2-P60-DHC01-DHCS-Pumps P-2A&B, P-3A&B, P-4A&B, and Miscellaneous Details. .
b. 2-P60-DHC04-DHCS - Transfer Canal / Fuel Pool Filter Trains i w A & B - Inlet Manifold Piping. '
c. 2-P60-DHC06-DHCS - Discharge Pigi ng from Sample Boxes No. I and No. 2 to Penetration R.537 '

s j d. 2-P60-DHC07-DHCS - Samples Lines Upstream and Downstream l of Ion Exchangars, i e. 2-P60-DHC08-DHCS - Forwarding Pumps P-6.and P-7 Suction 1

and Discharge Fipilg.

f. 2-P60-DHC09-DHCS - Forwarding fump: P-6 and P-7 Discharge  !

Piping. i

g. 2-P60-DHC10-DHCS - Supply Piping to Ion Exchangers K-1 and K-2, Supply and Discharge Piping from Post Filter F-8.

2 {

h. 2-P60-DHC11-DHCS - Supply Piping to Ion Exchangers K-1, i i K-2, and K-3.
1. 2-P60-DWC12-DHCS - Borated Hater Flush Piping from SPC-T-4. l l

Rev, 11/0136P l l

l

L 3525-015 ATTACHf'ENT 2

j. 2-P60-OHCl3-OHCS - Transfer Canal / Fuel-Pool F11ter Trains "A" and "B" Outlet Manifold Piping,
k. 2-P60-OHC14-OHCS - Transfer Canal / Fuel Pool Filter Trains "A" and "B" Outlet Manifold Discharge Piping, Supply and Discharge to Booster Pump P-5.
1. 2-P60-OHC15-0WCS - Nitrogen Supply. Piping to SPC-T-4 and Drying Station,
m. 2-P60-OHC16-OHCS - Discharge Piping from OHC Booster Pump P-5.
n. 2-P60-OHC17 DHC Miscellaneous Piping Details.
o. 2-P60-OHC18 - OHCS - Miscellaneous Piping Details.- 4
p. 2-P60-DHC19 - OHCS - Sample Panel No. 1, Fuel Handling Building.
q. 2-P60-OHC20 - DHCS - Sample Box No. 2, fuel Handling Building.
r. 2-P60-OHC21 - OHCS - Sample Panel No. 2 Drain and Return to Spent Fuel Pool A.
s. 2-P60-OHC22 - OHCC - Air Supply Piping Details.
19. ECA No. 3245-84-0034 - Defueling Hater Cleanup System Penetration Modifications.
20. ECA No. 3525-84-0041 - Definition of the Defueling Hater Cleanup System (OHCS).
21. ECA No. 3527-84-0042 - SDS Tle-in to OHCS.
22. Bechtel Area Piping Drawings
a. 2-P70-OHCO2 - Instrument Air Manifolds and Hose Routings for DHCS - Reactor and fuel Handling Building.
b. 2-P70-OHCO3 DHCS Hose Network Reactor Building Plan El. 347'-6".
c. 2-P?v-OHC04 DHCS Hose Network Fuel Handling Building Plan E!. 347'-6".
d. 2-P70-DWC05 - OHC System Hose Network Sections and Details,
e. 2-P70-OHC06 - OHCS - Process Hose Schedule .. Reactor and fuel Handling Building.

Rev. IlJ01369 L _

3525-015 ATTACHMENT 2

f. 2-P70-CLD01 - Canister Loading and Decontamination System, Fuel Handling Building.
23. TER 3527-016, THI-2 Division Technical Evaluation Report for Defueling Canisters.
24. ECA Ho. 3525-87-0476, Transfer Canal / Fuel Pool Tie-in to Reactor Vessel Filtration.
25. ECA No. 3525-87-0482, DWC Forwarding Pumps Exhaust Modification.
26. MMA 3525-87-0018, Air Dryer for DWC Forwarding Pumps.
27. ECA No. 3635-86-0322, FCC-LAHL-103 Alarm Modifications.
28. MMA 3257-87-0046, CLD System Isolation from DHCS.
29. ECA 3525-88-0503, DWC FTC/SFP Body Feed and Coagulant System
30. ECA 3525-88-0504, DHC FTC/SFP Body Feed and Coagulant System l 31. MMA 3525-88-0068, DHC IX Forwarding Pumps Changeout 1.3 Detailed System Description 1.3.1 Description The FTC/SFP cleanup system is a liquid processing system which can process water from the SFP and/or the FTC. For the corresponding P&ID's see references 4, 5, and 6. Some valves identified herein have been given an instrumentation designator as well as a valve number. When this occurs, the l instrument designator is shown in parentheses after the valve number.

l The SFP and the deep end of the FTC will be filled with water I to a level of 327'-3" +8". A dam with top elevation 328'-2"

-2" separates the shallow a'id deep ends of the FTC.

l Two vertical submersible well pumps, P-3A/B, ar2 located in l the FTC. Each is capable of pumping a net 200 gpm. A 20 gpm I

continuous recycle protects the pump motor. P-3A/B take suction from trough-type skimmer U-7 via a 6 inch flexible hose. A secondary, 4 inch, subsurface inlet below the skimmer will prevent pump starvation due to skimmer congestion.

