MONTHYEARML20216J0681999-09-29029 September 1999 Forwards Rev 3 of AP600 Design Control Document, Incorporating Documentation Changes Resulting from Final Review Performed to Check Consistency of Implementation of Approved Design Change Proposals.With Summary of Changes ML20207G5411999-06-0808 June 1999 Discusses Request Made by Westinghouse on 981109 That Proprietary WCAP-14252,Rev 1,be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20195D5201999-06-0404 June 1999 Discusses Westinghouse Request That Change Pages Submitted on 980921 to WCAP-14292 Be Withheld from Public Disclosure. Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20196G2431999-05-21021 May 1999 Informs That USNRC Has Published in Fr Encl Notice of Proposed Rulemaking Re AP600 Design Certification Rule. Rulemaking Allows Applicants or Licensees to Construct AP600 Std Plant Design by Referencing Design Certification Rule ML20206G5411999-05-0505 May 1999 Forwards Draft Environ Assessment Re Proposed Certification of AP600 Std Plant Design.Environ Assessment Will Be Used as Basis for NRC Finding of No Significant Environ Impact Resulting from Certification of AP600 Design ML20205J3351999-04-0707 April 1999 Informs That USNRC Staff Has Completed Review of Rev 2 of AP600 Design Control Document,Verified That All of Changes in Rev 2 Are Acceptable & Determined That AP600 Dcd,Rev 2, Can Now Be Used in Proposed Design Certification Rule NSD-NRC-99-5827, Forwards Rev 2 to AP600 Design Control Document.Attachment 1 Provides Summary of Changes Made as Part of Mar 1999 Rev to AP600 Design Control Document1999-03-31031 March 1999 Forwards Rev 2 to AP600 Design Control Document.Attachment 1 Provides Summary of Changes Made as Part of Mar 1999 Rev to AP600 Design Control Document ML20205D3051999-03-25025 March 1999 Requests Amend to 920626 Application for Design Certification of AP600,including AP600 Ssar & AP600 Dcd,To Reflect Sale of CBS Commercial Nuclear Business to W ML20203C5481999-02-10010 February 1999 Forwards Rev 1 to AP600 Design Control Document (DCD) for Docket File.Dcd Provides Reference Basis for AP600 Design Certification ML20199H8671999-01-20020 January 1999 Forwards Comments on AP600 Design Control Document,Submitted by Westinghouse ML20199B1121999-01-0707 January 1999 Advises That Info Contained in NSRA-APSL-92-0268 & Containing Presentation Matl Used in 921209-10 Meeting,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20198B4601998-12-14014 December 1998 Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned ML20197G3501998-11-30030 November 1998 Forwards AP600 Design Control Document, Vols 1-12 for Docket File.Submittal Closes Confirmatory Items 1.5-1 & 1.5-2 from Sept 1998 Final SER Re Certification of AP600 Std Design ML20195E9331998-11-0909 November 1998 Requests That Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept, Vols I- Iv,Be Withheld (Ref 10CFR2.790) NSD-NRC-98-5806, Forwards non-proprietary Rev 1 to WCAP-14253 & Proprietary Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept. Proprietary Rept Includes Vols 1-4.Proprietary Info Withheld,Per 10CFR2.7901998-11-0909 November 1998 Forwards non-proprietary Rev 1 to WCAP-14253 & Proprietary Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept. Proprietary Rept Includes Vols 1-4.Proprietary Info Withheld,Per 10CFR2.790 ML20155G9021998-11-0303 November 1998 Advises That Info Contained in 981012 ltr,NSD-NRC-98-5795, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) & Section 103(b) of AEA of 1954,as Amended ML20155G9271998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design.Staff Completed Review of Design & Issued Final Design Approval & FSER on 980903.Without Encl ML20155G7591998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design,Per Discussion at Sept 1997 Meeting.Staff Completed & Issued Final Design Approval of FSER on 980903.Without Encl NSD-NRC-98-5795, Informs That Figures from Rev 0 & Rev 3 of PRA Which Indicate Location of H Igniters Should Be Considered Proprietary.Nonproprietary Versions of AP600 General Arrangement Drawings Were Provided in Rev 7 of Ssar1998-10-12012 October 1998 Informs That