Investigation Rept A4-83-004 on 821201.Major Areas Investigated:Allegations Re Improper Use of white-out. Related Info Encl
ML20138G230
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/11/1983
From: Griffin H, Herr R
NRC OFFICE OF INVESTIGATIONS (OI)
To:
Shared Package
ML20138G131 List:
References
FOIA-84-291 A4-83-004, A4-83-4, NUDOCS 8512160269
Download: ML20138G230 (3)


Text

o e

, e *

/9/ ^

,/4'&4) k, */G/7N //D *'t A c-N D*.:11 D ET Al t ! ,

[g

  • g NUCLL AFi REGULATORY COMMISSION [jd h j h -
3 % .m ' j OFFICI OF lhi E511G AllONS FIELD OFFICE. REGION IV

(*1 F'YAN PLAZ A oRIVE. SUITE 10N-

.h , , ,

ARLINGTON. TEX AF 70011 ASSISTANCE TO INSPECTION REPORT

-em February 11, 1983

SUBJECT:

Kansas Gas & Electric, Wolf Creek --

IMPROPER USE OF WHITE-0UT REPORT NUMBER: A4-83-004 ~

1. During October 1982, four former Daniel. employees, now employed at the -

2immer site, made allegations to the Zimmer NRC SRI and subsequently to the Wolf Creek SRI about lack of QC freedom and procedural violations at Wolf Creek. Two of the former QC Inspectors',. Russell CROUCH and

, Marshall SEX.T,0N, agreed to talk to NRC Investigators. Following the

" receipt of these allegations by the Wolf Creet SRI, the Region IV Regional Administrator requested 01 assistance in investigating the allegations.

2. On December 1,1982, six former Daniel International QC Inspectors were interviewed by NRC Investigators at the Zimmer site concerning allegaticrr at Wolf Creek. The allegers, Marshall SEXT0h', Vernon DREWES, Russell CROUCH, Roy STUDDARD, Thomas O'CONNORjand Terry SJOUT were interviewed, and they made allegatior.s concerning intimidation of QC Inspectors, improper ..

use of white out on travelers, and improper use of three-part acmorar. curs to change prccecures. The allegation concerning intimidation is being _ _ __

investigated _under report number 4-82-016. The allegation concerning improper use of three-part memorandums is being reported under report nurr.ber A4-83-002. The allegation concerning the improper use of white-out is containec in this report. Daniel procedures relating to white-out en .

included in this report er Attachment (1).

3. Two of the six fcru r Daniel QC Inspectors alleged they had seen white-out on traveler occurents, but stated they lined through the white-out and initialed and dated the document, or bounced it back to the engineers.

One of the six 'former inspectors stated that( Larry ADKINSON; an employee in the Daniel training department at Wolf Creek, could identify numerous records containirc schite-out. l

4. On February 2, lh, Jim GAGLIARDO, Region IV, Director, Livision of Resident, Reacwr f rtject & Engineering Programs, was apprised of the -

results of thu irautigation to date. CE.GLIARD0 stated the allegation appeared to b( ef 2 ' u hnical nature and iequested that investigative results be forwarecd to him for technical review and inspection follow-up by his persont.ci.

8512160269 851107 PDR FOIA BROSIUS84- 91 PDR

-h

o

'b gN

  • A4-83-004 Page Two
5. This investigation is forwarded to you for any action you deem -

appropriate as you requested. No further investigative effort is anticipated at this time.

/.

Attachment (1) - Dariel procedures relating to white-out.

  1. AA &#0 Hl B. Griffin, Invpptigator
  • Office of Investig7tions Field Office Region IV APPROVED BY: /

R. K.' Herr, Director Office of Investigations Field Office

, Rcgion IV cc: T. Collins, RIV E. H. Johnson, RIV J. E. Gagliard:, RIV (w/ attachments)

W. J. Ward, 01:DF0

~

DU iv0T DISCLOSE 0.FlClA!. ;$E Of4!J 6

.,n . - , , , , -- -

v -- ---r , , , p. -- ,,-e -mm--

a .

t-lP-v11 i?08 INbilIt A Pa r.c 1 of 1 Rev. 3 TO: 111STR111UT10N I; *: FAliHICATION Sil0F SUBJr.CT: S110P RELEASE F0101-Fabrication is complete on listed items. llydrotenting and the exceptions noted are deferred to installation. Pipe has been examined for cleanliness and cleaned if required in accordance with WP-VII-203.

O n=nsers O Pi eP rabrication Traveler # . nev. - .

Item Number Exceptions Deferred _to Installation 1

r-.- . ,

i

' s

~ec: ,rabrication Traveler (Original) Shop Foreman Date Piping Superintendent (2 Copics)

Project Mechanical En:,ineer ,

Mechanical-Servlees Supervisor QC Inspector,,,_ , Date A I,_ , ,