! Pumps P-3A/B discharge to the FTC/SFP filter canisters via Reactor Building (RB) penetration R-524. The internals of check valve SF-V190 are removed to make use of existing piping connected to R-524.

\

1 l

1 Rev. 11/0136P l

.w

3525-015 ATTACHMENT 2 Two vertical submersible well pumps, P-4A/B, identical to P-3 A/B in the FTC, are located in the SFP. P-4A/B take suction from trough-type skimmer, U-8, similar to U-7.

The system has four particulate filters, each cdpable of filtering a flow of 100 gpm. The filters are contained in modified fuel canisters submersed in the SFP to provide the appropriate radiation shielding. These filters are capable of removing debris, mainly fuel fines (UO2 ) and core debris (Ir02 ), down to a 0.5 micron rating. Since the canisters contain fuel fines, they are designed to prevent a criticality condition from existing when they have been loaded.

The four pumps and four filters are normally manifcided so one pump from each source discharges to one pair of filters.

Therefore, the filtration portion of the system is divided into two trains. Train A contains pumps P-3A and P-4A and filter canisters F-9 and F-10. Train B contains pumps P-3B >

and P 4B and filter canisters F-Il and F-12. In the normal mode the system filters 400 gpm from the FTC and returns the filtrate to the SFP. The system can-be manifolded to filter 200 gpm from the FTC and 200 gpm from the SFP or 400 gpm from either source. This pump arrangement provides both ,

flexibility in operations and the redundancy to permit continued operation during pump maintenance.

The system may also be configured to bypass a set of filter canisters and to route water directly to the post filter and ion exchanger. This may be done by disconnecting the inlet and outlet hoses to one canister, from the manifold, inserting a hose bypass piece between the inlet and outlet flanges on the manifold for that canister position, and closing the isolation valves for the other canister in that train.

A filter canister is used untf1 the differential pressure reaches a set point (See section 2.2). At this point the

! system is shutdown and then, after a waiting period of approximately 5 minutes, it is restarted. The d*fferential l pressure is noted and if it returns to a low value the system will be run igain to the pressure setpoint. This process is repeated until the differential pressure at restart reaches a  !

, value near the shutdown setpoint. When this occurs within one hour of restart, the train is shutdown and the filters are replaced.

Coagulant and filter-aid may be injected into the process flow to enhance filter performance by DHC-P-14 and DHC-P-13. The coagulant is injected into the DHC skimmer (U-8) when 1 operating DHC-P-4A or via SF-V-238/239 when operating -l DHC-P-3A. Filter-aid is injected into the residence coil l which provides sufficient residence time for the coagulant and l body fe-d to react prior to reaching the filter (DHC-F-10). '

l Rev. 11/0136P l

3525-015 ATTACHMENT 2 Loaded canisters are expected to generate small quantities of oxygen and hydrogen gas due to radiolysis of water. Pressure relief valves R-8, R-9, R-10 and R-11 are provided on the filter canister outlet lines upstream of their isolation valves. Their purpose is to prevent overpressuring the filter canisters when isolated due to the small quantities of H2 and 02 produced (approximately 0.029 ft 3/ day). -

The filter canisters are connected to inlet and outlet manifolds via 2-1/2 inch flexible hoses with cam and groove couplings.

Once the water has been filtered, all, or a portion of the flow can be returned to its source (either the SFP or the FTC). The amount of water pumped from its source is controlled by manually adjusting globe valves V097 A/B. The return path to the FTC uses RB penetration R-539. At each source the return path splits into two 2-inch returns to provide back pressure to valves V097 A/B. One two inch return is used for 200 gpm operation; both are used for 400 gpm operation.

A portion of the flow not returned directly to source can be further processed through either the OHC lon exchanger K-2 or the submerged demineralizer system (SDS), or used for makeup /dllutloa water for the coagulant / filter aid system (see ). Routing to the SOS is provided as a backup to K-2 and to augment total processing capability during times of high ceslum concentration in either s"Jrce. The OHC lon exchanger K-2 can process 30 gpm. The ton exchange media is a bed of zeolite resin which will remove Cs-137. The resin is contained in a 4 x 4 liner, similar to those used in EPICOR II. K-2 influent is regulated by flow control valve V085 (FV-15) while K-2 effluent is regulated by level control valve V070 (LV-46). If either high or low levels occur in K-2, LSH-40 or LSL-40 will trip both isolation valve V069, halting influent, and solenoid valve V156, shutting off air supply to OHC forwarding pump P-7, thus halting effluent.

Two post filters are provided. Filter canister post filter F-8 protects K-2 from suspended solids in the event of a canister filter media rupture. ONC post filter F-7 is located downstream of the forwarding pump to prevent the migration of  ;

resin fines. DHC forwarding pump P-7, an air driven reciprocating diaph am pump, provides the head to return flow to either source. The air supply to the pump has been  ;

modified to include a dessicant air dryer, and the pump '

exhaust has been manifolded and routed to a floor drain to  !

prevent contamination due to diaphram rupture, j The SOS can process 15 gpm. The DHC Booster Pump, P-5, is provided to increase the pressure to 140 psig to overcome the high SOS differential pressure. P-5 suction pressure will ,

Rev. II/0136P

3525-015 ATTACHMENT 2 vary inversely with pressure differential across'the filter canisters. When the filter canisters are clean or bypassed, ,

P-5 will experience maximum suction pressure. 'Since P-5 outlet pressure is controlled, pump flowrate varies. Pressure '

regulator V122 (PCV-26) controls SDS inlet pressure at 140 ,

psig, bypassing excess flow past SDS. PSV R-1 is provided.  ;

downstream of the DHC Booster Pump to prevent overpressuring the SDS due to V122 (PCV-26) failure. From the SDS, flow is routed to either the FTC or SFP.