Figures from Rev 0 & Rev 3 of PRA Which Indicate Location of H Igniters Should Be Considered Proprietary.Nonproprietary Versions of AP600 General Arrangement Drawings Were Provided in Rev 7 of Ssar ML20154A4091998-09-29029 September 1998 Advises That Certain Info Contained in Westinghouse Ltr NTD-NRC-95-4506,dtd 950713,submitting WCAP-14425,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Figure 3-1 Will Be Placed Into Public Record ML20153G2521998-09-25025 September 1998 Advises That Proprietary Matl Discovered by NRC in NSD-NRC-97-4966 & Proprietary Matl Noted by W in NSD-NRC-98-5772 Will Be Withhheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20153C1001998-09-15015 September 1998 Advises That Matls Re AP600 Notrump Final Validation Rept, WCAP-14807,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended NSD-NRC-98-5788, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided1998-09-15015 September 1998 Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided ML20151X4381998-09-15015 September 1998 Informs That Staff Has Decided to Accept Claim That Info in WCAP-14135,Rev 1 Is Proprietary & Will Be Withheld from Public Disclosure,Per W 980821 & 26 Ltrs ML20151X4041998-09-11011 September 1998 Discusses Revised Tier 2 Info for AP600 Design.Staff Revised Decision on Whether Fire Protection Should Expire at First Full Power Encl ML20151V1711998-09-0808 September 1998 Advises That Info Re Westinghouse AP600 Std Safety Analysis Rept Through Rev 4 & PRA Through Rev 5 Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Disposition of Ssar & PRA Proprietary Info Encl ML20151V2231998-09-0808 September 1998 Informs That NRC Determined That WCAP-14132 Encl in Westinghouse Ltr NTD-NRC-94-4244,dtd 940729 & Marked as Proprietary,Will Be Withheld from Public Disclosure,Per to 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151S9181998-09-0303 September 1998 Advises That Info Marked as Proprietary Re Westinghouse AP600 Design Ltrs Concerning Pxs Scaling & Pirt Closure Rept WCAP-14727,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20239A1481998-09-0303 September 1998 Forwards Notice of Issuance of Final Design Approval & Final SER for AP600.FDA Allows AP600 Design to Be Referenced in Application for Construction Permit or Operating License Under 10CFR50 or Application for Combined License ML20239A3111998-09-0303 September 1998 Forwards Final SER Which Summarizes Staff Safety Review of AP600 Design Against Requirements of Subpart B of 10CF5R52 & Delineates Scope of Technical Details Considered in Evaluating Proposed Design ML20151V8521998-09-0101 September 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse NSD-NRC-98-5781, Informs That W Determined That AP600 FSER Contains No Proprietary Info1998-09-0101 September 1998 Informs That W Determined That AP600 FSER Contains No Proprietary Info ML20151V2201998-08-31031 August 1998 Informs That EPRI Documents, GOTHIC Containment Analysis Package Qualification Rept, GOTHIC Containment Analysis Qualification Manual, & Listed Documents Dtd Sept 1993 Will Be Withheld from Public Disclosure ML20151V8431998-08-31031 August 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20238F3241998-08-31031 August 1998 Advises That AP600 RAI Responses Encl in Westinghouse Ltrs NTD-NRC-95-4598,dtd 951117,as Modified by NSD-NRC-98-5776, Dtd 980826,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20238F5991998-08-31031 August 1998 Refers to W 980821 Revised Response to Insp Rept 99900404/97-01 That Contained All Substantive Info Provided w/DCP/NRC-1074 Ltr.Nrc Will Destroy DCP/NRC-1074,as Requested NSD-NRC-98-5783, Forwards non-proprietary Rev 2 to WCAP-14989, Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys1998-08-28028 August 1998 Forwards non-proprietary Rev 2 to WCAP-14989, Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys NSD-NRC-98-5782, Forwards Corrected Pages 4-28 Through 4-32 to Be Inserted in Rev 2 to non-proprietary WCAP-14953, AP600 Pxs Scaling & Pirt Closure Rept. Pages Were Originally Submitted W/Incorrect Header Which Stated 'W Proprietary Class 2.'1998-08-28028 August 1998 Forwards Corrected Pages 4-28 Through 