ML20136E781

From kanterella
Jump to navigation Jump to search
Forwards Control of Heavy Loads at Nuclear Power Plants Vogtle Electric Generating Plant Units 1 & 2 (Phase I & Ii), Draft Technical Evaluation Repts,In Response to NUREG-0612
ML20136E781
Person / Time
Site: 05000000, Vogtle
Issue date: 02/24/1984
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML082840446 List: ... further results
References
FOIA-84-663, REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NUDOCS 8403010452
Download: ML20136E781 (1)


Text

,

En f

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 5

E WASHINGTON, D. C. 20555

\\...../

FEB 2 41984 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, Division of Licensing FROM:

L. S. Rubenstein, ssistant Director for Core and Plant Systems, Division of Systems Integration'

SUBJECT:

CONTROL OF HEAVY LOADS (PHASES I AND II) - NUREG-0612 -

V0GTLE 1 AND 2 - DOCKET NOS. 50-424/425 is a draft technical evaluation report (TER) for Vogtle, Units 1 and 2, which was developed based on the applicant's Phase I response to the December 22, 1980 generic letter (NUREG-0612) on " Control of Heavy Loads." is the draft TER for the Phase II responses to NUREG-0612. The draft TERs were prepared by EG&G Idaho, Inc. (EG&G) under a technical assistance contract to the NRC.

The TERs were prepared based on information provided in the applicant's FSAR.

We have reviewed the TERs and concur with their conclu-sions.

Plea::e forward the TERs to the applicant for review and comment. He also request that a conference call be arranged with the applicant after a review period of about six weeks, to resolve open items listed in the draft TERs.

We intend to issue safety evaluation reports for Phases I and II which will be based on the final TERs to be issued by EG&G after resolution of the open items.

O W~..

%~ttbus(0ad L. S. RubMnstein, Assistant Director for Core and Plant Systems Division of Systems Integration

Enclosures: