ML20136F713
Text
'j.
('
/ ',
s.-
y s/P FEB i g 1985
^
MEMORANDUM FOR:
E. G. Adensam, Chief, Licensing Branch #4 Division of Lics:nsing FROM:
F. Rosa, Chief, Instrumentation & Control Systems Branch Division of Systems Integration
SUBJECT:
EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO R.G. 1.97, REV. 2 Plant Name:
Vogtle, Unit Nos. I and 2 Docket Nos.:
50-424/425 Licensing Status:
NT0L Responsible Branch:
LB #4 Project Manager:
.M. Miller Review Branch:
ICSB Review Status:
Incomplete
References:
(1) Georgia Power Company letter, D. Dutton to E. G. Adensam, NRC, " Supplement 1 to NUREG-0737 (Generic Letter No. 82-33)," April 14,1983.
(2) i5.C Generic Letter No. 82-33 (Supplement No. I to hdREG-0737--Requirements for Emergency Response Capability), December 17, 1982.
Reference 1, in response to Reference 2 referred to the Vogtle Station FSAR for a detailed description of conformance to Regulatory Guide 1.97, Rev. 2.
The enclosed interim report was prepared by INEL under a technical assistance program for the review of licensee and applicant responses on conformance to R.G. 1.97. We have reviewed Reference 1 and the applicable sections of the FSAR and conclude that the applicant has provided an explicit commitment on conformance to R.G, 1.97 with the exception of those items which were identi-fied by the applicant.
Further, it is concluded that the applicant's justification for exceptions to R.G.1.97 for some items are acceptable. However, there are some items for which INEL could not conclude that adequate justification was provided and has identified those as unjustified exceptions.
i It is requested that the enclosed interim report be sent to the applicant with a request to provide a resp 6nse to the open items within 60 days. The
Contact:
i J. Joyce, ICSB i
X29459 l
}
i i
' '.. P I
~
E. Adensam applicant should also provide any other coments if the' enclosed report includes any incorrect assumptions or reflects a commitment which the applicant believes is beyond the intent of his previous response.
Following the resolution of the open items, a safety evaluation will be provided to complete this action.
' Original Sisned By,:
Faust Rosa" Faust Rosa, Chief Instrumentation & Control Systems Branch Division of Systems Integration
Attachment:
As stated cc:
R. Bernero
~
R. W. Houston T. Novak M. Miller J. Shea P. Shemanski L. Phillips F. Witt Distribution:
Docket File ICSB Rdg.
J. Joyce (PF)(2)
T. Dunning F. Rosa Vogtle Subject File A. Udy, EG&G
- ICSB/D y ::--- --------::----------- :------------::-------
F
,/D5I
- ICSB/D I
,C p
'ME:
ce:ct
- TDunni g
- FRosa l, :
IATE :1/ tl /85 :1/ // /85
- 1/ // /85 :
t 0FFICIAL RECORD COPY
._-