4-32 to Be Inserted in Rev 2 to non-proprietary WCAP-14953, AP600 Pxs Scaling & Pirt Closure Rept. Pages Were Originally Submitted W/Incorrect Header Which Stated 'W Proprietary Class 2.' NSD-NRC-98-5778, Provides Commitment to Include Requested Changes Into AP600 Design Control Document.Discussion W/Vijuk on 980825 Re Disposition of Ltrs DCP/NRC1074,dtd 971016 & DCP/NRC1324,dtd 980403,formalized1998-08-27027 August 1998 Provides Commitment to Include Requested Changes Into AP600 Design Control Document.Discussion W/Vijuk on 980825 Re Disposition of Ltrs DCP/NRC1074,dtd 971016 & DCP/NRC1324,dtd 980403,formalized ML20237E4421998-08-27027 August 1998 Advises That Info Contained in Ltr DCP/NRC-0985,dtd 970821, Sought to Be Withheld,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended NSD-NRC-98-5777, Provides Revised Response to NRC Ltr Re W Requests for Withholding Info Re AP600 PCS Final Data rept,WCAP-14135 & WCAP-141381998-08-26026 August 1998 Provides Revised Response to NRC Ltr Re W Requests for Withholding Info Re AP600 PCS Final Data rept,WCAP-14135 & WCAP-14138 NSD-NRC-98-5776, Forwards Proprietary Revised Response to Ref NRC Ltr Re W Requests for Withholding Info Re AP600 Design Certification Test Program,Notrump Computer Code,Wcobra/Trac Computer Code & Loftran Computer Code.Proprietary Info Withheld1998-08-26026 August 1998 Forwards Proprietary Revised Response to Ref NRC Ltr Re W Requests for Withholding Info Re AP600 Design Certification Test Program,Notrump Computer Code,Wcobra/Trac Computer Code & Loftran Computer Code.Proprietary Info Withheld ML20237E0731998-08-26026 August 1998 Advises That Info in WCAP-14812,revs 1 & 2, Accident Spec & Phenomena Evaluation for AP600 PCS, Will Be Withheld from Public Disclosure ML20238F8031998-08-26026 August 1998 Requests That Proprietary W Revised Response to NRC Ltrs Re Requests for Withholding Info,Be Withheld from Public Disclosure IAW 10CFR2.790 NSD-NRC-98-5774, Informs That W Faxed Last Response Re Afser Open Item 1.1-1 to NRC on 980821.Last of Attachments Supporting Several of Responses Faxed to NRC Over Past Several Days Were Express Mailed to NRC on 980821.Responses Close Subject Open It1998-08-24024 August 1998 Informs That W Faxed Last Response Re Afser Open Item 1.1-1 to NRC on 980821.Last of Attachments Supporting Several of Responses Faxed to NRC Over Past Several Days Were Express Mailed to NRC on 980821.Responses Close Subject Open Item NSD-NRC-98-5773, Responds to Questions Raised in NRC 971022 & s Re Proprietary Info Contained in 970930 Summary of Meeting Held on 970804-15 Concerning Structural Design of AP600.Figure 12-24 of WCAP-14407 Still Considered Proprietary by W1998-08-21021 August 1998 Responds to Questions Raised in NRC 971022 & s Re Proprietary Info Contained in 970930 Summary of Meeting Held on 970804-15 Concerning Structural Design of AP600.Figure 12-24 of WCAP-14407 Still Considered Proprietary by W ML20237E7991998-08-21021 August 1998 Forwards non-proprietary Results of AP600 Design Assurance Review (Dar) That Was Commitment in W Response to NRC Insp Rept 99900404/97-02.Info Should Assist in Closing Nonconformances & Unresolved Item Identified in Insp Rept NSD-NRC-98-5771, Forwards non-proprietary Rev 2 to WCAP-14138, Final Data Rept for PCS Large-Scale Tests,Phase 2 & Phase 3. Submittal Satisfies Verbal Commitment to Revise non-proprietary Version of PCS Final Data Rept Made by W1998-08-21021 August 1998 Forwards non-proprietary Rev 2 to WCAP-14138, Final Data Rept for PCS Large-Scale Tests,Phase 2 & Phase 3. Submittal Satisfies Verbal Commitment to Revise non-proprietary Version of PCS Final Data Rept Made by W NSD-NRC-98-5769, Responds to NRC Ref Ltrs Re W Requests for Withholding Info. Info Provided as Proprietary in Ref 1 Has Either Been Moved from Ssar to Ref 3,which Includes non-proprietary Version of Rept or Made non-proprietary in Current Version of1998-08-21021 August 1998 Responds to NRC Ref Ltrs Re W Requests for Withholding Info. Info Provided as Proprietary in Ref 1 Has Either Been Moved from Ssar to Ref 3,which Includes non-proprietary Version of Rept or Made non-proprietary in Current Version of Ssar NSD-NRC-98-5772, Forwards non-proprietary & Proprietary Info in Response to NRC Ltrs Re W Requests for Withholding Info.Separate Ltr & Affidavit Justifying Proprietary Nature of Info,Encl. Proprietary Info Withheld,Per 10CFR2.7901998-08-21021 August 1998 Forwards non-proprietary & Proprietary Info in Response to NRC Ltrs Re W Requests for Withholding Info.Separate Ltr & Affidavit Justifying Proprietary Nature of Info,Encl. Proprietary Info Withheld,Per 10CFR2.790 1999-09-29