In the event of high Sb-125 levels, the return flow from K-2 can be routed to the reactor coolant bleed tanks for batch processing through EPICOR II.

Sample points are provided upstream and downstream of each filter train. These samples are routed to sample box 1, a glove box located in the FHB. The glove box has a self contained blower and HEPA filter which discharge to the FHB ventilation system. Sample points are also provided upstream and downstream of lon exchanger X-2. These samples are routed to sample box 2, a laboratory hood located in the FHB. The hood is connected to combination blower /prefilter HEPA filter package S-2 and discharges to the FHB atmosphere. The S-2 inlet dampers should be adjusted to maintain a 100 to 140 feet / minute face velocity at the sample box 2 hood.  ;

1.3.2 System Components 6 4

F-7/8 Filter Canister Post Filter and DHCS Post Filter i Type: Disposable Cartridge Model: Filterite No. 921273 Type 18M503C-304-2-FADB-C150 Rating: 0.45 to 30 micron nominal removal rating Flow: 20 to 30 gpm F-9. F-10. F-ll. F-12 Fuel Transfer Canal /? pent Fuel Pool Filters l Typa: Pleated sintered metal media i Model: Pall Trinity special product contained in a l criticality safe canister Rating: 0.5 or 16 micron Nominal Removal Rating Flow: 100 gpm K-2 Ion Exchanger J

Type: Zeolite resin contained in a 4' x 4' HIC Hodel: Nuclear Packaging 50 ft3 . Enviralloy, Demineralizer/ HIC Flow: 30 gpm )

1 l

1 Rev. 11/0136P i l

l 3

3525-015 ATTACHMENT 2 P-3 A/B Fuel Transfer Canal Pumps Type: Vertical, 2 stage, submersible pump; Goulds model VIS, ,

size 9AHC, 5.56 in impeller Metalurgy: Stainless steel bowl, bronze impeller, 41655 shaft Motor: Franklin Electric 25 HP, 3550 rpm, 460V, 3 phase Rating: 220 gpm at 264 ft Shutoff head: 289 ft.

Min Flow: 20 gpm-(recirculation)

P-4A/B Spent Fuel Pool Pumps Identical to P-3A/B P-5 DWC Booster Pump Type: Regenerative turbine, 2 stage, SIHI ngjel AEHY 3102 BN 112.42.4 Metalurgy: 316SS casing with 316S5 shaft, impeller, and internals .

Motor: 5 HP, 1750 rpm Rating: 15 gpm at 250 ft Shutoff head: 390 ft (at min flow)

Min flow: 5 gpm Seals: Mechanical, John Crane type I with tungsten carbide seal faces P-7 Forwarding Pump Type: Air driven double diaphragm pump Model: B. A. Bromley Heavy Metal Pump Model No. H25 or Harren Rupp Sandpiper Model SA-2A Rating: 60 feet TOH at 60 gpm D-14 Filter-Ald Pump Type: Progressing Cavity Pump Model: Moyno 6N2-CDQ-AAA Motor: 3/4 HP, 115/230 VAC Capacity: 4 to 30 gph P-15 Coagulant Addition Pump Type: Hydraulically Actuated Diaphragm Pump Model: Neptune 535-A-N5 Motor: 1/6 HP 115/230 VAC Capacity: 0-18 gph PCV-26 Pressure regulator. SDS bypass Capacity: 25 gpm Model: Fischer Controls No. 98H i

l Rev. II/0136P

3525-015 ATTACHMENT 2

' PSV R-1 Reitef Valve l Model: Anderson Greenwood No. 81PS88-8  !

Capacity: 30 gpm ,

Orifice: Size E, 0.196 in2

't Set Pressure: 150 psig PSV R-8, R-9, R-10 R-il Relief Valves Model: Anderson G'eenwood No. 83MS46-4L Orifice: Area: 0.049 in2 Set Pressure: 130 psig >

Sample Box 1 .-

2 Type: Glove Box Mfgr: Labconco Model:, No. 50002, Radioisotope Glove Box Material: Fiberglass-reinforced polyester l Built-in Blower: 115 Volt,1/15 HP, variable speed Filters: Prefilter, HEPA filter Dimensions: 50" x 30" x 37" Sample Box 2 i Type: Laboratory Hood Mfgr: Labconco  ;

Model: No. 47810, Radioisotope-47 Laboratory Hood j Material: 31655  ;

Dimensions: 47" x 29" x 59" l Recommended Face Velocity: 100-140 ft/ min l 1

S-2 Sample Box 2 Filtration Module Mfgr: General Dynamics, Reactor Plant Services

Hodel: PFB(H)-1000 Filters: Prefilter and HEPA Filter Blower: 230 VAC, S HP, 20 AMP, 3450 rpm j Rated Capacity: 1000 CFM .