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20207G5411999-06-0808 June 1999 Discusses Request Made by Westinghouse on 981109 That Proprietary WCAP-14252,Rev 1,be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20195D5201999-06-0404 June 1999 Discusses Westinghouse Request That Change Pages Submitted on 980921 to WCAP-14292 Be Withheld from Public Disclosure. Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20196G2431999-05-21021 May 1999 Informs That USNRC Has Published in Fr Encl Notice of Proposed Rulemaking Re AP600 Design Certification Rule. Rulemaking Allows Applicants or Licensees to Construct AP600 Std Plant Design by Referencing Design Certification Rule ML20206G5411999-05-0505 May 1999 Forwards Draft Environ Assessment Re Proposed Certification of AP600 Std Plant Design.Environ Assessment Will Be Used as Basis for NRC Finding of No Significant Environ Impact Resulting from Certification of AP600 Design ML20205J3351999-04-0707 April 1999 Informs That USNRC Staff Has Completed Review of Rev 2 of AP600 Design Control Document,Verified That All of Changes in Rev 2 Are Acceptable & Determined That AP600 Dcd,Rev 2, Can Now Be Used in Proposed Design Certification Rule ML20199H8671999-01-20020 January 1999 Forwards Comments on AP600 Design Control Document,Submitted by Westinghouse ML20199B1121999-01-0707 January 1999 Advises That Info Contained in NSRA-APSL-92-0268 & Containing Presentation Matl Used in 921209-10 Meeting,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20198B4601998-12-14014 December 1998 Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned ML20155G9021998-11-0303 November 1998 Advises That Info Contained in 981012 ltr,NSD-NRC-98-5795, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) & Section 103(b) of AEA of 1954,as Amended ML20155G7591998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design,Per Discussion at Sept 1997 Meeting.Staff Completed & Issued Final Design Approval of FSER on 980903.Without Encl ML20155G9271998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design.Staff Completed Review of Design & Issued Final Design Approval & FSER on 980903.Without Encl ML20154A4091998-09-29029 September 1998 Advises That Certain Info Contained in Westinghouse Ltr NTD-NRC-95-4506,dtd 950713,submitting WCAP-14425,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Figure 3-1 Will Be Placed Into Public Record ML20153G2521998-09-25025 September 1998 Advises That Proprietary Matl Discovered by NRC in NSD-NRC-97-4966 & Proprietary Matl Noted by W in NSD-NRC-98-5772 Will Be Withhheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151X4381998-09-15015 September 1998 Informs That Staff Has Decided to Accept Claim That Info in WCAP-14135,Rev 1 Is Proprietary & Will Be Withheld from Public Disclosure,Per W 980821 & 26 Ltrs ML20153C1001998-09-15015 September 1998 Advises That Matls Re AP600 Notrump Final Validation Rept, WCAP-14807,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20151X4041998-09-11011 September 1998 Discusses Revised Tier 2 Info for AP600 Design.Staff Revised Decision on Whether Fire Protection Should Expire at First Full Power Encl ML20151V1711998-09-0808 September 1998 Advises That Info Re Westinghouse AP600 Std Safety Analysis Rept Through Rev 4 & PRA Through Rev 5 Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Disposition of Ssar & PRA Proprietary Info Encl ML20151V2231998-09-0808 September 1998 Informs That NRC Determined That WCAP-14132 Encl in Westinghouse Ltr NTD-NRC-94-4244,dtd 940729 & Marked as Proprietary,Will Be Withheld from Public Disclosure,Per to 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151S9181998-09-0303 September 1998 Advises That Info Marked as Proprietary Re Westinghouse AP600 Design Ltrs Concerning Pxs Scaling & Pirt Closure Rept WCAP-14727,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20239A3111998-09-0303 September 1998 Forwards Final SER Which Summarizes Staff Safety Review of AP600 Design Against Requirements of Subpart B of 10CF5R52 & Delineates Scope of Technical Details Considered in Evaluating Proposed Design ML20239A1481998-09-0303 September 1998 Forwards Notice of Issuance of Final Design Approval & Final SER for AP600.FDA Allows AP600 Design to Be Referenced in Application for Construction Permit or Operating License Under 10CFR50 or Application for Combined License ML20151V8521998-09-0101 September 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20151V2201998-08-31031 August 1998 Informs That EPRI Documents, GOTHIC Containment Analysis Package Qualification Rept, GOTHIC Containment Analysis Qualification Manual, & Listed Documents Dtd Sept 1993 Will Be Withheld from Public Disclosure ML20151V8431998-08-31031 August 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20238F5991998-08-31031 August 1998 Refers to W 980821 Revised Response to Insp Rept 99900404/97-01 That Contained All Substantive Info Provided w/DCP/NRC-1074 Ltr.Nrc Will Destroy DCP/NRC-1074,as Requested ML20238F3241998-08-31031 August 1998 Advises That AP600 RAI Responses Encl in Westinghouse Ltrs NTD-NRC-95-4598,dtd 951117,as Modified by NSD-NRC-98-5776, Dtd 980826,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20237E4421998-08-27027 August 1998 Advises That Info Contained in Ltr DCP/NRC-0985,dtd 970821, Sought to Be Withheld,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20237E0731998-08-26026 August 1998 Advises That Info in WCAP-14812,revs 1 & 2, Accident Spec & Phenomena Evaluation for AP600 PCS, Will Be Withheld from Public Disclosure ML20237C4801998-08-20020 August 1998 Informs That Staff Will Withhold from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended, Presentation Matl from 970212-14 ACRS Meeting Encl in W Ltr NSD-NRC-98-5744 Dtd 980803,until Policy Matter,Clarified ML20237D4391998-08-18018 August 1998 Confirms Phone Conversation Between NRC & W Re Submittal of Final Portions of Documentation Necessary to Complete Review & Issue Final SER & Final Design Approval for AP600 ML20236V6671998-07-30030 July 1998 Advises That Info Contained in WCAP-14601,rev 2,submitted in Westinghouse Ltr NSD-NRC-98-5712,dtd 980616 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20236V8621998-07-30030 July 1998 Informs That Proprietary Info Encl in Westinghouse Ltr NSD-NRC-98-5736,dtd 980713 Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20236U7811998-07-29029 July 1998 Advises That WCAP-14270,rev 1, AP600 LP Integral Sys Test Facility Scaling Rept, Encl in Ltr NSD-NRC-98-5718,dtd 980619 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20236U7831998-07-29029 July 1998 Informs That Certain Info in AP600 Ssar,If Proposed for Change That Refs AP600 Std Design,Will Require Prior NRC Approval Before Proposed Change Can Be Implemented.Tier 2* Info for AP600 Design & Staff Decision Encl ML20236U8131998-07-29029 July 1998 Advises That WCAP-14471,rev 0, Steam Condensation Events at Osu AP600 Facility Submitted in Ltr NSD-NRC-96-4661,dtd 960306 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20236V0511998-07-29029 July 1998 Informs That AP600 Boron Dilution Transient Analysis Encl in Westinghouse Ltrs NSD-NRC-96-4792,dtd 960808 & NSD-NRC-98-5739,dtd 980720 & Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790 ML20236V0411998-07-28028 July 1998 Discusses Return of Proprietary Matl to Westinghouse Docketed Under AP600 Design Review.Proprietary Documents Listed in Encl 1 Removed from AP600 File & Returned for Disposition or Retention ML20236T3101998-07-22022 July 1998 Discusses W 941031 Submittal by Ltr (NTD-NRC-94-4330) of AP600 Notrump Core Makeup Tank Preliminary Validation Rept & Requests That Info Be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld from Public ML20236T4091998-07-22022 July 1998 Informs That Info Related to