For further information on valves and instrumentation, refer to the Valve List (Reference 15) and the Instrument Index (Reference 14). {

For a listing of all equipment see the Mechanical Equipment List {

(Reference 16). For piping information see the Standard for Piping Line Specifications (Reference 17).

1.4 Syste.n Performance Characteristics The system is designed to function in any of the modes of operation shown in Table 1.

l l

i 1

Rev. 11/0136P l

I

.. ~ -

3525-015 ATTACHMENT 2 -

TABLE 1 FUEL TRANSFER CANAL / SPENT FUEL POOL CLEANUP SYSTEM OPERATIONAL CONFIGURATIONS Filter Flow (GPM) SOS Flow (GPM) K-2 Flow (GPM) 1 From FTC From SFP From FTC From SFP From FTC. From SFP 400 (2003- 0 0 0 0 0 400 [2001 0 '15 0 0 .0 400 (200] O O O 30 0 400 (200] 0 15 0 30 0 0 400 (200) 0 0 0 0 0 400 (200) 0 15 0 0 ,

0 400 (200) 0 0 0 30 0 400 (200) 0 15 0 -30 ,

200 200 0 0 0 0 200 200 15 0 0 0 200 200 0 15 0 0 200 200 0 0 30 0 200 200 0 0 0 30 i 200 200 15 0 0 30 '

200 200 0 15 30 0 O O 15 0 0 0 1 0 0 0 15 0 0 l 0 0 0 0 30 0 i 0 0 0 0- 0 30  ;

O O 15 0 30 0 0 0 0 15 0 30 (numbers in brackets indicato 1 pump operation) -

l l

l l

I Rev. 11/0136P i

3525-015 ATTACHMENT 2 The operational mode is determined based upon which source needs to be processed. Normally, 30 gom from the FTC will be processed  !

through the ion exchanger and returned to the SFP (no filtration).

During periods of high Cs-137 loading, an additional 15 gpm could be processed through the 505, which would reduce the recovery time of the system. If the visibility in either source becomes too poor for defueling operations or exceeds an NTU valve of 5, processing should be discontinued until visibility is restored and the NTU valve is below 5. This would be done by filtering from the proper source, through the train without the bypass hose piece.

1.5 System Arrangement References 7 and 8 present the positioning of equipment. Hell pumps P-3 A/B, are submersed in 10 inch diameter wells in the north end of the FTC in the RB. The wells are connected by a 6" flexible.

hose to skimmer U-7 located at the dam separating the deep and shallow ends of the FTC. Hell pumps P-4A/B are submersed in the

, northeast end of SFP "A" in the Fuel Handling Building (FHB).

! These wells are connected by a 6" flexible hose to skimmer U-8 located at the south end of the SFP.

The discharge of pumps P-3A/B and P-4A/B is routed to the filter

' canisters inlet manifold near the northeast end of the SFP. The filter isolation valves, vent valves, and manual control valves V090A/B (HV-64A/B) are also located there. The filter outlet ,

manifold is adjacent to the inlet manifold. ,

Filter canisters F-9, F-10, F-11, and F-12 are submersed in the SFP in the north end of the dense pack fuel rack. They are connected to the ini'et and outlet manifolds by 2-1/2 inch flexible, coded

, hoses equipped with cam and groove couplings. The coupling at the 1

fuel canister is modified for long handled tool operation.

i From the filter outlet manifold the water 10 routed either directly [

back to source or to the OHC ion exchanger K-2 or SOS for further processing. The OHC lon exchangers are located behind appropriate shielding in the northwest end of the FHB. The forwarding pump P-7 is located near K-2. .

Sample box 1 is located at the southeast end of the SFP A and sample box 2 is on the OHCS platform near the OHC lon exchangers.

The system uses the following existing penetrations which have been modified for their temporary function. Armored hose is used downstream of penetration R-539 to the FTC. 1 Modified Penetration No. System Function ,

R-57.4 Spent fuel Discharge from Cooling fuel Transfer

Canal Pumps  ;

, Rev. II/013EP

3525-015 ATTACHMENT 2 Hodified

]

Penetration No. System Function R-539 Decay Heat Closed Return to Fuel Cooling Water Transfer Canal 1.6 Instrumentation and. Control L

1.6.1 Controls ,

The components of this system are located in accessible areas of the FHB and the RB. With the exception of the DHC 109' exchanger loop, valve alignment and adjustment is performed manually to achieve the proper flows to and from the various sources.

The flow to DHC lon exchanger K-2 is regulated automatically .

by flow control valve V085 (FV-15). K-2 effluent is regulated automatically by level control valve V070 (LV-46).

1.6.2 Power The pump motors are supplied with 480V power through a motor control center which is energized by an existing unit substation located in the Auxiliary Building. A stepdown transformer will provide 120 VAC for valve operation and the control panel.

1.6.3 Monitoring i

Honitoring equipment is provided to evaluate the performance of the system and to aid in proper operai:lon of the system.

PI-25 monitors the Booster Pump discharge pressure to verify the correct operation of both the pump and the bypass pressure regulator, V122 (PCV-26) l FI-15 and FQI-15 monitor the flowrate and total flow of filtered water routed to DHC lon exchanger K-2 )

AE-16 monitors the pH in the water leaving K-2 and SDS to l verify this parameter was not altered during lon exchange FI-23A and FQI-23A monitor the flowrate and total flow of filtered water returned directly to the FTC i i

FI-23B and FQI-238 monitor the flowrate and total flow of l filtered water returned directly to the SFP FI-60 and FQI-60 monitor flowrate and total flow to the SDS l to measure system perforr.1ance and to record water processed l Rev. II/0136P

3525-015 ATTACHMENT 2 OPI-22A/B monitor the differential pressure across the filter canisters to determine degree of loading and therefore time of replacement LI-46 monitors the liquid level in DHC lon exchanger K-2 FCC-LI-102 and SF-LI-102 monitor the water level in the FTC and SFP. They are panel mounted in the control room. The level indication system is a bubbler type system. A high or low level in the FTC will alarm FCC-LAHL-102 and a high or low level in the SFP will alarm SF-LAHL-102 at the panel in the '

control room. Additionally, there is a joint FTC/SFP high-low level alarm (FCC-LAHL-103) that is locally mounted and alarms on a high or low level in the FTC or SFP.

PI-81 and PI-82 monitor the pressure in'the two instrument air manifolds in the FHB.

The process fluid condit. ions can be sampled to determine the 4

effectiveness of the system. The capability to obtain grab samples of process fluid has been provided at the inlet and outlet piping of the FTC/SFP Filter Trains A and B. Grab samples may also be taken on the inlet / outlet lines to the DWC lon exchanger as well as several points in the SDS.

In line flow indicators are provided in the return lines from 4

the Sample Boxes to SFP A. Their purpose is to confirm that flow exists throug5 the sample box piping, and therefore, provide a means of assuring that a representative sample has been taken by showing that there has been flow long enough to flush out the stagnant water.

1.6.4 Trips 1

Low or high liquid levels in DHC lon exchanger K-2 will terminate flow to and from K-2. Both LSL-40 and LSH-40 trip

, closed the inlet isolation valve V069 and P-7 air supply isolation valve V156. i 1

A locally mounted switch is provided at K-2 to override the  !

level trips to fill and drain the ion exchanger. A signal alarm at the OHC control panel will notify the operator that the override is engaged.

i 1.7 System Interfaces Those systems interfacing with the OHC are as follows: j

a. Standby Reactor Pressure Control System i Use: Provide a source of borated water for backflushing and '

filling system Tle-in: A single connection from SPC-T-4 downstream of SPC-VI to the inlet manifold piping for the FTC/SFP Filters, i Trains A and B i Rev. II/0136P 4

3535-01S ATTACHMENT 2

b. Submerged Demineralizer System Use: Provide a system for soluble fission product processing.

Tie-in: To downstream of pump HG-P-1 of SDS from downstream of FTC/SFP Filters. From downstream of the SDS polishing filter to downstream of the DHCS manual control valves "097A/B.

c. Instrument Air System Use: Provide source of instrument air to equipment.

Tie-in: At existing valves AH-V220 and IA-V171 J

d. Service Air System Use: Provide a source of service air to the forwarding pump P-7.

Tle-in: Service Station 87 plus another station if needed

e. Dewatering System Use: Allow periodic use of DHC lon exchanger K-2 for the Dewatering System.

Tle-in: Upstream of filter canister post filter F-8.  :

f. Canister Loading and Decontamination System Use: Provide borated water for system fill / flush.

Tle-in: At Valves DHC-V321 V322, and V323. E 1.8 Quality Assurance The defueling water cleanup systee is classified according to the l safety functions of its parts. There are three classifications in this system:

a. Portions of the system associated with lon exchange processing are considered to be a radioactive waste processing system;  ;

therefore, these portions of the system shall be subject to the quality assurance guidelines contained in NRC Regulatory Guide 1.143.

b. The filter canisters a e classified as nuclear safety related  ;

4 and are designed to prevent a condition that could result in a return to nuclear criticality of the fuel retained in the filters.

i

c. The remaining portions of the system are subject to the BNAPC non-safety-related quality assurance program.

The THI-2 Recovery QA Plan will be applicable for work performed on site.

1 i

Rev. 11/0136P 1

4 3525-015 ATTACHMENT 2 2.0 SYSTEM LIMITATIONS. SETPOINTS. AND PRECAUTIONS l 2.1 Limitations i

The system is flow limited to 200 gpm through each filter train, 15  !

gpm through SOS and 30 gpm through the OWC ton exchanger K-2.

The main filter canisters are limited to 55 psid as read on DPI-22A/B. This allows a 45 pst differential across the ftIter media, with 10 pst of drop due to friction losses-in the piping and l hoses at design flow. ,

At this point an alarm on a local panel will inform the operator of the need to stop and restart the system or to remove and replace the filter.

1 The filter canister post filter (F-8) is limited to 18 psid. The J

lon exchanger post filter (F-7) is limited to 45 psid. Filters are l considered full and ready for change out when either the maximum  :

< pressure differential is reached or when the performance (flow) '

drops 20% below the design flow.

The system should not be started and stopped frequently since the  !

canister filter precoat is lost during a shutdown; thus it will be  :

necessary to reestabitsh a precoat on starting up before processing '

through SOS or K-2.  !