Wgothic lumped-parameter & Distributed Parameter Nodalization of AP600 & Wgothic Heat Sink & Flow Path Description Including Areas,Thickness & Evaluations Will Be Withheld,Per 10CFR2.790(b)(5) & 103(b) ML20236T1691998-07-22022 July 1998 Advises That Proprietary Matl Encl in NSD-NRC-96-4700,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)5) & Section 103(b) of AEA of 1954,as Amended ML20236T1361998-07-22022 July 1998 Advises That Info Contained in TRs WCAP-12945-P-A & WCAP-14747,respectively Submitted in Ltr NTD-NRC-95-4406, Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954,as Amended ML20236T0591998-07-22022 July 1998 Informs That Staff Plans to Return NSD-NRC-96-4762, NSD-NRC-96-4763,NSD-NRC-96-4790,... Transmittals to Westinghouse W/O Proprietary Determination,Due to Info Being Provided in Documents Submitted at Later Date ML20236S9841998-07-22022 July 1998 Informs That Staff Plans to Return NSD-NRC-94-4246, NSD-NRC-94-4327 & NSD-NRC-94-4318 Transmittals to Westinghouse W/O Proprietarty Determination,Due to Info Being Provided in Documents Submitted at Later Date ML20236S9621998-07-22022 July 1998 Advises That Info in NSD-NRC-97-5424 on AP600 Passive Containment Cooling Sys Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20236S9321998-07-22022 July 1998 Advises That Info in on AP600 Large Scale Test Facility Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20236S9131998-07-22022 July 1998 Informs That WCAP-14776 (Rev 2) Encl in Westinghouse Ltr NSD-NRC-97-5202,dtd 970620 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1601998-07-22022 July 1998 Informs That Encl Table,Associated W/Westinghouse AP600 Ltrs,Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1511998-07-22022 July 1998 Informs That Matl Encl in NTD-NRC-94-4215 & NTD-NRC-95-4436, Marked as Proprietary,Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1431998-07-22022 July 1998 Informs That Encl Table Associated W/Westinghouse AP600 Design Ltrs Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1321998-07-22022 July 1998 Informs That Matls Documented in Encl Table,Associated W/Westinghouse AP600 WCAPs Submitted in Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended 1999-06-08
[Table view] |
Text
-
May 29, 1997 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division '
Westinghouse Electric Corporation P.O. Box 355 i Pittsburgh, PA 15230 i
SUBJECT:
FOLLOWON QUESTIONS REGARDING THE AP600 LEVEL 2 PROBABILISTIC RISK ASSESSMENT (PRA)
Dear Mr. Liparulo:
As a result of its review of the_ June 1992 application for design certifica-tion of the AP600, the staff has determined that it needs additional informa- ;
tion. Specifically, the enclosure to this letter contains requests for ,
additional information concerning the Level 2 PRA treatment of anticipated !
transients without scram transients. ,
1 You have requested that portions of the information submitted in the June 1992, application for design certification be exempt from mandatory public disclosure. While the staff has not completed its review of your request in accordance with the requirements of 10 CFR 2.790, that portion of the submitted information is being withheld from public disclosure pending the staff's final determination. The staff concludes that these followon ques-tions do not contain those portions of the information for which exemption is sought. However, the staff will withhold this letter from public disclosure for 30 calendar days from the date of this letter to allow Westinghouse the opportunity to verify the staff's conclusions. If, after that time, you do not request that all or portions of the information in the enclosures be i
withheld from publi~c disclosure in accordance with 10 CFR 2.790, this letter ;
will be placed in the Nuclear Regulatory Commission Public Document Room.
If you have any questions regarding this matter, you may contact me at (301) 415-1132.
Sincerely, original signed by: j 1
Joseph M. Sebrosky, Project Manager :
Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003 ,
Enclosure:
As stated /
cc w/ enclosure.
-See next page g/D3 DISTRIBUTION:
See next page
, ; ,u; ?,- J O i hY :
g .