2.2 Setpoints OPSH-22A or OPSH-22B Trips alarm at 55 pst pressure differential across either FTC/SFP filter train A or B.

LSL-40 and LSH-40 Trip alarm, trip closed inlet isolation valve t V069 and trip closed P-7 air supply valve V156, shutting down P-7.  :

Low level set point is 10 inches below top of ton exchanger. High level set point is 4 inches below top of ton exchanger (i.e., + 3" from normal liquid level).

PSV-R-1 Set to relieve at 150 pstg with 10% overpressure to protect 505. '

1 PSV-R-8, R-9, R-10, and R-11 Set to relieve at 130 psig with 10% 1 overpressure to protect the filter canisters from hydrogen / oxygen butid up.

PCV-26 Regulates upstream pressure (SDS inlet pressure) at 140  !

psig. I Level indicators FCC-LI-102 and SF-LI-102 for FTC and SFP "A" levels, respectively, are located on control panel SPC-PNL-3 on the main control panel. In addition, high-low alarms FCC-LAllL-102 and SF-LAHL-102 are provided on SPC-PNL-3 for the FTC and SFP. High level setpoint is 327'-11" and low level set point is 327'-1". j I

Rev. 11/0136P i

3525-015 l ATTACHMENT 2 Level indication switches SF-LAHL-102 and FCC-LAHL-102 also actuate .

a common alarm FCC-LAHL-103 located on panel OHC-LCPI on high or low levels in the SFP or FTC. High level set point is 327'-11" and ,

low level set point is 327'-1". i 2.3 Precautions -

i Due to the use of quick disconnect couplings, extra care should be taken to ensure that the couplings are properly connected and that they are connected in the proper locations.

l The filter canisters operate by a surface filtration method, and  ;

4 their efficiency increases as a cake is built up on the surface of the media. Therefore, the build up of this cake is an important part of the filtration process. To prevent the migration of fines to the post filter, the ion exchange portion of the system should not be started until a cake has begun to be formed on the media.

4 This can be verified by observing the turbidity of the filter effluent. When the filter train is started up, there will be an initial turbidity spike caused by smaller pa"ticles passing through the media. As the cake is built, these particles are stopped and the turbidity decreases. Once the turbidity reaches a level of 5 4

NTU or less, the ton exchange portion of the sy: tem can be .

started. Also, to prevent the breakdown of the cake, the system I should not be started or stopped unnecessarily.

l Caution should be taken during a change of pump feeding a filter a

train. The new pump should be started and put on line before

shutting down the existing pump to protect the filter cake, Note ,

that outside of this brief exception no more than one pump should  !

feed one filter train.

' The portion of the startup procedures concerning the well pumps should be strictly adhered in order to prevent the rapid filling of an empty manifold. This situation could cause a harmful pressure wave to develop which might damage the canister filter media, The RB penetrations R-524 at elevation 293 ft-6 in and R-539 at

' elevation 320 ft are both below the water level of 327'-3" +8 -2.

When in use the connecting piping / hose should be periodically checked since a line break will cause water to be lost from the  ;

system. When not in use, the hose should be isolated by closing l valves V117A/B and V-099 (see discussion in section 4.5).

Periodically the face velocity across the sample box 2 hood should '

, be checked to verify it is within the range of 100 to 140 fekt/ min. If the face velocity is too low the S-2 Inlet dampers i

should be readjusted accordingly, i l

i i

Rev. 11/0136P I l

3525-015 ATTACHMENT 2 3.0 OPERATIONS 3.1 Initial Fill To initially fill the SFP and FTC borated water from the Spent fuel Cooling System may be pumped from the borated water storage tank, OH-T-1, by the spent fuel cooling pumps, SF-P-1A/B. To fill the FTC the water may be routed through penetration R-524 and into the FTC through the 3 inch fill line downstream of the P-3A discharge check valve. To fill the SFP, V087A/B and V097B are opened and the borated water may be routed through the filter canisters and through the normal return process path to the SFP.

The system is filled initially by borated water from the standby reactor coolant pressure system through the backflushing system provided (see section 3.7). The filters are filled to the inlet and outlet manifolds.

To initially fill the OHC lon exchanger K-2, the level switch LSL-40 must be overrode (see section 1.6.4) until low level is attained. At this time the override switch should be returned to

, normal operation for further filling.

l l

3.2 Startup l Prior to starting the system, the suction valve alignment is verified for the mode of operation selected. The valves to the ion l exchange portions of the system are also verified to be closed.

The pump discharge Isolation valves are closed and the cross-tie l valves are closed. The pump for one train is started and allowed to operate on minimum recirculation flow. The tsalation valve for this pump is slowly opened. Then the hand control valve V090 A or B (HV-64 A or B) is opened 10% and any trapped air vented through manual vent valves located on the inlet and outlet manifolds.

After venting, V090 (HV-64) is opened fully. Once this has been accomplished, the appropriate outlet cross-tie valve (s) (V096 A/P and V095) are opened. Flow is started by slowly openl59 the l appropriate hand operated controi valve (V097 A or B) Lintil the desired flow is obtained. Note that V097 A/B are provided for flow control of the system. Once cne tialn has been started, the other

! train,1f desired, may be brought inw service in the same manner.

Filter performance will initially increase with time as a cake forms on the filter surface. Therefore, the filtered water should be returned directly to source without further processing until this cake forms, as evidenced by a decrease in turbidity. A  !

turbidity below 5 NTU is suffletent to route to K-2 or 50S. '

The OHC lon exchanger K-2 should always be brought to normal operating liquid level prior to operation of this portion of the system. Either borated flush water or filtered water of less than 5 NTU can be used. If the liquid level is below the low level Rev. II/0136P I

3525-015 i ATTACHMENT 2 trip, the level switch trip override must be engaged untti low level is established (see section 3.1). Once normal level is established, the air supply solenoid valve V156 is opened.  ;

Pressure regulator V157 (PICV-58) is then manually adjusted to the pressure required to maintain the desired flowrate. Flow is slowly started to K-2 by opening flow control valve V085 (FV-15) until the i destreo flowrate to K-2 is obtained. K-2 effluent is automatically '

controlled by level control valve V070 (LV-46).

Processing water through the SOS requires opening the isolation t valves for that portion of the system and starting the DWC Booster pump. These actions will allow 15 gpm to be processed through the 505. For a detailed description of the SDS see reference 12.

'; The sample box 2 filtration module inlet dampers should be adjusted to create a 140 feet per minute face velocity across sample box 2.  ;

I Normal Operation 3.3 Normal operation of the system is in one of the modes shown in Table 1 of Section 1.4. The mode of operation is chosen based on what source is to be processed and what the particulate and  !

radioactivity concentrations of the sources are.

3.4 Shutdown The steps to bring the system to a shutdown condition are basically the reverse of the startup procedure. The ton exchanger flow is brought to zero gradually by remote operation of upstream control

. valve V085 (FV-15). Correspordingly, level control valve V070  !

e (LV-46) will gradually terminate flow from K-2. After termination  !

l of flow the inlet isolation valve V069 is closed and the P-7 air supply isolation valve is closed. If the 505 is in use, the  ;

, booster pump is switched off and isolation valves Vill, V139, and  !

, V102 are closed. Following this, the well pumps are switched off i 1 and the pump isolation valves and the cros3-tie valves are closed, i 3.5 Oraining I

\

The majority of the system can be drained to the SFP. The filter ~

canisters can not be drained, since they are submerged in the SFP, The piping to/from penetrations R-524 and R-539 must be drained to

. the Auxiliary Building sump since the penetration elevation is 1

below the SFP water level. The OWC lon exchanger K-2 can be pumped out to eit'ier source, FTC or SFP, or to the reactor coolant bleed tanks via a portion of the 505. A switch is provided to override the low level switch for pumping out K-2.

3.6 Refilling

The fully drained system may be reftlled in the same manner that the system was initially filled. A partially drained system may be refilted by using either the back flush system (see section 3.7) or the well pumps (see section 3.2).

Rev. II/0136P  ;

1

1 L

3525-015 ATTACHMENT 2 l 3.7 Infrequent Operations Flushing of the system may be performed when the internal contamination level gets high or prior to internal maintenance i work. The system is shutdown (see Section 3.4) prior to flushing.  ;

One flushing option is gravity flush from SPC-T-4. Borated water is stored in the charging water sto age tank, SPC-T-4, located at the 347 ft, elevation in the FHB. Tuls tank is connected to the t OWCS. If desired, the CLO booster pump (CLO-P-1) may be used to i assist in backflushing. Elther filter train may be flushed without stopping flow through the other. j Flushing may be accomplished by opening one of the inlet valves

, from the flushing system (depending on which portion of the system is to be flushed) and then routing the flod to the FTC or the SFP.

After sufficient time has been allowed to flush the system. the inlet valv9 frca the flushing system is closed, and the system is then restarted following the procedures in Section 3.2.

3.8 Transient Operations The results of loss of pumps or filter train mistlignment are flows  ;

not returning to the proper source. However, since this is the i normal operational mode of the system and since the sources are connected by the fuel transfer tubes, the results of these i transients are negligible. Vent or drain valve misoperation would '

have the same effect as a line break (see section 4.5) but could be i more readily rectified. '

4.0 CASUALTY EVENTS AND RECOVERY PROCEDURES 4.1 Loss of Power I A loss of power to any portion of the system would shut that portion of the system down. No adverse conditions would result.

4.2 Loss of Instrumentation / Instrument Air Loss of instrumentation would hamper operations due to loss of monitoring capability but no adverse conditions would result and the system could be safely shut down until the problem is resolved.

I Loss of a single instrument channel will result in the loss of I Indication for that channel and, for those channels that have control features a flow mismatch. This flow mismatch will result in an automatic shutdown of the affected portion of the system.

Loss of either the SFP or FTC level monitoring system will be noted when compared with the other. The readings should normally be the same since both water bodies are in communication via the fuel  !

transfer tubes. Neither system has control features. 4 Rev. 11/0136P  !

l

J 3525-015 ATTACHMENT 2

. Loss of instrument air will take the individual components to their ,

Flow mismatches induced by loss of air will fall safe position.

result in automatic trips.
On loss of instrument air, level control to the ion exchanger would be lost. But both the inlet isolation valve V069 and the outlet level control valve V070 (LV-46) would fall closed isolating the L lon exchanger.