DOCUMENT NAME: A: ATWS LV2.RAI Ta seceive a sepy of this document,ladcaTe in the boa: "C* yCopy without attachment /encloews *E" = Copy with attachment /encloswe "N* = No copy
]
0FFICE PM:PDST:DRPM SCSBipSS4 l D:PDST:DRPM l l NAME JSebrosky:sg-/x(T~JKudr%%( TQuay 4)?M DATE </7///97 f/ t-/1<Y$hM 9 /29 /97 1 9708040160 970529 PDR ADOCK 05200003 A PDR
N Mr. Nicholas J. Liparulo Docket No.52-003 i Westinjhouse Electric Corporation AP600 1
cc: Mr. B. A. McIntyre Ms. Cindy L. Haag Advanced Plant Safety & Licensing Advanced Plant Safety & Licensing Westinghouse Electric Corporation Westinghouse Electric Corporation 4 Energy Systems Business Unit Energy Systems Business Unit j P.O. Box 355 .
Box 355
- Pittsburgh, PA 15230 Pittsburgh, PA 15230 9
i Mr. S. M. Modro Nuclear Systems Analysis Technologies Lockheed Idaho Technologies Company Post Office Box 1625 Idaho Falls, ID 83415 i
Enclosure to be distributed to the following addressees after the result of the proprietary evaluation is received from Westinghouse:
Mr. Ronald Simard, Director Ms. Lynn Connor ,
i Advanced Reactor Programs DOC-Search Associates i
Nuclear Energy Institute Pcst Office Box 34
- 1776 Eye Street, N.W. Cabin John, MD 20818 >
d Suite 300 I
Washington, DC 20006-3706 Mr. Robert H. Buchholz GE Nuclear Energy Mr. James E. Quinn, Projects Manager 175 Curtner Avenue, MC-781 i LMR and SBWR Programs San Jose, CA 95125 3
- GE Nuclear Energy '
, 175 Curtner Avenue, M/C 165 Mr. Sterling Franks
- San Jose, CA 95125 U.S. Department of Energy
- NE-50
- Barton Z. Cowan, Esq. 19901 Germantown Road Eckert Seamans Cherin & Mellott Germantown, MD 20874 600 Grant Street 42nd Floor Pittsburgh, PA 15219 Mr. Charles Thompson, Nuclear Engineer i l AP600 Certification t i Mr. Frank A. Ross NE-50 J
U.S. Department of Energy, NE-42 19901 Germantown Road
. Office of LWR Safety and Technology Germantown, MD 20874 l 19901 Germantown Road t
Germantown, MD 20874
( ,
Mr. Ed Rodwell, Manager i i PWR Design Certification '
Electric Power Research Institut9 i 3412 Hillview Avenue 1 l Palo Alto, CA 94303
)
j I l
4 E
4
~ - - - - - . . _ __. . . _ - - . -_ _ - - . - -.- -
l-f' FOLLOWON OVESTIONS REGARDING LEVEL 2 PRA TREATMENT OF ATWS
, 720.393 Provide additional information (calculation note) regarding the LOFTRAN analyses cited in Chapter 36 of the PRA. For each
! sequence analyzed, include a description of major assumptions in i
the analysis (e.g., initial conditions and systems available and unavailable), a chronology of major events, and plots of key results (e.g., reactor power, RCS pressure).
720.394 Confirm that the MTC assumed in the LOFTRAN analyses is a bounding value and that technical specifications or other operation con-straints will assure that the plant will not be operated with a more severe MTC.
i 720.395 Provide justification that the LOFTRAN analyses are representative
, or conservatively bound the thermal hydraulic response for all l Level I core melt sequences assigned to accident class 3A.
1 i 720.396 Based on the description in Section 6.4.9 and Table 9-1 of the PRA, fault tree CM2NL (referenced in the footnote of Table 36-1) deals with failure of the CMT subsystem injecting water to the RCS following an intermediate LOCA, where the safety injection S-signal automatically actuates CMT operation. Please justify why a fault tree associated with a LOCA is used to quantify the avail-ability of the CMT for CET node DP, since success at DP assures that no LOCA will occur. Justify that the treatment of the safety injection S-signal in the fault tree is applicable to all Level I core melt sequences assigned to accident class 3A.
720.397 Based on the description in Tables 9-21 and 9-7, fault tree CM2NL includes operator actions CHN-MANO) and LPM-MAN 02. CMN-MAN 01 addresses manual actuation of CMTs if automatic actuation fails during a LOCA (Section 30.6.16), and LPM-MAN 02 addresses failure to recognize the need for RCS depressurization during LOCAs (Section 30.6.3). Justify why these actions can be credited in the focussed PRA, rather than using a different version of the fault tree (without operator actions) for the focussed PRA.
720.398 Based on the description in Section 6.4.25 and Table 262d.2 of the PRA, fault tree RCN (referenced in the footnr.te of Table 36-1) deals with failure to trip all four RCPs following an intermediate LOCA. Please justify why a fault tree associated with a LOCA is used to quantify the availability of RCP trip for CET node DP, since success at DP assures that no LOCA will occur.
Enclosure
j.. .,
e l l l 720.399 Based on the description in Tables 26-d.2 and 26-8, fault tree RCN 1
includes operator actions RCN-MAN 01, REC-MANDAS, and LPM-MAN 02.
j RCN-MAN 01 addresses manual backup if automatic trip fails during a small LOCA or transient (Section 30.6.37), REC-MANDAS addresses j failure to actuate manual DAS ESF functions using the cues ,
i provided by DAS (Section 30.6.58), and LPM-MAN 02 addresses failure to recognize the need for RCS dearessurization during LOCAs
- (Section 30.6.3). Justify why tiese actions can be credited in
' the focussed PRA, rather than using a different version of the fault tree (without operator actions) for the focussed PRA.
720.400 Provide the analysis (calculation note) that provides the. basis
! for the 0.01 probability of consequential SGTR in ATWS events
! (OTH-SGTR).
i 720.401 The discussion of sequence 1AP-1 in Section 34.4.13.1 states that the temperatures of the hot. leg and SG tubes were monitored for l creep rupture potential based on the Larsen-Miller correlation, i and the creep rupture of the SG_ tubes occurred first. Please provide: (1) plots of the accumulated damage (creep damage index) versus time for key RCS components, (2) clarification of the criteria used to determine when SG tube failure occurred.
720.402 Please provide additional information describing the quantification of CET node DP for accident class 6 sequences.
Table 36-1 indicates that for accident class 6 sequences, CET node DP is quantified based on failure of operator to actuate ADS.
However, no value for this failure rate is provided, and the fault trees or analyses used to determine the value are not identified 1 or discussed. 1 720.403 Based on information in Chapter 24, each valve in the containment air filter supply line (valves V03 and V04) and exhaust line ,
(valves V09 and V10) appears to be assigned a failure rate of '
IE-6/h (for failure to reclose) based on the EPRI URD. However, the URD indicates somewhat higher failure rates (2.0E-6/h).
Please justify that the valve failure rates used are: (1) appli-cable to the large diameter valves specified for AP600, (2) consistent with operating experience with valves of similar size and design, and (3) consistent with the stroking frequency assumptions 1:1 the URD and the stroking frequency specified in the AP600 design.
720.404 Although the probability of a pre-existing opening in containment (P0) was considered in the Level 1 success criteria for large LOCAs (Section 6.4.8), P0 does not appear to have been considered in quantifying the probability of containment isolation in the Level 2 PRA. P0 is not discussed in Chapter 37 or reflected-in Table 37-1, and is not included within fault tree CIC. Please
confirm this apparent omission, and provide a reassessment of Level 2 and 3 results given proper consideration of a pre-existing opening.
l 720.405 The quantification of CET node IS for accident class 10 is not I described in Chapter 37. Documentation should be provided. )
720.406 The quantification of CET node RFL for accident classes ID, 3A, l and 3C is not described in Chapter 38. Documentation should be provided, i
- I 4
I j
W 1
l 1
)
1 o
l I
9
s I DISTRIBUTION Letter to Mr. Nicholas J. Lioarulo. Dated: May 29.1997
- Enclosure to be held for 30 days .
- PUBLIC I PDST R/F MSlosson SWeiss TQuay i TKenyon l BHuffman i JSebrosky j DJackson l ACRS (11) j W0ean, 0-5 E23 '
JMoore, 0-15 B18 :
JFlack, 0-10 E4 !
NSaltos, 0-10 E4 l RPall&, 0-8 H7 :
JKudrick, 0-8 H7 I