4.3 Deleted 4.4 Filter Media Rupture A failure of the filter media in the canister could potentially release fuel fines to the ton exchange portion of the system. The SDS is egipped with a sand prefilter wh!ch has borosilicate glass to contreil reactivity (see ref. 12) and the DWC filter canister post filter orecedes DWC lon exchanger K-2. There are differential pressure gauges supplied on the filters to determine if they are loading. Loading of the SDS prefilter or the filter canister post >

filter could indicate ruptured filter media. .

4 i The recovery procedure is to isolate the filter trains and find the ruptured filter by observing the differential pressure versus flow

and/or effluent turbidity for each individual canister. Lower differential pressure for a given flow or increased effluent turbidity will Indicate that this filter is ruptured. That canister or canisters and the post filter cartridge and/or SDS sand filter would be replaced and the. system restarted.

4 The system may be operated in a mode that bypasses the filter canisters. During this mode of operation, the filter canister post filter will be providing the required system filtration. In order i to preclude the rupture of the post filter's filter media during operation, the maximum differential pressure that will be permitted across the post filter will be 18 psid. The post filters are

, designed for a maximum differential pressure of 45 pstd. >

l 4.5 Line and Hose Break .,

! II a rupture occurred in the system, the pumps could deliver FTC and/or SFP Water to the FHB or the RB. This action would lower the  :

level in the canal and the pool. A drop of one inch in canal / pool level is approximately equivalent to 1250 gal. A level loss would be detected and alarmed (see setpoints section 2.2) by at least one 4 of the two redundant level monitors provided for the canal / pool.  ;

The operator would then shut the system down. '

s Process water hoses are employed in three services in this system filter canister inlet / outlet, skimmers to well pumps, and '

j downstream of penetration R-539.

)

l Rev. II/0136P l 1

I

3525-015 ATTACHMENT 2:

]

Ifafiltercanisterinlet/outlethoseruptures,thatcbnisterOfil be isolated and the hose replaced. Since these hoses are submerged '

in the SFP, this results in no net water loss.

If a hose connecting the skimmer (0-7 or U-8) to the well pumps .

breaks, then the ability to surface skim will be hampered or lost. '

but pump capacity will not be deminished nor will there be a loss of water. ,

If the hose on the FTC return line downstream of penetration R-539 '

breaks, then process water will be lost to the RB sump. The '

i resulting loss in' level would be detected and alarmed by the- t canal / pool monitors. Check valves V-235A/B are provided to prevent siphoning the FTC if the hose (or connecting line) breaks.

l l Furthermore, the normal return path is to'the SFP; thus this hose is not normally used. When not in use this hose will be isolated

by closing valves V117A/B and V099 to minimize the effect of a hose break, A break on the P-3A/B discharge line which uses penetration R-524

. would cause process water to be lost to either the RB or the FHB.

j The water loss would be detected both by a decrease in the

, monitored flowrate returned to the fuel pool or FTC and also by the- -

i drop in fuel pool and/or transfer canal level. When the FTC pumps,.

4 P-3A/B, are not in use, the discharge valves V002A/8 and valve 1

SF-V103 should be closed. This would prevent.a syphoning of the FTC when the pumps are not in use.

5.0 SYSTEM MAINTENANCE The maintenance procedures are the recommended practices and intervals as i described by the equipment vendors.

4 6.0 TESTING f

6.1 Hydrostatic Testing i

All piping and hose will be hydrostatically pressure tested.

Testing of hose will be done after couplings have been attached.  :

1 Pipe will be tested outside the buildings.

l 6.2 Leak Testing j

All accessible connections will be initial service leak tested after the piping is assembled. l 1

6.3 Instrument Testing All instruments will be initially calibrated by vendors. Complete electric / pneumatic loop verification will be done during start-up.

Calibrations will be maintained by the Plant Halntenance Deparatment. ,

Rev. II/0136P 4

h

3525-015 ATTACHMENT 2 7.0 HUMAN FACTORS Filter canister hoses are coded for quick identification of inlet versus outlet.

Extensive use of hoses is made, especially in the RB, allowing quick installation and use of existing radiation shielding. Hoses exoected to be frequently disconnected are equipped with atick disconnect couplings for ease of removal and replacement.

The following human factors guidelines have been incorporated into the design of the DHCS control panel:

o The panel includes ell controls and displays required for normal operation.

o Displays provide immediate feedback that the system has responded appropriately to an operator's action, o Controls and displays are laid-out for a left to right flow path, o Mimic lines are used to clarify flow paths.

o Control devices are mounted to 3 to 6 feet above the floor.

o Each control device has a nameplate.

o Light bulbs are replaceable from the front of the panel, o Recorders art grouped on the right side of the panel away from the flow path, o Adjustments to recorders and controllers can be performed from the front of the panel.

l l

l l

l l i l l l

i l

l l

l 1

Rev, ll/0136P i

OVERSIZE

DOCUMENT PAGE PULLED e

SEE APERTURE CARDS NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARDS ,

4 1

1 APERTURE CARD /HARD COPY AVAILABLE FROM RECORD SERVICES BRANCH FTS 492-8989 l

l i

1 i

i i

I_ ___ __ - - _ . . _ _ _ - - __ _ _ _ _ _ - - _ . _